ML17355A265: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AC ESSXON NBR:9903260351-DOC.DATE: 99/03/19 NOTARIZED:
{{#Wiki_filter:AC ESSXON   NBR:9903260351-         DOC.DATE: 99/03/19         NOTARIZED: NO             DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                     C   05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light                   C   05000251 AUTH. NAME           AUTHOR AFFXLIATION HOVEY,R.J.           Florida   Power   & Light   Co.
NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFXLIATION HOVEY,R.J.
RECXP.NAME           RECXPIENT AFFILIATION Records Management Branch (Document Control Desk)
Florida Power&Light Co.RECXP.NAME RECXPIENT AFFILIATION Records Management Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards"Annual Radioactive Effluent Release Rpet for 980101-981231," IAW TS 6.9.1.4 8c 10CFR50.36a(a)(2).Encl 2 contains rev 7 to"ODCM." DISTRIBUTION CODE: IE4SD COPIES RECEIVED:LTR l ENCL SIZE: g4 TITLE: 50.36a(a)(2)Semiannual Effluent Release Reports NOTES: C" RECXPIENT XD CODE/NAME.PD2-3 LA JABBOUR, K COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD2-3 PD COPIES LTTR ENCL 1 1 0 INTERNA.ILE CENTER 01~1 1 RfDSFA/'SOS 1 1 RGN2 FILE 1 1 NRR/DRPM/PERB/A RGN2 DRS/RSB 1 1 1 1 EXTERNAL: NRC PDR NOTE TO ALL"RIDS" RECIPIENTS:
Forwards     "Annual Radioactive Effluent Release Rpet for                             C" 980101-981231," IAW TS 6.9.1.4 8c 10CFR50.36a(a)(2).Encl 2 contains rev     7 to   "ODCM."
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK tDCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 II=IPQ MAR 19 1999 L-99-069 10 CFR 50.36a(a)(2)
DISTRIBUTION CODE: IE4SD COPIES RECEIVED:LTR                 l ENCL       SIZE: g4 TITLE: 50.36a(a) (2) Semiannual Effluent Release               Reports NOTES:
U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Annual Radioactive Eflluent Release Re ort Attached is the Radioactive Effluent Release Report for the period of January 1, 1998, through December 31, 1998, for Turkey Point Units 3 and 4, as required by Technical Specification 6.9.1.4 and 10 CFR 50.36a (a)(2).Should there be any questions or comments regarding this information, please contact us.Very truly yours, R.J.Hovey Vice President Turkey Point Plant DRL Attachment cc: Regional Administrator, Region II, USNRC.Senior Resident Inspector, USNRC, Turkey Point Plant<v<s)rPQPgt 99032b035i 990319 PDR ADQCK 05000250 R PDR an FPL Group company  
RECXPIENT           COPIES              RECIPIENT            COPIES XD CODE/NAME   . LTTR ENCL        ID  CODE/NAME        LTTR ENCL              0 PD2-3 LA                   1     1       PD2-3 PD                 1    1 JABBOUR, K                  1     1 INTERNA . ILE RGN2 CENTER RfDSFA/'SOS FILE 01
~~
                                ~     1 1
TURKEY POINT PLANT UNITS 3 AND 4 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT Executive Summar Liquid effluent releases at Turkey Point did not exceed the concentrations specified in 10 CFR 20, Appendix B, Table II, Column 2.The limits for dissolved and entrained noble gases were not exceeded.The dose or dose commitment limits per reactor to a member of the public from liquid effluents were not exceeded.Dose rate limits due to radioactive materials in the gaseous effluents were not exceeded.The dose limits per reactor to a member of the public due to I-131, I-133, tritium, and particulates with half-lives greater than 8 days were not exceeded.All liquid and airborne discharges to the environment were analyzed in accordance with the Technical Specifications and Regulatory Guide 1.21.There were no unplanned liquid releases for either unit during this period.There were no unplanned gas releases for either unit during this period.Visitor dose limits were calculated and included in this report for both adult and children at the Satellite School.
1 1
1 1
NRR/DRPM/PERB/A RGN2     DRS/RSB 1
1 1
1 EXTERNAL: NRC PDR NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK tDCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                 9   ENCL     9
 
MAR 19 1999 L-99-069 10 CFR 50.36a(a)(2)
II=IPQ U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Annual Radioactive Eflluent Release Re ort Attached is the Radioactive Effluent Release Report for the period of January 1, 1998, through December 31, 1998, for Turkey Point Units 3 and 4, as required by Technical Specification 6.9.1.4 and 10 CFR 50.36a (a)(2).
Should there be any questions or comments regarding this information, please contact us.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant DRL Attachment cc:     Regional Administrator, Region II, USNRC.
Senior Resident Inspector, USNRC, Turkey Point Plant
                                                                                        <v<s   )
rPQPgt 99032b035i 990319 PDR     ADQCK 05000250 PDR R
an FPL Group company
 
~ ~
TURKEY POINT PLANT UNITS 3 AND 4 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT Executive Summar Liquid effluent releases at Turkey Point did not exceed the concentrations specified in 10 CFR 20, Appendix B, Table II, Column 2.
The limits for dissolved and entrained noble gases were not exceeded.
The dose or dose commitment limits per reactor to a member of the public from liquid effluents were not exceeded.
Dose rate limits due to radioactive materials in the gaseous effluents were not exceeded.
The dose   limits per reactor to a member of the public due to I-131, I-133, tritium, and particulates with half-lives greater than 8 days were not exceeded.
All liquid   and airborne discharges to the environment were analyzed in accordance   with the Technical Specifications and Regulatory Guide 1.21.
There were no unplanned   liquid releases for either unit during this period.
There were no unplanned gas releases   for either unit during this period.
Visitor dose limits were calculated and included   in this report for both adult and children at the Satellite School.
 
I T}}
I T}}

Latest revision as of 07:58, 22 October 2019

Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4.
ML17355A265
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/19/1999
From: Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17355A266 List:
References
L-99-069, L-99-69, NUDOCS 9903260351
Download: ML17355A265 (5)


Text

AC ESSXON NBR:9903260351- DOC.DATE: 99/03/19 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFXLIATION HOVEY,R.J. Florida Power & Light Co.

RECXP.NAME RECXPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards "Annual Radioactive Effluent Release Rpet for C" 980101-981231," IAW TS 6.9.1.4 8c 10CFR50.36a(a)(2).Encl 2 contains rev 7 to "ODCM."

DISTRIBUTION CODE: IE4SD COPIES RECEIVED:LTR l ENCL SIZE: g4 TITLE: 50.36a(a) (2) Semiannual Effluent Release Reports NOTES:

RECXPIENT COPIES RECIPIENT COPIES XD CODE/NAME . LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 LA 1 1 PD2-3 PD 1 1 JABBOUR, K 1 1 INTERNA . ILE RGN2 CENTER RfDSFA/'SOS FILE 01

~ 1 1

1 1

1 1

NRR/DRPM/PERB/A RGN2 DRS/RSB 1

1 1

1 EXTERNAL: NRC PDR NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK tDCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

MAR 19 1999 L-99-069 10 CFR 50.36a(a)(2)

II=IPQ U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Annual Radioactive Eflluent Release Re ort Attached is the Radioactive Effluent Release Report for the period of January 1, 1998, through December 31, 1998, for Turkey Point Units 3 and 4, as required by Technical Specification 6.9.1.4 and 10 CFR 50.36a (a)(2).

Should there be any questions or comments regarding this information, please contact us.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant DRL Attachment cc: Regional Administrator, Region II, USNRC.

Senior Resident Inspector, USNRC, Turkey Point Plant

<v<s )

rPQPgt 99032b035i 990319 PDR ADQCK 05000250 PDR R

an FPL Group company

~ ~

TURKEY POINT PLANT UNITS 3 AND 4 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT Executive Summar Liquid effluent releases at Turkey Point did not exceed the concentrations specified in 10 CFR 20, Appendix B, Table II, Column 2.

The limits for dissolved and entrained noble gases were not exceeded.

The dose or dose commitment limits per reactor to a member of the public from liquid effluents were not exceeded.

Dose rate limits due to radioactive materials in the gaseous effluents were not exceeded.

The dose limits per reactor to a member of the public due to I-131, I-133, tritium, and particulates with half-lives greater than 8 days were not exceeded.

All liquid and airborne discharges to the environment were analyzed in accordance with the Technical Specifications and Regulatory Guide 1.21.

There were no unplanned liquid releases for either unit during this period.

There were no unplanned gas releases for either unit during this period.

Visitor dose limits were calculated and included in this report for both adult and children at the Satellite School.

I T