ML14219A341: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML14219A341 | | number = ML14219A341 | ||
| issue date = 08/07/2014 | | issue date = 08/07/2014 | ||
| title = | | title = Public Meeting Summary Regarding Braidwood 2013 Annual Assessment Results | ||
| author name = Duncan E | | author name = Duncan E | ||
| author affiliation = NRC/RGN-III/DRP/B3 | | author affiliation = NRC/RGN-III/DRP/B3 | ||
| addressee name = | | addressee name = | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 7, 2014 LICENSEE: Exelon Generation Company, LLC FACILITY: Braidwood Generating Station | ||
LICENSEE: | |||
FACILITY: | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE JULY 17, 2014, PUBLIC MEETING REGARDING BRAIDWOOD NUCLEAR POWER STATION On July 17, 2014, the Nuclear Regulatory | OF THE JULY 17, 2014, PUBLIC MEETING REGARDING BRAIDWOOD NUCLEAR POWER STATION On July 17, 2014, the Nuclear Regulatory Commission (NRC) held a public meeting to discuss the 2013 annual assessment results for Braidwood Nuclear Power Station. The meeting was held at the Braidwood City Hall in Braidwood, Illinois. Enclosed are attendee lists for the meeting, a copy of the slides presented by the NRC staff during the meeting, and a copy of the slides presented by the licensees staff. | ||
The meeting started with the NRC providing an overview of the reactor oversight process and the results of the 2013 annual assessment for Braidwood Station. The Braidwood Station staff then gave a presentation that included a discussion of their perspective on plant performance. | The meeting started with the NRC providing an overview of the reactor oversight process and the results of the 2013 annual assessment for Braidwood Station. The Braidwood Station staff then gave a presentation that included a discussion of their perspective on plant performance. | ||
The business portion of the meeting closed with NRC staff describing some of the methods by which members of the public can share information with the NRC. | The business portion of the meeting closed with NRC staff describing some of the methods by which members of the public can share information with the NRC. | ||
After the business portion of the meeting ended, the NRC staff and licensee staff listened to comments and answered questions from the public. | After the business portion of the meeting ended, the NRC staff and licensee staff listened to comments and answered questions from the public. | ||
_/RA__________________ | |||
_/RA__________________ Eric R. Duncan, Chief Branch 3 Division of Reactor Projects | Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 | ||
Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. List of Principal Meeting Attendees | : 1. List of Principal Meeting Attendees | ||
: 2. List of Meeting Attendees of the Public | : 2. List of Meeting Attendees of the Public | ||
: 3. Braidwood Nuclear Power Station Meeting Slides (NRC slides) | : 3. Braidwood Nuclear Power Station Meeting Slides (NRC slides) | ||
: 4. Licensee Public Meeting Slides (Braidwood Station) cc w/encls: | : 4. Licensee Public Meeting Slides (Braidwood Station) cc w/encls: Distribution via LISTSERV | ||
August 7, 2014 | August 7, 2014 LICENSEE: Exelon Generation Company, LLC FACILITY: Braidwood Generating Station | ||
LICENSEE: | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE JULY 17, 2014, PUBLIC MEETING REGARDING BRAIDWOOD NUCLEAR POWER STATION On July 17, 2014, the Nuclear Regulatory Commission (NRC) held a public meeting to discuss the 2013 annual assessment results for Braidwood Nuclear Power Station. The meeting was held at the Braidwood City Hall in Braidwood, Illinois. Enclosed are attendee lists for the meeting, a copy of the slides presented by the NRC staff during the meeting, and a copy of the slides presented by the | OF THE JULY 17, 2014, PUBLIC MEETING REGARDING BRAIDWOOD NUCLEAR POWER STATION On July 17, 2014, the Nuclear Regulatory Commission (NRC) held a public meeting to discuss the 2013 annual assessment results for Braidwood Nuclear Power Station. The meeting was held at the Braidwood City Hall in Braidwood, Illinois. Enclosed are attendee lists for the meeting, a copy of the slides presented by the NRC staff during the meeting, and a copy of the slides presented by the licensees staff. | ||
The meeting started with the NRC providing an overview of the reactor oversight process and the results of the 2013 annual assessment for Braidwood Station. The Braidwood Station staff then gave a presentation that included a discussion of their perspective on plant performance. | The meeting started with the NRC providing an overview of the reactor oversight process and the results of the 2013 annual assessment for Braidwood Station. The Braidwood Station staff then gave a presentation that included a discussion of their perspective on plant performance. | ||
The business portion of the meeting closed with NRC staff describing some of the methods by which members of the public can share information with the NRC. | |||
The business portion of the meeting closed with NRC staff describing some of the methods by which members of the public can share information with the NRC. | After the business portion of the meeting ended, the NRC staff and licensee staff listened to comments and answered questions from the public. | ||
_/RA__________________ | |||
After the business portion of the meeting ended, the NRC staff and licensee staff listened to comments and answered questions from the public. | Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 | ||
_/RA__________________ Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. List of Principal Meeting Attendees | : 1. List of Principal Meeting Attendees | ||
: 2. List of Meeting Attendees of the Public | : 2. List of Meeting Attendees of the Public | ||
: 3. Braidwood Nuclear Power Station Meeting Slides (NRC slides) | : 3. Braidwood Nuclear Power Station Meeting Slides (NRC slides) | ||
: 4. Licensee Public Meeting Slides (Braidwood Station) cc w/encls: | : 4. Licensee Public Meeting Slides (Braidwood Station) cc w/encls: Distribution via LISTSERV DISTRIBUTION w/encls: | ||
See next page DOCUMENT NAME: Braidwood EOC Meeting Summary Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = | |||
Copy with attach/encl "N" = No copy OFFICE RIII NAME BBoston:mt EDuncan DATE 08/06/14 08/07/14 OFFICIAL RECORD COPY | |||
Memorandum from Eric R. Duncan dated August 7, 2014. | PUBLIC MEETING PRINCIPAL ATTENDEES July 17, 2014 NRC Attendees E. Duncan, Chief, Division of Reactor Projects, Branch 3 J. Benjamin, Braidwood Senior Resident Inspector D. Betancourt, Braidwood Resident Inspector V. Mitlyng, Senior Public Affairs Officer, Region III B. Boston, Reactor Engineer Exelon Generation Company Attendees M. Kanavos, Site Vice President M. Marchionda, Plant Manager Other plant employees Illinois Emergency Management Agency Attendees Cecil Settles Mike Perry Members of the Public See Enclosure 2 for members of the public who attended the meeting. | ||
Enclosure 1 Memorandum from Eric R. Duncan dated August 7, 2014. | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE JULY 17, 2014, PUBLIC MEETING REGARDING BRAIDWOOD NUCLEAR POWER STATION DISTRIBUTION w/encls | OF THE JULY 17, 2014, PUBLIC MEETING REGARDING BRAIDWOOD NUCLEAR POWER STATION DISTRIBUTION w/encls: | ||
Anthony Bowers RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov}} | |||
RidsNrrDorlLpl3-2 Resource | |||
Darrell Roberts Steven Orth Allan Barker DRPIII DRSIII Carole Ariano Linda Linn | |||
Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov}} |
Latest revision as of 18:35, 5 February 2020
ML14219A341 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 08/07/2014 |
From: | Eric Duncan Region 3 Branch 3 |
To: | Exelon Generation Co |
References | |
Download: ML14219A341 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 7, 2014 LICENSEE: Exelon Generation Company, LLC FACILITY: Braidwood Generating Station
SUBJECT:
SUMMARY
OF THE JULY 17, 2014, PUBLIC MEETING REGARDING BRAIDWOOD NUCLEAR POWER STATION On July 17, 2014, the Nuclear Regulatory Commission (NRC) held a public meeting to discuss the 2013 annual assessment results for Braidwood Nuclear Power Station. The meeting was held at the Braidwood City Hall in Braidwood, Illinois. Enclosed are attendee lists for the meeting, a copy of the slides presented by the NRC staff during the meeting, and a copy of the slides presented by the licensees staff.
The meeting started with the NRC providing an overview of the reactor oversight process and the results of the 2013 annual assessment for Braidwood Station. The Braidwood Station staff then gave a presentation that included a discussion of their perspective on plant performance.
The business portion of the meeting closed with NRC staff describing some of the methods by which members of the public can share information with the NRC.
After the business portion of the meeting ended, the NRC staff and licensee staff listened to comments and answered questions from the public.
_/RA__________________
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77
Enclosures:
- 1. List of Principal Meeting Attendees
- 2. List of Meeting Attendees of the Public
- 3. Braidwood Nuclear Power Station Meeting Slides (NRC slides)
- 4. Licensee Public Meeting Slides (Braidwood Station) cc w/encls: Distribution via LISTSERV
August 7, 2014 LICENSEE: Exelon Generation Company, LLC FACILITY: Braidwood Generating Station
SUBJECT:
SUMMARY
OF THE JULY 17, 2014, PUBLIC MEETING REGARDING BRAIDWOOD NUCLEAR POWER STATION On July 17, 2014, the Nuclear Regulatory Commission (NRC) held a public meeting to discuss the 2013 annual assessment results for Braidwood Nuclear Power Station. The meeting was held at the Braidwood City Hall in Braidwood, Illinois. Enclosed are attendee lists for the meeting, a copy of the slides presented by the NRC staff during the meeting, and a copy of the slides presented by the licensees staff.
The meeting started with the NRC providing an overview of the reactor oversight process and the results of the 2013 annual assessment for Braidwood Station. The Braidwood Station staff then gave a presentation that included a discussion of their perspective on plant performance.
The business portion of the meeting closed with NRC staff describing some of the methods by which members of the public can share information with the NRC.
After the business portion of the meeting ended, the NRC staff and licensee staff listened to comments and answered questions from the public.
_/RA__________________
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77
Enclosures:
- 1. List of Principal Meeting Attendees
- 2. List of Meeting Attendees of the Public
- 3. Braidwood Nuclear Power Station Meeting Slides (NRC slides)
- 4. Licensee Public Meeting Slides (Braidwood Station) cc w/encls: Distribution via LISTSERV DISTRIBUTION w/encls:
See next page DOCUMENT NAME: Braidwood EOC Meeting Summary Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =
Copy with attach/encl "N" = No copy OFFICE RIII NAME BBoston:mt EDuncan DATE 08/06/14 08/07/14 OFFICIAL RECORD COPY
PUBLIC MEETING PRINCIPAL ATTENDEES July 17, 2014 NRC Attendees E. Duncan, Chief, Division of Reactor Projects, Branch 3 J. Benjamin, Braidwood Senior Resident Inspector D. Betancourt, Braidwood Resident Inspector V. Mitlyng, Senior Public Affairs Officer, Region III B. Boston, Reactor Engineer Exelon Generation Company Attendees M. Kanavos, Site Vice President M. Marchionda, Plant Manager Other plant employees Illinois Emergency Management Agency Attendees Cecil Settles Mike Perry Members of the Public See Enclosure 2 for members of the public who attended the meeting.
Enclosure 1 Memorandum from Eric R. Duncan dated August 7, 2014.
SUBJECT:
SUMMARY
OF THE JULY 17, 2014, PUBLIC MEETING REGARDING BRAIDWOOD NUCLEAR POWER STATION DISTRIBUTION w/encls:
Anthony Bowers RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov