|
|
(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 07/05/2016 | | | issue date = 07/05/2016 |
| | title = June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter | | | title = June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter |
| | author name = Guthrie E F | | | author name = Guthrie E |
| | author affiliation = NRC/RGN-II/DRS | | | author affiliation = NRC/RGN-II/DRS |
| | addressee name = Smith K | | | addressee name = Smith K |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 5, 2016 Tennessee Valley Authority ATTN: Mr. Koda Smith | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 5, 2016 Tennessee Valley Authority ATTN: Mr. Koda Smith Training Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 |
| | |
| Training Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SEQUOYAH - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS | | SEQUOYAH - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS |
|
| |
|
| ==Dear Mr. Smith:== | | ==Dear Mr. Smith:== |
|
| |
|
| On June 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A "PASS" in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while a "FAIL" indicates that the individual failed the examination. | | On June 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A PASS in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while a FAIL indicates that the individual failed the examination. |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. |
| | If you have any questions concerning this examination, please contact me at (404) 997-4662. |
| | Sincerely, |
| | /RA by Gerald J. McCoy for/ |
| | Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If you have any questions concerning this exami nation, please contact me at (404) 997-4662.
| | ==Enclosures:== |
| Sincerely,
| | (See Page 2) |
| /RA by Gerald J. McCoy for/
| |
| Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety
| |
|
| |
|
| Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79
| | K. Smith 2 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| (See Page 2)
| | : 1. Final Answer Key |
| K. Smith 2
| | : 2. Examination Results Summary |
| | : 3. Individual Answer Sheets cc w/o encls.: |
| | Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 |
|
| |
|
| ==Enclosures:==
| | K. Smith 2 |
| : 1. Final Answer Key 2. Examination Results Summary 3. Individual Answer Sheets
| |
| | |
| cc w/o encls.:
| |
| Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000
| |
| | |
| Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000
| |
| | |
| K. Smith 2 | |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. Final Answer Key 2. Examination Results Summary 3. Individual Answer Sheets | | : 1. Final Answer Key |
| | | : 2. Examination Results Summary |
| cc w/o encls.: | | : 3. Individual Answer Sheets cc w/o encls.: |
| Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 | | Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 LETTER W/O ENCLS X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML16190A425 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE JHK GJM/FOR NAME JKIRBY EGUTHRIE DATE 6/30/16 7/5 /16 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO}} |
| | |
| Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 | |
| | |
| LETTER W/O ENCLSX PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML16190A425 X SUNSI REVIEW COMPLE TE OFFICE RII:DRS RII:DRS SIGNATURE JHK GJM/FOR NAME JKIRBY EGUTHRIE DATE 6/30/16 7/5 /16 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO}} | |
|
---|
Category:Letter
MONTHYEARCNL-24-021, Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020)2024-11-12012 November 2024 Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020) ML24312A1552024-11-0606 November 2024 Cycle 27 Core Operating Limits Report, Revision 1 IR 05000327/20240032024-11-0606 November 2024 Integrated Inspection Report 05000327/2024003 and 05000328/2024003 CNL-24-014, License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22)2024-11-0404 November 2024 License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) ML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 2024-09-08
[Table view] Category:License-Operator
MONTHYEARML24213A0132024-07-31031 July 2024 301 Adams 2B ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML22322A1072022-11-18018 November 2022 2023-301 Sequoyah - Licensed Operator Retake Initial Examination Corporate Notification Letter IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 ML22200A0402022-07-19019 July 2022 Exam Post Exam Comments ML22132A0282022-05-10010 May 2022 NRC Operator Licensing Examination Approval 05000327/2022301 and 05000328/2022301 ML22095A2632022-04-0505 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21286A6232021-10-13013 October 2021 301 Exam Corporate Notification Letter Aka 210-day Letter ML21111A0772021-04-20020 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20226A0972020-08-13013 August 2020 File 2B, Normal Release Exam Doc- 8-Written Exam Grading Quality Check Sheet (ES-403-1) ML20225A0242020-08-12012 August 2020 File 2A-2 Exam Final Items (Delayed Release) ML20225A0292020-08-12012 August 2020 File 2A-3 Exam Administrative Items (Delayed Release) ML20106F0992020-04-14014 April 2020 301 Final SRO Written Exam ML20106F0732020-04-14014 April 2020 301 Final RO Written Exam ML20106F0712020-03-31031 March 2020 301 Post Exam Comments ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18045A0772018-02-14014 February 2018 301 Final As-Given RO Written Exam with Answer Key - Delay Release 2 Yrs ML18045A1232018-02-14014 February 2018 301 Final As-Given SRO Written Exam with Answer Key - Delay Release 2 Yrs ML18045A0712018-02-14014 February 2018 301 Post Exam Comments ML17352B2242017-12-11011 December 2017 NRC Operator Licensing Examination Approval 05000327/2017301 and 05000328/2017301 ML17307A2832017-11-0303 November 2017 Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17263B1802017-09-20020 September 2017 Draft SRO Written Exam - Delay Release 2 Yrs ML17263B1792017-09-20020 September 2017 Draft RO Written Exam - Delay Release 2 Yrs ML17209B2092017-07-28028 July 2017 Draft Admin JPMs ML17209A9782017-07-28028 July 2017 Draft Administrative Documents ML17193A9632017-07-12012 July 2017 (Retake) 2016-302 Exam Final Items - Delay Release 2 Yrs ML17193A9652017-07-12012 July 2017 (Retake) 2016-302 Exam Administrative Items - Delay Release 2 Yrs ML17193A9612017-07-12012 July 2017 (Retake) 2016-302 Exam Draft Items - Delay Release 2 Yrs ML17125A0792017-05-0404 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16201A1192016-07-18018 July 2016 (Retake) Operator Licensing Operating Test Approval 05000327/2016302 and 05000328/2016302 ML16200A0372016-07-18018 July 2016 Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations ML16190A4252016-07-0505 July 2016 June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter ML16110A0272016-04-18018 April 2016 (Section 8) Sequoyah Initial Exam 2016-301 Final RO Written Exam ML16068A4452016-03-0303 March 2016 Operator Licensing Written Examination Approval 05000327,328/2016301 ML15293A5332015-10-20020 October 2015 Examination 05000327/2016301 and 0500328/2016301, October 15, 2015, Sequoyah Nuclear Plant - Notification of Licensed Operator ML15126A4212015-05-0606 May 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15126A4462015-05-0606 May 2015 Initial Exam 2015-301 Post Exam Comments ML15126A4452015-05-0606 May 2015 Initial Exam 2015-301 Final Administrative JPMs ML15126A4442015-05-0606 May 2015 Initial Exam 2015-301 Final Sim IN-Plant JPMs ML15126A4412015-05-0606 May 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15126A4402015-05-0606 May 2015 Initial Exam 2015-301 Final Administrative Documents ML15126A4392015-05-0606 May 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15126A4112015-05-0606 May 2015 Initial Exam 2015-301 Draft Administrative Documents ML15126A4162015-05-0606 May 2015 Initial Exam 2015-301 Draft RO Written Exam ML15126A4182015-05-0606 May 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15126A4232015-05-0606 May 2015 Initial Exam 2015-301 Draft Sim IN-Plant JPMs 2024-07-09
[Table view] Category:Other HQ and Regional Correspondence
MONTHYEARML16190A4252016-07-0505 July 2016 June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter ML13142A5262013-05-22022 May 2013 Operator Licensing Written Examination Approval 05000327/13-301 and 05000328/13-301 ML1006013392010-02-25025 February 2010 Operator Licensing Written Examination Approval 05000327, 328/2010301 ML1003901012010-02-0808 February 2010 June 2009 Sequoyah Generic Fundamentals Examination Results ML0729804052007-05-0909 May 2007 April/May 2007 Exam Nos. 05000327, 328/2007301 - Final Combined Ro/Sro Written Exam (Part 2 of 2) ML0729605452007-05-0909 May 2007 April/May 2007 Exam Nos. 05000327-07-301, 05000328-07-301 - Final JPMs (Part 3 of 3) (Section 3 of 4) 2016-07-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 5, 2016 Tennessee Valley Authority ATTN: Mr. Koda Smith Training Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000
SUBJECT:
SEQUOYAH - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS
Dear Mr. Smith:
On June 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A PASS in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while a FAIL indicates that the individual failed the examination.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
If you have any questions concerning this examination, please contact me at (404) 997-4662.
Sincerely,
/RA by Gerald J. McCoy for/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79
Enclosures:
(See Page 2)
K. Smith 2
Enclosures:
- 1. Final Answer Key
- 2. Examination Results Summary
- 3. Individual Answer Sheets cc w/o encls.:
Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000
K. Smith 2
Enclosures:
- 1. Final Answer Key
- 2. Examination Results Summary
- 3. Individual Answer Sheets cc w/o encls.:
Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 LETTER W/O ENCLS X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML16190A425 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE JHK GJM/FOR NAME JKIRBY EGUTHRIE DATE 6/30/16 7/5 /16 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO