Line 3: Line 3:
| issue date = 06/21/1990
| issue date = 06/21/1990
| title = Concurs W/Nrc Change in Terminology & Submits Revised Proposed Section 4.14 of Tech Specs
| title = Concurs W/Nrc Change in Terminology & Submits Revised Proposed Section 4.14 of Tech Specs
| author name = SMEDLEY R W
| author name = Smedley R
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  

Revision as of 19:48, 17 June 2019

Concurs W/Nrc Change in Terminology & Submits Revised Proposed Section 4.14 of Tech Specs
ML18057A300
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/21/1990
From: Smedley R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18057A301 List:
References
TAC-75815, NUDOCS 9006260163
Download: ML18057A300 (1)


Text

\, consumers Power POW ERi Nii NllCHlliAN'S PROliRESS General Offices: 1945 West Parnell Road, Jackson,'

Ml 49201 * (517) 788-0550 June 21, 1990 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -STEAM GENERATOR TUBE INSPECTION

-EXCEPTION (TAC 75815) Consumers Power Company (CPC) letter dated March 6, 1990 proposed a change to Technical Specification 4.14.1 that would grant a one-time exemption from the requirement to inspect steam generator tubes at intervals up to 24 months. That proposed exemption would have been valid until the 1990 refueling outage. The NRC staff has recommended we change the wording in our proposed change to allow a one-time exception to Technical Specification 4.14.1 until the September 1990 refueling outage. CPC concurs with the NRC change in terminology and hereby submits, as an attachment to this letter, a revised proposed section 4. 14 .. 1 of the Technical Specifications.

This revised proposal is a change in terminology only and does not change the intent of our March 6, 1990 proposal.

Therefore, additional Plant Review Committee and Nuclear Safety Services Department review is not required.

Richard W Smedley Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector

-Palisades Attachment 1 /.. -. 900621 9006260 ADOCK PDC p OC0690-0046-NL04 A CMS' ENERGY COMPANY n '\'