Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring | 15 December 2022 | Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring | Post Accident Monitoring |
ML22340A213 | 30 November 2022 | R1900-0024-001, Revision 13, NFPA 805 Nuclear Safety Capability Assessment | |
ML22340A199 | 30 November 2022 | Report of Changes, Tests, Experiments Pursuant to 10 CFR 50.59(d)(2) | |
ML22340A176 | 30 November 2022 | Commitment Change Summary October 2020 to May 2022 | Probabilistic Risk Assessment |
AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report | 24 October 2022 | U1C31 Steam Generator Tube Inspection Report | Nondestructive Examination |
AEP-NRC-2021-07, Supplement to Report Per Technical Specification 5.6.6, Lnoperability of Unit 1, Post Accident Monitoring, Containment Water Level | 28 January 2021 | Supplement to Report Per Technical Specification 5.6.6, Lnoperability of Unit 1, Post Accident Monitoring, Containment Water Level | Post Accident Monitoring |
AEP-NRC-2020-23, Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | 30 April 2020 | Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | Nondestructive Examination Dissimilar Metal Weld |
ML20108E999 | 5 March 2020 | Enclosure 7 - LTR-SCS-19-50, Revision 0, D.C. Cook Unit 1 Low Temperature Overpressure Protection System (Ltops) Analysis for 48 EFPY, Dated March 5, 2020, Attachment 2 Only (Non-Proprietary) | Stroke time |
ML20108F000 | 28 February 2020 | Enclosure 5 - WCAP-18455-NP, Revision 1, D.C. Cook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation, Westinghouse Electric Company, February 2020. (Non-Proprietary) | Hydrostatic |
ML18334A271 | 30 September 2018 | WCAP-18394-NP, Revision 1, Fatigue Crack Growth Evaluations of D.C. Cook, Units 1 and 2 RHR, Accumulator, and Safety Injection Lines Supporting Expanded Scope Leak-Before-Break. | Through-Wall Leak |
ML18274A095 | 30 September 2018 | WCAP-18394-NP, Revision 1, Fatigue Crack Growth Evaluations of D. C. Cook Units 1 and 2 RHR, Accumulator, and Safety Injection Lines Supporting Expanded Scope Leak-Before-Break, September 2018 (Non-Proprietary) | Through-Wall Leakage |
ML18334A269 | 31 January 2018 | WCAP-18302-NP, Revision 0, Technical Justification for Eliminating Residual Heat Removal Line Rupture as the Structural Design Basis for D.C. Cook Units 1 and 2, Using Leak-Before-Break Methodology. | Safe Shutdown Earthquake Design basis earthquake Pressure Boundary Leakage Pressure boundary leak |
ML18334A268 | 31 January 2018 | WCAP-18295-NP, Revision 0, Technical Justification for Eliminating Accumulator Line Rupture as the Structural Design Basis for D.C. Cook Units 1 and 2, Using Leak-Before-Break Methodology (Non-Proprietary) | Safe Shutdown Earthquake Design basis earthquake Pressure Boundary Leakage Pressure boundary leak |
ML18334A270 | 31 January 2018 | WCAP-18309-NP, Revision 0, Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis for D.C. Cook, Units 1 and 2, Using Leak-Before-Break Methodology. | |
ML16313A117 | 10 October 2016 | 1BTl1V001-RPT-01, Donald C. Cook Focused Scope Peer Review - Pre-Initiator Human Reliability Analysis. | Internal Flooding Probabilistic Risk Assessment Earthquake |
ML16169A118 | 31 March 2016 | RWA-1313-015, Rev. 1, AST Radiological Analysis Technical Report. | |
ML15308A093 | 15 October 2015 | Pressurized Water Reactor Owners Group (Pwrog), 15066-NP, Revision 1, Responses to Follow-Up NRC RAI 2 on the D.C. Cook, Units 1 and 2, Reactor Internals Aging Management Program. | Safe Shutdown Aging Management |
ML14253A317 | 4 September 2014 | Enclosure 2: I&M CAP Document AR 2010-1804-10, Root Cause Evaluation Attachment, Rx Vessel Core Support Lug Bolting Anomalies | Probabilistic Risk Assessment Aging Management Earthquake Flow Induced Vibration |
ML14147A329 | 18 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident | Unanalyzed Condition High winds Operator Manual Action Fukushima Dai-Ichi Earthquake |
ML14092A330 | 17 March 2014 | Document No. 13Q3208-RPT-003, Revion 1, Seismic Hazard and Screening Report for the Cook Nuclear Plant (Cnp), Enclosure 2 to AEP-NRC-2014-25 | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Design basis earthquake Earthquake |
ML13337A325 | 24 January 2014 | Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown Boric Acid High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
ML14035A364 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-1 Through Page D-91 | Scaffolding |
AEP-NRC-2014-08, SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-322 Through Page D-404 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-322 Through Page D-404 | Boric Acid Fire Barrier Scaffolding |
ML14035A368 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-241 Through Page D-321 | Scaffolding |
ML14035A367 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-170 Through Page D-240 | Boric Acid Scaffolding |
ML14035A352 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Cover Through Page B-312 | Safe Shutdown Unanalyzed Condition Boric Acid Ultimate heat sink Probabilistic Risk Assessment Arc flash Finite Element Analysis Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake Scaffolding Weak link |
ML14035A353 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-1 Through Page C-114 | |
ML14035A366 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-92 Through Page D-169 | Scaffolding |
ML14035A363 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-845 Through Page C-962 | |
ML14035A362 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-723 Through Page C-844 | |
ML14035A361 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-584 Through Page C-722 | |
ML14035A355 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-405 Through End | Boric Acid Foreign Material Exclusion Scaffolding |
ML14035A360 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-469 Through Page C-583 | |
ML14035A359 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-354 Through Page C-468 | |
ML14035A357 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-232 Through Page C-353 | |
ML14035A356 | 13 January 2014 | SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-115 Through Page C-231 | |
ML13357A325 | 10 January 2014 | Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Donald C. Cook Nuclear Plant, Units 1 and 2, TAC Nos.: MF0766 and MF0767 | Safe Shutdown Boric Acid High winds Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
ML14253A318 | 31 December 2013 | Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 1 of 3 | |
AEP-NRC-2014-59, Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 3 of 3 | 31 December 2013 | Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 3 of 3 | |
ML14253A319 | 31 December 2013 | Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 2 of 3 | |
ML13267A327 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-1 Through Page D-48 | Scaffolding |
AEP-NRC-2013-07, SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-405 Through End | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-405 Through End | Boric Acid Scaffolding |
ML13267A335 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-339 Through Page D-404 | Boric Acid Fire Barrier Scaffolding |
ML13267A334 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-271 Through Page D-338 | Scaffolding |
ML13267A332 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-221 Through Page D-270 | Scaffolding |
ML13267A329 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-115 Through Page D-160 | Scaffolding |
ML13267A328 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-49 Through Page D-114 | Scaffolding |
ML13267A325 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-801 Through Page C-884 | |
ML13267A316 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-312 | Safe Shutdown Unanalyzed Condition Boric Acid High Radiation Area Ultimate heat sink Probabilistic Risk Assessment Operating Basis Earthquake Arc flash Locked High Radiation Area Finite Element Analysis Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake Scaffolding Weak link |
ML13267A317 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-1 Through Page C-98 |