{{#Wiki_filter:DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: LYi] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
{{#Wiki_filter:DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LYi] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLProject:
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 121 Manufacturer/Model:
AB1, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-DGAB REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-DGAB REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Verified bolts A and B were left out of analysis 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-115 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: t-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Verified bolts A and B were left out of analysis6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-115 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:t-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: , George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-1 16 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
CommentsEvaluated by: , George G Thomas Date: 10/18/12Neda Stoeva 10/18/12C-1 16 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLPhotosC-117 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: 7-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-DGABEquipment Class: (20) Instrumentation and Control Panels and Cabinetspment
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Photos C-117 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets pment


== Description:==
== Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLC-118 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGABEquipment Class: (20) Instrumentation and Control Panels and Cabinets:nilinm=znt rl'at-rinfinn-AP FMFP:ltrV NI:IPATt'CP RAPI:_ AR n rKITInlC-119 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsC-120 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsGENCY DIESEL GENERATOR OME-150-AB CONTROLC-121 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-118 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets:nilinm=znt rl'at-rinfinn-AP FMFP:ltrV NI:IPATt'CP RAPI:_ AR n rKITInl C-119 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-120 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets GENCY DIESEL GENERATOR OME-150-AB CONTROL C-121 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLC-122 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Yj N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGABEquipment Class: (20) Instrumentation and Control Panels and Cabinetsin=iinmnt f ndmarinfinn" AR nImIqI (r,'I:=PAATIP rII:_tKA.nAP r C-123 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-122 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Yj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets in=iinmnt f ndmarinfinn" AR nImIqI (r,'I:=PAATIP rII:_tKA.nAP r C-123 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLC-124 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: EY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-124 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLC-125 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1-DGAB-INV Equipment Class: (16) Inverters Equipment  
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-125 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB-INV Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTERProject:
AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 121 Manufacturer/Model:
AB1, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., isthe item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
YSE 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., isthe item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
YSE4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-126 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I-DGAB-INV Equipment Class: (16) Inverters Equipment  
Yes C-126 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-DGAB-INV Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTEREdge distance OK on bolts but looks small due to oversized washersunderneath Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Edge distance OK on bolts but looks small due to oversized washers underneath Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-127 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment  
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12C-127 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: EY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:Equipment  


==
==
Description:==
Description:==


I -DGAB-INV (16) Inverters AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTERP9130214C-128 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB-INV Equipment Class: (16) Inverters JCY DIEC-129 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (16) Inverters 1-DGAB-INV NCY DIEC-1 30 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (16) Inverters F:::n, egrrinti~nn AP ::FMFP:l(~l:::I I-DGAB-INV NCY DIEC-131 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I-ESWEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
I -DGAB-INV (16) Inverters AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER P9130214 C-128 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB-INV Equipment Class: (16) Inverters JCY DIE C-129 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (16) Inverters 1-DGAB-INV NCY DIE C-1 30 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (16) Inverters F:::n, egrrinti~nn AP ::FMFP:l(~l:::I I-DGAB-INV NCY DIE C-131 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


ESSENTIAL SERVICE WATER CONTROL PANELProject:
ESSENTIAL SERVICE WATER CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123 Manufacturer/Model:
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincis.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findincis.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documentinq other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Welded to embedded plate with shim plates 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Welded to embedded plate with shim plates5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable
Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-132 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-ESWEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
Yes C-132 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


ESSENTIAL SERVICE WATER CONTROL PANELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
ESSENTIAL SERVICE WATER CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
Check ceiling tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-133 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12C-133 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: LY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESWEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


ESSENTIAL SERVICE WATER CONTROL PANELPhotosC-1 34 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESWEquipment Class: (20) Instrumentation and Control Panels and CabinetsVICEC-135 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESWEquipment Class: (20) Instrumentation and Control Panels and Cabinets-NTIAL SERVICE ýC-136 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: jY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-AEquipment Class: (1) Motor Control CentersEquipment
ESSENTIAL SERVICE WATER CONTROL PANEL Photos C-1 34 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets VICE C-135 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets-NTIAL SERVICE ýC-136 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: jY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-AProject:
600VAC MOTOR CONTROL CENTER EZC-A Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 613.00 ft, 205 Manufacturer/Model:
AB1, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-EZC-A REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-EZC-A REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-137 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -EZC-A Equipment Class: (1) Motor Control Centers Equipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-137 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -EZC-AEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-AInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER EZC-A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-138 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12C-138 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-AEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-AC-139 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-AEquipment Class: (1) Motor Control CentersEquipment
600VAC MOTOR CONTROL CENTER EZC-A C-139 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-AC-140 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-EZC-AEquipment Class: (1) Motor Control CentersPi::a ,iinm,'nf rn,',trinfinn.
600VAC MOTOR CONTROL CENTER EZC-A C-140 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-EZC-A Equipment Class: (1) Motor Control Centers Pi::a ,iinm,'nf rn,',trinfinn.
RFINr\/I('_  
RFINr\/I('_  
('l::PKlTlPPl J I UI \ UUI ! I I \VI.. C-141 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-AEquipment Class: (1) Motor Control CentersEquipment
('l::PKlTlPPl J I UI \ UUI ! I I \VI.. C-141 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-AC-142 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: I -EZC-A1Equipment Class: (1) Motor Control CentersEquipment
600VAC MOTOR CONTROL CENTER EZC-A C-142 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -EZC-A1 Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-A1Project:
600VAC MOTOR CONTROL CENTER EZC-A1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 613.00 ft, 205 Manufacturer/Model:
AB1, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Attached to 1-EZC-B1 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Attached to 1-EZC-B12. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-143 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -EZC-A1 Equipment Class: (1) Motor Control Centers Equipment
Not Applicable (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-143 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -EZC-A1Equipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-A1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER EZC-A1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: "'- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-144 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-AI Equipment Class: (1) Motor Control Centers Equipment
CommentsEvaluated by: "'- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12C-144 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-AIEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-A1C-145 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:Eauipment  
600VAC MOTOR CONTROL CENTER EZC-A1 C-145 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment  


==
==
Description:==
Description:==


1 -EZC-AI(1) Motor Control Centers600VAC MOTOR CONTROL CENTER EZC-AIP9170602P9170603C-146 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-BEquipment Class: (1) Motor Control CentersEquipment
1 -EZC-AI (1) Motor Control Centers 600VAC MOTOR CONTROL CENTER EZC-AI P9170602 P9170603 C-146 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-BProject:
600VAC MOTOR CONTROL CENTER EZC-B Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 613.00 ft, 205 Manufacturer/Model:
AB1, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-EZC-B REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-EZC-B REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-147 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -EZC-B Equipment Class: (1) Motor Control Centers Equipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-147 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -EZC-BEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-BInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER EZC-B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: '''"- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-148 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: -] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers Equipment
CommentsEvaluated by: '''"- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-148 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: -] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-BEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-BC-149 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-BEquipment Class: (1) Motor Control Centers)L CENTER EZC-Bý%, IVIj 1 ý.Jr-, 1 rxC-150 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-BEquipment Class: (1) Motor Control CentersPri r-im: o rgc-inin nn\/At't IAt*)Tn"P f'tnKlT~tnl t(r:::KlTl:D 19=7r"_1P r-d I/UOzLIC-1 51 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: T] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-BEquipment Class: (1) Motor Control CentersE ui ment Descri tion: 600VAC MOTORP9170625CONTRCC-152 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-BIEquipment Class: (1) Motor Control CentersEquipment
600VAC MOTOR CONTROL CENTER EZC-B C-149 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers)L CENTER EZC-Bý%, IVIj 1 ý.Jr-, 1 rx C-150 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers Pri r-im: o rgc-inin nn\/At't IAt*)Tn"P f'tnKlT~tnl t(r:::KlTl:D 19=7r"_1P r-d I/UOzLI C-1 51 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: T] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers E ui ment Descri tion: 600VAC MOTOR P9170625 CONTRC C-152 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-BI Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-B1Project:
600VAC MOTOR CONTROL CENTER EZC-B1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 613.00 ft, 205 Manufacturer/Model:
AB1, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Attached to 1-EZC-A 1 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Attached to 1-EZC-A 12. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-153 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Eli N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -EZC-BI Equipment Class: (1) Motor Control Centers Equipment
Not Applicable (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-153 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Eli N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -EZC-BIEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-B1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER EZC-B1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-154 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment  
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12C-154 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:Equipment  


==
==
Description:==
Description:==


I -EZC-BI(1) Motor Control Centers600VAC MOTOR CONTROL CENTER EZC-B1C-155 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B1Equipment Class: (1) Motor Control CentersEquipment
I -EZC-BI (1) Motor Control Centers 600VAC MOTOR CONTROL CENTER EZC-B1 C-155 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B1 Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-BIP9170609 P9170610C-156 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-FFI-240 Equipment Class: (18) Instruments on RacksEquipment
600VAC MOTOR CONTROL CENTER EZC-BI P9170609 P9170610 C-156 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-FFI-240 Equipment Class: (18) Instruments on Racks Equipment


==
==
Description:==
Description:==


AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Project:
AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1,621.00ft, 10 Manufacturer/Model:
AB1,621.00ft, 10Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
DOCS SD-090519-001, SD-090313-001, SD-090313-002
DOCS SD-090519-001, SD-090313-001, SD-090313-002
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-157 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [f N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -FFI1-240 Equipment Class: (18) Instruments on RacksEquipment
C-157 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [f N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -FFI1-240 Equipment Class: (18) Instruments on Racks Equipment


==
==
Description:==
Description:==


AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: .-,-"&. George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-158 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-FFI-240 Equipment Class: (18) Instruments on Racks Equipment
CommentsEvaluated by: .-,-"&. George G Thomas Date: 10/18/12Neda Stoeva 10/18/12C-158 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-FFI-240 Equipment Class: (18) Instruments on RacksEquipment


==
==
Description:==
Description:==


AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER PhotosP9100281 P9100282C-159 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:I -FFI-240(18) Instruments on Racks.R TOTTERC-160 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -HE-I 5WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Photos P9100281 P9100282 C-159 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -FFI-240 (18) Instruments on Racks.R TO TTER C-160 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -HE-I 5W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST COMPONENT COOLING WATER HEAT EXCHANGER Project:
WEST COMPONENT COOLING WATER HEAT EXCHANGER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB2, 609.00 ft, 609 Manufacturer/Model:
AB2, 609.00 ft, 609Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Threads not fully engaged on south west bolt, but OK only minor.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Threads not fully engaged on south west bolt, but OK only minor.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
YesYes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-161 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-HE-15WEquipment Class: (21) Tanks and Heat Exchangers Eauipment  
Yes C-161 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-15W Equipment Class: (21) Tanks and Heat Exchangers Eauipment  


==
==
Description:==
Description:==


WEST COMPONENT COOLING WATER HEAT EXCHANGER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST COMPONENT COOLING WATER HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall on south-west side of heat exchanger  
Block wall on south-west side of heat exchanger  
-retrofitted  
-retrofitted  
-OK perDWG 12-4028, Wall W-109. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
-OK per DWG 12-4028, Wall W-10 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Cable trays lightly loadedCommentsFire piping above well supported Evaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12C-162 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:Equipment  
Cable trays lightly loaded Comments Fire piping above well supported Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-162 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment  


==
==
Description:==
Description:==


I-HE-15W(21) Tanks and Heat Exchangers WEST COMPONENT COOLING WATER HEAT EXCHANGER PhotosC-163 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (21) Ta1-HE-15Winks and Heat Exchangers WESTCOMPONENT COOLING VrtI" I UUU I0C-164 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-15WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
I-HE-15W (21) Tanks and Heat Exchangers WEST COMPONENT COOLING WATER HEAT EXCHANGER Photos C-163 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (21) Ta 1-HE-15W inks and Heat Exchangers WEST COMPONENT COOLING V rtI" I UUU I0 C-164 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-15W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST COMPONENT COOLING WATER HEAT EXCHANGER C-165 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
WEST COMPONENT COOLING WATER HEAT EXCHANGER C-165 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Project:
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
ABI, 609.00 ft, 6 Manufacturer/Model:
ABI, 609.00 ft, 6Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
SQUG 1-HE-17WREVO
SQUG 1-HE-17WREVO
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-166 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-HE-17WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
C-166 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-167 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Equipment  
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12C-167 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17WEquipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER C-168 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17WEquipment Class: (21) Tanks and Heat Exchangers I:niirnm,=nt rlmj'rinfinn.  
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER C-168 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17W Equipment Class: (21) Tanks and Heat Exchangers I:niirnm,=nt rlmj'rinfinn.  
\AIFg::.T Pg5-1 1-1 IAI WIAT WPAT 9FYICWAKI.'JI:P i iC-169 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -HE-1 8WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
\AIFg::.T Pg5-1 1-1 IAI WIAT WPAT 9FYICWAKI.'JI:P i i C-169 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -HE-1 8W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER Project:
WEST CONTAINMENT SPRAY HEAT EXCHANGER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
ABI, 609.00 ft, 4 Manufacturer/Model:
ABI, 609.00 ft, 4Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
SQUG 1-HE-18WREVO
SQUG 1-HE-18WREVO
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes Verified with pictures where not visible from platforms 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
YesYesVerified with pictures where not visible from platforms
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
Yes C-170 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment  
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Yes6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YesC-170 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-HE-18WEquipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST CONTAINMENT SPRAY HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8.. Are overhead equipment, distribution  
8.. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: " George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-171 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-HE-18W Equipment Class: (21) Tanks and Heat Exchangers
CommentsEvaluated by: " George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-171 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-HE-18WEquipment Class: (21) Tanks and Heat Exchangers
:NT C-172 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FYi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-HE-18W Equipment Class: (21) Tanks and Heat Exchangers
:NTC-172 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FYi N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-HE-18WEquipment Class: (21) Tanks and Heat Exchangers
ýNT C-173 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-HE-18W Equipment Class: (21) Tanks and Heat Exchangers JTAINMENT FWHJUý10!j C-1 74 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EZ-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment  
ýNTC-173 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-HE-18WEquipment Class: (21) Tanks and Heat Exchangers JTAINMENT FWHJUý10!j C-1 74 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: EZ-I N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-18WEquipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER C-175 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-18WEquipment Class: (21) Tanks and Heat Exchangers IAIr-O-QTC 4J-DDAV LIIATr VCC-1 76 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1-HV-ACRA-2 Equipment Class: (10) Air HandlersEquipment
WEST CONTAINMENT SPRAY HEAT EXCHANGER C-175 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-18W Equipment Class: (21) Tanks and Heat Exchangers IAIr-O-QTC 4J-DDAV LIIATr VC C-1 76 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project:
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
ABI, 650.00 ft, 129 Manufacturer/Model:
ABI, 650.00 ft, 129Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-177 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.:' 1-HV-ACRA-2 Equipment Class: (10) Air HandlersEquipment
Yes C-177 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: ' 1-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-178 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers IPrwiinmo-n' n,'ef-rinfinn" PnnCI 1-HV-ACRA-2 M VENTILATION SOUTH AIR CONDITIONII I \%./1,=I-'.11[ It II J.I C-179 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-ACRF-2 Equipment Class: (9) Fans Equipment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-178 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (10) Air HandlersIPrwiinmo-n' n,'ef-rinfinn" PnnCI1-HV-ACRA-2 M VENTILATION SOUTH AIR CONDITIONII I \%./1,=I-'.11[ It II J.IC-179 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-HV-ACRF-2 Equipment Class: (9) FansEquipment


==
==
Description:==
Description:==


CONTROL ROOM PRESSURIZATION/CLEANUP FILTER UNITProject:
CONTROL ROOM PRESSURIZATION/CLEANUP FILTER UNIT Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 650.00 ft, 129 Manufacturer/Model:
AB1, 650.00 ft, 129Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional snace is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional snace is provided at the end of this checklist for documentinq other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofootentiallv adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of ootentiallv adverse seismic conditions?
YesC-180 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 1 -HV-ACRF-2 Equipment Class: (9) FansEquipment
Yes C-180 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 1 -HV-ACRF-2 Equipment Class: (9) Fans Equipment


==
==
Description:==
Description:==


CONTROL ROOM PRESSURIZATION/CLEANUP FILTER UNITInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
CONTROL ROOM PRESSURIZATION/CLEANUP FILTER UNIT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block Wall -retrofitted  
Block Wall -retrofitted  
-OK per DWG 12-403 1, Wall W-19. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
-OK per DWG 12-403 1, Wall W-1 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-181 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY3] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-ACRF-2 Equipment Class: (9) FansPRC-1 82 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: LII N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (9) Fans1 -HV-ACRF-2 FC-183 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-AES-2 Equipment Class: (10) Air HandlersEquipment
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-181 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY3] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-ACRF-2 Equipment Class: (9) Fans PR C-1 82 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (9) Fans 1 -HV-ACRF-2 F C-183 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-AES-2 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


AUXILIARY BUILDING VENTILATION ENGINEERED SAFETYProject:
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 8 Manufacturer/Model:
AB1, 633.00 ft, 8Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
DWG 12-5739 REVI 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
DWG 12-5739 REVI2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-184 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-AES-2 Equipment Class: (10) Air Handlers Equipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-184 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-HV-AES-2 Equipment Class: (10) Air HandlersEquipment


==
==
Description:==
Description:==


AUXILIARY BUILDING VENTILATION ENGINEERED SAFETYInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall behind filter unit -DWG 12-4029, Wall W-1 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
Block wall behind filter unit -DWG 12-4029, Wall W-19. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-185 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers Eauioment Descrintion:
CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-185 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (10) Air HandlersEauioment Descrintion:
AUXILIARY BUlL 1 -HV-AES-2 C-186 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-AES-2 Equipment Class: (10) Air Handlers Equipment
AUXILIARY BUlL1 -HV-AES-2 C-186 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-AES-2 Equipment Class: (10) Air HandlersEquipment


==
==
Description:==
Description:==


AUXILIARY BUILDING VENTILATION ENGINEERED SAFETYC-1 87 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (10) Air Handlers1 -HV-AES-2 C-188 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: IY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (10) Air HandlersIEauioment Descrintion:
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-1 87 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers 1 -HV-AES-2 C-188 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: IY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers IEauioment Descrintion:
AUXIIIARY R1JII1 -HV-AES-2 C-189 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-HV-CEQ-1 Equipment Class: (10) Air HandlersEquipment
AUXIIIARY R1JII 1 -HV-AES-2 C-189 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1Project:
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
CON1, 612.00 ft, 75 Manufacturer/Model:
CON1, 612.00 ft, 75Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Only saw 2.5 out of 4 sides of bolts 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Only saw 2.5 out of 4 sides of bolts3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
YesYes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-190 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Fi N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -HV-CEQ-1 Equipment Class: (10) Air HandlersEquipment
Yes C-190 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Fi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: "'- ''" " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-191 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers Eauinment Descrintion:
CommentsEvaluated by: "'- ''" " George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-191 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (10) Air HandlersEauinment Descrintion:
CONTAINMENT I -H V-C EQ-I HYDROGEN SKIMMER VENTILATION FAN #1 C-192 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-1 Equipment Class: (10) Air Handlers EauiDment
CONTAINMENT I -H V-C EQ-IHYDROGEN SKIMMER VENTILATION FAN #1C-192 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-1 Equipment Class: (10) Air HandlersEauiDment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1C-193 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-2 Equipment Class: (10) Air HandlersEquipment
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 C-193 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2Project:
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
CON1, 625.00 ft, 74 Manufacturer/Model:
CON1, 625.00 ft, 74Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SHOULD BE CHANGED TO 'NO' NOT ACCESSIBLE ALL THE WAY AROUND 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes Can only see one side and I wall beam anchorage 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
Painted bolts 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?5. Is the anchorage configuration consistent with plant documentation?
SHOULD BE CHANGED TO 'NO' NOT ACCESSIBLE ALL THE WAYAROUND2. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YesCan only see one side and I wall beam anchorage
Should be taken off anchorage list cannot see all anchors 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
C-194 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment
Painted bolts4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?5. Is the anchorage configuration consistent with plant documentation?
Not Applicable (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Should be taken off anchorage list cannot see all anchors6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-194 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -HV-CEQ-2 Equipment Class: (10) Air HandlersEquipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-195 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-195 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-2 Equipment Class: (10) Air HandlersEquipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2C-1 96 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (10) Air HandlersPrIminmnf F-lmcrinfinn-('CKITAIIMFAI:MT 1 -HV-CEQ-2 HYDROGEN SKIMMER VENTILATION FAN #21 I / Ill 11¥1L,,,.l 1 I I UrtoIl /U4 I-LC-197 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-2 Equipment Class: (10) Air HandlersEquipment
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 C-1 96 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers PrIminmnf F-lmcrinfinn-('CKITAIIMFAI:MT 1 -HV-CEQ-2 HYDROGEN SKIMMER VENTILATION FAN #21 I / Ill 11¥1L,,,.l 1 I IU rtoIl /U4 I-L C-197 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2t-ViLU414 C-1 98 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-DGX-1 Equipment Class: (9) FansEquipment
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 t-ViLU414 C-1 98 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-DGX-1 Equipment Class: (9) Fans Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project:
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 121 Manufacturer/Model:
AB1, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-HV-DGX-1 REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes Cannot see all bolts -other equipment/piping in area obstruct view.Visible bolts OK 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
Visible bolts OK 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-HV-DGX-1 REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YesCannot see all bolts -other equipment/piping in area obstruct view.Visible bolts OK3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
CANNOT VERIFY ALL BOLTS 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Visible bolts OK4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?5. Is the anchorage configuration consistent with plant documentation?
C-199 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -HV-DGX-1 Equipment Class: (9) Fans Equipment
Not Applicable (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
CANNOT VERIFY ALL BOLTS6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-199 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -HV-DGX-1 Equipment Class: (9) FansEquipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: ' George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-200 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LI-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-DGX-1 Equipment Class: (9) Fans C-201 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-DGX-1 Equipment Class: (9) Fans 4ICY DIE C-202 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -HV-SGRS-8 Equipment Class: (9) Fans Equipment
CommentsEvaluated by: ' George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-200 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: LI-I N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-DGX-1 Equipment Class: (9) FansC-201 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-DGX-1 Equipment Class: (9) Fans4ICY DIEC-202 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -HV-SGRS-8 Equipment Class: (9) FansEquipment


==
==
Description:==
Description:==


4KV ROOM 600V SWITCHGEAR TRANSFORMERS TR1 1A ANDProject:
4KV ROOM 600V SWITCHGEAR TRANSFORMERS TR1 1A AND Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
ABI, 609.00 ft, 204 Manufacturer/Model:
ABI, 609.00 ft, 204Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG' 1-HV-SGRS-8 REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Unistrut mounted 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
Not Applicable Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
SQUG' 1-HV-SGRS-8 REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes C-203 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Eli] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-SGRS-8 Equipment Class: (9) Fans Equipment
YesYes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Unistrut mounted5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Yes6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YesC-203 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Eli] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-HV-SGRS-8 Equipment Class: (9) FansEquipment


==
==
Description:==
Description:==


4KV ROOM 600V SWITCHGEAR TRANSFORMERS TR 11A ANDInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
4KV ROOM 600V SWITCHGEAR TRANSFORMERS TR 11A AND Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?.
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?.
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: 2I " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-204 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-SGRS-8 Equipment Class: (9) Fans'V SWITCH C-205 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-SGRS-8 Equipment Class: (9) Fans f SWIT C-206 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IFI-53 Equipment Class: (18) Instruments on Racks Equipment
CommentsEvaluated by: 2I " George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-204 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-SGRS-8 Equipment Class: (9) Fans'V SWITCHC-205 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-SGRS-8 Equipment Class: (9) Fansf SWITC-206 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -IFI-53Equipment Class: (18) Instruments on RacksEquipment


==
==
Description:==
Description:==


BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOWProject:
BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
CON1, 598.00 ft, 56 Manufacturer/Model:
CON1, 598.00 ft, 56Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-207 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: EYi] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -IFI-53Equipment Class: (18) Instruments on RacksEauipment
Yes C-207 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EYi] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IFI-53 Equipment Class: (18) Instruments on Racks Eauipment


==
==
Description:==
Description:==


BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOWInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: " George G Thomas Date: 10/18/12 LJJ " Neda Stoeva 10/18/12 Photos C-208 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IFI-53 Equipment Class: (18) Instruments on Racks inmontnoct-rinfinn-BORON INJECTION TO REACTOR COOLANT LOOP: C-209 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
CommentsEvaluated by: " George G Thomas Date: 10/18/12LJJ " Neda Stoeva 10/18/12PhotosC-208 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-IFI-53Equipment Class: (18) Instruments on Racksinmontnoct-rinfinn-BORON INJECTION TO REACTOR COOLANT LOOP:C-209 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY PUMP DISCHARGE TOProject:
WEST CONTAINMENT SPRAY PUMP DISCHARGE TO Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 573.00 ft, 52 Manufacturer/Model:
AB1, 573.00 ft, 52Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which* an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which* an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-2 10 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -IMO-222Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-2 10 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY PUMP DISCHARGE TOInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST CONTAINMENT SPRAY PUMP DISCHARGE TO Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall -OK per 12-4025, Wall W- I 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
Block wall -OK per 12-4025, Wall W- I9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: ' " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-21 1 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves I=rminmcmnf rman' rintin" \AII:T (f' ITAIKIKINIT 4QPPAV Pl I11 Tr)C-212 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IMO-225 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
CommentsEvaluated by: ' " George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-21 1 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesI=rminmcmnf rman' rintin" \AII:T (f' ITAIKIKINIT 4QPPAV Pl I11 Tr)C-212 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -IMO-225Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment


==
==
Description:==
Description:==


REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Project:
REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 573.00 ft, 52 Manufacturer/Model:
AB1, 573.00 ft, 52Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-213 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -IMO-225Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-213 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -IMO-225 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall -OK per 12-4025, Wall W-1 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Block wall -OK per 12-4025, Wall W-19. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: ' " -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-214 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -IMO-225 (8) Motor-Operated and Solenoid-Operated Valves rER I-C-215 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: L-j] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
CommentsEvaluated by: ' " -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-214 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F-7 N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:I -IMO-225(8) Motor-Operated and Solenoid-Operated ValvesrERI-C-215 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: L-j] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment


==
==
Description:==
Description:==


WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTIONProject:
WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 573.00 ft, 55 Manufacturer/Model:
AB1, 573.00 ft, 55Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documentinq other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-216 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F7j N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -IMO-320Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEauioment
Yes C-216 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F7j N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment


==
==
Description:==
Description:==


WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTIONInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment,,
: 8. Are overhead equipment,, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
distribution  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
Comments Evaluated by: ' George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-217 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves)UAL HEAT IXVAI Pl IIAP PP .C-218 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FjJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauipment
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: ' George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-217 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves)UAL HEATIXVAI Pl IIAP PP .C-218 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FjJ NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEauipment


==
==
Description:==
Description:==


WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVEProject:
WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 609.00 ft, 6 Manufacturer/Model:
AB1, 609.00 ft, 6Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-219 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -IMO-331Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-219 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVEInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?.
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?.
9.. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
9.. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-220 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves pment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-220 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valvespment


== Description:==
== Description:==


WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVEC-221 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves1AIR TO UPPER CONTAC-222 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FTj] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE C-221 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 1A IR TO UPPER CONTA C-222 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FTj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Project:
WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 609.00 ft, 6 Manufacturer/Model:
AB1, 609.00 ft, 6Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinas.
Additional space is provided at the end of this checklist for documentinci other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documentinci other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-223 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -IMO-350Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-223 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-224 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: r-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (8) Mot I-IMO-350 or-Operated and Solenoid-Operated Valves rE C-225 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
CommentsEvaluated by: " George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-224 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: r-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (8) MotI-IMO-350 or-Operated and Solenoid-Operated ValvesrEC-225 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment


==
==
Description:==
Description:==


WEST RHR HEAT EXCHANGER OUTLET TO SAla:ITV Wk IrMtI7C-226 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -IMO-52Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
WEST RHR HEAT EXCHANGER OUTLET TO SAl a:ITV Wk IrMtI7 C-226 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFFProject:
BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
CON1, 598.00 ft, 59 Manufacturer/Model:
CON1, 598.00 ft, 59Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofDotentiallv adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
YesC-227 DC Cook Unit I & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -IMO-52Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment
Yes C-227 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
==
Description:==
Description:==


BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFFInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-228 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1 -IMO-52 (8) Motor-Operated and Solenoid-Operated Valves CTION TO C-229 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FIY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves IPnm inmnf nfelrintinne PC)R(MIN)I IKIF::.TIIM' TC RIZAr.TfIP CflI AMT I OfP "f9 5HI IT"PFF rlu IUJOZ C-230 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-228 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: [Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:1 -IMO-52(8) Motor-Operated and Solenoid-Operated ValvesCTION TOC-229 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: FIY- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-52Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesIPnm inmnf nfelrintinne PC)R(MIN)I IKIF::.TIIM' TC RIZAr.TfIP CflI AMT I OfP "f9 5HI IT"PFFrlu IUJOZC-230 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 2, 01/13/14Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-52Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment


==
==
Description:==
Description:==


BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFFC-231}}
BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF C-231}}

Latest revision as of 17:09, 13 July 2018

SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-115 Through Page C-231
ML14035A356
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/13/2014
From: Yates L M
American Electric Power
To:
Office of Nuclear Reactor Regulation
Shared Package
ML14035A350 List:
References
AEP-NRC-2014-08 SD-121023-001, Rev 2
Download: ML14035A356 (117)


Text

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LYi] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-DGAB REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Verified bolts A and B were left out of analysis 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-115 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: t-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: , George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-1 16 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Photos C-117 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets pment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-118 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets:nilinm=znt rl'at-rinfinn-AP FMFP:ltrV NI:IPATt'CP RAPI:_ AR n rKITInl C-119 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-120 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets GENCY DIESEL GENERATOR OME-150-AB CONTROL C-121 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-122 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Yj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets in=iinmnt f ndmarinfinn" AR nImIqI (r,'I:=PAATIP rII:_tKA.nAP r C-123 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-124 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-125 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB-INV Equipment Class: (16) Inverters Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., isthe item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YSE 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-126 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-DGAB-INV Equipment Class: (16) Inverters Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Edge distance OK on bolts but looks small due to oversized washers underneath Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-127 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

I -DGAB-INV (16) Inverters AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER P9130214 C-128 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB-INV Equipment Class: (16) Inverters JCY DIE C-129 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (16) Inverters 1-DGAB-INV NCY DIE C-1 30 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (16) Inverters F:::n, egrrinti~nn AP ::FMFP:l(~l:::I I-DGAB-INV NCY DIE C-131 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ESSENTIAL SERVICE WATER CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincis.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Welded to embedded plate with shim plates 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-132 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ESSENTIAL SERVICE WATER CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-133 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ESSENTIAL SERVICE WATER CONTROL PANEL Photos C-1 34 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets VICE C-135 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets-NTIAL SERVICE ýC-136 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: jY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-EZC-A REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-137 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -EZC-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-138 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A C-139 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A C-140 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-EZC-A Equipment Class: (1) Motor Control Centers Pi::a ,iinm,'nf rn,',trinfinn.

RFINr\/I('_

('l::PKlTlPPl J I UI \ UUI ! I I \VI.. C-141 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A C-142 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -EZC-A1 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

Attached to 1-EZC-B1 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-143 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -EZC-A1 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: "'- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-144 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-AI Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A1 C-145 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment

==

Description:==

1 -EZC-AI (1) Motor Control Centers 600VAC MOTOR CONTROL CENTER EZC-AI P9170602 P9170603 C-146 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-EZC-B REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-147 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -EZC-B Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: "- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-148 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: -] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B C-149 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers)L CENTER EZC-Bý%, IVIj 1 ý.Jr-, 1 rx C-150 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers Pri r-im: o rgc-inin nn\/At't IAt*)Tn"P f'tnKlT~tnl t(r:::KlTl:D 19=7r"_1P r-d I/UOzLI C-1 51 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: T] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers E ui ment Descri tion: 600VAC MOTOR P9170625 CONTRC C-152 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-BI Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

Attached to 1-EZC-A 1 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-153 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Eli N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -EZC-BI Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-154 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

I -EZC-BI (1) Motor Control Centers 600VAC MOTOR CONTROL CENTER EZC-B1 C-155 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B1 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-BI P9170609 P9170610 C-156 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-FFI-240 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1,621.00ft, 10 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DOCS SD-090519-001, SD-090313-001, SD-090313-002

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-157 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [f N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -FFI1-240 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: .-,-"&. George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-158 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-FFI-240 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Photos P9100281 P9100282 C-159 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -FFI-240 (18) Instruments on Racks.R TO TTER C-160 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -HE-I 5W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST COMPONENT COOLING WATER HEAT EXCHANGER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 609 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Threads not fully engaged on south west bolt, but OK only minor.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-161 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-15W Equipment Class: (21) Tanks and Heat Exchangers Eauipment

==

Description:==

WEST COMPONENT COOLING WATER HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall on south-west side of heat exchanger

-retrofitted

-OK per DWG 12-4028, Wall W-10 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Cable trays lightly loaded Comments Fire piping above well supported Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-162 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

I-HE-15W (21) Tanks and Heat Exchangers WEST COMPONENT COOLING WATER HEAT EXCHANGER Photos C-163 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (21) Ta 1-HE-15W inks and Heat Exchangers WEST COMPONENT COOLING V rtI" I UUU I0 C-164 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-15W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST COMPONENT COOLING WATER HEAT EXCHANGER C-165 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

ABI, 609.00 ft, 6 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-HE-17WREVO

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-166 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 C-167 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER C-168 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-17W Equipment Class: (21) Tanks and Heat Exchangers I:niirnm,=nt rlmj'rinfinn.

\AIFg::.T Pg5-1 1-1 IAI WIAT WPAT 9FYICWAKI.'JI:P i i C-169 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -HE-1 8W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

ABI, 609.00 ft, 4 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

SQUG 1-HE-18WREVO

2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes Verified with pictures where not visible from platforms 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-170 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8.. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: " George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-171 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-HE-18W Equipment Class: (21) Tanks and Heat Exchangers

NT C-172 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FYi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-HE-18W Equipment Class: (21) Tanks and Heat Exchangers

ýNT C-173 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-HE-18W Equipment Class: (21) Tanks and Heat Exchangers JTAINMENT FWHJUý10!j C-1 74 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EZ-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER C-175 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HE-18W Equipment Class: (21) Tanks and Heat Exchangers IAIr-O-QTC 4J-DDAV LIIATr VC C-1 76 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

ABI, 650.00 ft, 129 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-177 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: ' 1-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-178 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers IPrwiinmo-n' n,'ef-rinfinn" PnnCI 1-HV-ACRA-2 M VENTILATION SOUTH AIR CONDITIONII I \%./1,=I-'.11[ It II J.I C-179 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-ACRF-2 Equipment Class: (9) Fans Equipment

==

Description:==

CONTROL ROOM PRESSURIZATION/CLEANUP FILTER UNIT Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 650.00 ft, 129 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional snace is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of ootentiallv adverse seismic conditions?

Yes C-180 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 1 -HV-ACRF-2 Equipment Class: (9) Fans Equipment

==

Description:==

CONTROL ROOM PRESSURIZATION/CLEANUP FILTER UNIT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block Wall -retrofitted

-OK per DWG 12-403 1, Wall W-1 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-181 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY3] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-ACRF-2 Equipment Class: (9) Fans PR C-1 82 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (9) Fans 1 -HV-ACRF-2 F C-183 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-AES-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 8 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-5739 REVI 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-184 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-AES-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall behind filter unit -DWG 12-4029, Wall W-1 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-185 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers Eauioment Descrintion:

AUXILIARY BUlL 1 -HV-AES-2 C-186 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-AES-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-1 87 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers 1 -HV-AES-2 C-188 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: IY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers IEauioment Descrintion:

AUXIIIARY R1JII 1 -HV-AES-2 C-189 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

CON1, 612.00 ft, 75 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Only saw 2.5 out of 4 sides of bolts 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-190 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Fi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: "'- " " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-191 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers Eauinment Descrintion:

CONTAINMENT I -H V-C EQ-I HYDROGEN SKIMMER VENTILATION FAN #1 C-192 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-1 Equipment Class: (10) Air Handlers EauiDment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 C-193 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

CON1, 625.00 ft, 74 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SHOULD BE CHANGED TO 'NO' NOT ACCESSIBLE ALL THE WAY AROUND 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes Can only see one side and I wall beam anchorage 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

Painted bolts 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?5. Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Should be taken off anchorage list cannot see all anchors 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-194 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-195 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 C-1 96 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers PrIminmnf F-lmcrinfinn-('CKITAIIMFAI:MT 1 -HV-CEQ-2 HYDROGEN SKIMMER VENTILATION FAN #21 I / Ill 11¥1L,,,.l 1 I IU rtoIl /U4 I-L C-197 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 t-ViLU414 C-1 98 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-DGX-1 Equipment Class: (9) Fans Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-HV-DGX-1 REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes Cannot see all bolts -other equipment/piping in area obstruct view.Visible bolts OK 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

Visible bolts OK 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?5. Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

CANNOT VERIFY ALL BOLTS 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-199 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -HV-DGX-1 Equipment Class: (9) Fans Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: ' George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-200 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LI-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-DGX-1 Equipment Class: (9) Fans C-201 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-DGX-1 Equipment Class: (9) Fans 4ICY DIE C-202 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -HV-SGRS-8 Equipment Class: (9) Fans Equipment

==

Description:==

4KV ROOM 600V SWITCHGEAR TRANSFORMERS TR1 1A AND Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

ABI, 609.00 ft, 204 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

SQUG' 1-HV-SGRS-8 REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Unistrut mounted 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-203 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Eli] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-SGRS-8 Equipment Class: (9) Fans Equipment

==

Description:==

4KV ROOM 600V SWITCHGEAR TRANSFORMERS TR 11A AND Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?.

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: 2I " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-204 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-SGRS-8 Equipment Class: (9) Fans'V SWITCH C-205 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-HV-SGRS-8 Equipment Class: (9) Fans f SWIT C-206 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IFI-53 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

CON1, 598.00 ft, 56 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-207 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EYi] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IFI-53 Equipment Class: (18) Instruments on Racks Eauipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: " George G Thomas Date: 10/18/12 LJJ " Neda Stoeva 10/18/12 Photos C-208 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IFI-53 Equipment Class: (18) Instruments on Racks inmontnoct-rinfinn-BORON INJECTION TO REACTOR COOLANT LOOP: C-209 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST CONTAINMENT SPRAY PUMP DISCHARGE TO Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 573.00 ft, 52 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which* an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-2 10 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST CONTAINMENT SPRAY PUMP DISCHARGE TO Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall -OK per 12-4025, Wall W- I 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: ' " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-21 1 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves I=rminmcmnf rman' rintin" \AII:T (f' ITAIKIKINIT 4QPPAV Pl I11 Tr)C-212 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IMO-225 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 573.00 ft, 52 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-213 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -IMO-225 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall -OK per 12-4025, Wall W-1 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: ' " -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-214 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -IMO-225 (8) Motor-Operated and Solenoid-Operated Valves rER I-C-215 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: L-j] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 573.00 ft, 55 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-216 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F7j N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment

==

Description:==

WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment,, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: ' George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-217 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves)UAL HEAT IXVAI Pl IIAP PP .C-218 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FjJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauipment

==

Description:==

WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 609.00 ft, 6 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-219 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?.

9.. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-220 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves pment

Description:

WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE C-221 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 1A IR TO UPPER CONTA C-222 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FTj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 609.00 ft, 6 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.

Additional space is provided at the end of this checklist for documentinci other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-223 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-224 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: r-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (8) Mot I-IMO-350 or-Operated and Solenoid-Operated Valves rE C-225 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

WEST RHR HEAT EXCHANGER OUTLET TO SAl a:ITV Wk IrMtI7 C-226 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

CON1, 598.00 ft, 59 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?

Yes C-227 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-228 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1 -IMO-52 (8) Motor-Operated and Solenoid-Operated Valves CTION TO C-229 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FIY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves IPnm inmnf nfelrintinne PC)R(MIN)I IKIF::.TIIM' TC RIZAr.TfIP CflI AMT I OfP "f9 5HI IT"PFF rlu IUJOZ C-230 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF C-231