ML18057B022: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 25: | Line 25: | ||
==SUMMARY== | ==SUMMARY== | ||
The changes made to pump testing procedure EM-09-04 included various editorial changes, as well as the following: | The changes made to pump testing procedure EM-09-04 included various editorial changes, as well as the following: | ||
I. The pump hydraulic test circuits for all pumps tested were added to the procedure to aid in IST program development. | I. The pump hydraulic test circuits for all pumps tested were added to the procedure to aid in IST program development. | ||
: 2. All but four Relief Requests in Attachment 3 of EM-09-04 were deleted due to modifications being implemented in the fall 1990 outage to enhance pump parameter measurements. | : 2. All but four Relief Requests in Attachment 3 of EM-09-04 were deleted due to modifications being implemented in the fall 1990 outage to enhance pump parameter measurements. | ||
: 3. Attachment 2 Table 2 of EM-09-04 "Allowable Ranges of Test Quantities" was revised to reflect ASME Section. XI IWP rather than OM-6 limits. 4. Basis Statements for all pumps in the IST Program were added to the procedure to provide a quick reference for pump function. | : 3. Attachment 2 Table 2 of EM-09-04 "Allowable Ranges of Test Quantities" was revised to reflect ASME Section. XI IWP rather than OM-6 limits. 4. Basis Statements for all pumps in the IST Program were added to the procedure to provide a quick reference for pump function. | ||
: 5. Tables for each pump were added to the procedure delineating the parameters tested, and if applicable, the reference value and instrument number that measures the hydraulic parameter. | : 5. Tables for each pump were added to the procedure delineating the parameters tested, and if applicable, the reference value and instrument number that measures the hydraulic parameter. | ||
I Page}} | I Page}} |
Revision as of 21:34, 25 April 2019
ML18057B022 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 05/10/1991 |
From: | OROZ R D, SCHRADER G E, TONER K A CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | |
Shared Package | |
ML18057B020 | List: |
References | |
EM-09-04, EM-9-4, NUDOCS 9107120204 | |
Download: ML18057B022 (2) | |
Text
- ATTACHMENT 3 Consumers Power Company Palisades Plant Docket 50-255
SUMMARY
OF CHANGES TO PLANT PROCEDURE EM-09-04 "INSERVICE TESTING OF SELECTED SAFETY-RELATED PUMPS June 28, 1991 1 Page
- ATTACHMENT 3 INSERVICE TESTING OF SELECTED SAFETY-RELATED PUMPS REVISION
SUMMARY
The changes made to pump testing procedure EM-09-04 included various editorial changes, as well as the following:
I. The pump hydraulic test circuits for all pumps tested were added to the procedure to aid in IST program development.
- 2. All but four Relief Requests in Attachment 3 of EM-09-04 were deleted due to modifications being implemented in the fall 1990 outage to enhance pump parameter measurements.
- 3. Attachment 2 Table 2 of EM-09-04 "Allowable Ranges of Test Quantities" was revised to reflect ASME Section. XI IWP rather than OM-6 limits. 4. Basis Statements for all pumps in the IST Program were added to the procedure to provide a quick reference for pump function.
- 5. Tables for each pump were added to the procedure delineating the parameters tested, and if applicable, the reference value and instrument number that measures the hydraulic parameter.
I Page