{{#Wiki_filter:March 11, 2013  
{{#Wiki_filter:UNITE D S TATE S
                            NUC LEAR RE GULATOR Y C OMMI S SI ON
EA-13-043  
                                              RE G IO N I V
                                          1600 EAST LAMAR BLVD
Louis P. Cortopassi, Site Vice President  
                                    AR L INGTON , TEXAS 7 601 1 - 4511
Omaha Public Power District  
                                            March 11, 2013
EA-13-043
Louis P. Cortopassi, Site Vice President
Omaha Public Power District
Fort Calhoun Station FC-2-4
P.O. Box 550
Fort Calhoun, NE 68023-0550
Subject:        FORT CALHOUN - NRC INSPECTION REPORT NUMBER 05000285/2013011
                AND NOTICE OF VIOLATION
Dear Mr. Cortopassi:
On February 28, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an
inspection at your Fort Calhoun Station. The enclosed inspection report documents the
inspection results which were discussed on March 1, 2013, with you and other members of your
staff.
During the inspections performed between November 18, 2012 and February 28, 2013, the
NRC staff examined activities conducted under your license as they relate to safety and
compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.
Based on the results of this inspection, a finding was identified involving the failure to classify
the river sluice gates as Safety Class 3. This finding was determined to involve a violation of
NRC requirements and related to a previously issued Yellow finding regarding the ability to
mitigate an external flooding event (Inspection Reports 05000285/2010007 and
05000285/2010008; ML101970547 and ML102800342, respectively). The significance of this
finding was bounded by the Yellow finding and therefore was not characterized by color
significance.
The NRC determined that a violation is associated with this finding and was evaluated in
accordance with the NRC Enforcement Policy. The violation is being cited in the enclosed
Notice of Violation (Notice) and the circumstances surrounding it are described in detail in the
subject inspection report. The violation is being treated as a cited violation, consistent with
Section 2.3.2(a)(2) of the NRC Enforcement Policy. Specifically, Fort Calhoun Station has not
restored compliance in a timeframe commensurate with the significance of this violation (EA-13-
043).


Fort Calhoun Station FC-2-
L. Cortopassi                                    -2-
P.O. Box 550
You are required to respond to this letter and should follow the instructions specified in the
Fort Calhoun, NE  68023-0550
enclosed Notice when preparing your response. If you have additional information that you
believe the NRC should consider, you may provide it in your response to the Notice. The NRC
Subject:  FORT CALHOUN - NRC INSPECTION REPORT NUMBER 05000285/2013011 AND NOTICE OF VIOLATION
review of your response to the Notice will also determine whether further enforcement action is
Dear Mr. Cortopassi:
necessary to ensure compliance with regulatory requirements.
Also, the NRC identified another finding during this inspection. This finding was determined to
On February 28, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an
involve a violation of NRC requirements. The finding was of more than minor significance
inspection at your Fort Calhoun Station. The enclosed inspection report documents the inspection results which were discussed on March 1, 2013, with you and other members of your staff.
because the two licensee evaluations performed under 10 CFR 50.59, "Change, Tests, and
During the inspections performed between November 18, 2012 and February 28, 2013, the  
Experiments" would require NRC's review and approval prior to implementation. Because this
issue affected the NRC's ability to perform its regulatory function, the inspectors evaluated it
using the traditional enforcement process and assessed the significance of the underlying issue
using the SDP. The violation associated with this finding was determined to be a Severity
Level IV violation consistent with Section 6.1.d of the Enforcement Policy. However, the NRC is
treating this violation as non-cited violation consistent with Section 2.3.2.a of the Enforcement
Policy.
The NRC views adherence to 10 CFR 50.59 as critical to the regulatory process. These two
examples of violations of this requirement are concerning, because they directly support the
efforts by the facility to address the resolution of the previously issued Yellow finding for
flooding. The NRC views proper resolution of the flooding finding as key to the long term safety
of Fort Calhoun Station.
If you contest these violations, you should provide a response within 30 days of the date of this
inspection report, with the basis for your denial, to the Nuclear Regulatory Commission,
ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional
Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory
Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Fort Calhoun
Station.
If you disagree with a cross-cutting aspects assignment in this report, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at
Fort Calhoun Station.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its
enclosure, and your response (if any) will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's Agencywide Document Access and Management System (ADAMS).


NRC staff examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.
L. Cortopassi                              -3-
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.  
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Based on the results of this inspection, a finding was identified involving the failure to classify the river sluice gates as Safety Class 3. This finding was determined to involve a violation of NRC requirements and related to a previously issued Yellow finding regarding the ability to
Public Electronic Reading Room).
mitigate an external flooding event (Inspection Reports 05000285/2010007 and 05000285/2010008; ML101970547 and ML102800342, respectively).  The significance of this finding was bounded by the Yellow finding and therefore was not characterized by color
                                        Sincerely,
significance. 
                                        /RA/
                                        Michael Hay, Chief
                                        Project Branch F
                                        Division of Reactor Projects
Docket No. 50-285
License No. DPR-40
Enclosure:
NRC Inspection Report 05000285/2013011
      w/Attachment: Supplemental Information
cc w/ encl: Electronic Distribution


   
  L. Cortopassi                                  -4-
The NRC determined that a violation is associated with this finding and was evaluated in
Electronic Distribution by RIV:
accordance with the NRC Enforcement Policy. The violation is being cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding it are described in detail in the subject inspection report. The violation is being treated as a cited violation, consistent with Section 2.3.2(a)(2) of the NRC Enforcement Polic
Regional Administrator (Elmo.Collins@nrc.gov)
y. Specifically, Fort Calhoun Station has not restored compliance in a timeframe commensurate with the significance of this violation (EA-13-
Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)
043).  
MC0350 Chairman (Anton.Vegel@nrc.gov)
  UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
MC0350 Vice Chairman (Louise.Lund@nrc.gov)
L. Cortopassi
DRP Director (Kriss.Kennedy@nrc.gov)
  - 2 - You are required to respond to this letter and should follow the instructions specified in the
Acting DRP Deputy Director (Michael.Scott@nrc.gov)
enclosed Notice when preparing your response. If you have additional information that you believe the NRC should consider, you may provide it in your response to the Notice. The NRC review of your response to the Notice will also determine whether further enforcement action is
Acting DRS Director (Tom.Blount@nrc.gov)
necessary to ensure compliance with regulatory requirements.  
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Chief, DRS/TSB (Ray.Kellar@nrc.gov)
Project Manager (Lynnea.Wilkins@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OE Specialist (Carolyn.Faria-Ocasio@nrc.gov)
ROPreports
RIV/ETA: OEDO (John.Cassidy@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
  MC 0350 Panel Member (Micheal.Markley@nrc.gov)
MC 0350 Panel Member (Joseph.Sebrosky@nrc.gov)
  MC 0350 Panel Member (Michael.Balazik@nrc.gov)
  ROPreports
File Located: S:\DRP\DRPDIR\_FCS                          Accession No.ML13070A399
SUNSI Rev Compl. Yes  No ADAMS                    Yes  No Reviewer Initials  MCH
Publicly Avail.         Yes  No Sensitive        Yes No Sens. Type Initials MCH
RI:DRP/F        RI:DRP/RIII        SPE:DRP/F    ACES:SES      BC:DRP/F
JFWingebach FRamirez                RWDeese      RBrowder      MCHay
/RA via Email/ /RA via Email/          /RA/          /RA/          /RA/
    3/8/13          3/8/13          3/6/13        3/7/13        3/11/13
                                      OFFICIAL RECORD COPY


                                        NOTICE OF VIOLATION
Also, the NRC identified another finding during this inspection.  This finding was determined to  
Omaha Public Power District                                      Docket No. 05000285
involve a violation of NRC requirements. The finding was of more than minor significance because the two licensee evaluations performed under 10 CFR 50.59, "Change, Tests, and Experiments" would require NRC's review and approval prior to implementation.  Because this issue affected the NRC's ability to perform its regulatory function, the inspectors evaluated it
Fort Calhoun Station                                              License No. DPR-40
using the traditional enforcement process and assessed the significance of the underlying issue
                                                                  EA-13-043
using the SDP. The violation associated with this finding was determined to be a Severity
During an NRC inspection conducted from November 18, 2012 to February 28, 2013, a violation
Level IV violation consistent with Section 6.1.d of the Enforcement Policy.  However, the NRC is treating this violation as non-cited violation consistent with Section 2.3.2.a of the Enforcement  
of NRC requirements was identified. In accordance with the NRC Enforcement Policy, the
violation is listed below:
        Title 10 CFR 50, Appendix B, Criterion III, Design Control, requires, in part that
        measures shall be established to assure that applicable regulatory requirements and the
        design basis, as defined in 10 CFR 50.2, for those structures, systems, and components
        are correctly translated into specifications, drawings, procedures, and instructions.
        Contrary to the above, the licensee failed to establish measures to assure that
        applicable regulatory requirements and the design basis for those components were
        correctly translated into specifications, drawings, procedures, and instructions.
        Specifically, the licensee failed to classify the six intake structure exterior sluice gates
        and their motor operators as Safety Class 3 as defined in the Updated Safety Analysis
        Report, Appendix N.
This violation is associated with and is bounded by a Yellow Significance Determination Process
finding.
Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is hereby required to
submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001 with a copy to the Regional
Administrator, Region IV, and a copy to the NRC Resident Inspector - Fort Calhoun Station,
within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply
should be clearly marked as a "Reply to a Notice of Violation; EA-13-043" and should include for
each violation: (1) the reason for the violation or, if contested, the basis for disputing the
violation or severity level, (2) the corrective steps that have been taken and the results
achieved, (3) the corrective steps that will be taken, and (4) the date when full compliance will
be achieved. Your response may reference or include previous docketed correspondence, if
the correspondence adequately addresses the required response. If an adequate reply is not
received within the time specified in this Notice, an order or a Demand for Information may be
issued as to why the license should not be modified, suspended, or revoked, or why such other
action as may be proper should not be taken. Where good cause is shown, consideration will
be given to extending the response time.
If you contest this enforcement action, you should also provide a copy of your response with the
basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory
Commission, Washington, DC 20555-0001.
Because your response will be made available electronically for public inspection in the NRC
Public Document Room or from the NRCs document system (ADAMS), accessible from the
                                                  A-1                                        Attachment


Policy. 
NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should not
 
include any personal privacy, proprietary, or safeguards information so that it can be made
available to the public without redaction. If personal privacy or proprietary information is
The NRC views adherence to 10 CFR 50.59 as critical to the regulatory process.  These two examples of violations of this requirement are concerning, because they directly support the efforts by the facility to address the resolution of the previously issued Yellow finding for
necessary to provide an acceptable response, then please provide a bracketed copy of your
flooding.  The NRC views proper resolution of the
response that identifies the information that should be protected and a redacted copy of your
flooding finding as key to the long term safety of Fort Calhoun Station.
response that deletes such information. If you request withholding of such material, you must
 
specifically identify the portions of your response that you seek to have withheld and provide in
detail the bases for your claim of withholding (e.g., explain why the disclosure of information will
If you contest these violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission,  ATTN:  Document Control Desk, Washington DC 20555-0001; with copies to the Regional
create an unwarranted invasion of personal privacy or provide the information required by
Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory
10 CFR 2.390(b) to support a request for withholding confidential commercial or financial
 
information). If safeguards information is necessary to provide an acceptable response, please
Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Fort Calhoun
provide the level of protection described in 10 CFR 73.21.
 
In accordance with 10 CFR 19.11, you may be required to post this Notice within two working
Station.  If you disagree with a cross-cutting aspects assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your
days of receipt.
 
disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at
Fort Calhoun Station.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of  NRC's Agencywide Document Access and Management System (ADAMS). 
 
 
L. Cortopassi
- 3 -  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,  /RA/  Michael Hay, Chief 
Project Branch F
Division of Reactor Projects
Docket No.  50-285 License No.  DPR-40
Enclosure:
NRC Inspection Report 05000285/2013011
  w/Attachment:  Supplemental Information
cc w/ encl:  Electronic Distribution 
L. Cortopassi
- 4 -  Electronic Distribution by RIV
: Regional Administrator (Elmo.Collins@nrc.gov)  Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)  MC0350 Chairman (Anton.Vegel@nrc.gov) 
MC0350 Vice Chairman (Louise.Lund@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov) 
Acting DRP Deputy Director (Michael.Scott@nrc.gov) 
Acting DRS Director (Tom.Blount@nrc.gov)  Acting DRS Deputy Director (Jeff.Clark@nrc.gov)  Senior Resident Inspector (John.Kirkland@nrc.gov) 
Resident Inspector (Jacob.Wingebach@nrc.gov) 
Branch Chief, DRP/F (Michael.Hay@nrc.gov) 
Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)  Project Engineer, DRP/F (Chris.Smith@nrc.gov)  Public Affairs Officer (Victor.Dricks@nrc.gov) 
Public Affairs Officer (Lara.Uselding@nrc.gov) 
Chief, DRS/TSB (Ray.Kellar@nrc.gov) 
Project Manager (Lynnea.Wilkins@nrc.gov)  RITS Coordinator (Marisa.Herrera@nrc.gov)  Regional Counsel (Karla.Fuller@nrc.gov) 
Congressional Affairs Officer (Jenny.Weil@nrc.gov) 
 
OE Specialist (Carolyn.Faria-Ocasio@nrc.gov)
ROPreports 
RIV/ETA: OEDO (John.Cassidy@nrc.gov) 
DRS/TSB STA (Dale.Powers@nrc.gov) MC 0350 Panel Member (Micheal.Markley@nrc.gov)
MC 0350 Panel Member (Joseph.Sebrosky@nrc.gov)
MC 0350 Panel Member (Michael.Balazik@nrc.gov)
ROPreports
File Located:  S:\DRP\DRPDIR\_FCS                                  Accession No.ML13070A399 SUNSI Rev Compl. Yes  No ADAMS Yes  No Reviewer Initials MCH Publicly Avail. Yes  No Sensitive Yes  No Sens. Type Initials MCH RI:DRP/F RI:DRP/RIII SPE:DRP/F ACES:SES BC:DRP/F  JFWingebach FRamirez RWDeese RBrowder MCHay  /RA via Email/ /RA via Email/ /RA/ /RA/ /RA/  3/8/13 3/8/13 3/6/13 3/7/13 3/11/13  OFFICIAL RECORD COPY
  A-1 Attachment NOTICE OF VIOLATION
Omaha Public Power District      Docket No. 05000285  Fort Calhoun Station      License No. DPR-40 
EA-13-043 
 
During an NRC inspection conducted from November 18, 2012 to February 28, 2013, a violation
of NRC requirements was identified. In accordance with the NRC Enforcement Policy, the
violation is listed below: 
Title 10 CFR 50, Appendix B, Criterion III, "Design Control," requires, in part that
measures shall be established to assure that applicable regulatory requirements and the
design basis, as defined in 10 CFR 50.2, for those structures, systems, and components are correctly translated into specifications, drawings, procedures, and instructions. 
Contrary to the above, the licensee failed to establish measures to assure that
applicable regulatory requirements and the design basis for those components were
correctly translated into specifications, drawings, procedures, and instructions.
Specifically, the licensee failed to classify the six intake structure exterior sluice gates and their motor operators as Safety Class 3 as defined in the Updated Safety Analysis
Report, Appendix N. 
 
This violation is associated with and is bounded by a Yellow Significance Determination Process
finding.
Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is hereby required to
submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001 with a copy to the Regional
Administrator, Region IV, and a copy to the NRC Resident Inspector - Fort Calhoun Station,
within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a "Reply to a Notice of Violation; EA-13-043" and should include for each violation: (1) the reason for the violation or, if contested, the basis for disputing the
violation or severity level, (2) the corrective steps that have been taken and the results
achieved, (3) the corrective steps that will be taken, and (4) the date when full compliance will
be achieved.  Your response may reference or include previous docketed correspondence, if
the correspondence adequately addresses the required response.  If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other
action as may be proper should not be taken.  Where good cause is shown, consideration will
be given to extending the response time. 
 
If you contest this enforcement action, you should also provide a copy of your response with the basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory
Commission, Washington, DC 20555-0001. 
 
Because your response will be made available el
ectronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the 
  A-2 NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your  
response that deletes such information. If you request withholding of such material, you must
specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will  
create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.390(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please  
 
provide the level of protection described in 10 CFR 73.21.
 
In accordance with 10 CFR 19.11, you may be required to post this Notice within two working days of receipt.
Dated this 11th day of March 2013.
Dated this 11th day of March 2013.
 
                                                A-2
  A-3 U.S. NUCLEAR REGULATORY COMMISSION REGION IV
Docket: 05000285
License: DPR-40
Report: 05000285/2013011
Licensee: Omaha Public Power District
Facility: Fort Calhoun Station
Location: 9610 Power Lane Blair, NE  68008
 
Dates: November 18, 2012 through February 28, 2013
Inspectors: R. Deese, Senior Project Engineer F. Ramirez, Resident Inspector, LaSalle  J. Wingebach, Resident Inspector, Fort Calhoun


  Approved By: Michael Hay, Chief
                  U.S. NUCLEAR REGULATORY COMMISSION
Project Branch F  
                                    REGION IV
Docket:      05000285
License:    DPR-40
Report:      05000285/2013011
Licensee:    Omaha Public Power District
Facility:    Fort Calhoun Station
Location:    9610 Power Lane
            Blair, NE 68008
Dates:      November 18, 2012 through February 28, 2013
Inspectors: R. Deese, Senior Project Engineer
            F. Ramirez, Resident Inspector, LaSalle
            J. Wingebach, Resident Inspector, Fort Calhoun
Approved By: Michael Hay, Chief
            Project Branch F
            Division of Reactor Projects
                                        A-3


Division of Reactor Projects
                                    SUMMARY OF FINDINGS
 
IR 05000285/2013011; 11/18/2012 - 2/28/2013; Fort Calhoun Station (FCS); Changes, Tests
 
  A-4 SUMMARY OF FINDINGS  
IR 05000285/2013011; 11/18/2012 - 2/28/2013; Fort Calhoun Station (FCS); Changes, Tests  
and Experiments (10 CFR 50.59).
and Experiments (10 CFR 50.59).
    The report covered a period of inspection by resident and regional inspectors. One Severity  
The report covered a period of inspection by resident and regional inspectors. One Severity
Level IV NCV was identified. The significance of most findings is indicated by their color  
Level IV NCV was identified. The significance of most findings is indicated by their color
(Green, White, Yellow, or Red) using Inspection Manual Chapter 0609, "Significance  
(Green, White, Yellow, or Red) using Inspection Manual Chapter 0609, Significance
Determination Process.The cross-cutting aspect is determined using Inspection Manual Chapter 0310, "Components Within the Cross-Cutting Areas.Findings for which the significance determination process does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of  
Determination Process. The cross-cutting aspect is determined using Inspection Manual
 
Chapter 0310, Components Within the Cross-Cutting Areas. Findings for which the
commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process,"
significance determination process does not apply may be Green or be assigned a severity level
Revision 4, dated December 2006.  
after NRC management review. The NRC's program for overseeing the safe operation of
 
commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process,
Revision 4, dated December 2006.
A. NRC-Identified Findings and Self-Revealing Findings
A.     NRC-Identified Findings and Self-Revealing Findings
    Cornerstone: Mitigating Systems  
        Cornerstone: Mitigating Systems
  * N/A. The inspectors identified a cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," for licensee's failure to classify the six intake structure exterior sluice gates and their motor operators as Safety Class 3 as defined in the  
        * N/A. The inspectors identified a cited violation of 10 CFR Part 50, Appendix B,
Updated Safety Analysis Report, Appendix N. This violation was first presented in  
          Criterion III, Design Control, for licensees failure to classify the six intake structure
Inspection Report 05000285/2012002 and the licensee has remained in non-
          exterior sluice gates and their motor operators as Safety Class 3 as defined in the
compliance.  
          Updated Safety Analysis Report, Appendix N. This violation was first presented in
The inspectors determined that the continued fa
          Inspection Report 05000285/2012002 and the licensee has remained in non-
ilure to classify the intake structure exterior sluice gates and their motor operators as Safety Class 3 was a performance  
          compliance.
deficiency. This finding was more than minor because it adversely impacted the  
          The inspectors determined that the continued failure to classify the intake structure
protection against external events attribute of the Mitigating Systems Cornerstone  
          exterior sluice gates and their motor operators as Safety Class 3 was a performance
objective of ensuring the availability, reliability and capability of systems that respond to initiating events to prevent undesirable consequences. The significance of this finding is bounded by the significance of a related Yellow finding regarding the ability  
          deficiency. This finding was more than minor because it adversely impacted the
to mitigate an external flooding event (Inspection Report 05000285/2010008). This  
          protection against external events attribute of the Mitigating Systems Cornerstone
finding has a cross-cutting aspect in the area of problem identification and resolution,  
          objective of ensuring the availability, reliability and capability of systems that respond
corrective action program, for failure to thoroughly evaluate problems such that the  
          to initiating events to prevent undesirable consequences. The significance of this
resolutions address causes and extent of conditions. This also includes conducting  
          finding is bounded by the significance of a related Yellow finding regarding the ability
effectiveness reviews of corrective actions to ensure that the problems are resolved  
          to mitigate an external flooding event (Inspection Report 05000285/2010008). This
[P.1(c)] (EA-13-043) (Section 4OA4.1).
          finding has a cross-cutting aspect in the area of problem identification and resolution,
  * SL-IV. The inspectors identified two examples of a Severity Level IV violation of 10 CFR 50.59, Changes, Tests and Experiments," and associated Green findings for the licensee's failure to appropriately perform written evaluations for two changes for  
          corrective action program, for failure to thoroughly evaluate problems such that the
flooding mitigation strategies. In the first example, the licensee changed the Updated Safety Analysis Report and Abnormal Operating Procedure 01 (AOP-01), "Acts of Nature," to incorporate use of backflow through the circulating water system  
          resolutions address causes and extent of conditions. This also includes conducting
for a flow path for raw water. In the second example, the licensee was implementing
          effectiveness reviews of corrective actions to ensure that the problems are resolved
  A-5 a flooding mitigation modification which would have used components which did not
          [P.1(c)] (EA-13-043) (Section 4OA4.1).
meet full quality requirements for their Safety Class 3 designated function.  Had the licensee appropriately evaluated these two changes, they would have determined that a license amendment was required for implementation of both changes since both resulted in more than a minimal increase in the likelihood of occurrence of a
        * SL-IV. The inspectors identified two examples of a Severity Level IV violation of
malfunction of a system, structure, or component important to safety.
          10 CFR 50.59, Changes, Tests and Experiments, and associated Green findings for
The failure to perform adequate written evaluations of changes in accordance with
          the licensees failure to appropriately perform written evaluations for two changes for
10 CFR 50.59(d)(1) was a performance deficiency.  This performance deficiency was of more than minor safety significance because it was associated with the human performance attribute of the mitigating systems cornerstone and it adversely affected the cornerstone objective to ensure the availability, reliability, and capability of
          flooding mitigation strategies. In the first example, the licensee changed the
systems that respond to initiating events to prevent undesirable consequences. 
          Updated Safety Analysis Report and Abnormal Operating Procedure 01 (AOP-01),
In accordance with the NRC Enforcement Policy, the inspectors used MC 0609, "Significance Determination Process," Appendix A, Exhibit 2, to determine the final significance of the finding.  For the back flow through the circulating water system
          Acts of Nature, to incorporate use of backflow through the circulating water system
example, the finding represented a potential loss of the intake structure due to
          for a flow path for raw water. In the second example, the licensee was implementing
flooding; therefore, a Phase 3 evaluation by a senior reactor analyst was necessary. 
                                                  A-4
The senior reactor analyst evaluated a bounding risk analysis case which assumed that the raw water system and offsite power were lost.  This bounding case had an incremental conditional core damage probability of 5.0 x 10
-7, and therefore the finding was determined to have very low safety significance (Green).  For the trash
rack blowdown modification example, the inspectors determined the finding was of
very low safety significance (Green) because the finding was a design deficiency that
did not result in the loss of functionality.  The NRC's significance determination process (SDP) considers the safety significance of findings by evaluating their potential safety consequences.  The traditional enforcement process separately
considers the significance of willful violations, violations that impact the regulatory
process, and violations that result in actual safety consequences.  Traditional
enforcement applied to this finding because it involved a violation that impacted the regulatory process.  Assessing the violation in accordance with Enforcement Policy, the inspectors determined it to be of Severity Level IV because it resulted in a
condition evaluated by the SDP as having very low safety significance (Example
6.1.d.2 of the NRC Enforcement Policy).  The inspectors determined the Green
finding had a cross-cutting aspect in the area of problem identification and resolution
because the licensee failed to thoroughly evaluate problems such that resolutions address the causes and extent of condition specifically associated with deficiencies involving the "Acts of Nature" procedural guidance [P.1(c)] (Section 4OA4.3).
B. Licensee-Identified Violations
  None   
  A-6 REPORT DETAILS
Summary of Plant Status 
The station remained in Mode 5 with the fuel in the spent fuel pool for the entire inspection
period.  4. OTHER ACTIVITIES
Cornerstones:  Initiating Events, Mitigating Systems, Barrier Integrity, Emergency Preparedness, Public Radiation Safety, Occupational Radiation Safety, and
Physical Protection


  4OA4 IMC 0350 Inspection Activities (92702)
      a flooding mitigation modification which would have used components which did not
Inspectors continued the IMC 0350 inspection activities, which include follow-up on the restart checklist contained in Confirmatory Action Letter (CAL) EA-13-020 issued
      meet full quality requirements for their Safety Class 3 designated function. Had the
February 26, 2013. The purpose of the beginning phase of this inspection is to assess
      licensee appropriately evaluated these two changes, they would have determined
the licensee's performance and progress in addressing its implementation and effectiveness of FCS's Integrated Performance Improvement Plan (IPIP), significant performance issues, weaknesses in programs and processes, and flood restoration activities. This phase of inspection determines whether the depth and breadth of
      that a license amendment was required for implementation of both changes since
performance concerns are understood.
      both resulted in more than a minimal increase in the likelihood of occurrence of a
Inspectors used the criteria described in baseline and supplemental inspection procedures, various programmatic NRC inspection procedures, and IMC 0350 to assess the licensee's performance and progress in implementing its performance improvement initiatives.  Inspectors performed on-site and in-office activities, which are described in
      malfunction of a system, structure, or component important to safety.
more detail in the following sections of this report.  This report covers inspection
      The failure to perform adequate written evaluations of changes in accordance with
activities from November 18, 2012, through February 28, 2013. Specific documents reviewed during this inspection are listed in the attachment.
      10 CFR 50.59(d)(1) was a performance deficiency. This performance deficiency was
The following inspection scope, assessments, observations, and findings are
      of more than minor safety significance because it was associated with the human
documented by CAL restart checklist item number.  
      performance attribute of the mitigating systems cornerstone and it adversely affected
.1 Causes of Significant Performance Deficiencies and Assessment of
      the cornerstone objective to ensure the availability, reliability, and capability of
Organizational Effectiveness
      systems that respond to initiating events to prevent undesirable consequences.
  Section 1 of the restart checklist contains those items necessary to develop a  
      In accordance with the NRC Enforcement Policy, the inspectors used MC 0609,
comprehensive understanding of the root causes of safety-significant performance
      Significance Determination Process, Appendix A, Exhibit 2, to determine the final
deficiencies identified at FCS.  In addition, Section 1 includes the independent safety culture assessment with the associated root causes and findings.  
      significance of the finding. For the back flow through the circulating water system
 
      example, the finding represented a potential loss of the intake structure due to
      flooding; therefore, a Phase 3 evaluation by a senior reactor analyst was necessary.
      The senior reactor analyst evaluated a bounding risk analysis case which assumed
 
      that the raw water system and offsite power were lost. This bounding case had an
  A-7 .a Flooding Issue - Yellow Finding
      incremental conditional core damage probability of 5.0 x 10-7, and therefore the
Item 1.a is included in the restart checklist for the failure of FCS to maintain procedures and equipment that protects the plant from the effects of a design basis flood.  These deficiencies resulted in a Yellow (substantial safety significance) finding.  
      finding was determined to have very low safety significance (Green). For the trash
(1) Inspection Scope
      rack blowdown modification example, the inspectors determined the finding was of
      very low safety significance (Green) because the finding was a design deficiency that
The inspectors reviewed the progress of resolution of VIO 05000285/2012002-02.  This review included interviewing licensee engineers and reviewing associated licensee change packages.  
      did not result in the loss of functionality. The NRCs significance determination
      process (SDP) considers the safety significance of findings by evaluating their
(2) Assessment
      potential safety consequences. The traditional enforcement process separately
The inspectors noted that the licensee had not yet resolved VIO 05000285/2012002-02.  The resolution was planned as part of the trash rack blowdown modification described in
      considers the significance of willful violations, violations that impact the regulatory
Section 4OA4.3 of this report. Because the inspectors concluded that NRC approval
      process, and violations that result in actual safety consequences. Traditional
      enforcement applied to this finding because it involved a violation that impacted the
      regulatory process. Assessing the violation in accordance with Enforcement Policy,
      the inspectors determined it to be of Severity Level IV because it resulted in a
      condition evaluated by the SDP as having very low safety significance (Example
      6.1.d.2 of the NRC Enforcement Policy). The inspectors determined the Green
      finding had a cross-cutting aspect in the area of problem identification and resolution
      because the licensee failed to thoroughly evaluate problems such that resolutions
      address the causes and extent of condition specifically associated with deficiencies
      involving the Acts of Nature procedural guidance [P.1(c)] (Section 4OA4.3).
B. Licensee-Identified Violations
  None
                                            A-5


would be needed to implement this change, the licensee was evaluating its desired path for resolving this issueThe inspectors noted the continued non-compliance with the violation in the "Findings" section below.  This violation and its ultimate resolution will be considered in the future assessment of whether the licensee has adequately addressed
                                        REPORT DETAILS
the Yellow flooding finding.  
Summary of Plant Status
The station remained in Mode 5 with the fuel in the spent fuel pool for the entire inspection
(3) Findings
period.
            Continued Failure to Classify Intake Structure Sluice Gates as Safety Class 3
4.     OTHER ACTIVITIES
  Introduction. The inspectors identified a cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," for licensee's failure to classify the six intake structure
        Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency
exterior sluice gates and their motor operators as Safety Class 3 as defined in the Updated Safety Analysis Report, Appendix N. This violation was first presented in Inspection Report 05000285/2012002 and the licensee has remained in non-
        Preparedness, Public Radiation Safety, Occupational Radiation Safety, and
compliance.  
        Physical Protection
  4OA4 IMC 0350 Inspection Activities (92702)
        Inspectors continued the IMC 0350 inspection activities, which include follow-up on the
        restart checklist contained in Confirmatory Action Letter (CAL) EA-13-020 issued
        February 26, 2013. The purpose of the beginning phase of this inspection is to assess
        the licensees performance and progress in addressing its implementation and
        effectiveness of FCSs Integrated Performance Improvement Plan (IPIP), significant
        performance issues, weaknesses in programs and processes, and flood restoration
        activities. This phase of inspection determines whether the depth and breadth of
        performance concerns are understood.
        Inspectors used the criteria described in baseline and supplemental inspection
        procedures, various programmatic NRC inspection procedures, and IMC 0350 to assess
        the licensees performance and progress in implementing its performance improvement
        initiatives. Inspectors performed on-site and in-office activities, which are described in
        more detail in the following sections of this report. This report covers inspection
        activities from November 18, 2012, through February 28, 2013. Specific documents
        reviewed during this inspection are listed in the attachment.
        The following inspection scope, assessments, observations, and findings are
        documented by CAL restart checklist item number.
    .1 Causes of Significant Performance Deficiencies and Assessment of
        Organizational Effectiveness
        Section 1 of the restart checklist contains those items necessary to develop a
        comprehensive understanding of the root causes of safety-significant performance
        deficiencies identified at FCS. In addition, Section 1 includes the independent safety
        culture assessment with the associated root causes and findings.
                                                A-6


.a Flooding Issue - Yellow Finding
Description. The inspectors initially discovered that this finding had been originally identified by licensee personnel in February 2011, as Action Item No. 34 to Condition Report 2010-2387. However, this action item was closed in August 2011, without action taken to classify the sluice gates as safety related. In preparation for the NRC flooding  
  Item 1.a is included in the restart checklist for the failure of FCS to maintain procedures
inspection in February 2012, licensee personnel conducted a review of Condition Report  
  and equipment that protects the plant from the effects of a design basis flood. These
2010-2387 Action Item No. 34 that revealed the quality classification of each  
  deficiencies resulted in a Yellow (substantial safety significance) finding.
penetration/flood barrier had not been verified. Condition Report 2011-10302 was initiated in December 2011, to identify that the quality classification of the intake structure cell level control and level monitoring equipment may be incorrect. Because of  
  (1) Inspection Scope
the failure of the corrective action program to resolve the issue after initially being  
        The inspectors reviewed the progress of resolution of VIO 05000285/2012002-02.
identified, and the significant value added by further inspection effort, the finding was  
        This review included interviewing licensee engineers and reviewing associated
        licensee change packages.
  (2) Assessment
        The inspectors noted that the licensee had not yet resolved VIO 05000285/2012002-02.
        The resolution was planned as part of the trash rack blowdown modification described in
        Section 4OA4.3 of this report. Because the inspectors concluded that NRC approval
        would be needed to implement this change, the licensee was evaluating its desired path
        for resolving this issue. The inspectors noted the continued non-compliance with the
        violation in the Findings section below. This violation and its ultimate resolution will be
        considered in the future assessment of whether the licensee has adequately addressed
        the Yellow flooding finding.
  (3) Findings
  Continued Failure to Classify Intake Structure Sluice Gates as Safety Class 3
  Introduction. The inspectors identified a cited violation of 10 CFR Part 50, Appendix B,
  Criterion III, Design Control, for licensees failure to classify the six intake structure
  exterior sluice gates and their motor operators as Safety Class 3 as defined in the
  Updated Safety Analysis Report, Appendix N. This violation was first presented in
  Inspection Report 05000285/2012002 and the licensee has remained in non-
  compliance.
  Description. The inspectors initially discovered that this finding had been originally
  identified by licensee personnel in February 2011, as Action Item No. 34 to Condition
  Report 2010-2387. However, this action item was closed in August 2011, without action
  taken to classify the sluice gates as safety related. In preparation for the NRC flooding
  inspection in February 2012, licensee personnel conducted a review of Condition Report
  2010-2387 Action Item No. 34 that revealed the quality classification of each
  penetration/flood barrier had not been verified. Condition Report 2011-10302 was
  initiated in December 2011, to identify that the quality classification of the intake
  structure cell level control and level monitoring equipment may be incorrect. Because of
  the failure of the corrective action program to resolve the issue after initially being
  identified, and the significant value added by further inspection effort, the finding was
  documented as NRC-identified violation VIO 05000285/2012002-02.
                                              A-7


documented as NRC-identified violation VIO 05000285/2012002-02. 
Upon further inspection of this sluice gate safety classification issue, inspectors learned
  A-8 Upon further inspection of this sluice gate safety classification issue, inspectors learned that the licensee planned to implement a new modification for flooding mitigation. This  
that the licensee planned to implement a new modification for flooding mitigation. This
modification would employ the trash rack blowdown portion of the circulating water system to allow river water to flow into four of those pipes and then through four newly installed safety class valves for control of  
modification would employ the trash rack blowdown portion of the circulating water
cell level (raw water pump suction level) using river level as the driving force. The licensee concluded that implementing this strategy  
system to allow river water to flow into four of those pipes and then through four newly
would eliminate the need for the exterior sluice gates to be safety class, thereby resolving the previous violation.  
installed safety class valves for control of cell level (raw water pump suction level) using
Inspectors reviewed this modification strategy and in Section 4OA4.3 of this report questioned whether the modification would require NRC approval prior to  
river level as the driving force. The licensee concluded that implementing this strategy
implementation. The inspectors determined that prior NRC approval was required and  
would eliminate the need for the exterior sluice gates to be safety class, thereby
until that time, the river sluice gates would need to be classified and treated as Safety  
resolving the previous violation.
Class 3. Since the licensee had not yet accomplished this classification, the inspectors considered the licensee to still be in non-compliance with design controls.  
Inspectors reviewed this modification strategy and in Section 4OA4.3 of this report
Analysis. The inspectors determined that the continued failure to classify the intake structure exterior sluice gates and their motor operators as Safety Class 3 was a  
questioned whether the modification would require NRC approval prior to
performance deficiency. This finding was more than minor because it adversely impacted the protection against external events attribute of the Mitigating Systems Cornerstone objective of ensuring the availability, reliability and capability of systems that respond to initiating events to prevent undesirable consequences. The significance  
implementation. The inspectors determined that prior NRC approval was required and
of this finding is bounded by the significance of a related Yellow finding regarding the  
until that time, the river sluice gates would need to be classified and treated as Safety
ability to mitigate an external flooding event (Inspection Report 05000285/2010008).  
Class 3. Since the licensee had not yet accomplished this classification, the inspectors
This finding has a cross-cutting aspect in the area of problem identification and resolution, corrective action program, for failure to thoroughly evaluate problems such that the resolutions address causes and extent of conditions. This also includes  
considered the licensee to still be in non-compliance with design controls.
conducting effectiveness reviews of corrective actions to ensure that the problems are  
Analysis. The inspectors determined that the continued failure to classify the intake
structure exterior sluice gates and their motor operators as Safety Class 3 was a
performance deficiency. This finding was more than minor because it adversely
impacted the protection against external events attribute of the Mitigating Systems
Cornerstone objective of ensuring the availability, reliability and capability of systems
that respond to initiating events to prevent undesirable consequences. The significance
of this finding is bounded by the significance of a related Yellow finding regarding the
ability to mitigate an external flooding event (Inspection Report 05000285/2010008).
This finding has a cross-cutting aspect in the area of problem identification and
resolution, corrective action program, for failure to thoroughly evaluate problems such
that the resolutions address causes and extent of conditions. This also includes
conducting effectiveness reviews of corrective actions to ensure that the problems are
resolved [P.1(c)].
Enforcement. 10 CFR 50, Appendix B, Criterion III, Design Control, requires, in part,
that measures shall be established to assure that applicable regulatory requirements
and the design basis for those structures, systems, and components are correctly
translated into specifications, drawings, procedures, and instructions. Contrary to this
requirement, the licensee failed to establish measures to assure that applicable
regulatory requirements and the design basis for those components were correctly
translated into specifications, drawings, procedures, and instructions. Specifically, the
licensee failed to classify the six intake structure exterior sluice gates and their motor
operators as Safety Class 3 as defined in the Updated Safety Analysis Report, Appendix
N. This violation is not being treated as a new violation. Instead, it is considered as a
related violation to the Yellow finding issued in October 2010, which, in general, dealt
with issues related to mitigating a significant external flooding event. This violation is
being treated as a cited violation, consistent with Section 2.3.2(a)(2) of the NRC
Enforcement Policy: VIO 05000285/2013011-01, Continued Failure to Classify Intake
Structure Sluice Gates as Safety Class 3, (EA-13-043).
                                          A-8


resolved [P.1(c)].
.3 Adequacy of Significant Programs and Processes
Enforcement. 10 CFR 50, Appendix B, Criterion III, "Design Control," requires, in part, that measures shall be established to assure that applicable regulatory requirements
  Section 3 of the Restart Checklist addresses major programs and processes in place at
and the design basis for those structures, systems, and components are correctly translated into specifications, drawings, procedures, and instructions.  Contrary to this
  FCS.
requirement, the licensee failed to establish measures to assure that applicable
  .a Corrective Action Program
regulatory requirements and the design basis for those components were correctly translated into specifications, drawings, procedures, and instructions.  Specifically, the licensee failed to classify the six intake structure exterior sluice gates and their motor
      (1) Inspection Scope
operators as Safety Class 3 as defined in the Updated Safety Analysis Report, Appendix
          For the period covered by this inspection report, activities related to the corrective
N.  This violation is not being treated as a new violation. Instead, it is considered as a
          action program included a review of any aspects of the corrective action program
related violation to the Yellow finding issued in October 2010, which, in general, dealt with issues related to mitigating a significant external flooding event.  This violation is being treated as a cited violation, consistent with Section 2.3.2(a)(2) of the NRC
          which could have prevented or were contributing factors in the violations detailed in
Enforcement Policy: VIO 05000285/2013011-01, "Continued Failure to Classify Intake  
          this report.
Structure Sluice Gates as Safety Class 3," (EA-13-043).  
      (2) Assessment
          The inspectors made two corrective action program observations in the two
          violations in this report.
          In VIO 05000285/2013011-01, Continued Failure to Classify Intake Structure Sluice
          Gates as Safety Class 3, the inspectors noted the failure to thoroughly evaluate
          problems such that the resolutions address causes and extent of conditions. This
          also included conducting effectiveness reviews of corrective actions to ensure that
          the problems were resolved.
          In NCV 5000285/2013011-02, Two Examples of Failure to Obtain Prior NRC
          Approval for Flooding Mitigation Strategies, the inspectors noted the licensee failed
          to thoroughly evaluate problems such that resolutions address the causes and extent
          of condition specifically associated with deficiencies involving the Acts of Nature
          procedural guidance.
      (3) Findings
          No findings of significance were identified.
  .c Design Changes and Modifications
      (1) Inspection Scope
          i.  Design Changes and Modifications
              The inspectors reviewed the two modifications associated with the licensees
              mitigating strategies for maintaining cell level control, Packages EC 55394 and
              EC 53392.
          .ii 10 CFR 50.59 Screening and Safety Evaluations
                                              A-9


        The inspectors evaluated the effectiveness of the licensees 10 CFR 50.59
 
        process to ensure proper treatment of changes to the facility as it was applied to
  A-9 .3 Adequacy of Significant Programs and Processes
        Packages EC 55394 and EC 53392.
  Section 3 of the Restart Checklist addresses major programs and processes in place at
 
FCS.  .a Corrective Action Program 
(1) Inspection Scope
  For the period covered by this inspection report, activities related to the corrective
action program included a review of any aspects of the corrective action program which could have prevented or were contributing factors in the violations detailed in this report.  
(2) Assessment
(2) Assessment
  The inspectors made two corrective action program observations in the two
    The inspectors observed two instances of changes which were made in accordance
violations in this report.
    with the licensees 10 CFR 50.59 process which, when evaluated, determined that
In VIO 05000285/2013011-01, "Continued Failure to Classify Intake Structure Sluice
    prior NRC approval was not required for the changes. The inspectors took exception
Gates as Safety Class 3," the inspectors noted the failure to thoroughly evaluate
    with these conclusions and have described them in the Findings section below.
problems such that the resolutions address causes and extent of conditions. This
    These two examples will be considered in the future assessment of the health of the
also included conducting effectiveness reviews of corrective actions to ensure that the problems were resolved.
    licensees 10 CFR 50.59 program. Of note, the change associated with the trash
    rack blowdown modification was a recent change.
In NCV 5000285/2013011-02, "Two Examples of Failure to Obtain Prior NRC
(3) Findings
Approval for Flooding Mitigation Strategies," the inspectors noted the licensee failed
Two Examples of Failure to Obtain Prior NRC Approval for Flooding Mitigation Strategies
to thoroughly evaluate problems such that resolutions address the causes and extent
Introduction. The inspectors identified two examples of a Severity Level IV violation of
of condition specifically associated with deficiencies involving the "Acts of Nature" procedural guidance.
10 CFR 50.59, Changes, Tests and Experiments, and associated Green findings for the
(3) Findings
licensees failure to appropriately perform written evaluations for two changes associated
 
with flooding mitigation strategies. In the first example, the licensee changed the
No findings of significance were identified.
.c Design Changes and Modifications 
 
(1) Inspection Scope
 
i.    Design Changes and Modifications
The inspectors reviewed the two modifications associated with the licensee's
mitigating strategies for maintaining cell level control, Packages EC 55394 and
 
EC 53392.  .ii 10 CFR 50.59 Screening and Safety Evaluations
 
  A-10 The inspectors evaluated the effectiveness of the licensee's 10 CFR 50.59 process to ensure proper treatment of changes to the facility as it was applied to
Packages EC 55394 and EC 53392. 
(2) Assessment
 
The inspectors observed two instances of changes which were made in accordance with the licensee's 10 CFR 50.59 process which, when evaluated, determined that  
prior NRC approval was not required for the changes. The inspectors took exception with these conclusions and have described them in the "Findings" section below.  
These two examples will be considered in the future assessment of the health of the licensee's 10 CFR 50.59 program. Of note, the change associated with the trash  
rack blowdown modification was a recent change.  
(3) Findings  
Two Examples of Failure to Obtain Prior NRC Approval for Flooding Mitigation Strategies
  Introduction. The inspectors identified two examples of a Severity Level IV violation of 10 CFR 50.59, Changes, Tests and Experiments," and associated Green findings for the  
licensee's failure to appropriately perform written evaluations for two changes associated  
with flooding mitigation strategies. In the first example, the licensee changed the  
Updated Safety Analysis Report (USAR) and Abnormal Operating Procedure 01 (AOP-
Updated Safety Analysis Report (USAR) and Abnormal Operating Procedure 01 (AOP-
01), "Acts of Nature," to incorporate use of backflow through the circulating water system for a flow path for raw water. In the second example, the licensee was implementing a  
01), Acts of Nature, to incorporate use of backflow through the circulating water system
flooding mitigation modification which woul
for a flow path for raw water. In the second example, the licensee was implementing a
d have used components which did not meet full quality requirements for their Safety Class 3 designated function. Had the licensee  
flooding mitigation modification which would have used components which did not meet
appropriately evaluated these two changes, they would have determined that a license  
full quality requirements for their Safety Class 3 designated function. Had the licensee
amendment was required for implementation of both changes, since both resulted in more than a minimal increase in the likelihood of occurrence of a malfunction of a system, structure, or component important to safety.  
appropriately evaluated these two changes, they would have determined that a license
amendment was required for implementation of both changes, since both resulted in
more than a minimal increase in the likelihood of occurrence of a malfunction of a
system, structure, or component important to safety.
Description. At FCS, the raw water system draws water from the Missouri River, cools
plant components, and then returns water back to the discharge canal. The raw water
pumps draw water from the intake cell, which under normal river conditions is at
approximately the same level as the river. A set of six normally opened river sluice gates
are available to isolate portions of the intake cells from the river. Under flooded river
conditions above 1007.5 feet river level, the licensee must control intake cell level. If
intake cell level were to get too high, the intake structure would be flooded and the raw
water pumps would be adversely affected. If intake cell level were to get too low, the
raw water pumps would not meet pump suction requirements. Control of the intake level
would be accomplished by manipulating the river sluice gates such that the flow pumped
from the intake cell and through the raw water system would be made up by the same
amount of water being allowed into the intake cell. On two occasions, the licensee
improperly evaluated proposed methods to obtain the proper raw water flow balance in
the intake cells to mitigate a flooding event as described below.
                                        A-10


Backflow Through the Circulating Water System via Sand Intrusion Mitigation Strategy
Description.  At FCS, the raw water system draws water from the Missouri River, cools plant components, and then returns water back to the discharge canal.  The raw water
In this strategy, operators would be required to match the flow developed by the raw
pumps draw water from the intake cell, which under normal river conditions is at approximately the same level as the river.  A set of six normally opened river sluice gates are available to isolate portions of the intake cells from the river.  Under flooded river
water pumps with the flow past one partially opened river sluice gate and the leakage
conditions above 1007.5 feet river level, the licensee must control intake cell level.  If
past all of the other river sluice gates. Level in the intake cell by procedure was to be
intake cell level were to get too high, the intake structure would be flooded and the raw
controlled between 983 and 988 feet.
water pumps would be adversely affected.  If intake cell level were to get too low, the raw water pumps would not meet pump suction requirements.  Control of the intake level would be accomplished by manipulating the river sluice gates such that the flow pumped
In February 2012, NRC inspectors identified that the motor operators for the river sluice
from the intake cell and through the raw water system would be made up by the same
gates would start becoming submerged at 1010 feet of river level. In response, the
amount of water being allowed into the intake cell.  On two occasions, the licensee
licensee changed their Procedure AOP-01 to instruct operators to de-energize the motor
improperly evaluated proposed methods to obtain the proper raw water flow balance in
operators for the river sluice gates at 1010 feet of river level. This change was made
the intake cells to mitigate a flooding event as described below. 
even though it did not match the original intentions for control as described in Section
  A-11  Backflow Through the Circulating Water System via Sand Intrusion Mitigation Strategy
9.8.6 of the Final Safety Analysis Report (FSAR) which stated that, For water levels
  In this strategy, operators would be required to match the flow developed by the raw water pumps with the flow past one partially opened river sluice gate and the leakage past all of the other river sluice gates. Level in the intake cell by procedure was to be  
above 1007.5 feet, the water level inside the intake structure is controlled by positioning
controlled between 983 and 988 feet.
the exterior sluice gates to restrict the inflow into the wet wells to match the rate of
In February 2012, NRC inspectors identified that the motor operators for the river sluice  
pumped outflow. The licensee changed the USAR (Revision 30) along with the AOP-01
gates would start becoming submerged at 1010 feet of river level. In response, the licensee changed their Procedure AOP-01 to instruct operators to de-energize the motor operators for the river sluice gates at 1010 feet of river level. This change was made  
change to state, The water level inside the intake cells can be controlled by positioning
even though it did not match the original intentions for control as described in Section  
the exterior sluice gates to restrict the inflow into the cells. If the cell intake through the
9.8.6 of the Final Safety Analysis Report (FSAR) which stated that, "For water levels  
river sluice gates is blocked during flooding condition (possibly due to debris or other
above 1007.5 feet, the water level inside the intake structure is controlled by positioning the exterior sluice gates to restrict the inflow into the wet wells to match the rate of pumped outflow.The licensee changed the USAR (Revision 30) along with the AOP-01  
failure mechanism) an alternate flow path to the cells can be provided by allowing flow
change to state, "The water level inside the intake cells can be controlled by positioning  
backward through one of the circulating pumps. Cell level would then be controlled
the exterior sluice gates to restrict the inflow into the cells. If the cell intake through the  
using either the circulating water pump discharge valve or suction gate. This flow path
river sluice gates is blocked during flooding condition (possibly due to debris or other failure mechanism) an alternate flow path to the cells can be provided by allowing flow backward through one of the circulating pumps. Cell level would then be controlled  
may also be used during extreme flooding conditions if the river flow has a high debris
using either the circulating water pump discharge valve or suction gate. This flow path  
load to minimize sand/debris buildup in the cells.
may also be used during extreme flooding conditions if the river flow has a high debris load to minimize sand/debris buildup in the cells
The change to AOP-01 prescribed that any trends in intake cell level upward past 988
." The change to AOP-01 prescribed that any trends in intake cell level upward past 988 feet would be controlled by starting another raw water pump to lower level. Any trends in  
feet would be controlled by starting another raw water pump to lower level. Any trends in
intake cell level downward past 983 feet would be compensated for by aligning backflow  
intake cell level downward past 983 feet would be compensated for by aligning backflow
through the circulating water system.
through the circulating water system.
The path would be from the discharge canal, through the circulating water discharge  
The path would be from the discharge canal, through the circulating water discharge
piping, through the condensor water box, through more circulating water piping, through  
piping, through the condensor water box, through more circulating water piping, through
the circulating water discharge check and discharge valves, through the circulating water  
the circulating water discharge check and discharge valves, through the circulating water
pumps, and through a circulating water sluice gate. The inspectors questioned the use of the circulating water system in lieu of the safety related river sluice gates. Instead of using a fully qualified, tested, designed, and constructed safety related system, the  
pumps, and through a circulating water sluice gate. The inspectors questioned the use
licensee changed the operating scheme to rely on the non-safety related circulating  
of the circulating water system in lieu of the safety related river sluice gates. Instead of
water system.  
using a fully qualified, tested, designed, and constructed safety related system, the
Section 4.3.2 of Nuclear Energy Institute Document 96-07, "Guidelines For 10 CFR 50.59 Evaluations," states in part, "Departures fr
licensee changed the operating scheme to rely on the non-safety related circulating
om the design, fabrication, construction, testing, and performance standards as outlined in the General Design Criteria (Appendix  
water system.
A to Part 50) are not compatible with a 'no more than minimal increase' standard.The  
Section 4.3.2 of Nuclear Energy Institute Document 96-07, Guidelines For 10 CFR
inspectors concluded that substituting the safety-related method with a non-safety  
50.59 Evaluations, states in part, Departures from the design, fabrication, construction,
related system fit this description. This led inspectors to conclude the "no more than minimal" standard was not met and the change constituted a more than minimal increase in the likelihood of occurrence of a malfunction of a system, structure, or
testing, and performance standards as outlined in the General Design Criteria (Appendix
  A-12 component important to safety than previ
A to Part 50) are not compatible with a no more than minimal increase standard. The
ously evaluated, and therefore should have
inspectors concluded that substituting the safety-related method with a non-safety
required a license amendment. 
related system fit this description. This led inspectors to conclude the no more than
Further, inspectors noted that the change package used to incorporate the change into AOP-01 did not have its own evaluation.  When questioned by inspectors, the licensee
minimal standard was not met and the change constituted a more than minimal
stated that the change package to Procedure AOP-01 was based on EC 53392 which
increase in the likelihood of occurrence of a malfunction of a system, structure, or
was developed to change Procedure OI-CW-1.  The licensee explained that the same
                                          A-11
individual who performed that change was involved in the change to AOP-01 and was
knowledgeable of the evaluation, so the change to AOP-01 was made informed by EC 53392.  The inspectors considered this oversight in documentation to be a smaller part of the larger issue of not properly evaluating and incorporating the change. 


component important to safety than previously evaluated, and therefore should have
required a license amendment.
Further, inspectors noted that the change package used to incorporate the change into
AOP-01 did not have its own evaluation. When questioned by inspectors, the licensee
stated that the change package to Procedure AOP-01 was based on EC 53392 which
was developed to change Procedure OI-CW-1. The licensee explained that the same
individual who performed that change was involved in the change to AOP-01 and was
knowledgeable of the evaluation, so the change to AOP-01 was made informed by EC
53392. The inspectors considered this oversight in documentation to be a smaller part
of the larger issue of not properly evaluating and incorporating the change.
Trash Rack Blowdown Backflow Modification Strategy
Trash Rack Blowdown Backflow Modification Strategy
In this strategy, operators would be required to match the flow developed by the raw water pumps with the flow allowed through manually throttled valves in the trash rack blowdown lines. The throttle valves were being installed by modification and had been  
In this strategy, operators would be required to match the flow developed by the raw
formally evaluated by the licensee per 10 CFR 50.59. Level in the intake cell by procedure was to be controlled between 983 and 988 feet.
water pumps with the flow allowed through manually throttled valves in the trash rack
The trash rack blowdown piping used was part of the circulating water system. A portion of the circulating water pump flow would be diverted to piping which penetrates the  
blowdown lines. The throttle valves were being installed by modification and had been
intake structure near the trash racks to blow trash off the trash racks weekly. The piping is isolated the rest of the time by an isolation valve. During a flood, this piping outside  
formally evaluated by the licensee per 10 CFR 50.59. Level in the intake cell by
the intake structure would be submerged. Water would fill it up to the isolation valve  
procedure was to be controlled between 983 and 988 feet.
inside the intake structure. The licensee was in the process of installing valves in the intake structure between the intake structure wall and the isolation valve on 4 of the trash rack cleaning piping to open to dump water into the cells.  
The trash rack blowdown piping used was part of the circulating water system. A portion
By doing this, the licensee evaluated that they could fully shut all of the sluice gates and make them limited critical quality equipment (LCQE) components, thus resolving their safety class issue.  
of the circulating water pump flow would be diverted to piping which penetrates the
The licensee had classified the throttle valve as safety class. They had classified the  
intake structure near the trash racks to blow trash off the trash racks weekly. The piping
piping and the isolation valve as not fully safety qualified based on their definition of  
is isolated the rest of the time by an isolation valve. During a flood, this piping outside
 
the intake structure would be submerged. Water would fill it up to the isolation valve
LCQE. By the FCS Quality Assurance Plan, LCQE is defined as those structures, systems, components or items whose satisfactory performance is required to prevent or mitigate the failure of those structures, systems, components or items identified as critical quality equipment (CQE). CQE is defined as those structures, systems,  
inside the intake structure. The licensee was in the process of installing valves in the
components, or items whose satisfactory performance is required to prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and  
intake structure between the intake structure wall and the isolation valve on 4 of the
safety of the public. LCQE would contain enhanced safety qualifications, but not the fully safety qualification of CQE.  
trash rack cleaning piping to open to dump water into the cells.
By doing this, the licensee evaluated that they could fully shut all of the sluice gates and
The licensee determined that since all the piping would do would be to constitute a  
make them limited critical quality equipment (LCQE) components, thus resolving their
barrier for flooding and prevent the failure of the valve by staying intact, it would be  
safety class issue.
LCQE.    
The licensee had classified the throttle valve as safety class. They had classified the
  A-13 The inspectors questioned this classification.  The inspectors considered that the necessary components would be required to mitigate the consequences of flooding, and
piping and the isolation valve as not fully safety qualified based on their definition of
not just serve as a flooding barrier, and would be necessary conduit for raw water flow to the cell and eventually on to the raw water pumps.  Between the intake structure wall and the isolation valve, the piping would provide a flow path from the river to the intake
LCQE. By the FCS Quality Assurance Plan, LCQE is defined as those structures,
cells whose performance is needed to ensure flow only goes out the throttle valve.  The
systems, components or items whose satisfactory performance is required to prevent or
piping would have to satisfactorily perform to allow proper flow to the raw water pumps.
mitigate the failure of those structures, systems, components or items identified as
The inspectors noted that in Appendix N to the licensee's USAR, the licensee stated that Safety Class (SC) 3 shall apply to equipment, not included in SC-1 or -2, that is designed and relied upon to accomplish the two following nuclear safety functions: 
critical quality equipment (CQE). CQE is defined as those structures, systems,
* Ensure required cooling for liquid-cooled stored fuel (e.g., spent fuel storage pool and cooling system)
components, or items whose satisfactory performance is required to prevent or mitigate
* Ensure nuclear safety functions provided by SC-1, -2, or -3 equipment (e.g., provide heat removal of SC-1, -2, or -3 heat exchangers, -)
the consequences of postulated accidents that could cause undue risk to the health and
The inspectors concluded that those two definitions were met.  The piping and isolation valve would be required to ensure raw water cooling flowed such that it could be used for spent fuel pool cooling and that it could be used to cool the shutdown cooling heat
safety of the public. LCQE would contain enhanced safety qualifications, but not the
 
fully safety qualification of CQE.
exchanger (a SC-3 heat exchanger).
The licensee determined that since all the piping would do would be to constitute a
From this, the inspectors concluded that the licensee would have replaced a safety class strategy (throttling sluice gates) with a strategy that uses non-safety class components for a function that is required by the licensee's licensing basis per Appendix N of their
barrier for flooding and prevent the failure of the valve by staying intact, it would be
USAR to be safety class (SC-3).
LCQE.
Section 4.3.2 of Nuclear Energy Institute Document 96-07, "Guidelines For 10 CFR
                                        A-12
50.59 Evaluations," states that "- departures fr
om the design, fabrication, construction, testing, and performance standards as outlined in the General Design Criteria (Appendix A to Part 50) are not compatible with a 'no more than minimal increase'
standard."  The inspectors concluded that substituting the safety-related method with a
non-safety related system fit this description.  This led inspectors to conclude the "no
more than minimal" was not met and the change constituted a more than minimal increase in the likelihood of occurrence of a malfunction of a system, structure, or
component important to safety than previ
ously evaluated, and therefore should have
required a license amendment. 
Additionally, the inspectors identified another concern with the licensee's evaluation. 
The modification would introduce the possibility of a failure of the raw water pumps due to draining of the intake cells.  Flow through the circulating water system trash rack blowdown supply header would be driven by river level alone and enter the Intake
Structure at a higher elevation than the normal path via the exterior sluice gates. 
Following a flooding event, the river level would decrease to the point where there could
be insufficient flow through the backwash supply header and the exterior sluice gates would need to be reopened.  However, the motor operators for the exterior sluice gates would likely be damaged which could impair the ability to reopen the sluice gates and 
  A-14 establish sufficient flow to the intake bays. The inspectors and NRC staff noted that this consideration had not been a part of the licensee's 10 CFR 50.59 evaluation. 
Analysis. The failure to perform adequate written evaluations of changes in accordance with 10 CFR 50.59(d)(1) was a performance deficiency. This performance deficiency
was more than minor because it was associated with the human performance attribute of the mitigating systems cornerstone and it adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating
events to prevent undesirable consequences. 
 
In accordance with the NRC Enforcement Policy, the inspectors used MC 0609, "Significance Determination Process," Appendix A, Exhibit 2, to determine the final significance of the finding.  For the back flow through the circulating water system
example, the finding represented a potential loss of the intake structure due to flooding;
therefore, a Phase 3 evaluation by a senior reactor analyst was necessary.  The senior
reactor analyst evaluated a bounding risk analysis case which assumed that the raw
water system and offsite power were lost.  This bounding case had an incremental conditional core damage probability of 5.0 x 10
-7, and therefore the finding was determined to have very low safety significance (Green).  For the trash rack blowdown modification example, determined the finding was of very low safety significance (Green) because the finding was a design deficiency that did not result in the loss of functionality.
 
The NRC's significance determination process (SDP) considers the safety significance of findings by evaluating their potential safety consequences. The traditional
enforcement process separately considers the significance of willful violations, violations
that impact the regulatory process, and violations that result in actual safety
consequences. Traditional enforcement applied to this finding because it involved a
violation that impacted the regulatory process.  Assessing the violation in accordance with Enforcement Policy, the inspectors determined it to be of Severity Level IV because it resulted in a condition evaluated by the SDP as having very low safety significance (Example 6.1.d.2 of the NRC Enforcement Policy).
 
The inspectors determined the Green finding had a cross-cutting aspect in the area of problem identification and resolution because the licensee failed to thoroughly evaluate problems such that resolutions address the causes and extent of condition specifically associated with deficiencies involving the "Acts of Nature" procedural guidance [P.1(c)].
Enforcement.  10 CFR 50.59(c)(2) states, in part, that a licensee shall obtain a license amendment prior to implementing a proposed change if the change would result in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure, system, or component important to safety previously evaluated in the final safety analysis report. 
Contrary to the above on two occasions, the licensee failed to obtain a license amendment prior to implementing a change that resulted in a more than minimal increase in the likelihood of occurrence of a malfunction of a SSC important to safety


previously evaluated in the FSAR (as updated).  Specifically:
The inspectors questioned this classification. The inspectors considered that the
   A-15  i. In May 2012, the licensee changed AOP-01, "Acts of Nature," and their USAR, which resulted in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure, system, or  
necessary components would be required to mitigate the consequences of flooding, and
component important to safety previously evaluated in the final safety analysis report. Specifically, Step 9.g of AOP-01 and
not just serve as a flooding barrier, and would be necessary conduit for raw water flow to
Section 9.8 of the USAR were included in the change to replace opening a  
the cell and eventually on to the raw water pumps. Between the intake structure wall
safety-related river sluice gate to increase river flow to the intake cell with  
and the isolation valve, the piping would provide a flow path from the river to the intake
aligning circulating water flow through the non-safety related circulating water
cells whose performance is needed to ensure flow only goes out the throttle valve. The
system. This change introduced new failure mechanisms which constituted a more than a minor change in the frequency of a malfunction and the consequences of a previously evaluated accident in the USAR.   
piping would have to satisfactorily perform to allow proper flow to the raw water pumps.
ii. On December 13, 2012, the licensee evaluated their trash rack blowdown modification in EC 55394 and continued physical installation of the plant modification in the intake structure.  This modification would result in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure,  
The inspectors noted that in Appendix N to the licensees USAR, the licensee stated that
system, or component important to safety previously evaluated in the FSAR.  Specifically, use of LCQE components in a Safety Class 3 function would
Safety Class (SC) 3 shall apply to equipment, not included in SC-1 or -2, that is
constitute a more than a minor change in the frequency of a malfunction and the consequences of a previously evaluated accident in the USAR.  
designed and relied upon to accomplish the two following nuclear safety functions:
The licensee entered these issues into their corrective action program as Condition
    *   Ensure required cooling for liquid-cooled stored fuel (e.g., spent fuel storage pool
Reports 2012-15293 and 2013-00545, and as of the end of this inspection, was planning
        and cooling system)
corrective action.  Because this finding was determined to be of very low safety
    *  Ensure nuclear safety functions provided by SC-1, -2, or -3 equipment (e.g.,
significance (Green) and the associated examples of this violation have been entered into the licensee's corrective action program, this violation is being treated as a non-cited consistent with Section 2.3.2.a of the NRC Enforcement Policy, NCV 5000285/2013011-
        provide heat removal of SC-1, -2, or -3 heat exchangers, )
02, "Two Examples of Failure to Obtain Prior NRC Approval for Flooding Mitigation
The inspectors concluded that those two definitions were met. The piping and isolation
Strategies."
valve would be required to ensure raw water cooling flowed such that it could be used
4OA6 Meetings, Including Exit Exit Meeting Summary
for spent fuel pool cooling and that it could be used to cool the shutdown cooling heat
On March 1, 2013, the inspectors presented the inspection results to Mr. L. Cortopassi, Site Vice President, and other members of the licensee staff.  The licensee acknowledged the issues presented.  The inspector asked the licensee whether any materials examined during the inspection should be considered proprietary.  No
exchanger (a SC-3 heat exchanger).
proprietary information was identified.
From this, the inspectors concluded that the licensee would have replaced a safety class
   
strategy (throttling sluice gates) with a strategy that uses non-safety class components
  A-16 SUPPLEMENTAL INFORMATION
for a function that is required by the licensees licensing basis per Appendix N of their
  KEY POINTS OF CONTACT
USAR to be safety class (SC-3).
  Licensee Personnel    C. Cameron, Supervisor Regulatory Compliance 
Section 4.3.2 of Nuclear Energy Institute Document 96-07, Guidelines For 10 CFR
L. Cortopassi, Site Vice President 
50.59 Evaluations, states that  departures from the design, fabrication, construction,
testing, and performance standards as outlined in the General Design Criteria
(Appendix A to Part 50) are not compatible with a no more than minimal increase
standard. The inspectors concluded that substituting the safety-related method with a
non-safety related system fit this description. This led inspectors to conclude the no
more than minimal was not met and the change constituted a more than minimal
increase in the likelihood of occurrence of a malfunction of a system, structure, or
component important to safety than previously evaluated, and therefore should have
required a license amendment.
Additionally, the inspectors identified another concern with the licensees evaluation.
The modification would introduce the possibility of a failure of the raw water pumps due
to draining of the intake cells. Flow through the circulating water system trash rack
blowdown supply header would be driven by river level alone and enter the Intake
Structure at a higher elevation than the normal path via the exterior sluice gates.
Following a flooding event, the river level would decrease to the point where there could
be insufficient flow through the backwash supply header and the exterior sluice gates
would need to be reopened. However, the motor operators for the exterior sluice gates
would likely be damaged which could impair the ability to reopen the sluice gates and
                                          A-13


D. Ferraro, Attorney, Exelon Corporation K. Ihnen, Manager, Site Nuclear Oversight
establish sufficient flow to the intake bays. The inspectors and NRC staff noted that this
M. Prospero, Plant Manager
consideration had not been a part of the licensees 10 CFR 50.59 evaluation.
B. Rash, Recovery Manager
Analysis. The failure to perform adequate written evaluations of changes in accordance
with 10 CFR 50.59(d)(1) was a performance deficiency. This performance deficiency
was more than minor because it was associated with the human performance attribute of
the mitigating systems cornerstone and it adversely affected the cornerstone objective to
ensure the availability, reliability, and capability of systems that respond to initiating
events to prevent undesirable consequences.
In accordance with the NRC Enforcement Policy, the inspectors used MC 0609,
Significance Determination Process, Appendix A, Exhibit 2, to determine the final
significance of the finding. For the back flow through the circulating water system
example, the finding represented a potential loss of the intake structure due to flooding;
therefore, a Phase 3 evaluation by a senior reactor analyst was necessary. The senior
reactor analyst evaluated a bounding risk analysis case which assumed that the raw
water system and offsite power were lost. This bounding case had an incremental
conditional core damage probability of 5.0 x 10-7, and therefore the finding was
determined to have very low safety significance (Green). For the trash rack blowdown
modification example, determined the finding was of very low safety significance (Green)
because the finding was a design deficiency that did not result in the loss of functionality.
The NRCs significance determination process (SDP) considers the safety significance
of findings by evaluating their potential safety consequences. The traditional
enforcement process separately considers the significance of willful violations, violations
that impact the regulatory process, and violations that result in actual safety
consequences. Traditional enforcement applied to this finding because it involved a
violation that impacted the regulatory process. Assessing the violation in accordance
with Enforcement Policy, the inspectors determined it to be of Severity Level IV because
it resulted in a condition evaluated by the SDP as having very low safety significance
(Example 6.1.d.2 of the NRC Enforcement Policy).
The inspectors determined the Green finding had a cross-cutting aspect in the area of
problem identification and resolution because the licensee failed to thoroughly evaluate
problems such that resolutions address the causes and extent of condition specifically
associated with deficiencies involving the Acts of Nature procedural guidance [P.1(c)].
Enforcement. 10 CFR 50.59(c)(2) states, in part, that a licensee shall obtain a license
amendment prior to implementing a proposed change if the change would result in more
than a minimal increase in the likelihood of occurrence of a malfunction of a structure,
system, or component important to safety previously evaluated in the final safety
analysis report.
Contrary to the above on two occasions, the licensee failed to obtain a license
amendment prior to implementing a change that resulted in a more than minimal
increase in the likelihood of occurrence of a malfunction of a SSC important to safety
previously evaluated in the FSAR (as updated). Specifically:
                                          A-14


T. Simpkin, Manager, Site Regulatory Assurance 
    i.     In May 2012, the licensee changed AOP-01, Acts of Nature, and their USAR,
J. Wiegand, Manager, Operations Engineering
            which resulted in more than a minimal increase in the likelihood of occurrence of
  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
            a malfunction of a structure, system, or component important to safety previously
  Opened 05000285/2013011-01 VIO Continued Failure to Classify Intake Structure Sluice Gates as Safety Class 3 (Section 4OA4.1)    Opened and Closed  05000285/2013011-02 NCV Two Examples of Failure to Obtain Prior NRC Approval for Flooding Mitigation Strategies (Section 4OA4.3)
            evaluated in the final safety analysis report. Specifically, Step 9.g of AOP-01 and
 
            Section 9.8 of the USAR were included in the change to replace opening a
LIST OF DOCUMENTS REVIEWED
            safety-related river sluice gate to increase river flow to the intake cell with
All documents which supported the inspection scope and determinations were identified in the
            aligning circulating water flow through the non-safety related circulating water
            system. This change introduced new failure mechanisms which constituted a
            more than a minor change in the frequency of a malfunction and the
            consequences of a previously evaluated accident in the USAR.
    ii.    On December 13, 2012, the licensee evaluated their trash rack blowdown
            modification in EC 55394 and continued physical installation of the plant
            modification in the intake structure. This modification would result in more than a
            minimal increase in the likelihood of occurrence of a malfunction of a structure,
            system, or component important to safety previously evaluated in the FSAR.
            Specifically, use of LCQE components in a Safety Class 3 function would
            constitute a more than a minor change in the frequency of a malfunction and the
            consequences of a previously evaluated accident in the USAR.
    The licensee entered these issues into their corrective action program as Condition
    Reports 2012-15293 and 2013-00545, and as of the end of this inspection, was planning
    corrective action. Because this finding was determined to be of very low safety
    significance (Green) and the associated examples of this violation have been entered
    into the licensees corrective action program, this violation is being treated as a non-cited
    consistent with Section 2.3.2.a of the NRC Enforcement Policy, NCV 5000285/2013011-
    02, Two Examples of Failure to Obtain Prior NRC Approval for Flooding Mitigation
    Strategies.
4OA6 Meetings, Including Exit
    Exit Meeting Summary
    On March 1, 2013, the inspectors presented the inspection results to Mr. L. Cortopassi,
    Site Vice President, and other members of the licensee staff. The licensee
    acknowledged the issues presented. The inspector asked the licensee whether any
    materials examined during the inspection should be considered proprietary. No
    proprietary information was identified.
                                              A-15


                              SUPPLEMENTAL INFORMATION
                                  KEY POINTS OF CONTACT
Licensee Personnel
C. Cameron, Supervisor Regulatory Compliance
L. Cortopassi, Site Vice President
D. Ferraro, Attorney, Exelon Corporation
K. Ihnen, Manager, Site Nuclear Oversight
M. Prospero, Plant Manager
B. Rash, Recovery Manager
T. Simpkin, Manager, Site Regulatory Assurance
J. Wiegand, Manager, Operations Engineering
                    LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
                                Continued Failure to Classify Intake Structure Sluice Gates as
05000285/2013011-01      VIO
                                Safety Class 3 (Section 4OA4.1)
Opened and Closed
                                Two Examples of Failure to Obtain Prior NRC Approval for
05000285/2013011-02      NCV
                                Flooding Mitigation Strategies (Section 4OA4.3)
                              LIST OF DOCUMENTS REVIEWED
All documents which supported the inspection scope and determinations were identified in the
body of the report.
body of the report.
                                              A-16
}}
}}

Latest revision as of 21:58, 4 November 2019

IR 0500285-13-011, and Notice of Violation, on 11/18/2012 - 02/28/2013, Fort Calhoun
ML13070A399
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/11/2013
From: Hay M
NRC/RGN-IV/DRP
To: Cortopassi L
Omaha Public Power District
References
EA-13-043 IR-13-011
Download: ML13070A399 (20)


See also: IR 05000285/2013011

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

RE G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 7 601 1 - 4511

March 11, 2013

EA-13-043

Louis P. Cortopassi, Site Vice President

Omaha Public Power District

Fort Calhoun Station FC-2-4

P.O. Box 550

Fort Calhoun, NE 68023-0550

Subject: FORT CALHOUN - NRC INSPECTION REPORT NUMBER 05000285/2013011

AND NOTICE OF VIOLATION

Dear Mr. Cortopassi:

On February 28, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at your Fort Calhoun Station. The enclosed inspection report documents the

inspection results which were discussed on March 1, 2013, with you and other members of your

staff.

During the inspections performed between November 18, 2012 and February 28, 2013, the

NRC staff examined activities conducted under your license as they relate to safety and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

Based on the results of this inspection, a finding was identified involving the failure to classify

the river sluice gates as Safety Class 3. This finding was determined to involve a violation of

NRC requirements and related to a previously issued Yellow finding regarding the ability to

mitigate an external flooding event (Inspection Reports 05000285/2010007 and

05000285/2010008; ML101970547 and ML102800342, respectively). The significance of this

finding was bounded by the Yellow finding and therefore was not characterized by color

significance.

The NRC determined that a violation is associated with this finding and was evaluated in

accordance with the NRC Enforcement Policy. The violation is being cited in the enclosed

Notice of Violation (Notice) and the circumstances surrounding it are described in detail in the

subject inspection report. The violation is being treated as a cited violation, consistent with

Section 2.3.2(a)(2) of the NRC Enforcement Policy. Specifically, Fort Calhoun Station has not

restored compliance in a timeframe commensurate with the significance of this violation (EA-13-

043).

L. Cortopassi -2-

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. If you have additional information that you

believe the NRC should consider, you may provide it in your response to the Notice. The NRC

review of your response to the Notice will also determine whether further enforcement action is

necessary to ensure compliance with regulatory requirements.

Also, the NRC identified another finding during this inspection. This finding was determined to

involve a violation of NRC requirements. The finding was of more than minor significance

because the two licensee evaluations performed under 10 CFR 50.59, "Change, Tests, and

Experiments" would require NRC's review and approval prior to implementation. Because this

issue affected the NRC's ability to perform its regulatory function, the inspectors evaluated it

using the traditional enforcement process and assessed the significance of the underlying issue

using the SDP. The violation associated with this finding was determined to be a Severity

Level IV violation consistent with Section 6.1.d of the Enforcement Policy. However, the NRC is

treating this violation as non-cited violation consistent with Section 2.3.2.a of the Enforcement

Policy.

The NRC views adherence to 10 CFR 50.59 as critical to the regulatory process. These two

examples of violations of this requirement are concerning, because they directly support the

efforts by the facility to address the resolution of the previously issued Yellow finding for

flooding. The NRC views proper resolution of the flooding finding as key to the long term safety

of Fort Calhoun Station.

If you contest these violations, you should provide a response within 30 days of the date of this

inspection report, with the basis for your denial, to the Nuclear Regulatory Commission,

ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional

Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory

Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Fort Calhoun

Station.

If you disagree with a cross-cutting aspects assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at

Fort Calhoun Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response (if any) will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide Document Access and Management System (ADAMS).

L. Cortopassi -3-

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Michael Hay, Chief

Project Branch F

Division of Reactor Projects

Docket No. 50-285

License No. DPR-40

Enclosure:

NRC Inspection Report 05000285/2013011

w/Attachment: Supplemental Information

cc w/ encl: Electronic Distribution

L. Cortopassi -4-

Electronic Distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)

MC0350 Chairman (Anton.Vegel@nrc.gov)

MC0350 Vice Chairman (Louise.Lund@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Michael.Scott@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (John.Kirkland@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Branch Chief, DRP/F (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)

Project Engineer, DRP/F (Chris.Smith@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Chief, DRS/TSB (Ray.Kellar@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OE Specialist (Carolyn.Faria-Ocasio@nrc.gov)

ROPreports

RIV/ETA: OEDO (John.Cassidy@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

MC 0350 Panel Member (Micheal.Markley@nrc.gov)

MC 0350 Panel Member (Joseph.Sebrosky@nrc.gov)

MC 0350 Panel Member (Michael.Balazik@nrc.gov)

ROPreports

File Located: S:\DRP\DRPDIR\_FCS Accession No.ML13070A399

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials MCH

Publicly Avail. Yes No Sensitive Yes No Sens. Type Initials MCH

RI:DRP/F RI:DRP/RIII SPE:DRP/F ACES:SES BC:DRP/F

JFWingebach FRamirez RWDeese RBrowder MCHay

/RA via Email/ /RA via Email/ /RA/ /RA/ /RA/

3/8/13 3/8/13 3/6/13 3/7/13 3/11/13

OFFICIAL RECORD COPY

NOTICE OF VIOLATION

Omaha Public Power District Docket No. 05000285

Fort Calhoun Station License No. DPR-40

EA-13-043

During an NRC inspection conducted from November 18, 2012 to February 28, 2013, a violation

of NRC requirements was identified. In accordance with the NRC Enforcement Policy, the

violation is listed below:

Title 10 CFR 50, Appendix B, Criterion III, Design Control, requires, in part that

measures shall be established to assure that applicable regulatory requirements and the

design basis, as defined in 10 CFR 50.2, for those structures, systems, and components

are correctly translated into specifications, drawings, procedures, and instructions.

Contrary to the above, the licensee failed to establish measures to assure that

applicable regulatory requirements and the design basis for those components were

correctly translated into specifications, drawings, procedures, and instructions.

Specifically, the licensee failed to classify the six intake structure exterior sluice gates

and their motor operators as Safety Class 3 as defined in the Updated Safety Analysis

Report, Appendix N.

This violation is associated with and is bounded by a Yellow Significance Determination Process

finding.

Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is hereby required to

submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001 with a copy to the Regional

Administrator, Region IV, and a copy to the NRC Resident Inspector - Fort Calhoun Station,

within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply

should be clearly marked as a "Reply to a Notice of Violation; EA-13-043" and should include for

each violation: (1) the reason for the violation or, if contested, the basis for disputing the

violation or severity level, (2) the corrective steps that have been taken and the results

achieved, (3) the corrective steps that will be taken, and (4) the date when full compliance will

be achieved. Your response may reference or include previous docketed correspondence, if

the correspondence adequately addresses the required response. If an adequate reply is not

received within the time specified in this Notice, an order or a Demand for Information may be

issued as to why the license should not be modified, suspended, or revoked, or why such other

action as may be proper should not be taken. Where good cause is shown, consideration will

be given to extending the response time.

If you contest this enforcement action, you should also provide a copy of your response with the

basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory

Commission, Washington, DC 20555-0001.

Because your response will be made available electronically for public inspection in the NRC

Public Document Room or from the NRCs document system (ADAMS), accessible from the

A-1 Attachment

NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should not

include any personal privacy, proprietary, or safeguards information so that it can be made

available to the public without redaction. If personal privacy or proprietary information is

necessary to provide an acceptable response, then please provide a bracketed copy of your

response that identifies the information that should be protected and a redacted copy of your

response that deletes such information. If you request withholding of such material, you must

specifically identify the portions of your response that you seek to have withheld and provide in

detail the bases for your claim of withholding (e.g., explain why the disclosure of information will

create an unwarranted invasion of personal privacy or provide the information required by

10 CFR 2.390(b) to support a request for withholding confidential commercial or financial

information). If safeguards information is necessary to provide an acceptable response, please

provide the level of protection described in 10 CFR 73.21.

In accordance with 10 CFR 19.11, you may be required to post this Notice within two working

days of receipt.

Dated this 11th day of March 2013.

A-2

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket: 05000285

License: DPR-40

Report: 05000285/2013011

Licensee: Omaha Public Power District

Facility: Fort Calhoun Station

Location: 9610 Power Lane

Blair, NE 68008

Dates: November 18, 2012 through February 28, 2013

Inspectors: R. Deese, Senior Project Engineer

F. Ramirez, Resident Inspector, LaSalle

J. Wingebach, Resident Inspector, Fort Calhoun

Approved By: Michael Hay, Chief

Project Branch F

Division of Reactor Projects

A-3

SUMMARY OF FINDINGS

IR 05000285/2013011; 11/18/2012 - 2/28/2013; Fort Calhoun Station (FCS); Changes, Tests

and Experiments (10 CFR 50.59).

The report covered a period of inspection by resident and regional inspectors. One Severity

Level IV NCV was identified. The significance of most findings is indicated by their color

(Green, White, Yellow, or Red) using Inspection Manual Chapter 0609, Significance

Determination Process. The cross-cutting aspect is determined using Inspection Manual

Chapter 0310, Components Within the Cross-Cutting Areas. Findings for which the

significance determination process does not apply may be Green or be assigned a severity level

after NRC management review. The NRC's program for overseeing the safe operation of

commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process,

Revision 4, dated December 2006.

A. NRC-Identified Findings and Self-Revealing Findings

Cornerstone: Mitigating Systems

Criterion III, Design Control, for licensees failure to classify the six intake structure

exterior sluice gates and their motor operators as Safety Class 3 as defined in the

Updated Safety Analysis Report, Appendix N. This violation was first presented in

Inspection Report 05000285/2012002 and the licensee has remained in non-

compliance.

The inspectors determined that the continued failure to classify the intake structure

exterior sluice gates and their motor operators as Safety Class 3 was a performance

deficiency. This finding was more than minor because it adversely impacted the

protection against external events attribute of the Mitigating Systems Cornerstone

objective of ensuring the availability, reliability and capability of systems that respond

to initiating events to prevent undesirable consequences. The significance of this

finding is bounded by the significance of a related Yellow finding regarding the ability

to mitigate an external flooding event (Inspection Report 05000285/2010008). This

finding has a cross-cutting aspect in the area of problem identification and resolution,

corrective action program, for failure to thoroughly evaluate problems such that the

resolutions address causes and extent of conditions. This also includes conducting

effectiveness reviews of corrective actions to ensure that the problems are resolved

P.1(c) (EA-13-043) (Section 4OA4.1).

10 CFR 50.59, Changes, Tests and Experiments, and associated Green findings for

the licensees failure to appropriately perform written evaluations for two changes for

flooding mitigation strategies. In the first example, the licensee changed the

Updated Safety Analysis Report and Abnormal Operating Procedure 01 (AOP-01),

Acts of Nature, to incorporate use of backflow through the circulating water system

for a flow path for raw water. In the second example, the licensee was implementing

A-4

a flooding mitigation modification which would have used components which did not

meet full quality requirements for their Safety Class 3 designated function. Had the

licensee appropriately evaluated these two changes, they would have determined

that a license amendment was required for implementation of both changes since

both resulted in more than a minimal increase in the likelihood of occurrence of a

malfunction of a system, structure, or component important to safety.

The failure to perform adequate written evaluations of changes in accordance with

10 CFR 50.59(d)(1) was a performance deficiency. This performance deficiency was

of more than minor safety significance because it was associated with the human

performance attribute of the mitigating systems cornerstone and it adversely affected

the cornerstone objective to ensure the availability, reliability, and capability of

systems that respond to initiating events to prevent undesirable consequences.

In accordance with the NRC Enforcement Policy, the inspectors used MC 0609,

Significance Determination Process, Appendix A, Exhibit 2, to determine the final

significance of the finding. For the back flow through the circulating water system

example, the finding represented a potential loss of the intake structure due to

flooding; therefore, a Phase 3 evaluation by a senior reactor analyst was necessary.

The senior reactor analyst evaluated a bounding risk analysis case which assumed

that the raw water system and offsite power were lost. This bounding case had an

incremental conditional core damage probability of 5.0 x 10-7, and therefore the

finding was determined to have very low safety significance (Green). For the trash

rack blowdown modification example, the inspectors determined the finding was of

very low safety significance (Green) because the finding was a design deficiency that

did not result in the loss of functionality. The NRCs significance determination

process (SDP) considers the safety significance of findings by evaluating their

potential safety consequences. The traditional enforcement process separately

considers the significance of willful violations, violations that impact the regulatory

process, and violations that result in actual safety consequences. Traditional

enforcement applied to this finding because it involved a violation that impacted the

regulatory process. Assessing the violation in accordance with Enforcement Policy,

the inspectors determined it to be of Severity Level IV because it resulted in a

condition evaluated by the SDP as having very low safety significance (Example

6.1.d.2 of the NRC Enforcement Policy). The inspectors determined the Green

finding had a cross-cutting aspect in the area of problem identification and resolution

because the licensee failed to thoroughly evaluate problems such that resolutions

address the causes and extent of condition specifically associated with deficiencies

involving the Acts of Nature procedural guidance P.1(c) (Section 4OA4.3).

B. Licensee-Identified Violations

None

A-5

REPORT DETAILS

Summary of Plant Status

The station remained in Mode 5 with the fuel in the spent fuel pool for the entire inspection

period.

4. OTHER ACTIVITIES

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency

Preparedness, Public Radiation Safety, Occupational Radiation Safety, and

Physical Protection

4OA4 IMC 0350 Inspection Activities (92702)

Inspectors continued the IMC 0350 inspection activities, which include follow-up on the

restart checklist contained in Confirmatory Action Letter (CAL) EA-13-020 issued

February 26, 2013. The purpose of the beginning phase of this inspection is to assess

the licensees performance and progress in addressing its implementation and

effectiveness of FCSs Integrated Performance Improvement Plan (IPIP), significant

performance issues, weaknesses in programs and processes, and flood restoration

activities. This phase of inspection determines whether the depth and breadth of

performance concerns are understood.

Inspectors used the criteria described in baseline and supplemental inspection

procedures, various programmatic NRC inspection procedures, and IMC 0350 to assess

the licensees performance and progress in implementing its performance improvement

initiatives. Inspectors performed on-site and in-office activities, which are described in

more detail in the following sections of this report. This report covers inspection

activities from November 18, 2012, through February 28, 2013. Specific documents

reviewed during this inspection are listed in the attachment.

The following inspection scope, assessments, observations, and findings are

documented by CAL restart checklist item number.

.1 Causes of Significant Performance Deficiencies and Assessment of

Organizational Effectiveness

Section 1 of the restart checklist contains those items necessary to develop a

comprehensive understanding of the root causes of safety-significant performance

deficiencies identified at FCS. In addition, Section 1 includes the independent safety

culture assessment with the associated root causes and findings.

A-6

.a Flooding Issue - Yellow Finding

Item 1.a is included in the restart checklist for the failure of FCS to maintain procedures

and equipment that protects the plant from the effects of a design basis flood. These

deficiencies resulted in a Yellow (substantial safety significance) finding.

(1) Inspection Scope

The inspectors reviewed the progress of resolution of VIO 05000285/2012002-02.

This review included interviewing licensee engineers and reviewing associated

licensee change packages.

(2) Assessment

The inspectors noted that the licensee had not yet resolved VIO 05000285/2012002-02.

The resolution was planned as part of the trash rack blowdown modification described in

Section 4OA4.3 of this report. Because the inspectors concluded that NRC approval

would be needed to implement this change, the licensee was evaluating its desired path

for resolving this issue. The inspectors noted the continued non-compliance with the

violation in the Findings section below. This violation and its ultimate resolution will be

considered in the future assessment of whether the licensee has adequately addressed

the Yellow flooding finding.

(3) Findings

Continued Failure to Classify Intake Structure Sluice Gates as Safety Class 3

Introduction. The inspectors identified a cited violation of 10 CFR Part 50, Appendix B,

Criterion III, Design Control, for licensees failure to classify the six intake structure

exterior sluice gates and their motor operators as Safety Class 3 as defined in the

Updated Safety Analysis Report, Appendix N. This violation was first presented in

Inspection Report 05000285/2012002 and the licensee has remained in non-

compliance.

Description. The inspectors initially discovered that this finding had been originally

identified by licensee personnel in February 2011, as Action Item No. 34 to Condition

Report 2010-2387. However, this action item was closed in August 2011, without action

taken to classify the sluice gates as safety related. In preparation for the NRC flooding

inspection in February 2012, licensee personnel conducted a review of Condition Report

2010-2387 Action Item No. 34 that revealed the quality classification of each

penetration/flood barrier had not been verified. Condition Report 2011-10302 was

initiated in December 2011, to identify that the quality classification of the intake

structure cell level control and level monitoring equipment may be incorrect. Because of

the failure of the corrective action program to resolve the issue after initially being

identified, and the significant value added by further inspection effort, the finding was

documented as NRC-identified violation VIO 05000285/2012002-02.

A-7

Upon further inspection of this sluice gate safety classification issue, inspectors learned

that the licensee planned to implement a new modification for flooding mitigation. This

modification would employ the trash rack blowdown portion of the circulating water

system to allow river water to flow into four of those pipes and then through four newly

installed safety class valves for control of cell level (raw water pump suction level) using

river level as the driving force. The licensee concluded that implementing this strategy

would eliminate the need for the exterior sluice gates to be safety class, thereby

resolving the previous violation.

Inspectors reviewed this modification strategy and in Section 4OA4.3 of this report

questioned whether the modification would require NRC approval prior to

implementation. The inspectors determined that prior NRC approval was required and

until that time, the river sluice gates would need to be classified and treated as Safety

Class 3. Since the licensee had not yet accomplished this classification, the inspectors

considered the licensee to still be in non-compliance with design controls.

Analysis. The inspectors determined that the continued failure to classify the intake

structure exterior sluice gates and their motor operators as Safety Class 3 was a

performance deficiency. This finding was more than minor because it adversely

impacted the protection against external events attribute of the Mitigating Systems

Cornerstone objective of ensuring the availability, reliability and capability of systems

that respond to initiating events to prevent undesirable consequences. The significance

of this finding is bounded by the significance of a related Yellow finding regarding the

ability to mitigate an external flooding event (Inspection Report 05000285/2010008).

This finding has a cross-cutting aspect in the area of problem identification and

resolution, corrective action program, for failure to thoroughly evaluate problems such

that the resolutions address causes and extent of conditions. This also includes

conducting effectiveness reviews of corrective actions to ensure that the problems are

resolved P.1(c).

Enforcement. 10 CFR 50, Appendix B, Criterion III, Design Control, requires, in part,

that measures shall be established to assure that applicable regulatory requirements

and the design basis for those structures, systems, and components are correctly

translated into specifications, drawings, procedures, and instructions. Contrary to this

requirement, the licensee failed to establish measures to assure that applicable

regulatory requirements and the design basis for those components were correctly

translated into specifications, drawings, procedures, and instructions. Specifically, the

licensee failed to classify the six intake structure exterior sluice gates and their motor

operators as Safety Class 3 as defined in the Updated Safety Analysis Report, Appendix

N. This violation is not being treated as a new violation. Instead, it is considered as a

related violation to the Yellow finding issued in October 2010, which, in general, dealt

with issues related to mitigating a significant external flooding event. This violation is

being treated as a cited violation, consistent with Section 2.3.2(a)(2) of the NRC

Enforcement Policy: VIO 05000285/2013011-01, Continued Failure to Classify Intake

Structure Sluice Gates as Safety Class 3, (EA-13-043).

A-8

.3 Adequacy of Significant Programs and Processes

Section 3 of the Restart Checklist addresses major programs and processes in place at

FCS.

.a Corrective Action Program

(1) Inspection Scope

For the period covered by this inspection report, activities related to the corrective

action program included a review of any aspects of the corrective action program

which could have prevented or were contributing factors in the violations detailed in

this report.

(2) Assessment

The inspectors made two corrective action program observations in the two

violations in this report.

In VIO 05000285/2013011-01, Continued Failure to Classify Intake Structure Sluice

Gates as Safety Class 3, the inspectors noted the failure to thoroughly evaluate

problems such that the resolutions address causes and extent of conditions. This

also included conducting effectiveness reviews of corrective actions to ensure that

the problems were resolved.

In NCV 5000285/2013011-02, Two Examples of Failure to Obtain Prior NRC

Approval for Flooding Mitigation Strategies, the inspectors noted the licensee failed

to thoroughly evaluate problems such that resolutions address the causes and extent

of condition specifically associated with deficiencies involving the Acts of Nature

procedural guidance.

(3) Findings

No findings of significance were identified.

.c Design Changes and Modifications

(1) Inspection Scope

i. Design Changes and Modifications

The inspectors reviewed the two modifications associated with the licensees

mitigating strategies for maintaining cell level control, Packages EC 55394 and

EC 53392.

.ii 10 CFR 50.59 Screening and Safety Evaluations

A-9

The inspectors evaluated the effectiveness of the licensees 10 CFR 50.59

process to ensure proper treatment of changes to the facility as it was applied to

Packages EC 55394 and EC 53392.

(2) Assessment

The inspectors observed two instances of changes which were made in accordance

with the licensees 10 CFR 50.59 process which, when evaluated, determined that

prior NRC approval was not required for the changes. The inspectors took exception

with these conclusions and have described them in the Findings section below.

These two examples will be considered in the future assessment of the health of the

licensees 10 CFR 50.59 program. Of note, the change associated with the trash

rack blowdown modification was a recent change.

(3) Findings

Two Examples of Failure to Obtain Prior NRC Approval for Flooding Mitigation Strategies

Introduction. The inspectors identified two examples of a Severity Level IV violation of

10 CFR 50.59, Changes, Tests and Experiments, and associated Green findings for the

licensees failure to appropriately perform written evaluations for two changes associated

with flooding mitigation strategies. In the first example, the licensee changed the

Updated Safety Analysis Report (USAR) and Abnormal Operating Procedure 01 (AOP-

01), Acts of Nature, to incorporate use of backflow through the circulating water system

for a flow path for raw water. In the second example, the licensee was implementing a

flooding mitigation modification which would have used components which did not meet

full quality requirements for their Safety Class 3 designated function. Had the licensee

appropriately evaluated these two changes, they would have determined that a license

amendment was required for implementation of both changes, since both resulted in

more than a minimal increase in the likelihood of occurrence of a malfunction of a

system, structure, or component important to safety.

Description. At FCS, the raw water system draws water from the Missouri River, cools

plant components, and then returns water back to the discharge canal. The raw water

pumps draw water from the intake cell, which under normal river conditions is at

approximately the same level as the river. A set of six normally opened river sluice gates

are available to isolate portions of the intake cells from the river. Under flooded river

conditions above 1007.5 feet river level, the licensee must control intake cell level. If

intake cell level were to get too high, the intake structure would be flooded and the raw

water pumps would be adversely affected. If intake cell level were to get too low, the

raw water pumps would not meet pump suction requirements. Control of the intake level

would be accomplished by manipulating the river sluice gates such that the flow pumped

from the intake cell and through the raw water system would be made up by the same

amount of water being allowed into the intake cell. On two occasions, the licensee

improperly evaluated proposed methods to obtain the proper raw water flow balance in

the intake cells to mitigate a flooding event as described below.

A-10

Backflow Through the Circulating Water System via Sand Intrusion Mitigation Strategy

In this strategy, operators would be required to match the flow developed by the raw

water pumps with the flow past one partially opened river sluice gate and the leakage

past all of the other river sluice gates. Level in the intake cell by procedure was to be

controlled between 983 and 988 feet.

In February 2012, NRC inspectors identified that the motor operators for the river sluice

gates would start becoming submerged at 1010 feet of river level. In response, the

licensee changed their Procedure AOP-01 to instruct operators to de-energize the motor

operators for the river sluice gates at 1010 feet of river level. This change was made

even though it did not match the original intentions for control as described in Section

9.8.6 of the Final Safety Analysis Report (FSAR) which stated that, For water levels

above 1007.5 feet, the water level inside the intake structure is controlled by positioning

the exterior sluice gates to restrict the inflow into the wet wells to match the rate of

pumped outflow. The licensee changed the USAR (Revision 30) along with the AOP-01

change to state, The water level inside the intake cells can be controlled by positioning

the exterior sluice gates to restrict the inflow into the cells. If the cell intake through the

river sluice gates is blocked during flooding condition (possibly due to debris or other

failure mechanism) an alternate flow path to the cells can be provided by allowing flow

backward through one of the circulating pumps. Cell level would then be controlled

using either the circulating water pump discharge valve or suction gate. This flow path

may also be used during extreme flooding conditions if the river flow has a high debris

load to minimize sand/debris buildup in the cells.

The change to AOP-01 prescribed that any trends in intake cell level upward past 988

feet would be controlled by starting another raw water pump to lower level. Any trends in

intake cell level downward past 983 feet would be compensated for by aligning backflow

through the circulating water system.

The path would be from the discharge canal, through the circulating water discharge

piping, through the condensor water box, through more circulating water piping, through

the circulating water discharge check and discharge valves, through the circulating water

pumps, and through a circulating water sluice gate. The inspectors questioned the use

of the circulating water system in lieu of the safety related river sluice gates. Instead of

using a fully qualified, tested, designed, and constructed safety related system, the

licensee changed the operating scheme to rely on the non-safety related circulating

water system.

Section 4.3.2 of Nuclear Energy Institute Document 96-07, Guidelines For 10 CFR 50.59 Evaluations, states in part, Departures from the design, fabrication, construction,

testing, and performance standards as outlined in the General Design Criteria (Appendix

A to Part 50) are not compatible with a no more than minimal increase standard. The

inspectors concluded that substituting the safety-related method with a non-safety

related system fit this description. This led inspectors to conclude the no more than

minimal standard was not met and the change constituted a more than minimal

increase in the likelihood of occurrence of a malfunction of a system, structure, or

A-11

component important to safety than previously evaluated, and therefore should have

required a license amendment.

Further, inspectors noted that the change package used to incorporate the change into

AOP-01 did not have its own evaluation. When questioned by inspectors, the licensee

stated that the change package to Procedure AOP-01 was based on EC 53392 which

was developed to change Procedure OI-CW-1. The licensee explained that the same

individual who performed that change was involved in the change to AOP-01 and was

knowledgeable of the evaluation, so the change to AOP-01 was made informed by EC 53392. The inspectors considered this oversight in documentation to be a smaller part

of the larger issue of not properly evaluating and incorporating the change.

Trash Rack Blowdown Backflow Modification Strategy

In this strategy, operators would be required to match the flow developed by the raw

water pumps with the flow allowed through manually throttled valves in the trash rack

blowdown lines. The throttle valves were being installed by modification and had been

formally evaluated by the licensee per 10 CFR 50.59. Level in the intake cell by

procedure was to be controlled between 983 and 988 feet.

The trash rack blowdown piping used was part of the circulating water system. A portion

of the circulating water pump flow would be diverted to piping which penetrates the

intake structure near the trash racks to blow trash off the trash racks weekly. The piping

is isolated the rest of the time by an isolation valve. During a flood, this piping outside

the intake structure would be submerged. Water would fill it up to the isolation valve

inside the intake structure. The licensee was in the process of installing valves in the

intake structure between the intake structure wall and the isolation valve on 4 of the

trash rack cleaning piping to open to dump water into the cells.

By doing this, the licensee evaluated that they could fully shut all of the sluice gates and

make them limited critical quality equipment (LCQE) components, thus resolving their

safety class issue.

The licensee had classified the throttle valve as safety class. They had classified the

piping and the isolation valve as not fully safety qualified based on their definition of

LCQE. By the FCS Quality Assurance Plan, LCQE is defined as those structures,

systems, components or items whose satisfactory performance is required to prevent or

mitigate the failure of those structures, systems, components or items identified as

critical quality equipment (CQE). CQE is defined as those structures, systems,

components, or items whose satisfactory performance is required to prevent or mitigate

the consequences of postulated accidents that could cause undue risk to the health and

safety of the public. LCQE would contain enhanced safety qualifications, but not the

fully safety qualification of CQE.

The licensee determined that since all the piping would do would be to constitute a

barrier for flooding and prevent the failure of the valve by staying intact, it would be

LCQE.

A-12

The inspectors questioned this classification. The inspectors considered that the

necessary components would be required to mitigate the consequences of flooding, and

not just serve as a flooding barrier, and would be necessary conduit for raw water flow to

the cell and eventually on to the raw water pumps. Between the intake structure wall

and the isolation valve, the piping would provide a flow path from the river to the intake

cells whose performance is needed to ensure flow only goes out the throttle valve. The

piping would have to satisfactorily perform to allow proper flow to the raw water pumps.

The inspectors noted that in Appendix N to the licensees USAR, the licensee stated that

Safety Class (SC) 3 shall apply to equipment, not included in SC-1 or -2, that is

designed and relied upon to accomplish the two following nuclear safety functions:

  • Ensure required cooling for liquid-cooled stored fuel (e.g., spent fuel storage pool

and cooling system)

  • Ensure nuclear safety functions provided by SC-1, -2, or -3 equipment (e.g.,

provide heat removal of SC-1, -2, or -3 heat exchangers, )

The inspectors concluded that those two definitions were met. The piping and isolation

valve would be required to ensure raw water cooling flowed such that it could be used

for spent fuel pool cooling and that it could be used to cool the shutdown cooling heat

exchanger (a SC-3 heat exchanger).

From this, the inspectors concluded that the licensee would have replaced a safety class

strategy (throttling sluice gates) with a strategy that uses non-safety class components

for a function that is required by the licensees licensing basis per Appendix N of their

USAR to be safety class (SC-3).

Section 4.3.2 of Nuclear Energy Institute Document 96-07, Guidelines For 10 CFR 50.59 Evaluations, states that departures from the design, fabrication, construction,

testing, and performance standards as outlined in the General Design Criteria

(Appendix A to Part 50) are not compatible with a no more than minimal increase

standard. The inspectors concluded that substituting the safety-related method with a

non-safety related system fit this description. This led inspectors to conclude the no

more than minimal was not met and the change constituted a more than minimal

increase in the likelihood of occurrence of a malfunction of a system, structure, or

component important to safety than previously evaluated, and therefore should have

required a license amendment.

Additionally, the inspectors identified another concern with the licensees evaluation.

The modification would introduce the possibility of a failure of the raw water pumps due

to draining of the intake cells. Flow through the circulating water system trash rack

blowdown supply header would be driven by river level alone and enter the Intake

Structure at a higher elevation than the normal path via the exterior sluice gates.

Following a flooding event, the river level would decrease to the point where there could

be insufficient flow through the backwash supply header and the exterior sluice gates

would need to be reopened. However, the motor operators for the exterior sluice gates

would likely be damaged which could impair the ability to reopen the sluice gates and

A-13

establish sufficient flow to the intake bays. The inspectors and NRC staff noted that this

consideration had not been a part of the licensees 10 CFR 50.59 evaluation.

Analysis. The failure to perform adequate written evaluations of changes in accordance

with 10 CFR 50.59(d)(1) was a performance deficiency. This performance deficiency

was more than minor because it was associated with the human performance attribute of

the mitigating systems cornerstone and it adversely affected the cornerstone objective to

ensure the availability, reliability, and capability of systems that respond to initiating

events to prevent undesirable consequences.

In accordance with the NRC Enforcement Policy, the inspectors used MC 0609,

Significance Determination Process, Appendix A, Exhibit 2, to determine the final

significance of the finding. For the back flow through the circulating water system

example, the finding represented a potential loss of the intake structure due to flooding;

therefore, a Phase 3 evaluation by a senior reactor analyst was necessary. The senior

reactor analyst evaluated a bounding risk analysis case which assumed that the raw

water system and offsite power were lost. This bounding case had an incremental

conditional core damage probability of 5.0 x 10-7, and therefore the finding was

determined to have very low safety significance (Green). For the trash rack blowdown

modification example, determined the finding was of very low safety significance (Green)

because the finding was a design deficiency that did not result in the loss of functionality.

The NRCs significance determination process (SDP) considers the safety significance

of findings by evaluating their potential safety consequences. The traditional

enforcement process separately considers the significance of willful violations, violations

that impact the regulatory process, and violations that result in actual safety

consequences. Traditional enforcement applied to this finding because it involved a

violation that impacted the regulatory process. Assessing the violation in accordance

with Enforcement Policy, the inspectors determined it to be of Severity Level IV because

it resulted in a condition evaluated by the SDP as having very low safety significance

(Example 6.1.d.2 of the NRC Enforcement Policy).

The inspectors determined the Green finding had a cross-cutting aspect in the area of

problem identification and resolution because the licensee failed to thoroughly evaluate

problems such that resolutions address the causes and extent of condition specifically

associated with deficiencies involving the Acts of Nature procedural guidance P.1(c).

Enforcement. 10 CFR 50.59(c)(2) states, in part, that a licensee shall obtain a license

amendment prior to implementing a proposed change if the change would result in more

than a minimal increase in the likelihood of occurrence of a malfunction of a structure,

system, or component important to safety previously evaluated in the final safety

analysis report.

Contrary to the above on two occasions, the licensee failed to obtain a license

amendment prior to implementing a change that resulted in a more than minimal

increase in the likelihood of occurrence of a malfunction of a SSC important to safety

previously evaluated in the FSAR (as updated). Specifically:

A-14

i. In May 2012, the licensee changed AOP-01, Acts of Nature, and their USAR,

which resulted in more than a minimal increase in the likelihood of occurrence of

a malfunction of a structure, system, or component important to safety previously

evaluated in the final safety analysis report. Specifically, Step 9.g of AOP-01 and

Section 9.8 of the USAR were included in the change to replace opening a

safety-related river sluice gate to increase river flow to the intake cell with

aligning circulating water flow through the non-safety related circulating water

system. This change introduced new failure mechanisms which constituted a

more than a minor change in the frequency of a malfunction and the

consequences of a previously evaluated accident in the USAR.

ii. On December 13, 2012, the licensee evaluated their trash rack blowdown

modification in EC 55394 and continued physical installation of the plant

modification in the intake structure. This modification would result in more than a

minimal increase in the likelihood of occurrence of a malfunction of a structure,

system, or component important to safety previously evaluated in the FSAR.

Specifically, use of LCQE components in a Safety Class 3 function would

constitute a more than a minor change in the frequency of a malfunction and the

consequences of a previously evaluated accident in the USAR.

The licensee entered these issues into their corrective action program as Condition

Reports 2012-15293 and 2013-00545, and as of the end of this inspection, was planning

corrective action. Because this finding was determined to be of very low safety

significance (Green) and the associated examples of this violation have been entered

into the licensees corrective action program, this violation is being treated as a non-cited

consistent with Section 2.3.2.a of the NRC Enforcement Policy, NCV 5000285/2013011-

02, Two Examples of Failure to Obtain Prior NRC Approval for Flooding Mitigation

Strategies.

4OA6 Meetings, Including Exit

Exit Meeting Summary

On March 1, 2013, the inspectors presented the inspection results to Mr. L. Cortopassi,

Site Vice President, and other members of the licensee staff. The licensee

acknowledged the issues presented. The inspector asked the licensee whether any

materials examined during the inspection should be considered proprietary. No

proprietary information was identified.

A-15

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

C. Cameron, Supervisor Regulatory Compliance

L. Cortopassi, Site Vice President

D. Ferraro, Attorney, Exelon Corporation

K. Ihnen, Manager, Site Nuclear Oversight

M. Prospero, Plant Manager

B. Rash, Recovery Manager

T. Simpkin, Manager, Site Regulatory Assurance

J. Wiegand, Manager, Operations Engineering

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

Continued Failure to Classify Intake Structure Sluice Gates as05000285/2013011-01 VIO

Safety Class 3 (Section 4OA4.1)

Opened and Closed

Two Examples of Failure to Obtain Prior NRC Approval for

05000285/2013011-02 NCV

Flooding Mitigation Strategies (Section 4OA4.3)

LIST OF DOCUMENTS REVIEWED

All documents which supported the inspection scope and determinations were identified in the

body of the report.