Line 16: |
Line 16: |
| | stage = Supplement | | | stage = Supplement |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:Code of Federal Regulations |
| | |
| | "Your technical justification for continued use of the loaded cask systems evaluated the thermal and radiological performance of the casks and concluded that the casks would continue to meet all of their required functions. The justification relied upon an assumed leakage rate from the casks, and utilized a dose assessment methodology that credited gravitational settling to reduce calculated release estimates. The NRC does not have any data to confirm the acceptability of your assumed cask leakage rates, and has not previously reviewed or endorsed the methodology used in your response for calculating the site dose rates attributed to postulated leakage from the casks. The NRC concluded that while your response provides supplemental information to support the continued safe operation of the casks, additional site specific information is needed to ensure that the loaded casks will continue to meet all regulatory requirements." |
| | |
| | "Casks previously loaded to Amendment 7 and all prior amendments are exempt from this requirement and must meet the requirements of the amendment to which they were loaded." |
| | |
| | "Casks previously loaded to Amendment 7 and all prior amendments are exempt from this requirement and must meet the requirements of the amendment to which they were loaded." "Casks loaded prior to July 1, 2009, to Amendment Nos. 2 through 7 are grandfathered and therefore not required to comply with the above helium leak test requirements. Casks fabricated and loaded after July 1, 2009, must comply with the above helium leak test requirement." |
| | |
| | "Leakage testing has been reinstated at the manufacturing facility for all MPCs currently being fabricated or in storage. Leakage tested on newly fabricated MPCs was reinstated on July 1, 2009." |
| | |
| | "Written cask acceptance tests and maintenance program shall be prepared consistent with the technical basis described in Chapter 9 of the FSAR." |
| | |
| | "This issue is considered to be of greater than minor significance since approximately 120 MPCs were loaded without being adequately tested to demonstrate their leaktightness." "[-] 107 MPCs were manufactured and loaded without fabrication leakage testing being performed."}} |
|
| |
|
| =Text= | | =Text= |
Revision as of 23:50, 5 November 2018
Letter Sequence Acceptance Review |
---|
|
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML18351A172, ML18351A173, ML18351A174, ML18351A175, ML18351A176, ML18351A177, ML18351A178, ML18355A372, ML18355A373, ML18355A374, ML18355A376, ML18355A379, ML18355A380, ML18355A381, ML18355A382, ML19154A066
|
MONTHYEARML18100A0802018-04-0909 April 2018 Letter to K. Manzione Approval of Holtec International Request for Withholding Information from Public Disclosure-Certificate of Compliance No. 1014, Hi-Storm 100 Multipurpose Canister Storage System, Amendment Request No. 12 Project stage: Withholding Request Acceptance ML18292A5232018-10-19019 October 2018 Letter to K. Manzione Acceptance Review of Request for Amendment No. 13 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Request for Supplemental Information (W/Enclosure) Project stage: Acceptance Review ML18351A1802019-01-17017 January 2019, 14 February 2019 Hi STORM 100 Amendment 13 Preliminary SER, CoC & TS Project stage: Request ML18351A1722019-01-17017 January 2019 Memorandum to K. Morgan-Butler User Need for Rulemaking for Amendment No. 13 to the Holtec International HI-STORE 100 Cask System Project stage: Other ML18355A3812019-01-29029 January 2019 Appendix A-100U to Certificate of Compliance No. 1014 Amendment No. 12 Project stage: Other ML19107A0022019-01-29029 January 2019 Package: Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendment No. 12 for the HI-STORM 100 Multipurpose Canister Cask System (CAC No. 001028, Epids: L-2017-LLA-0028 and L-2017-LLA-0017) Project stage: Request ML18355A3832019-01-29029 January 2019 Enclosure 4: Safety Evaluation Report for Amendment No. 12 (Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendments No. 11 and 12 for the HI-STORM 100 Multipurpose Canister Cask System (CAC No. 001028, Epids: L-2017 Project stage: Approval ML18355A3692019-01-29029 January 2019 Package: Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendments No. 11 and 12 for the HI-STORM 100 Multipurpose Canister Cask System (CAC No. 001028, Epids: L-2017-LLA-0028 and L-2017-LLA-0017) Project stage: Request ML18355A3702019-01-29029 January 2019 Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendments No. 11 and 12 for the HI-STORM 100 Multipurpose Canister Cask System (CAC No. 001028, Epids: L-2017-LLA-0028 and L-2017-LLA-0017) Project stage: Approval ML18355A3712019-01-29029 January 2019 Enclosure 1: CoC No. 1014, Amendment No. 11 (Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendments No. 11 and 12 for the HI-STORM 100 Multipurpose Canister Cask System (CAC No. 001028, Epids: L-2017-LLA-0028 and L Project stage: Approval ML18355A3722019-01-29029 January 2019 Appendix a to Certificate of Compliance No. 1014 Amendment No. 11 Project stage: Other ML18355A3732019-01-29029 January 2019 Appendix B to Certificate of Compliance No. 1014 Amendment No. 11 Project stage: Other ML18355A3762019-01-29029 January 2019 Appendix B-100U to Certificate of Compliance No. 1014 Amendment No. 11 Project stage: Other ML18355A3822019-01-29029 January 2019 Appendix B-100U to Certificate of Compliance No. 1014 Amendment No. 12 Project stage: Other ML18355A3802019-01-29029 January 2019 Appendix B to Certificate of Compliance No. 1014 Amendment No. 12 Project stage: Other ML18355A3792019-01-29029 January 2019 Appendix a to Certificate of Compliance No. 1014 Amendment No. 12 Project stage: Other ML18355A3772019-01-29029 January 2019 Enclosure 2: Safety Evaluation Report for Amendment No. 11 (Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendments No. 11 and 12 for the HI-STORM 100 Multipurpose Canister Cask System (CAC No. 001028, Epids: L-2017 Project stage: Approval ML18355A3742019-01-29029 January 2019 Appendix A-100U to Certificate of Compliance No. 1014 Amendment No. 11 Project stage: Other ML18355A3782019-01-29029 January 2019 Enclosure 3: CoC No. 1014, Amendment No. 12 (Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendments No. 11 and 12 for the HI-STORM 100 Multipurpose Canister Cask System (CAC No. 001028, Epids: L-2017-LLA-0028 and L Project stage: Approval ML18351A1732019-02-14014 February 2019 Reference 1: Proposed CoC 1014 Amendment 13 CoC Project stage: Other ML18351A1782019-02-14014 February 2019 Reference 6: Preliminary CoC 1014 Amendment 13 SER Project stage: Other ML18351A1772019-02-14014 February 2019 Reference 5: Proposed CoC 1014 Amendment 13 Appendix B-100U Project stage: Other ML18351A1762019-02-14014 February 2019 Reference 4: Proposed CoC 1014 Amendment 13 Appendix A-100U Project stage: Other ML18351A1752019-02-14014 February 2019 Reference 3: Proposed CoC 1014 Amendment 13 Appendix B Project stage: Other ML18351A1742019-02-14014 February 2019 Reference 2: Proposed CoC 1014 Amendment 13 Appendix a Project stage: Other ML19099A3012019-04-15015 April 2019 Enclosure 6: CoC 1014, A13, Final SER (Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendment No. 13 for the HI-STORM 100 Multipurpose Canister Cask System (Dkt. 72-1014, CAC: 001028, EPID: L-2018-LLA-0202) Project stage: Approval ML19099A2942019-04-15015 April 2019 Package: Issuance of Certificate of Compliance No. 1014, Amendment No. 13 for the HI-STORM 100 Multipurpose Canister Cask System (Dkt. 72-1014, CAC: 001028, EPID: L-2018-LLA-0202) Project stage: Request ML19099A3002019-04-15015 April 2019 Enclosure 5: CoC 1014, A13, App B-100U (Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendment No. 13 for the HI-STORM 100 Multipurpose Canister Cask System (Dkt. 72-1014, CAC: 001028, EPID: L-2018-LLA-0202) Project stage: Approval ML19099A2992019-04-15015 April 2019 Enclosure 4: CoC 1014, A13, App A-100U (Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendment No. 13 for the HI-STORM 100 Multipurpose Canister Cask System (Dkt. 72-1014, CAC: 001028, EPID: L-2018-LLA-0202) Project stage: Approval ML19099A2982019-04-15015 April 2019 Enclosure 3: CoC 1014, A13, App B (Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendment No. 13 for the HI-STORM 100 Multipurpose Canister Cask System (Dkt. 72-1014, CAC: 001028, EPID: L-2018-LLA-0202) Project stage: Approval ML19099A2972019-04-15015 April 2019 Enclosure 2: CoC 1014, A13, App a (Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendment No. 13 for the HI-STORM 100 Multipurpose Canister Cask System (Dkt. 72-1014, CAC: 001028, EPID: L-2018-LLA-0202) Project stage: Approval ML19099A2962019-04-15015 April 2019 Enclosure 1: CoC 1014, A13, CoC (Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendment No. 13 for the HI-STORM 100 Multipurpose Canister Cask System (Dkt. 72-1014, CAC: 001028, EPID: L-2018-LLA-0202) Project stage: Approval ML19099A2952019-04-15015 April 2019 Letter to K. Manzione Issuance of Certificate of Compliance No. 1014, Amendment No. 13 for the HI-STORM 100 Multipurpose Canister Cask System (Dkt. 72-1014, CAC: 001028, EPID: L-2018-LLA-0202) Project stage: Approval ML19154A0662019-06-0303 June 2019 Letter to K. Manzione Correction to Certificate of Compliance No. 1014, Amendment No. 12 and 13 for the HI-STORM 100 Multipurpose Canister Cask System (CAC No. 001028, Docket No. 72-1014, Epids: L-2017-LLA-0017 and L-2018-LLA-0202) Project stage: Other 2019-01-29
[Table View] |
|
---|
Category:Letter
MONTHYEARAEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask RS-24-092, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS2024-09-19019 September 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS NL-24-0351, – ISFSI - Registration of Spent Fuel Cask Use2024-09-13013 September 2024 – ISFSI - Registration of Spent Fuel Cask Use ML24222A8592024-08-0909 August 2024 International - HI-STORM 100 Multipurpose Canister Storage System Amendment 19 Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask SVP-24-048, Registration of Use of Casks to Store Spent Fuel2024-07-31031 July 2024 Registration of Use of Casks to Store Spent Fuel ML24178A4312024-07-29029 July 2024 Issuance of Certificate of Compliance No. 1014, Amendment No. 16 for the HI-STORM 100 Cask System, Cover Letter AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask NL-24-0199, Request for Specific Exemption2024-06-25025 June 2024 Request for Specific Exemption SVP-24-040, Registration of Use of Casks to Store Spent Fuel2024-06-25025 June 2024 Registration of Use of Casks to Store Spent Fuel NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24183A2752024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel ML24145A0432024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel 10 CFR 72.212 SVPLTR 24-0019, Registration of Use of Casks to Store Spent Fuel2024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks NL-24-0197, Registration of Spent Fuel Cask Use2024-05-20020 May 2024 Registration of Spent Fuel Cask Use ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters SVP-24-028, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-04-26026 April 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report ML24109A2072024-04-18018 April 2024 International - Submittal of HI-STORM Final Safety Analysis Report Update BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration ML24046A2552024-02-15015 February 2024 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML24016A1902024-01-30030 January 2024 International, Inc. - Notice of Violation; the U.S. Nuclear Regulatory Commission Inspection Report 07201014/2022201 ML24018A1992024-01-18018 January 2024 International, Administrative Change to HI-2200343-A ML23363A0312024-01-0404 January 2024 Application for HI-STORM 100 Cask System, Amendment No. 19 - Acknowledgement of Withdrawal and Notification of the U.S. Nuclear Regulatory Commission Staff Efforts Closure ML23355A0842023-12-21021 December 2023 International, Withdrawal of HI-STORM I00 Multipurpose Canister Storage System Amendment ML23324A0952023-12-0606 December 2023 Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multi-purpose Canister Storage System - Request for Additional Information ML23328A0052023-12-0505 December 2023 Issuance of Renewed Certificate of Compliance No. 1014, Amendment No. 17 for the Hi-Storm 100 Cask System (Cac/Epid 001028/L-2021-LLA-0140) ML23338A3052023-12-0404 December 2023 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML23334A1912023-11-30030 November 2023 International, Submittal of Topical Report HI-2210161-A Version ML23321A2172023-11-17017 November 2023 International, Responses to NRC Questions Form EA-23-044 Pre-Decisional Enforcement Conference JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use ML23310A0362023-11-0909 November 2023 International, Inc. - U.S. Nuclear Regulatory Commission Inspection Report 07201014/2023201 ML23283A1262023-11-0202 November 2023 Letter - Second Request for Additional Information - HI-STORM 100 Amd 18 ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23263B1232023-09-20020 September 2023 HI-STORM 100 Amendment 16 Responses to Second Round Requests for Additional Information ML23234A1572023-09-14014 September 2023 Letter to Holtec International Final Safety Evaluation for Hi-2210161, Revision No. 4, Topical Report on the Radiological Fuel Qualification Methodology for Dry Storage Systems ML23145A1752023-09-12012 September 2023 NRC Choice Letter to Holtec International with Attached Safety Inspection Report, IR 72-1014/2022-201, December 12-15, 2022, Inspection of Holtec International in Camden, New Jersey (Docket Nos.: 72-1014, 72-1032) ML23251A2512023-09-0808 September 2023 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23230B1582023-08-28028 August 2023 Amendment 16 to Certificate of Compliance 1014 for HI-STORM 100 Multipurpose Canister Storage System Request for Additional Information Second Round NL-23-0620, ISFSI, and Edwin I. Hatch Nuclear Plant ISFSI, Registration of Spent Fuel Cask Use2023-08-0303 August 2023 ISFSI, and Edwin I. Hatch Nuclear Plant ISFSI, Registration of Spent Fuel Cask Use ML23135A7582023-07-20020 July 2023 Letter to Holtec - Draft SE for HI-2210161, Revision No. 4, Topical Report ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23195A0382023-07-14014 July 2023 U.S. Nuclear Regulatory Commission Inspection Report No. 72-1014/2023-201 2024-09-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24031A5622024-01-24024 January 2024 Enclosure 1 -(Public) - Second Round Requests for Additional Information Clarifications ML23324A0942023-12-0606 December 2023 Request for Additional Information ML23283A1242023-11-0202 November 2023 Enclosure 1 (Public) - HI-STORM 100 Amd 18 - 2nd RAI Round ML23257A0402023-09-12012 September 2023 SUNSI and Proprietary Review Determination Email Regarding: Holtec HI-STORM 100 Amd. 18 - Supplemental RAI Responses ML23230B1582023-08-28028 August 2023 Amendment 16 to Certificate of Compliance 1014 for HI-STORM 100 Multipurpose Canister Storage System Request for Additional Information Second Round ML23215A0612023-08-0202 August 2023 Enclosure - Summary of Discussion ML23058A1282023-03-0606 March 2023 CoC No.1014 Amendment 18 - RAI Letter (Public) ML23058A1272023-03-0606 March 2023 CoC No.1014 Amendment 18 - Enclosure RAI (Public) ML22335A4572022-12-13013 December 2022 Enclosure 1- Amendment 16 to Certificate of Compliance No. 1014 for Hi-Storm 100 Multipurpose Canister Storage System Request for Additional Information Batch 5 ML22297A1252022-10-31031 October 2022 Enclosure 1 - Summary of RAI Discussion Between NRC and Holtec Staff ML22167A1202022-07-0101 July 2022 Amendment No. 16 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Request for Additional Information First Batch ML22122A2002022-06-23023 June 2022 Enclosure - Request for Supplemental Information - Rsi ML22021B5632022-01-19019 January 2022 Enclosure 2 - NRC Staff Comments on Draft RAI Response ML21299A2652021-11-0303 November 2021 RAI Letter to Holtec_Shielding Moe Topical Report ML21299A2662021-11-0303 November 2021 Enclosure - Moe Topical Report RAIs ML21176A1102021-06-29029 June 2021 Moe Fqt Topical Report - Enclosure (Request for Supplemental Information) ML21029A1072021-02-18018 February 2021 HI-STORM 100 CoC Renewal Clarification RAIs ML20205L5022020-08-0404 August 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Second Request for Additional Information ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information ML18292A5232018-10-19019 October 2018 Letter to K. Manzione Acceptance Review of Request for Amendment No. 13 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Request for Supplemental Information (W/Enclosure) 0CAN111405, Response to Request for Additional Information Request for Exemption from Holtec International Certificate of Compliance (CoC) (72-1014) Fuel Specification and Loading Conditions (TAC No. L24954)2014-11-0707 November 2014 Response to Request for Additional Information Request for Exemption from Holtec International Certificate of Compliance (CoC) (72-1014) Fuel Specification and Loading Conditions (TAC No. L24954) ML14308A0152014-11-0303 November 2014 Ltr to S. L. Pyle Request for Exemption from Holtec International Certificate of Compliance No. 1014 Fuel Specification and Loading Conditions at Arkansas Nuclear One Independent Spent Fuel Storage Installation - Request for Additional Info 2024-01-24
[Table view] |
Text
Code of Federal Regulations
"Your technical justification for continued use of the loaded cask systems evaluated the thermal and radiological performance of the casks and concluded that the casks would continue to meet all of their required functions. The justification relied upon an assumed leakage rate from the casks, and utilized a dose assessment methodology that credited gravitational settling to reduce calculated release estimates. The NRC does not have any data to confirm the acceptability of your assumed cask leakage rates, and has not previously reviewed or endorsed the methodology used in your response for calculating the site dose rates attributed to postulated leakage from the casks. The NRC concluded that while your response provides supplemental information to support the continued safe operation of the casks, additional site specific information is needed to ensure that the loaded casks will continue to meet all regulatory requirements."
"Casks previously loaded to Amendment 7 and all prior amendments are exempt from this requirement and must meet the requirements of the amendment to which they were loaded."
"Casks previously loaded to Amendment 7 and all prior amendments are exempt from this requirement and must meet the requirements of the amendment to which they were loaded." "Casks loaded prior to July 1, 2009, to Amendment Nos. 2 through 7 are grandfathered and therefore not required to comply with the above helium leak test requirements. Casks fabricated and loaded after July 1, 2009, must comply with the above helium leak test requirement."
"Leakage testing has been reinstated at the manufacturing facility for all MPCs currently being fabricated or in storage. Leakage tested on newly fabricated MPCs was reinstated on July 1, 2009."
"Written cask acceptance tests and maintenance program shall be prepared consistent with the technical basis described in Chapter 9 of the FSAR."
"This issue is considered to be of greater than minor significance since approximately 120 MPCs were loaded without being adequately tested to demonstrate their leaktightness." "[-] 107 MPCs were manufactured and loaded without fabrication leakage testing being performed."
Text
Code of Federal Regulations
"Your technical justification for continued use of the loaded cask systems evaluated the thermal and radiological performance of the casks and concluded that the casks would continue to meet all of their required functions. The justification relied upon an assumed leakage rate from the casks, and utilized a dose assessment methodology that credited gravitational settling to reduce calculated release estimates. The NRC does not have any data to confirm the acceptability of your assumed cask leakage rates, and has not previously reviewed or endorsed the methodology used in your response for calculating the site dose rates attributed to postulated leakage from the casks. The NRC concluded that while your response provides supplemental information to support the continued safe operation of the casks, additional site specific information is needed to ensure that the loaded casks will continue to meet all regulatory requirements."
"Casks previously loaded to Amendment 7 and all prior amendments are exempt from this requirement and must meet the requirements of the amendment to which they were loaded."
"Casks previously loaded to Amendment 7 and all prior amendments are exempt from this requirement and must meet the requirements of the amendment to which they were loaded." "Casks loaded prior to July 1, 2009, to Amendment Nos. 2 through 7 are grandfathered and therefore not required to comply with the above helium leak test requirements. Casks fabricated and loaded after July 1, 2009, must comply with the above helium leak test requirement."
"Leakage testing has been reinstated at the manufacturing facility for all MPCs currently being fabricated or in storage. Leakage tested on newly fabricated MPCs was reinstated on July 1, 2009."
"Written cask acceptance tests and maintenance program shall be prepared consistent with the technical basis described in Chapter 9 of the FSAR."
"This issue is considered to be of greater than minor significance since approximately 120 MPCs were loaded without being adequately tested to demonstrate their leaktightness." "[-] 107 MPCs were manufactured and loaded without fabrication leakage testing being performed."