SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-801 Through Page C-884
ML13267A325
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/12/2013
From: Stoeva N
Stevenson & Associates
To:
American Electric Power, Indiana Michigan Power Co, Office of Nuclear Reactor Regulation
Shared Package
ML13267A279 List:
References
AEP-NRC-2013-074 SD-121023-001, Rev 1
Download: ML13267A325 (84)


Text

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-XRV-222 Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

AB EMERGENCY DIESEL REAR BANK STARTING AIR SHUTOFF Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinq other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-801

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-XRV-222 Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

AB EMERGENCY DIESEL REAR BANK STARTING AIR SHUTOFF Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-802

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-XRV-222 Equipment Class:

(7) Fluid-Operated Valves MNCY DIESEL F1uiujub C-803

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Table C-3 Summary of Seismic Walkdown Checklists for DCCNP1 Outage Walkdowns COMPONENT DESCRIPTION Anchorage PAGE ID Verification Confirmed 1-11B 600 VAC Bus 11 B Switchgear Y

C-805 1-AZ-BC 600 VAC Motor Control Center AZ-N C-81 0 BC 1-AZ-BC-3B Essential Service Water to Turbine y

C-816 Driven 1-BCTC-AB Plant Battery Chargers BC-AB1 &

y C-820 BC-AB2 Transfer 1-MCAB 250 VDC Distribution Panel MCAB Y

C-825 1-NLI-320 Lower Containment Train 'B' Water N

C-831 Level Indicator XMTR 1-NMO-151 Pressureizer Relief Valve NRV-151 N/A C-836 Upstream Shutoff 1-NRV-151 Pressurizer Train 'B' Pressure N/A C-840 Relief Valve 1-NRV-152 Pressurizer Train 'B' Pressure N/A C-845 Relief Valve 1-NTR-230 Reactor Coolant Loop #3 Cold Leg N/A C-850 Wide Range 1-NTR-240 Reactor Coolant Loop #4 Cold Leg N/A C-854 Wide Range Excess Letdown Heat Exchanger 1-QRV-170 HE-13 Outlet Pressure Control N/A C-857 Valve 1-T1 1A1 South Safety Injection Pump PP-Y C-862 26S Supply Breaker 1-T1 1A5 West Essential Service Water Y

C-868 Pump PP-7W Supply 1-TDAB 250 VDC Train 'B' Transfer Cabinet N

C-874 1-XSO-321 Steam Generator #2 Blowdown N

C-880 Containment Isolation Note: Pages C-805 through C-884 are all new pages in Revision 1 of this Report.

1 C-804

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

NEI UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-11B Equip. Class (02) Low Voltage Switch gear Equipment Description 600 VAC Bus 11B Switchgear Location: Bldg. ABI Floor El. 609 Room, Area 204 (Sys - 600AC)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document tile results of the Seismic Walkdown of anl item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is tile item one Y] NE of tile 50% of SWEL items requiring such verification)?

SQUG-1-11B

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YZ NW UW-N/AW Y[

NW UW-N/AW YZ NWI UW-N/AW YEA NW--

UW-N/AW YZ NE] UW-I C-805

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ ND-- U-Seismic Walkdown Checklist (SWC)

Equipment IDNo. 1-11B Equip. Class (02) Low Voltage Switchgear Equipment Description 600 VAC Bus 11B Switchgear Interaction Effects

7. Are soft targets firee friom impact by nearby equipment or structures?

YN ND-UD-- N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND-UD N/AD]

and masonry block walls not likely to collapse onto the equipment?

Overhead cable trays and conduit well supported on trapeze supports.

Overhead lighting is rod hung and adequately secured.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ ND UD-N/AD YM NDI UD-Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[

NDI UD adversely affect the safety functions of the equipment?

Corninents(Additional pages may be added as necessary)

Status control stantion has minimal self-weight, a weighted base with a low center of gravity, and are interconnected. Therefore, any potential impacts from the stantion during a seismic event would be insignificant and would not cause damage or imapir the function of the MCC. In addition, chatter is not a concern with breakers. This assesment is in agreement with conclusions drawn in seismic house keeping procedure PMP-5020-RTM-001.

Walkdown performed on 4/7/2013.

Evaluated by: Tyler Blosser Date: 6/26/2013 Lindsav Yates 6/26/2013 C-806

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NO UD-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-IIB Equip. Class (02) Low Voltage Switch gear Equipment Description 600 VAC Bus 11B Switch gear Photographs Note:(P4071425)

Note:

C-807

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 lNote:(I-'4U/74J4) lNote:(I-'4U 174 1)

Note:(

Note: (i C-808

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:

r~~:I-4.(iq-oL) rnoye.

C-809

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ N-- uD--

Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-AZ-BC Equip. Class (01) Motor Control Centers Equipment Description 600 VAC Motor Control Center AZ-BC Location: Bldg. AB1 Floor El. 609 Room, Area 609 (Sys - 600AC)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YZ NEI UF-1 N/AD Y[

NEI UE-N/A--

4. Is the anchorage firee of visible cracks in the concrete neatr the anchors?

YZ N[] UE] N/ADl

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for" which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEI NDI UE1 N/AZ YN NEI U--

C-810

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YE ND UFDu Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-AZ-BC Equip. Class (01) Motor Control Centers Equipment Description 600 VAC Motor Control Center AZ-BC Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YE NI LIED N/ADl

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND UD N/A[D and masonry block walls not likely to collapse onto the equipment?

All overhead and wall mounted conduit piping is adequately supported.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ NDI UD N/AD Y M N F1 UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ NEI UD Coin ments(Add itional pages may be added as necessary.)

Walkdown performed on 4/5/20 13.

Evaluated by: Tyler Blosse.

Date: 6/26/2013 w

Lindsay Yates 6/26/2013 C-811

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NF U-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-AZ-BC Equip. Class (01) Motor Control Centers Equipment Description 600 VAC Motor Control Center AZ-BC Photographs Note:(P4040241) iN ote: i rNote:

i-iote: j C-812

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:

INote: (tP4u4uz4zf) 1'4u tc (I Note:(P4040252)

C-813

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 lnote:(t-q(.JuLu INote:(t-'4U4ULJO0)

Note:

Note:i C-814

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:

C-815

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YM N[D UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-AZ-BC-3B Equip. Class (01) Motor Control Centers Equipment Description Essential Service Water to Turbine Driven Location: Bldg. ABI Floor El. 609 Room, Area 609 (Sys - 600AC)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the followinIg questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[

ND of the 50% of SWEL items requiring such verification)?

SQUG-1-AZ-BC, Rule of the box

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YE ND UEi N/AD YZ ND UD1 N/AD

4. Is the anchorage free of visible cracks in the concrete near the anchors?

Y[

NE] UD-N/AD

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YZ ND] UD] N/AD YN[:ND U-1 C-816

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

NEI u D Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-AZ-BC-3B Equip. Class (01) Motor Control Centers Equipment Description Essential Service Water to Turbine Driven Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y[K NDI UD-N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] UD] N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ ND UD N/AD YZ ND-1 UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y] N[D] UD-Comnmnents(Additional pages may be added as necessary)

Evaluated by: Tyler Blosse Date: 4/5/2013 w

v Lindsav Yates 4/5/2013 C-817

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ N[-] U-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-AZ-BC-3B Equip. Class (01) Motor Control Centers Equipment Description Essential Service Water to Turbine Driven Photo ra hs Note:Front of 1-AZ-BC-3B(P4050264)

Note:(P4050266)

C-818

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ N[-] U-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-AZ-BC-3B Equip. Class (01) Motor Control Centers

! Water to Turbine C-819

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

N--

U--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-BCTC-AB Equip. Class (14) Distribution Panels & Aut Equipment Description Plant Battery Chargers BC-ABI & BC-AB2 Transfer Location: Bldg. ABI Floor El. 613 Room, Area 205 (Sys - 250D)

Manufacturer, Model, Etc. (optional but recomnlended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoiaue

1. Is the anchorage configuration verification required (i.e., is the item one YZ NF-of the 50% of SWEL items requiring such verification)?

SQUG 1-BCTC-AB, Rev. 0

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage firee of corrosion that is more than mild surface oxidation?

Y[K NEI U-1 N/AD YN NEI UI--

N/AD

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YZ NEI UF-N/AD

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YZ NEI UD N/AD YN NEI DUD C-820

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ N[D UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-BCTC-AB Equip. Class (14) Distribution Panels & Aut Equipment Description Plant Battery Chargers BC-ABI & BC-AB2 Transfer Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YZ ND UD N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[

ND UD N/AD and masonry block walls not likely to collapse onto the equipment?

There are two battery lights mounted to the wall approximately 4 ft behind the battery charger. Both are bolted down and not a seismic concern.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ ND UD-N/AD Y[

ND UD-Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YM NEI UD Comments(Additional pages may be added as necessary)

Seismic walkdown performed on March 28, 2013.

Evaluated by: Tyler Blosser Date: 6/26/2013 Lindsay Yates 6/26/2013 C-821

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NO u-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-BCTC-AB Equip. Class (14) Distribution Panels & Aut Equipment Description Plant Battery Charcers BC-AB1 & BC-AB2 Transfer Photoigraphs IN 0 LC: (

I NOnotelnr DOltS (I-'ZdLJ4Z4)

II Note:/-fcnor oOI1S (l--'JZIU4ZO)

C-822

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:Attached Lines (P3280426)

Note:(P.:

Note:

Note:Battery lights mounted on wall behindpanel and adequately secured (P3280430)

C-823

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 IN ote:(Kd 4J)

C-824

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ N-- U--

Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-MCAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Distribution Panel MCAB Location: Bldg. ABI Floor El. 609 Room, Area 200 (Sys - 250D)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN ND of the 50% of SWEL items requiring such verification)?

SQUG-1-MCAB

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YZ ND UE-N/AD YM ND UD N/AD

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YZ NE] U-- N/AD

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage flee of potentially adverse seismic conditions?

YZ ND UD N/AD YM NI ND UD C-825

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ ND-- UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-MCAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Distribution Panel MCAB Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YO NEI UD-N/AD-

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NO UDi N/AD and masonry block walls not likely to collapse onto the equipment?

Overhead cable trays are welded to their trapeze supports.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment fiee of potentially adverse seismic interaction effects?

YZ NDI UD-N/AD YZ NEI U--

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ NEI DUD Coniments(Additional pages may be added as necessary)

Walkdown perfom~ed on 4/4/2013.

Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsav Yates 6/26/2013 C-826

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ ND-- UD-]

Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-MCAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Distribution Panel MCAB Photographs Note:(

I'NOEC:(r-,+U.f /'+UU)

C-827

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NO U-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-MCAB E ui ment Descri tion 250 k Note: Upper left anchor bolt (P4041402)

Equip. Class (14) Distribution Panels & Aut tion Panel MCAB Note: Lower left anchor MCAB(P4041403)

C-828

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:Lower right anchor bolt of I MCAB(P4041404)

Note: Upper right anchor (P4041405) 1-4ote;(1--tV-f I -fV/j nute;(

C-829

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 C-830

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YE NEI u--

Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-NLI-320 Equip. Class (18) Instrument Racks Equipment Description Lower Containment Train 'B' Water Level Indicator XMTR Location: Bldg. CONI Floor El. 612 Room, Area 60 (Sys - Containment)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YD No of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in tile concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YZ ND UD-- N/AD YZ ND Ui1 N/AD YZ NEI UD-] N/AD1 YD ND UD-N/AZ YZ ND UD C-831

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

NEI u[D Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NLI-320 Equip. Class (18) Instrument Racks Equipment Description Lower Containment Train 'B' Water Level Indicator XMTR Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y[

N[l UD N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[

NEI UD-N/AD and masonry block walls not likely to collapse onto the equipment?

Temporary lighting and zip ties hung for Unit 1 Cycle 25 outage -

not present during normal operation

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment fiee of potentially adverse seismic interaction effects?

YZ ND UD N/AD YZ NDl UD Other Adverse Conditions I 1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YN NEI UD Comments(Additional pages may be added as necessary)

Walkdown performed on 4/1/2013.

Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsay Yates Mc4-*

6/26/2013 C-832

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

NO uD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NLI-320 Equip. Class (18) Instrument Racks Equipment Description Lower Containment Train 'B' Water Level Indicator XMTR Photozraphs Note: Debris Interceptor on the floor (P4010111) 1 Note: Cord hung for temporary lighting for Unit I Cycle 25 refueling outage. (P4010112)

Note:Lora hung tor temporary iighting tor 1 Cycle 25 refueling outage. (P4010113)

Note: Cord hung for temporary lighting for U I Cycle 25 refueling outage. (P4010114)

C-833

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13

[Note:zip ties supportng coras nung Tor I f ote:(t-"(.I U I ()

temporary lighting for Unit I Cycle 25 refueling outage. (P4010115) f-4ote:(t-4u7u7 7,Y) fNote:(t-4u7uizq)

C-834

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 iNote:(I-'4U7U7ZZ)

C-835

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

NEI uF-D Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NMO-151 Equip. Class (8) Motor Operated & Solenoid Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff Location: Bldg. CONI Floor El. 650 Room, Area 81 (Sys - RCS)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YD NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YW ND UD N/A[

Y-I NEI UD N/AZ YD ND UD1 N/AZ YLI ND UD N/AN YM NEI---UD C-836

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NEI UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NMO-151 Equip. Class (8) Motor Operated & Solenoid Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff Interaction Effects

7. Are soft targets fi-ee from impact by nearby equipment or structures?

Y[

NEI U-- N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND UD N/AD and masonry block walls not likely to collapse onto the equipment?

Overhead ventilation ductwork adequately supported Abandoned hanger above, however no concern - more than adequate thread engagement on the anchor

9. Do attached lines have adequate flexibility to avoid damage?
10. Based o01 the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ ND UD N/AD Y[

N-I U -

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YM NEIUD Coininents(Additional pages may be added as necessary)

Walkdown performed on 3/29/2013.

Evaluated by: Tyler Blosser Date: 6/26/2013 Lindsay Yates M t f/

6/26/2013 C-837

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

NEI-U[D Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NMO-151 Equip. Class (8) Motor Operated & Solenoid Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff routograpgs Note:(P3280005)

Note:Lines connecting to 1-NA (P3280007)

Note: Overhead ductwork support (P C-838

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 iN ote:ULuci inwaKeexnausi opening, no fiange iNote:/ADanooneu -ianger yj-sz installed, bolts not required. (P3280010)

J iNote:/iLIudufeunu n~dfi1gw (t-,3 C-839

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

NEI u--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NRV-151 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Location: Bldg. CONI Floor El. 650 Room, Area 81 (Sys - RCS)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anhoaoe

1. Is the anchorage configuration verification required (i.e., is the item one Y[-] NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions'?

Y[-- NI] Ur-N/AM YEI NEI Ur-N/AZK YFl N[] UI-N/AZ YEl NEI U[J N/AN YN NE U--1 C-840

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NEI U[--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NRV-151 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YZ ND UD N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead ductwork is adequately supported.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YM ND UD N/AD YZ ND UD N/AD YZ NND UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YN ND UD Comments(Additional pages may be added as necessary)

Walkdown performed on 3/29/2013.

Evaluated by: Tyler Blosse Date: 6/26/2013 v

Lindsav Yates 6/26/2013 C-841

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YO N[-] UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NRV-151 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Photographs Note:P3280017 Note:P3280018 C-842

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NO U-D Seismic Walkdown Checklist (SWC)

Equip. Class (7) Pneumatic Operated Valves C-843

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:P3280022 Note:Spring can next to valve note:opflfly t-dfl (I NoMe:tveufeldu UUGI WCRK, nuts wre not required for sheet metal screws. (P3280026)

C-844

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YM N[D UD-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NRV-152 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Location: Bldg. CON1 Floor El. 650 Room, Area 81 (Sys - RCS)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an iten of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

AnehoQage

1. Is the anchorage configuration verification required (i.e., is the item one YD-NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YLI ND U-1 N/AZ YEI ND U-- N/AZ

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YE] NE] UD N/AZ

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YLI1 NEI UEI N/AH YM NEIUD-C-845

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y NEI u F Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NRV-152 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y[Z NDI UD N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[

NO UD N/AD and masonry block walls not likely to collapse onto the equipment?

Abandoned support overhead, however no concern - more than adequate thread engagement on the anchor.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y[

ND UD N/AD Y[K ND UD-1 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YM NDI UD-adversely affect the safety functions of tile equipment?

Coimnents(Additional pages may be added as necessary)

Overhead ductwork adequately supported and has no loose nuts or bolts.

Walkdown performed on 3/29/2013.

Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsay Yates 6/26/2013 C-846

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YM NV-- U-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NRV-152 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Photographs Note:J-Note:

C-847

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NO UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NRV-152 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve l

l L

Note: P3280031 C-848

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:Ducting support overhead adequately supported. (P3280037) i Ote'.-'jzouuo INote:'-iu.fuurwu uvmuiiu.iuputi wIa adequate thread engagement (P3280039)

C-849

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Vi NEI uD-Seismic Walkdown Checklist (SWC)

Equipmlent ID No. 1-NTR-230 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #3 Cold Leg Wide Range Location: Bldg. CON1 Floor El. 617 Room, Area 62 (Sys - RCS)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraoe

1. Is the anchorage configuration verification required (i.e., is the item one YW NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y-I NEI U1 N/AN Y[I ND U[-] N/AZ Y-I NEI U1 N/AN YLI ND UDI N/AZ YZNEND UD C-850

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NEI UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NTR-230 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #3 Cold Leg Wide Range Interaction Effects

7. Are soft targets firee from impact by nearby equipment or structures?

Y[

NEI UD N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NE] UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment fi'ee of potentially adverse seismic interaction effects?

YE ND ULI N/AD YM Nr-- UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ NEI DUD Cornments(Additional pages may be added as necessary)

Instrument is located directly below grating which is seismically adequate. Therefore, the instrument is free from any adverse seismic interactions.

Seismic walkdown performed on May 9, 2013 Evaluated by: Tyler Blosse Date: 6/26/2013 w

Lindsay Yates At y&

6/26/2013 C-851

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1,09/12/13 Status: YN N[

U-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NTR-230 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #3 Cold Leg Wide Range Note:Instrument below grating (

irlote:-ieXiuie iines aacIneu to Iinstrument (P5081525)

C-852

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 rNote:A(Wacnea tines

.I C-853

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YM N[--] UFu Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NTR-240 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #4 Cold Leg Wide Range Location: Bldg. CONI Floor El. 617 Room, Area 63 (Sys - RCS)

Manufacturer, Model, Etc. (optional but recoininended)

Instructions for Completing Checklist This checklist may be used to document tile results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsrnay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] No of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YE] NEI UE] N/AZ YE] NEI UE] N/A19

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YE] NE] UE:] N/AZ

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions'?

YEI NE] UE] N/AZ YM NEI UE]

C-854

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

N[D U[D Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-NTR-P40 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #4 Cold Leg Wide Range Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YZ NDI UD N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND UD-N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ ND U[:] N/AD YN NEI U-Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y M N u-U Comments(Additional pages may be added as necessary)

Instrument is located directly below grating which is seismically adequate. Therefore, the instrument is free from any adverse seismic interactions.

Seismic walkdown performed on May 9, 2013.

Evaluated by: Tyler Blosser Date: 6/26/2013 Lindsav Yates L,

6/26/2013 C-855

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

N[-- UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-NTR-240 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #4 Cold Leg Wide Range Photo ra hs Note: (P5081533)

Note:(P5081538)

Note:Junction box open due to Unit I Cycle 25 refueling outage maintenance. (P5081544)

Note:Conduit for 1-NTR-240 (P5081542)

C-856

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

N[-] UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-QRV-170 Equip. Class (7) Pneumatic Operate Valves Equipment Description Excess Letdown Heat Exchanqer HE-13 Outlet Pressure Control Valve Location: Bldg. CONI Floor El. 612 Room. Area 66 (Sys - CVCS)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YD NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y-I ND UL1 N/A[

YI-ND UD--J N/AM Y-- ND U[-] N/AM Y[-] NEI UD1 N/AM YN NEI UD C-857

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

NEI U[D Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-QRV-170 Equip. Class (7) Pneumatic Operate Valves Equipment Description Excess Letdown Heat Exchanger HE-13 Outlet Pressure Control Valve Interaction Effects

7. Are soft targets free friom impact by nearby equipment or structures?

Y[K NDI UD N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y] N[D-UD-N/AD and masonry block walls not likely to collapse onto the equipment?

Rod hung lights and conduit in the overhead - adequately supported.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YX NDI UD N/AD YZ ND UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ ND-1 UD Cominients(Additional pages may be added as necessary)

Initial walkdown peformed prior to lead shielding being hung and a second walkdown was performed after the lead shielding was hung.

Walkdown performed on 4/1/2013.

Evaluated by: Tyler Blosse, Date: 6/26/2013 Lindsay Yates aýý 6/26/2013 C-858

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ N[-] U--

Seismic Walkdown Checklist (SWC)

Equipment ID No.

f-QRV-170 Equip. Class (7) Pneumatic Operate Valves Equipment Description Excess Letdown Heat Exchanger HE-13 Outlet Pressure Control Valve Photographs Note: Lead shielding hung for Unit I Cycle 25 refueling outage and equipment is out of service. (P4010167)

Note:Lead shielding hung for Unit I Cycle 25 refueling outage and equipment is out of service. (P4010168)

INote:rFUI, pIp& Ziupp[JUIn fIiff I-..rN V-I /UL.dU rlNLoe:I.,IIu.lu wll 1 lIUll]

shielding hung for Unit 1 Cycle 25 refueling overhead (P4010171) outage and equipment is out of service.

C-859

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 INOle INOte:j Note:(P4010174)

Note:(P4010175)

C-860

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note: Hope anc nooK stagea tor ieaci snelmng movement during the Unit I Cycle 25 outage(P4010177)

Note: Uora stagea Tor faawarlon t-'rorecrion remote coverage during the Unit I Cycle 25 outage (P4010179) rNote: uLamp usea tor teau snietuing activilles for the Unit 1 Cycle 25 refueling outage.

(P4010180)

C-861

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

ND uD--

Seismic Walkdown Checklist (SWC)

Equipmlent ID No. 1-TI1A I Equip. Class (3) Medium Voltage Metal Clad Switchgear Equipment Description South Safety Injection Pump PP-26S Supply Breaker Location: Bldg. ABI Floor El. 609 Room, Area 140 (Sys-4KVAC)

Manufacturer, Model, Etc. (optional but recominmended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmnay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ ND of the 50% of SWEL items requiring such verification)?

SQUG-1-TI1IAI

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage flee of potentially adverse seismic conditions?

YM NEI UD-N/AD YZ ND UD N/AD YZ ND UD--

N/AD YZ ND UD N/AD1 YZ NEI U--

C-862

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YM NEI uD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-T11A 1 Equip. Class (3) Medium Voltage Metal Clad Switchgear Equipment Description South Safety Iniection Pump PP-26S Supply Breaker Interaction Effects

7. Are soft targets flee from impact by nearby equipment or structures?

Y[

ND] UD N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls riot likely to collapse onto the equipment?

1-BA TLIT-378 mounted on the wall above and to the left of 1-T1 IA 1 (when facing front of MCC) which is bolted down and adequately secured.

Overhead cable trays are welded to their trapeze supports.

Hoses hung on hooks on the wall -4 ft from the back of the breakers. Vertical acceleration at the El. 609' in the Auxiliary Building is not large enough to project the hoses from the hooks so they adveresely affect the MCCs.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ ND UD N/AD YN NDI UD N/AD Y[

ND-I UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ ND UD Comments(Additional pages may be added as necessary)

Walkdown performed on 4/5/2013.

C-863

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YE NEI U[D Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-TIIA I Equip. Class (3) Medium Voltage Metal Clad Switchgear EqkUipment Description South Safety Injection Pump PP-26S Supply Breaker Evaluated by: Tyler Blosse Date: 6/26/2013 w

Lindsav Yates '

J1 6/26/2013 C-864

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YV NO U-I-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-Ti1A 1 Equip. Class (3) Medium Voltage Metal Clad Switchqear Equipment Description South Safety Injection Pump PP-26S Supply Breaker Note:(P4040193)

Note: (P4040184)

Note:

C-865

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note: (P4040187) iNote:(t-'4uquziu)

Note:(P4040216)

Note:(P4040218)

C-866

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:j Note: 1-BA TLIT-378 above and to the left -

bolted down (P4040234) rnote:nu~sus UlI JIUU1-S Ulf IUii WdII VW~II IIU,

note;(/

breakers(P4040237)

C-867

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ N[-] UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-T11A5 Equip. Class (3) Medium Voltage Metal Clad Equipment Description West Essential Service Water Pump PP-7W Supp1ly Location: Bldg. AB3 Floor El. 611 Room, Area 140 (Sys-4KVAC)

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmnay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ ND of the 50% of SWEL items requiring such verification)?

SQUG-1-TI1A5

2. Is the anchorage firee of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documenltation?(Note: This question only applies if the itemn is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YN NDI UD-N/AD YZ NDI U-1 N/AD YZ ND UD-N/AD YN ND U[-] N/AD YZ ND UD C-868

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NEI uD0 Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-Ti1A5 Equip. Class (3) Medium Voltage Metal Clad Equipment Description West Essential Service Water Pump PP-7W Supply Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y] NEI Ui-- N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[

NE] UD N/AD and masonry block walls not likely to collapse onto the equipment?

Overhead lights are rod hung and adequately secured.

Overhead cable trays are welded to their trapeze supports.

Hoses hung on hooks on the wall -4 ft from the back of the breaker. Hooks are deep and the vertical acceleration at El. 609' of the Auxiliary Building is not large enough to project the hoses from the hooks so they adversely affect the MCCs.

9. Do attached lines have adequate flexibility to avoid damage?

YZ N[: UD-N/ADl

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YN ND1U17 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y [

ND UD-1 Coninments(Additional pages may be added as necessary)

Walkdown performed on 4/5/2013.

Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsay Yates M At Jw*ta-6/26/2013 C-869

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

NO u--I Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-TI1A5 Equip. Class (3) Medium Voltage Metal Clad Equipment Description West Essential Service Water Pump_ PP-7W Suoolv Note:

INote:

rNote:

C-870

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:(P4040225)

Note:t IN ote:(I-,~4ULLIzz) 1note:j C-871

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:q brloearsu(44 nu23y it) ull lu cn breakers(P404 0237)

C-872

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note: Gable hung tor Ul outage(P4040240)

C-873

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YN ND-- UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-TDAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Train 'B' Transfer Cabinet Location: Bldg. ABI Floor El. 609 Room, Area 200 (Sys - 250D)

Manufacturer, Model, Etc. (optional but reconmmended)

Instructions for Completing Checklist This checklist may be used to document tile results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YD No of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage firee of potentially adverse seismic conditions?

YZ ND UD-N/AD YZ ND U-- N/AD-YI ND UD N/AD YDI ND UD N/AZ YZN ND UD C-874

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

NEI uD--

Seismic Walkdown Checklist (SWC)

Equipment ID No.

1-TDAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Train 'B' Transfer Cabinet Interaction Effects

7. Are soft targets firee from impact by nearby equipment or structures?

YZ NEI U[:] N/AD

8. Are overhead equipirnent, distribution systems, ceiling tiles and lighting, YZ ND UD:] N/AD and masonry block walls not likely to collapse onto the equipment?

1-BA TLIT-7 Above and to the right of 1-TDAB (when facing the front of the cabinet, it is bolted down and adequately supported.

Rod hung lights and conduits overhead are well supported.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment filee of potentially adverse seismic interaction effects?

Y[Z NDI UD N/AD YE ND UD Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YM ND UFI Comments(Additional pages may be added as necessary)

Walkdown performed on 4/4/2013.

Evaluated by: Tyler Blosser Date: 6/26/2013 Lindsay Yates 6/26/2013 C-875

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

N--] UD--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-TDAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Train 'B' Transfer Cabinet Note: Upper lett anchor bolt ot panel.(P4041413)

C-876

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[

N[-] U-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-TDAB Equip. Class (14) Distribution Panels & Aut

'Transfer Cabinet Note: Lower left anchor bolt of panel. (P4041415)

Note: Lower right an4 panel. (P4041416)

C-877

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note: Upper right anchor bolt of panel. (P4041417)

Note:Battery light above and to the right. (P4041418)

Note:i C-878

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note: (P4041423)

C-879

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[D NM u--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-XSO-321 Equip. Class (8) Motor Operated & Solenoid Equipment Description Steam Generator #2 Blowdown Containment Isolation Location: Bldg. AB1 Floor El. 591 Room., Area 29 (Sys - BD)

Manufacturer, Model, Etc. (optional but recomnmended)

Instructions for Completing Checklist This checklist may be used to document tile results of the Seismic Walkdown of an item of equipment on the SWEL. The space below eacti of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Aneoaoe I. Is the anchorage configuration verification required (i.e., is the item one YE] NZ of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Lower left bolt appears to be missing. There is weld material present inside the nut however no bolt appears to be behind it.

Bolt possibly broken off-AR 2013-4493 was issued.

3. Is tile anchorage free of corrosion that is more than mild surface oxidation?

YLI NZ UD-N/AD YZJ ND UD-N/AD

4. Is the anchorage free of visible cracks in the concrete near the anchors?

Y[

NEI UI N/AD

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage flee of potentially adverse seismic conditions?

Lower left bolt appears to be missing - AR 2013-4493 was issued (See Question 2 above).

An evalaution was completed under AR 2013-4499. The component was determined to be seismically adequate.

Follow-up walkdown was performed in support of the AR evaluation.

YD--

NDI UD-N/AN YDI NE UD-1 C-880

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YE] N[

U[D Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-XSO-321 Equip. Class (8) Motor Operated & Solenoid Equipment Description Steam Generator #2 Blowdown Containment Isolation Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y[Z ND:] UDI N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND UD-N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YZ NDI UD N/AD YM NEI UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ ND UD Coniments(Additional pages may be added as necessary)

Walkdown performed on 3/29/2013.

Evaluated by: Tyler Blosset Date: 6/26/2013 Lindsay Yates M.

,j 6/26/2013 C-881

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YE] N u[--

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1-XSO-321 Equip. Class (8) Motor Operated & Solenoid Equipment Description Steam Generator #2 Blowdown Containment Isolation fNote:(I-"jddUUbf)

IN ote: (t-.jzdtiuud)

Note:(P3280069)

Note: Upper right bolt (P3280077)

C-882

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 lNote:Lower rignt DOln missing (P3280083)

INote: t-exenslon cora Tor unlit 7 ycie z, refueling outage. (P3280084)

IN U We; Note: Extension cord for Unit 1 Cycle 25 refueling outage. (P3280087)

C-883

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:Extension cord for Unit 1 Cycle 25 refueling outage. (P3280087)

C-884