DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ Nr-- U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NRV-152 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Location: Bldg. CON1 Floor El. 650 Room., Area 81 (Sys - RCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YrI NM of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Y-- NEI U-1 N/AMs YD ND UEI N/AE
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YE] NEI UI-N/AZ
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YrI NEI Ur-N/A[K YM NEI Ur1 C-845
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N-- UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NRV-152 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YM NEI U-- N/AZ
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE N[l UW-N/AD and masomny block walls not likely to collapse onto the equipment?
Abandoned support overhead, however no concern - more than adequate thread engagement on the anchor.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE NEI UW N/AZ Y[
NEI U[-]
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YZ NE] UWI adversely affect the safety functions of the equipment?
Comments(Additional pages may be added as necessary)
Overhead ductwork adequately supported and has no loose nuts or bolts.
Walkdown performed on 3/29/2013.
Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsay Yates c4t9dA Ad.~~
6/26/2013 C-846
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
N[-- UFD Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NRV-152 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Photographs Note:
C-847
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO uli-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NRV-152 Equip. Class (7) Pneumatic Operated Valves Faninment De-crintion PrPnssirizer Train 'R' PrP~ssre Relief Valve C-848
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 suppoLred.uUuiiy pPUI uv2II(P 0U d
supported. (P328003 7)
INote:WADandonea ovemeaa supporr wirn adequate thread engagement (P3280039)
C-849
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: -YO ND-uDl Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NTR-230 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #3 Cold Leg Wide Range Location: Bldg. CON1 Floor El. 617 Room, Area 62 (Svs - RCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YE-] N[E of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
YE] NEI U[3 N/A[K YEI NEI U[
N/AN
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YE NE] UE] N/AM
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y[
NE UE1 N/AN YO NE UE C-850
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NF-- UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NTR-230 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #3 Cold Leg Wide Range Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y[
NDI UD-N/AD[
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN ND UD-N/ADl and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YN NDI UD-N/ADl YN ND UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ N[-]UD Comments(Additional pages may be added as necessary)
Instrument is located directly below grating which is seismically adequate. Therefore, the instrument is free from any adverse seismic interactions.
Seismic walkdown performed on May 9, 2013 Evaluated by: Tyler Blosset Date: 6/26/2013 Lindsav Yates 0 AtA.uJ 6/26/2013 C-851
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
N U-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NTR-230 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #3 Cold Leo Wide Range i ote:r--exIole tines auacneci to instrument (P5081525)
C-852
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 C-853
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND] U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NTR-240 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #4 Cold Leg Wide Range Location: Bldg. CON1 Floor El. 617 Room, Area 63 (Sys - RCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one Y[
NZ of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage firee of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YEI NEI UI-N/A[K Y[-- NE UD-N/A[K YDI NEI UD-N/AX Y-- ND U-- N/AZ YE NEI UD C-854
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND-- U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NTR-240 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #4 Cold Leg Wide Range Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YN NDI U(( N/AD-
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] UD N/AD and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ NDI U-1 N/AD YE NEI UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE NDI UDl adversely affect the safety functions of the equipment?
Comments(Additional pages may be added as necessary)
Instrument is located directly below grating which is seismically adequate. Therefore, the instrument is free from any adverse seismic interactions.
Seismic walkdown performed on May 9, 2013.
Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsay Yates 4adca3A 6/26/2013 C-855
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NDi UDI Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NTR-240 Equip. Class (19) Temperature Sensors Equipment Description Reactor Coolant Loop #4 Cold Leg Wide Range Note:(P5081533)
Note:(P5081538)
Note:Junction box open due to Unit 1 Cycle 25 refueling outage maintenance. (P5081544)
Note: Conduit for 1-NTR-240 (P5081542)
C-856
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
N[-- UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. f-QRV-170 Equip. Class (7) Pneumatic Operate Valves Equipment Description Excess Letdown Heat Exchanger HE-13 Outlet Pressure Control Valve Location: Bldg. CONI Floor El. 612 Room., Area 66 (Sys - CVCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YI-- NZ of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Y-- N[I U[] N/AZ Y[-1 ND UD N/AZ
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YI-NEI U-N/AN
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YE1 ND] UD-N/AZ YND Nil UD-1 C-857
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND] U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. f-QRV-170 Equip. Class (7) Pneumatic Operate Valves Equipment Description Excess Letdown Heat Exchanger HE-13 Outlet Pressure Control Valve Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YZ NEI UrI N/A[]
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Rod hung lights and conduit in the overhead - adequately supported.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y[
N[W Ur-N/AZ-Y[
N[W] UZ N/AZ Y[
NEI U--
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ NE U[-
Comments(Additional pages may be added as necessary)
Initial walkdown peformed prior to lead shielding being hung and a second walkdown was performed after the lead shielding was hung.
Walkdown performed on 4/1/2013.
Evaluated by: Tyler Blosset Date: 6/26/2013 Lindsay Yates a
A ivajw 6/26/2013 C-858
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N[" U[-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-QRV-170 Equip. Class (7) Pneumatic Operate Valves Equipment Description Excess Letdown Heat Exchanger HE-13 Outlet Pressure Control Valve VII(
Photo ra ils Note: Lead shielding hung for Unit I Cycle 25 refueling outage and equipment is out of service. (P4010167)
Note: Lead shielding hung for Unit I Cycle refueling outage and equipment is out of service. (P4010168) note: i-oor pipe support near i-wt v-7/uLeaa shielding hung for Unit I Cycle 25 refueling outage and equipment is out of service.
IN ote: uonauir ana roa nung itgnrs in me overhead (P4010171)
C-859
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 lNote:(t-4(flC7/-i ij rote:
i'M01e:(t C-860
DC Cook Unit 1 & Unit 2
)23-001 Rev. 2, 01/13/14 Note:lmope and nooK stageC ror leac s movement during the Unit I Cycle 25 outage(P4010177)
IN ote: uoru stagea tor Kaciatlion protection remote coverage during the Unit I Cycle 25 outage (P4010179)
N ote: uiamp usea ror ieao snimeing aciviries for the Unit I Cycle 25 refueling outage.
(P4010180)
C-861
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI uD-Seismic Walkdown Checklist (SWC)
Equipment ID No.
1-T11A 1 Equip. Class (3) Medium Voltage Metal Clad Switchgear Equipment Description South Safety Iniection Pump PP-26S Supply Breaker Location: Bldg. ABI Floor El. 609 Room, Area 140 (Sys-4KVAC)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on tile SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one Y9 NEI of the 50% of SWEL items requiring such verification)?
SQUG-1-TI IA I
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near tile anchors?
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YM NEI UD1 N/ADl Y[
NDI U[-D N/ADl YM NEI U[: N/AD1 YO N[D UDl N/AD YO NEI UDl C-862
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI-UEl Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-TIIA I Equip. Class (3) Medium Voltage Metal Clad Switchgear Equipment Description South Safety Injection Pump PP-26S Supply Breaker Interaction Effects
- 7. Are soft targets fi'ee from impact by nearby equipment or structures?
Y[
N[
Ur-N/AZ
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[Z N[-- UZ N/AZ and masonry block walls not likely to collapse onto the equipment?
I-BA TLIT-378 mounted on the wall above and to the left of 1-T1 IA I (when facing front of MCC) which is bolted down and adequately secured.
Overhead cable trays are welded to their trapeze supports.
Hoses hung on hooks on the wall -4 ft from the back of the breakers. Vertical acceleration at the El. 609' in the Auxiliary Building is not large enough to project the hoses from the hooks so they adveresely affect the MCCs.
- 9. Do attached lines have adequate flexibility to avoid damage?
YZ NZ-] UZ1 N/AZ
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ NZ-- UZ Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YZ NEI UF--
adversely affect the safety functions of the equipment?
Comments(Additional pages may be added as necessary)
Walkdown performed on 4/5/2013.
C-863
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YE] NEI UD]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-TI1A 1 Equip. Class (3) Medium Voltage Metal Clad Switchgear Equipment Description South Safety Injection Pumn PP-26S Sumply Breaker Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsav Yates 6/26/2013 C-864
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N-- UD-I Seismic Walkdown Checklist (SWC)
Equipment ID No. I-TIIA 1 Equip. Class (3) Medium Voltage Metal Clad Switch-gear Equipment Description South Safely Injection Pump PP-26S Supply Breaker Note:
ote:Front left welds (P4040185)
Note: Front right we C-865
DC Cook Unit 1& Unit 2 SD-121023-001 Rev. 2, 01/13/14 f-4ote: I m~te:j C-866
DC Cook Unit 1 & Unit 2
)23-001 Rev. 2, 01/13/14 Note:
Note: 1-BA TLIT-378 above and to the left-bolted down (P4040234)
Note:Hoses on nooKs on me way Deninc me breakers(P4040237)
C-867
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N[-- UD--
Seismic Walkdown Checklist (SWC)
Equipment IDNo. 1-T11A5 Equip. Class (3) Medium Voltage Metal Clad Equipment Description West Essential Service Water Pump PP-7W Supply Location: Bldg. AB3 Floor El. 611 Room., Area 140 (Sys-4KVAC)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YZ ND of the 50% of SWEL items requiring such verification)?
SQUG-1-T11A5
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y[O ND UD N/AD Y5 NDI UD-N/AD-YE NDI UD N/AD YZ ND UD N/AD YO NND UD-C-868
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N-- UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-T1IA5 Equip. Class (3) Medium Voltage Metal Clad Equipment Description West Essential Service Water Pump PP-7W Supply Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YZ NDI UD1 N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead lights are rod hung and adequately secured.
Overhead cable trays are welded to their trapeze supports.
Hoses hung on hooks on the wall -4 ft from the back of the breaker.Hooks are deep and the vertical acceleration at El. 609' of the Auxiliary Building is not large enough to project the hoses from the hooks so they adversely affect the MCCs.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YN ND UD N/AD YN ND UD N/AD YENEND UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y I NEI Ur--
Comments(Additional pages may be added as necessary)
Walkdown performed on 4/5/2013.
~eZ~
Evaluated by: Tyler Blosser Date: 6/26/2013 Lindsay Yates AJ/ouJ 6/26/2013 C-869
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YN N-- U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-T11A5 Equip. Class (3) Medium Voltage Metal Clad Equipment Description West Essential Service Water Pump PP-7W Supply Photo ra ns Note: (P4040207)
Note:
b C-870
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 N-ote: (I-'4u4Lrdz) 1N4ote:I-'4u4uJzOe)
II~ULV; C-871
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2. 01/13/14 Note:
h iNote:(*'-uquzLjO) iNote:Hloses nung -4
- Trom me oacK OT me breakers(P4040237) h C-872
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 iNote: uaole hung Tor unit 7 uycie zo outage(P4040240)
C-873
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI U-Seismic Walkdown Checklist (SWC)
Equipment ID No.
1-TDAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Train 'B' Transfer Cabinet Location: Bldg. ABI Floor El. 609 Room, Area 200 (SVs - 250D)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YE:] NO of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YZ NEI UE N/AEl YN NE UE N/AE]
YM NEI U[E] N/A[]
YEI NE UE N/AZ YZ NEI UE1 C-874
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO UDI Seismic Walkdown Checklist (SWC)
Equipment ID No.
1-TDAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Train 'B' Transfer Cabinet Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y[
ND-- UD N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE ND UD N/AD]
and masonry block walls not likely to collapse onto the equipment?
1-BA TLIT-7 Above and to the right of 1-TDAB (when facing the front of the cabinetit is bolted down and adequately supported.
Rod hung lights and conduits overhead are well supported.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ ND UD N/AD YO ND UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YZ NDI UDl adversely affect the safety functions of the equipment?
Cominents(Additional pages may be added as necessary)
Walkdown performed on 4/4/2013.
~ez-Evaluated by: Tyler Blosser Date: 6/26/2013 Lindsay Yates M~n-a At 6/26/2013 C-875
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N[-] UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-TDAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Train 'B' Transfer Cabinet Note: upper len ancnor Do panel (P4041413)
C-876
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND-- UD-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-TDAB Equipment Description 250 1 Equip. Class (14) Distribution Panels & Aut Note: Lower left an panel. (P4041415)
'lUW,.LUWtfl IIgIIL oIIuIItUI paneL.(P4041416)
C-877
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Note: Upper right an panel.(P4041417)
Note:Battery light above and to the right.(P4041418)
C-878
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Note:
C-879
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YE] N U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-XSO-321 Equip. Class (8) Motor Operated & Solenoid Equipment Description Steam Generator #2 Blowdown Containment Isolation Location: Bldg. ABI Floor El. 591 Room, Area 29 (Sys - BD)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one Y[:] N[
of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
Lower left bolt appears to be missing. There is weld material present inside the nut however no bolt appears to be behind it.
Bolt possibly broken off-AR 2013-4493 was issued.
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is tile anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage fiee of potentially adverse seismic conditions?
Lower left bolt appears to be missing - AR 2013-4493 was issued (See Question 2 above).
An evalaution was completed under AR 2013-4499. The component was determined to be seismically adequate.
Follow-up walkdown was performed in support of the AR evaluation.
YD NO U[-
N/A[:]
YZ N[:] UD N/AEII YM ND U[:I N/A[1 Y-I ND U[- N/AN Y-I NO UE-C-880
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YE] NN uF Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-XSO-321 Equip. Class (8) Motor Operated & Solenoid Equipment Description Steam Generator #2 Blowdown Containment Isolation Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y[
NDI UD-N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND UD-N/AD and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ ND UD N/AD Y[
NDE Ur-Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YN ND-1UD Comments(Additional pages may be added as necessary)
Walkdown performed on 3/29/2013.
Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsav Yates 6/26/2013 C-881
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y]- NM U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-XSO-321 Equip. Class (8) Motor Operated & Solenoid Eauipment Description Steam Generator #2 Blowdown Containment Isolation INote:,
INote:
Note: (P3280069)
Note: Upper right bolt C-882
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Note:Lower fight bolt which appears to be missing (P3280083)
Note:bxtenston cord for Unit 1 Cycle refueling outage. (P3280084) iNoteq(
Note: Extension cord for Unit I Cycle refueling outage. (P3280087)
C-883
DC Cook Unit 1 & Unit 2
)23-001 Rev. 2, 01/13/14 Note: Extension cord for Unit refueling outage. (P3280087)
C-884
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Table C-4 Summary of Seismic Walkdown Checklists for DCCNP2 Outage Walkdowns COMPONENT DESCRIPTION Anchorage PAGE ID Verification Confirmed 2-XSO-321 Steam Generator #2 Blowdown N
C-886 Containment Isolation 2-NMO-151 Pressurizer Relief Valve NRV-1 51 N/A C-892 Upstream Shutoff 2-NRV-151 Pressurizer Train "B" Pressure N/A C-896 Relief Valve 2-NRV-152 Pressurizer Train "B" Pressure N/A C-901 Relief Valve 2-MCAB 250VDC Distribution Panel MCAB N
C-907 2-TDAB 250VDC Train "B" Transfer Cabinet Y
C-912 2-BCTC-AB Plant Battery Chargers BC-AB1 N
C-917 and BC-AB2 Transfer Cabinet 2-NLI-320 Lower Containment Train "B" y
C-923 Water Level Indicator Transmitter 2-NTR-230 Reactor Coolant Loop #3 Cold Leg N/A C-928 Wide Range 2-NTR-240 Reactor Coolant Loop #4 Cold Leg N/A C-932 Wide Range 2-T21A5 West Essential Service Water Y
C-936 Pump (PP-7W) Supply 2-T21A2 West Motor Driven Auxiliary Y
C-941 Feedwater Pump 2-TR-21A 600V Bus 21A Supply Transformer Y
C-945 2-21C 600V Bus 21C Switchgear Y
C-950 2-21C10 600V Motor Control Center ABD-C N
C-955 Supply Breaker 2-21C6 600V Motor Control Center EZC-C y
C-959 Supply Breaker Note: Pages C-886 through C-962 are all new pages in Revision 2 of this Report.
C-885
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YD NH UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-XSO-321 Equip. Class1 (8) Motor Operated & Solenoid Operated Valves Equipment Description Steam Generator #2 Blowdown Containment Isolation Location: Bldg. AB2 Floor El. 591 Room, Area 29 (Sys - BD)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YE. NO
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
Top right bolt is intact but is missing a nut. AR 2013-14872 was written to evaluate this condition.
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Bolts have minor surface rust. There is no material degradation of any bolts.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y[-E NO UD N/AE YN NE UE N/AE YE NE UE N/AE YE NE UE N/AE C-886
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YO N UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-XSO-321 Equip. Class' (8) Motor Operated & Solenoid Operated Valves Equipment Description Steam Generator #2 Blowdown Containment Isolation
- 6. Based onl the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YN NEI UE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YZ ND UD N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE ND UD N/AD and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ ND UD N/AD YM NND UD Other Adverse Conditions i 1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
There was loose hardware found in the bottom of the protection cabinet. Not a seismic concern and all loose hardware was removed by the walkdown team.
YZ N[IUD C-887
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[:] NZ U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-XSO-321 Equip. Class' (8) Motor Operated & Solenoid Operated Valves Equipment Description Steam Generator #2 Blowdown Containment Isolation Comments (Additional pages may be added as necessary)
Walkdown was performed on 10/04/2013.
Evaluated by: Lindsay M. Yates Tyler C. Blosser Date: 1/2/14 1/2/14 C-888
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] No U[
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-XSO-321 Equip. Class1 (8) Motor Operated & Solenoid Operated Valves Equipment Description Steam Generator #2 Blowdown Containment Isolation Photographs Note: (PA040544)
Note: (PA040545)
C-889
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Yr] NZ UL]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-XSO-321 Equip. Class1 (8) Motor Operated & Solenoid Operated Valves Equipment Description Steam Generator #2 Blowdown Containment Isolation Note:
Note: (IAU4052d)
I1 C-890
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Note: (PA040534)
C-891
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NMO-151 Equip. Class2 (8) Motor Operated & Solenoid Operated Valves Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff Location: Bldg. CON2 Floor El. 650 Room., Area 81 (Sys - RCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YEI NM
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE NEI U[] N/AN YE[
NE U-1 N/A[
YE[
NE U[I N/AZ YE[
NE ULE N/AN C-892
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NEI u[--
Seismic Walkdown Checklist (SWC)
Equipment IDNo. 2-NMO-151 Equip. Class2 (8) Motor Operated & Solenoid Operated Valves Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YM NEIUE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YZ NE UEI N/AZ
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] UrI N/AlZ and masonry block walls not likely to collapse onto the equipment?
Overhead ductwork is rod hung. Rods have adequate thread engagement.
Ductwork sections are held together with machine screws.
There is an abandoned snubber to the right of 2-NMO-151 which has been converted to a rod support and is adequately supported.
- 9. Do attached lines have adequate flexibility to avoid damage?
YE NWI UZ N/AZ
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ NEIUE Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ NEW1UW C-893
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NMO-151 Equip. Class2 (8) Motor Operated & Solenoid Operated Valves Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff Comments (Additional pages may be added as necessary)
The cover for the seal tight junction box for 2-NMO-151 is missing two screws. This is not a seismic concern, however AR #2013-14788 has been written as a work request to replace the two screws.
Walkdown was performed on 10/03/2013.
Evaluated by: Lindsay M. Yates Date: 1/2/14 Tyler C. Blosser 1/2/14 C-894
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YN NO-U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NM0-151 Equip. Class2 (8) Motor Operated & Solenoid Operated Valves Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff Photographs Note: (PA030032)
Note: (PA030029) irute:; iA-niuie snu °ertLme [0gnit oF nmvave(A3 1
II(PA 03003 1)1 C-895
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
N[-] UD Seismic Walkdown Checklist (SWC)
Equipment IDNo. 2-NRV-151 Equip. Class3 (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Location: Bldg. CON2 Floor El. 650 Room, Area 81 (Sys - RCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YZ NO
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE NE UE-N/AZ YE NE UE-- N/AZ YE NE U-- N/AZ YE-NE UE-N/AZ C-896
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI U--
Seismic Walkdown Checklist (SWC)
Equipment IDNo. 2-NMO-151 Equip. Class2 (8) Motor Operated & Solenoid Operated Valves Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YZ N[: UD--
Interaction Effects
- 7. Are soft targets free friom impact by nearby equipment or structures?
YER NDI UD N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND U[-- N/AD and masonry block walls not likely to collapse onto the equipment?
Overhead ductwork is rod hung. Rods have adequate thread engagement.
Ductwork sections are held together with machine screws.
- 9. Do attached lines have adequate flexibility to avoid damage?
There are 3 attached lines to 2-NRV-151; all have adequate flexibility.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ ND UD N/AD YZJ N[: UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YN NEI UD C-897
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI U-D Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NMO-151 Equip. Class2 (8) Motor Operated & Solenoid Operated Valves Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff Comments (Additional pages may be added as necessary)
Walkdown was performed on 10/03/2013.
Evaluated by: Lindsay M. Yates AJ Tyler C. Blosser Date: 1/2/14 1/2/14 C-898
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND-- U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NMO-151 Equip. Class2 (8) Motor Operated & Solenoid Operated Valves Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff Photographs Note: Overhead ductwork (PA030006)
Note: (PA030008)
Note: (PA030010)
C-899
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Note:
'I C-900
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YE] N[
uD Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NRV-152 Equip. Class4 (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Location: Bldg. CON2 Floor El. 650 Room., Area 81 (Sys - RCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Y-- NM
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE NE UE N/AN YE NE UE N/ACK YE-NEI UE N/AZ YE NE UE-1 N/AN C-901
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YE] NM UD-Seismic Walkdown Checklist (SWC)
Equipment ID No.
2-NRV-152 Equip. Class4 (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve
- 6. Based on the above anchorage evaluations, is the anchorage firee of potentially adverse seismic conditions?
YO N[-]UE Interaction Effects
- 7. Are soft targets filee from impact by nearby equipment or structures?
YO ND U[
N/AZ
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NEI UFI N/AD and masonry block walls not likely to collapse onto the equipment?
There is an abaondoned snubber to the left of valve 2-NRV-152 which is adequately supported and not a seismic concern.
Overhead ductwork is rod hung and the rods have adequate thread engagement.
Ductwork sections are held together with machine screws.
- 9. Do attached lines have adequate flexibility to avoid damage?
Y[
NDI UrI N/A[
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
The top of valve 2-NRV-152 is touching the overhead ductwork. AR 2013-14796 was written to evaluate this condition.
YEINO UE Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YO NDjUD C-902
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YE] NZ UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NRV-152 Equip. Class4 (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Comments (Additional pages may be added as necessary)
RFC #2994 box missing 2 screws on cover plate for the seal tight electrical junction box feeding the motor operators for valves 2-NMO-152 & 2-NMO-151. This is not a seismic concern. AR 2013-14788 has been written to address this issue.
Walkdown was performed on 10/03/2013.
Evaluated by: Lindsay M. Yates J
Tyler C. Blosser Date: 1/2/14 1/2/14 C-903
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-] NZ uF-Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NRV-152 Equip. Class4 (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Photographs Note: (PA030020)
C-904
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[-] NZ uD Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NRV-152 Equip. Class4 (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Note: Abandoned snubber to the left of 2-A (PA030022) 1-152 Note:
Note: Seal tight junction box missing two screws Note: (PA030025)
(PA030024)
C-905
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 iNote: lop o0 vaive roucning ovemeaa auciworK louvers (PA030019) imote: iop or valve roucning ovemeaa aucrworK louvers (PA030018)
C-906
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI uF--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-MCAB Equip. Class 5 (14) Distribution Panels & Automatic Transfer Swt Equipment Description 250VDC Distribution Panel MCAB Location: Bldg. AB2 Floor El. 609 Room, Area 200 (Sys - 250D)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YD NZ
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage fi'ee of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question'only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YN NE UE-N/AW YZ NE U-N/AD YE NE UW N/AD YD NEI UW N/AM C-907
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-MCAB Equip. Class5 (14) Distribution Panels & Automatic Transfer Swt Equipment Description 250VDC Distribution Panel MCAB
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y[
NEI U[-]
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y[
ND UD N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ N[-D U-- N/ADl and masonry block walls not likely to collapse onto the equipment?
Overhead cable raceway (2EI-C9 1) not bolted to top of panel on left side and questionable thread engagement on other bolts. Neighboring panels 2-MDAB, and 2-DAB have bolts on all sides. Judged to be acceptable and not a seismic concern based on number of bolts intact.
- 9. Do attached lines have adequate flexibility to avoid damage?
YZ NDl UD-N/AD]
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE NEI UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ N[:DUD C-908
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NR U[-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-MCAB Equip. Class 5 (14) Distribution Panels & Automatic Transfer Swt Equipment Description 250VDC Distribution Panel MCAB Comments (Additional pages may be added as necessary)
Walkdown was performed on 10/03/2013.
Evaluated by: Lindsay M. Yates Tyler C. Blosser Date: 1/2/14 1/2/14 C-909
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N[-I UM Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-MCAB Equip. Class5 (14) Distribution Panels & Automatic Transfer Swt Equipment Description 250VDC Distribution Panel MCAB Photographs C-9 10
DC Cook Unit I & Unit 2
)23-001 Rev. 2. 01/13/14 Note: Lower Note: Cable raceway with missing bolts on nght side (PA030076)
C-91 1
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI uF--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TDAB Equip. Class6 (14) Distribution Panels & Automatic Transfer Swt Equipment Description 250VDC Train 'B' Transfer Cabinet Location: Bldg. AB2 Floor El. 609 Room, Area 200 (Sys - 250D)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
SQUG-2-TDAB, Revision 0
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YN NEI YZ NEI U[- N/A--
YM NEI U-- N/AD-YN NEI U[I N/AD YN NEI U-- N/AZ C-912
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND-- UD-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TDAB Equip. Class6 (14) Distribution Panels & Automatic Transfer Swt Equipment Description 250VDC Train 'B' Transfer Cabinet
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YZ N[LJUD Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YZ ND UD N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN ND U[I N/AD and masonry block walls not likely to collapse onto the equipment?
Overhead conduit raceways are trapeze supported with adequate thread engagement on the rods.
Conduit is well supported on unistrut on the wall behind the panel.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE NDI UD N/AD YER NEI DUD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YZK ND-- UD adversely affect the safety functions of the equipment?
C-913
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NO UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TDAB Equip. Class6 (14) Distribution Panels & Automatic Transfer Swt Equipment Description 250VDC Train 'B' Transfer Cabinet Comments (Additional pages may be added as necessary)
Walkdown was performed on 10/03/2013.
Evaluated by: Lindsay M. Yates Date: 1/2114 Tyler C. Blosser 1/2114 C-914
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO U[-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TDAB Equip. Class6 (14) Distribution Panels & Automatic Transfer Swt Equipment Description 250VDC Train 'B' Transfer Cabinet Photographs Note: (PA030061)
Note: Upper right bolt (PA030052)
C-915
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Note: Lower left bolt (PA030055)
Note: Upper right bolt (PA030057)
Note: (PA030060)
C-916
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y--
NM U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-BCTC-AB Equip. Class7 (14) Distribution Panels & Automatic Transfer Swt Equipment Description Plant Battery Chargers BC-ABI & BC-AB2 Transfer Location: Bldg. AB2 Floor El. 613 Room, Area 205 (Sys - 250D)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YD NZ
- 2. Is the anchorage fiee of bent, broken, missing or loose hardware?
Insufficient thread engagement on 3 of 4 anchor bolts.
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YD NZ UD N/AD YE ND UD N/AD Y[
ND UD N/AD YO ND UD N/AO C-917
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YE] No U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-BCTC-AB Equip. Class7 (14) Distribution Panels & Automatic Transfer Swt Equipment Description Plant Battery Chargers BC-AB1 & BC-AB2 Transfer
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YFNEINLUMl Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y9 ND UD-N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND-] UD-N/AD and masonry block walls not likely to collapse onto the equipment?
Overhead lights rod hung.
Conduit hung overhead on trapeze supports.
Carbon dioxide fire protection piping suppored with rod hangers overhead.
- 9. Do attached lines have adequate flexibility to avoid damage?
YZ NDl UD N/AD
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YN NEI Ur-Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ NND UD C-918
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[-] N U--]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-BCTC-AB Equip. Class7 (14) Distribution Panels & Automatic Transfer Swt Equipment Description Plant Battery Chargers BC-ABI & BC-AB2 Transfer Comments (Additional pages may be added as necessary)
Caulked seal at cabinet upper seams was to be replaced per EC-49577, however the seal was very degraded. Not a seismic concern. AR 2013-14849 was written as a work request to replace the seal.
Upon further investigation subsequent to the walkdown, the SQUG SEWS document (SQUG-2-BCTC-AB) was found which documents and accepts the lack of full thread engagement on the 4 anchor bolts. AR 2013-14848 was written to document that further investigation was needed after leaving the field.
Walkdown was performed on 10/04/2013.
Evaluated by: Lindsay M. Yates O'vJ At Date: 1/2/14 Tyler C. Blosser 1/2/14 C-919
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y-I NH U[
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-BCTC-AB Equip. Class7 (14) Distribution Panels & Automatic Transfer Swt Equipment Description Plant Battery Chargers BC-AB 1 & BC-AB2 Transfer Photographs Note: (PA040013) 1 Note: (PA040002)
I C-920
DC Cook Unit I & Unit 2
)23-001 Rev. 2, 01/13/14 Note: (PA040007)
I more: mvore ro reptace caulK seat per -*-qi, (PA040009)
INote: uvemeaa Tire prorection piping yi-'Au/uuiu)
C-921
DC Cook Unit I & Unit 2
)23-001 Rev. 2, 01/13/14 Note: (PA0400012)
C-922
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI U E]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NLI-320 Equip. Class8 (18) Instrument Racks Equipment Description Lower Containment Train 'B' Water Level Indicator Transmitter Location: Bldg. CON2 Floor El. 598 Room, Area 60 (Sys - Contmt)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2-5570F, Revision 6
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
YE NEI YN ND UD N/AD Y[
ND UD N/AD
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YE ND] Ur] N/AD
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YN ND UED N/AD C-923
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI-UD Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NLI-320 Equip. Class8 (18) Instrument Racks Equipment Description Lower Containment Train 'B' Water Level Indicator Transmitter
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YM ND U-Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YE ND UD N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[
ND UD N/AD and masonry block walls not likely to collapse onto the equipment?
Pipe run above debris interceptor is adequately supported.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ NDI UD N/AD YN NEI U-Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YCKNO UD C-924
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NLI-320 Equip. Class 8 (18) Instrument Racks Equipment Description Lower Containment Train 'B' Water Level Indicator Transmitter Comments (Additional pages may be added as necessary)
Flex hose laid on ground for Unit 2 Cycle 21 Outage work (not present during normal operation).
Walkdown was performed on 10/04/2013.
Evaluated by: Lindsay M. Yates Tyler C. Blosser Date: 1/2/14 1/2/14 C-925
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N[-
U[-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NLI-320 Equip. Class8 (18) Instrument Racks Equipment Description Lower Containment Train 'B' Water Level Indicator Transmitter Photographs Note: Flex hose laid on ground for Unit 1 Cycle 21 Note: (PA040488)
Outage (PA 040487)
J Note: Second support trom tme t ottom (PA040490)
'C-926
DC Cook Unit I & Unit 2
)23-001 Rev. 2, 01/13/14 INote: inirasupportrrommne nottom(I-Au4u46z)
INote: iOpsupport(-Au4U46 0)
C-927
DC Cook Unit 1 & Unit 2 SD-121023-001-Rev. 2, 01/13/14 Status: YZ NEI U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NTR-230 Equip. Class9 (19) Temperature Sensors Equipment Description Reactor Coolant Loon #3 Cold Leq Wide Ranqe Location: Bldg. CON2 Floor El. 617 Room, Area 62 (Sys - RCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YD NN of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
YLI N[:- UZ N/A[
Y[-- NE UE-N/AN
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YE NE] UE N/AZ
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE NE UE-N/A[
C-928
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NO u0 Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NTR-230 Equip. Class9 (19) Temperature Sensors Equipment Description Reactor Coolant Loop #3 Cold Leg Wide Ranqe
- 6. Based on the above anchorage evaluations, is the anchorage free of YE ND UD potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YE NDI UD1 N/AD]
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM ND UD N/AD and masonry block walls not likely to collapse onto the equipment?
Overhead lighting well supported on unistrut.
- 9. Do attached lines have adequate flexibility to avoid damage?
YE NEI UD N/AZ
- 10. Based on the above seismic interaction evaluations, is equipment free YM ND UD of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ NEIUE C-929
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NO UD-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NTR-230 Equip. Class9 (19) Temperature Sensors Equipment Description Reactor Coolant Loon #3 Cold Leg Wide Range Comments (Additional pages may be added as necessary)
Walkdown was performed on 10/04/2013.
Evaluated by: Lindsay M. Yates Tyler C. Blosser Date: 1/2/14 1/2/14 C-930
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NTR-230 Equip. Class9 (19) Temperature Sensors Equipment Description Reactor Coolant Loow #3 Cold Leg Wide Range Photographs Note: (PA-040452)
C-931
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N[II UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NTR-240 Equip. Class1° (19) Temperature Sensors Equipment Description Reactor Coolant Loop #4 Cold Leq Wide Range Location: Bldg. CON2 Floor El. 617 Room., Area 63 (Sys - RCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Y-I NO
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YEI NEI-U-N/AM YEl-NEI U-] N/AZ YE-- NEI UL] N/AZ YE] NE] UF1 N/AO C-932
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND] UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NTR-240 Equip. Class1° (19) Temperature Sensors Equipment Description Reactor Coolant Loop #4 Cold Leq Wide Ranqie
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YE ND1UE1 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YN NE UD N/AD1
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM ND UW N/ADl and masonry block walls not likely to collapse onto the equipment?
Lead shielding hung and laid for Unit 2 Cycle 21 Outage (not present during normal operation).
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE ND UD N/AD YE NEI DUD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YM NEI UD C-933
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N-- U[
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NTR-240 Equip. Class1° (19) Temperature Sensors Equipment Description Reactor Coolant Loop #4 Cold Leg Wide Ranqe Comments (Additional pages may be added as necessary)
Walkdown was performed on 10/04/2013.
Evaluated by: Lindsay M. Yates Tyler C. Blosser Date: 1/2/14 1/2/14 C-934
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N[-- UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-NTR-240 Equip. Class'° (19) Temperature Sensors Equipment Description Reactor Coolant Loop #4 Cold Leq Wide Range Photographs I
I I
Note: (PA-040448)
Note: (PA-040447)
C-935
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND-- UR-Seismic Walkdown Checklist (SWC)
Equipment IDNo. 2-T21A5 Equip. Class11 (3) Medium Voltage, Metal Clad Switchqear Equipment Description West Essential Service Water Pump PP-7W Supply Location: Bldg. AB2 Floor El. 609 Room, Area 140 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
SQUG-2-T21A, Rev. 0
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE NEI YE NE U-1 N/AW YN NEI UW N/AW YZ NE U[W N/AZ-Y[K N[
UW N/AZ C-936
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YE N[-- UD Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-T21A5 Equip. Class1 1 (3) Medium Voltape, Metal Clad Switch-gear Equipment Description West Essential Service Water Pump PP-7WNSugonl
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YZ ND UD Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YM ND U-1 N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE ND] UD-N/AD]
and masonry block walls not likely to collapse onto the equipment?
Cable trays are hung on trapeze hangers above. Rods have adequate thread engagement.
Overhead lighting is rod hung. Not a seismic concern.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YM ND UD N/AD1 YZ NND UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety finctions of the equipment?
YZ ND UD C-937
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-T21A5 Equip. Class11 (3) Medium Voltage, Metal Clad Switch qear Equipment Description West Essential Service Water Pump PP-7W Supply Comments (Additional pages nlay be added as necessary)
Walkdown was performed on 10/11/2013.
Evaluated by: Lindsay M. Yates M
At
- Iu-
.Tyler C. Blosser Date: 1/2/14 1/2/14 C-938
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NO U[-'
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-T21A5 Equip. Class11 (3) Medium Voltage, Metal Clad Switchcqear Equipment Description West Essential Service Water Pump PP-7W Supply Photographs Note: (PA 110612)
Note: (PA 110589)
Note:
C-939
DC Cook Unit I & Unit 2
)-121023-001 Rev. 2, 01/13/14 Note: (PA 110617)
Note: (PA 11061 Note:
C-940
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y]
NO u--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-T21A2 Equip. Class12 (3) Medium Voltage, Metal Clad Switch-pear Equipment Description West Motor Driven Auxiliary Feedwater Pump Location: Bldg. AB2 Floor El. 609 Room, Area 140 (Sys-4KVAC)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
SQUG-2-T21A, Rev. 0
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y[
NEI YE NEI UW N/A-1 YZ NE UE1 N/AW YO NEI UW N/AM YO NEI UW N/AD-C-941
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI uV-I Seismic Walkdown Checklist (SWC)
Equipment IDNo. 2-T21A2 Equip. Class12 (3) Medium Voltage, Metal Clad Switch pear Equipment Description West Motor Driven Auxiliary Feedwater Pump
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YZ N[l U-1 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead cable trays are hung with trapeze hangers. Rods have adequate thread engagement.
Overhead lighting is rod hung. Not a seismic concern.
Fire extinguisher is hanging on a long hook on the wall to the left of the breaker.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ ND UI-N/AZ YZ ND UD N/AD YMI NEI-U] N/AZ YZ NE UZ--
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ NND UZ C-942
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YN NO UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-T21A2 Equip. Class 12 (3) Medium Voltage, Metal Clad Switch-gear Equipment Description West Motor Driven Auxiliary Feedwater Pump Comments (Additional pages may be added as necessary)
Walkdown performed on 10/11/2013.
Evaluated by: Lindsay M. Yates M 4ý Tyler C. Blosser Date: 1/2/14 1/2/14 C-943
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
N[D U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-T21A2 Equip. Class 12 (3) Medium Voltaie, Metal Clad Switch qear Equipment Description West Motor Driven Auxiliary Feedwater Pump Photographs r
I I I Note: (PA110581)
I Note: (PA 110579)
Note: (PA 110604)
Note: (PA 110605)
C-944
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
ND-1 UD Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TR21A Equip. Class (4) Transformers Equipment Description 600V Bus 21A Suoply Transformer Location: Bldg. AB2 Floor El. 609 Room, Area 204 (Sys-600AC)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
SQUG-2-TR21A, Rev. 0
- 2. Is the anchorage free of bent, broken, missing or loose hard ware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y NEI Y[
ND UD N/AD Y19 ND U[-
N/AD Y] ND U[-- N/AD-Y[
ND U-- N/AD C-945
DC Cook Unit 1 & Unit 2 SD-I121023-001 Rev. 2, 01/13/14 Status: Y[
NEI UD--
Seismic Walkdown Checklist (SWC)
EquipmentiDNo. 2-TR21A Equip. Class13 (4) Transformers Equipment Description 600V Bus 21A Supply Transformer
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y~aNEIUW-Interaction Effects
- 7. Are soft targets free friom impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Reinforced masonry block wall to the left of the transformer.
Overhead lighting is rod hung and is not a seismic concern.
Overhead cable trays are hung on trapeze hangers. Rods have adequate thread engagement.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y[9 NEI Ur1 N/A[
Y[
N[
UW N/AZ YN NE UW N/AZ YZ N[
urI Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
There is a power cord run on the ground for Unit 2 Cycle 21 Outage work. Not present during normal operation.
Y[
NZ UZ C-946
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO-UD]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TR21A Equip. Class13 (4) Transformers Equipment Description 600V Bus 21A Supply Transformer Comments (Additional pages may be added as necessary)
Walkdown was performed on 10/11/2013.
Evaluated by: Lindsay M. Yates Tyler C. Blosser Date: 1/2/14 1/2/14 C-947
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N-] UD-Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TR21A Equip. Class13 (4) Transformers Equipment Description 600V Bus 21A Supply Transformer Photographs Note: (PA 110644)
Note: (PA 110648)
Note: (PA 110646)
Note: (PA 110649)
C-948
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NO uD]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TR21A Equip. Class13 (4) Transformers Equipment Description 600V Bus 21A Supply Transformer I
'I___
I I
Note: (PA 110650)
Note: (PA 110653)
Note: (PA 110655)
C-949
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YE NO uL-Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-21C Equip. Class14 (2) Low VoltaQe Switchqear & Breaker Panels Equipment Description 600V BUS 21C SWITCHGEAR Location: Bldg. AB2 Floor El. 609 Room, Area 204 (Sys - 600AC)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
SQUG-2-21C Rev, 0
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YN NE1 YN ND UD-N/AD Y[
ND UD N/AD YE NDI UD N/AD-YN ND UD N/AD C-950
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N-- UF--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TR21A Equip. Class (4) Transformers Equipment Description 600V Bus 21A Suonlv Transformer
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YE NEIUE Interaction Effects
- 7. Are soft targets free fiorn impact by nearby equipment or structures?
YZ N[D U-- N/All
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] U-N/AD and masomy block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Grating removed at back of panel for electrical maintenance for Unit 2 Cycle 21 outage.
Y[
NDI UD N/All YM NEI UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Breakers tagged out for Unit 2 Cycle 21 refueling outage and stanchions have been placed for safety marking open floor grating.
Y[
NEI UFD C-951
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[Z NO UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TR21A Equip. Class 13 (4) Transformers Equipment Description 600V Bus 21A Suoply Transformer Comments (Additional pages may be added as necessary)
Walkdown was performed on 10/19/2013.
Evaluated by: Lindsay M. Yates Tyler C. Blosser Date: 1/2/14 1/2/14 C-952
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NO U" Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TR21A Equip. Class13 (4) Transformers Equipment Description 600V Bus 21A Supply Transformer Photographs I
I Note: (PA 190717) Energized panel flagged with caution tape.
Note: (PA 190715) Danger tape and stanchions marking open floor grating for safety.
C-953
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND-1 U0 Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-TR21A Equip. Class13 (4) Transformers Equipment Description 600V Bus 21A Supply Transformer I I Note: (PA 190704) Example of front bottom cubicles with breakers removed.
Note: (PA 190709) Example of rear cubicle.
C-954
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NV] UD-]
Seismic Walkdown Checklist (SWC)
Equipment IDNo. 2-21C10 Equip. Class 15 (2) Low Voltacge Switch-gear & Breaker Panels Equipment Description 600 VAC Motor Control Center ABD-C ELSC
- ELSCX Location: Bldg. AB2 Floor El. 609 Room, Area 204 (Sys - 600AC)
Manufacturer., Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YEI NO
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE NE UW N/AZ YM NEI U-1 N/AF-D YN NE U-I N/AD YE NE U-1 N/A[
C-955
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
ND uD-]
Seismic Walkdown Checklist (SWC)
Equipment IDNo. 2-21C10 Equip. Class15 (2) Low Voltage Switch-gear & Breaker Panels Equipment Description 600 VAC Motor Control Center ABD-C ELSC
- ELSCX
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YZ NEIU[:
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y[
N[D] UD N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[
NDI UD-N/AD and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YN ND UD N/AD-Y[
NEI UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YM NEIUD C-956
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YM NO u--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-21C10 Equip. Class's (2) Low VoltaQe Switch-gear & Breaker Panels Equipment Description 600 VAC Motor Control Center ABD-C ELSC
- ELSCX Comments (Additional pages may be added as necessary)
Walkdown was performed on 10/19/13 Evaluated by: Lindsay M. Yates
,/',
Tyler C. Blosser Date: 1/2/14 1/2/14 C-957
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND] U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-21C10 Equip. Class15 (2) Low Voltage Switch gear & Breaker Panels Equipment Description 600 VAC Motor Control Center ABD-C ELSC
- ELSCX Photographs I I Note: (PA190706) Front of 2-21C10 F--
I I
Note: (PA 190711) Zip ties to support cleaning activities during the Unit 2 Cycle 21 refueling outage Note: (PA 190715) The third cabinet from the left is the rear of 2-21C10 C-958
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND-- UD--
Seismic Walkdown Checklist (SWC)
Equipment IDNo. 2-21C6 Equip. Class16 (2) Low Voltage Switch-gear & Breaker Panels Equipment Description 600 VAC Motor Control Center ABD-A Supply Breaker Location: Bldg. AB2 Floor El. 609 Room, Area 204 (Sys - 600AC)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
SQUG-2-21C, Rev 0
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YM NE YZ NO U[
N/AZJ YM ND UD N/AD YN ND U-N/AD YZ ND UL N/AD C-959
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-21C6 Equip. Class16 (2) Low Voltage Switch gear & Breaker Panels Equipment Description 600 VAC Motor Control Center ABD-A Supply Breaker
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YZ NEI UI Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YZ NE U-I N/AZ
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yj NE] UEI N/A[
and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ NEI UW N/A[
YN N-D UL1 Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ NE UW-1 C-960
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZE N[-- U[-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-21C6 Equip. Class 16 (2) Low Volta-ge Switch gear & Breaker Panels Equipment Description 600 VAC Motor Control Center ABD-A Supply Breaker Comments (Additional pages may be added as necessary)
Walkdown was performed on 10/19/13.
Evaluated by: Lindsay M. Yates Tyler C. Blosser Date: 1/2/14 1/2/14 C-961
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZK NO UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 2-21C6 Equip. Class16 (2) Low Voltage Switchgear & Breaker Panels Equipment Description 600 VAC Motor Control Center ABD-A Supply Breaker Photographs Note: (PA 190710) Zip ties to support cleaning activities during the Unit 2 Cycle 21 refueling outage.
Note: (PA 190715) The second cabinet from the left is the rear of 2-21C6 C-962