IR 05000285/2010008
| ML102920720 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 10/19/2010 |
| From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
| To: | Bannister D Omaha Public Power District |
| References | |
| EA-10-084, FOIA/PA-2014-0210 IR-10-008 | |
| Download: ML102920720 (4) | |
Text
October 19, 2010
David J. Bannister, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P. O. Box 550 Fort Calhoun, NE 68023-0550
Subject:
ERRATA FOR FORT CALHOUN STATION NRC INSPECTION REPORT 05000285/2010008
Dear Mr. Bannister:
This Errata corrects the report number listed in the subject line of our original final determination letter (ML102800342). The subject line erroneously identified the inspection report as 05000285/2010007 instead of 05000285/2010008. Please replace the cover page with the enclosed revised page. We regret any inconvenience this may have caused.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosure, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this inspection, we will be pleased to discuss them.
Sincerely,
/RA/
Thomas R. Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety
Docket: 50-285 License: DPR-40
Enclosure:
Errata - Cover Page for Final Significance Determination Letter, dated October 6, 2010 UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125
Mr. David