ML14035A361

From kanterella
Jump to navigation Jump to search
SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-584 Through Page C-722
ML14035A361
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/13/2014
From: Yates L
American Electric Power
To:
Office of Nuclear Reactor Regulation
Shared Package
ML14035A350 List:
References
AEP-NRC-2014-08 SD-121023-001, Rev 2
Download: ML14035A361 (139)


Text

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

,UOJ Lindsay M. Yates Date:

08/15/2013 Neda Stoeva 08/15/2013 Photos C-584

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers T HYC C-585

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EZ-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-H Equipment Class:

(10) Air Handlers V-CEQ-1 E ui ment Descri tion:

CONTAINMENT P9130264 HY1 C-586

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EY-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(10) Air Handlers 2-HV-CEQ-1 I a*Jr

'iI tI-L C-587

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers

-NT HYDRO C-588

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-HV-CEQ-1 (10) Air Handlers HY[

C-589

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EZ-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

liDment DescriDtion:

2-H V-CEQ-1 (10) Air Handlers CONTAINMENT HYDROGEN C-590

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(10) Air Handlers 2-HV-CEQ-1 r HYr C-591

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers EauiDment DescriDtion:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 C-592

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 625.00 ft, 74 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincis. Additional space is provided at the end of this checklist for documentina other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Missing bolt on support directly below 2-VMO-101 - OK per SEWS report - SQUG 2-HV-CEQ-2 REVO

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-593

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

01*,i

,,4O/,t-Lindsay M. Yates Date:

08/15/2013 Neda Stoeva 08/15/2013 Photos C-594

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(10) Air Handlers r..&:......

rfr*kl-r'A Ikli ar'-kl I

2-HV-CEQ-2 I

m-HYC C-595

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 C-596

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-DGX-2 Equipment Class:

(9) Fans Equipment

Description:

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Limited visibility of anchorage, visible portions OK

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

VERY LIMITED VISIBILITY

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

VERY LIMITED VISIBILITY

5.

Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-597

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LIYI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-DGX-2 Equipment Class:

(9) Fans Equipment

Description:

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Rod hung light can swing into fan - OK, because it will not affect function of equipment

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-598

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class: (9) Fans 2-HV-DGX-2 MNCY DIESEL GENERATOR ROOM VENTILATION C-599

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-DGX-2 Equipment Class:

(9) Fans NCY E C-600

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-SGRS-8 Equipment Class:

(9) Fans Equipment

Description:

4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21A Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 204 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-HV-SGRS-8 REVO

/

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?

Unistrut mounted

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-601

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-SGRS-8 Equipment Class:

(9) Fans Equipment

Description:

4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21A Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-602

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-SGRS-8 Equipment Class:

(9) Fans VOLT C-603

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IFI-53 Equipment Class:

(18) Instruments on Racks Equipment

Description:

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 598.00 ft, 56 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG. 2-5571 G, Rev. 0

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-604

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IFI-53 Equipment Class:

(18) Instruments on Racks Equipment

Description:

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Valve directly above but transmitter is water tight so even if fail open there is no concern.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

MA9,,,eI,.

Lindsay M. Yates Date:

08/15/2013 Neda Stoeva 08/15/2013 Photos C-605

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IFI-53 Equipment Class:

(18) Instruments on Racks EauiDment Descrition:

BORON INJECTIONT REACTORCO LANT LOOP#3FLOW C-606

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(18) Ins 2-IFI-53

  • truments on Racks TION "I P9120170 P9120171 P9120172 P9120173 C-607

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IFI-53 Equipment Class:

(18) Instruments on Racks 4 INJECTION TO C-608

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-222 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Eauipment

Description:

WEST CONTAINMENT SPRAY PUMP PP-9W DISCHARGE TO Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 573.00 ft, 52 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-609

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-222 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST CONTAINMENT SPRAY PUMP PP-9W DISCHARGE TO Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall near by - OK per DWG 12-4025, Wall W-22

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that' Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

'=

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12

..Photos C-610

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-222 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves C-611

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-225 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 573.00 ft, 52 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincis. Additional space is provided at the end of this checklist for documentina other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-612

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-225 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall near by - OK per DWG 12-4025, Wall W-22

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-613

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-Y--] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(8) Mol 2-IMO-225 or-Operated and Solenoid-Operated Valves WATER STORi

- TAKIV Tn C-614

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

T] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-320 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 573.00 ft, 55 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinq other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-615

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-320 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION Interaction Effects 7,

Are soft targets free from impact by nearby equipment or structures?

8, Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall - look at AR# 00863253 OK per DWG 12-4025, Wall W-24 9,

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-616

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-IMO-320 (8) Motor-Operated and Solenoid-Operated Valves

)UAL HEAT REMOVAL PUMP PP-35W SUCTION P9180859 C-617

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-320 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves pment

Description:

WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION C-618

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-331 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE Project:

DC Cook 2 SWEL Location (Bldg, Elev,

-, Room/Area):

AB2, 609.00 ft, 6 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-619

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FT] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-331 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-620

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-331 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves TO UPPER CC AIMM~rkPJT qPPAV 5qI-I ITrC[FF \\/AI VP P9181141 C-621

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-350 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 6 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentiallv adverse seismic conditions?

Yes C-622

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-350 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Eauinment

Description:

WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-623

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-350 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves t

ui ment uescri tion: vvl--,I KHRK-MIA P9181144 I LAL MAI UJ'(UU I r I I 0/-k C-624

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves r EXC rUlj51 4?5 C-625

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FT] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-52 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 598.00 ft, 59 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinq other comments.

Anchorage 1, Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2,

Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3,

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-626

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-52 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

9 Lindsay M. Yates Date:

08/15/2013 Neda Stoeva 08/15/2013 Photos C-627

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-52 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves TIONTO C-628

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-52 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves

CTION TO C-629

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FYl] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-IMO-52 (8) Motor-Operated and Solenoid-Operated Valves JECTION TO REAC' C-630

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-911I Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

REFUELING WATER STORAGE TANK TO CVCS CHARGING Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 40 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentina other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of ootentiallv adverse seismic conditions?

Yes C-631

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-911 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

REFUELING WATER STORAGE TANK TO CVCS CHARGING Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10, Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions 11, Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-632

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: rzii N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-911 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves r-*..

.:..~..&

r' r-%rir ll1ri l

P' IA "r,

rF A p'kr-rA kll

-ý if-I1 iA rrý lklS I VV/I-I r-I' M I UI' M C-633

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-911 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves

)n:

REFUELING WATER STORAGE TANK TO C C-634

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y N [i-Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCAB Equipment Class:

(14) Distribution Panels Equipment

Description:

250VDC DISTRIBUTION PANEL MCAB Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 200 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

CANNOT OPEN - CAN'T SEE ANCHORAGE

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Unknown

3.

Is the anchorage free of corrosion that is more than mild surface Unknown oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Unknown anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?

C-635

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y N jjj Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCAB Equipment Class:

(14) Distribution Panels Equipment

Description:

250VDC DISTRIBUTION PANEL MCAB Cannot open - cannot see anchorage Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

CANNOT OPEN Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-636

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y N -U-1 Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCAB Equipment Class:

(14) Distribution Panels TION F C-637

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y N E-l Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCi Equipment Class:

(14) Distribution Panels Iýo ai^mýnf rl~oerimflnn.

')rnlr)*

r)IQTDIQI TItI AB N PANEL MCAB U I IU C-638

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCM-221 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

MAIN STEAM LEAD #2 TO AUXILIARY FEED PUMP TURBINE Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 633.00 ft, 9 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentincq other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-639

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCM-221 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

MAIN STEAM LEAD #2 TO AUXILIARY FEED PUMP TURBINE Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 J-,

Neda Stoeva 10/18/12 Photos C-640

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Pni iinmant ractrrinfinn" 2-MCM-221 (8) Motor-Operated and Solenoid-Operated Valves MAIN STEAM LEAD #2 TO AUXILIARY FEED PUMP TURBIIS C-641

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCM-221 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Eaui"ment

Description:

MAIN STEAM LEAD #2 TO AUXILIARY FEED PUMP TURBINE C-642

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MRV-243 Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

STEAM GENERATOR OME-3-4 POWER OPERATED RELIEF Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2,621.00 ft, 10 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-643

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MRV-243 Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

STEAM GENERATOR OME-3-4 POWER OPERATED RELIEF Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-644

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MRV-243 Equipment Class: (7) Fluid-Operated Valves TOR C C-645

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [KI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MRV-243 Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

STEAM GENERATOR OME-3-4 POWER OPERATED RELIEF C-646

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [*

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-N LP-1 53 Equipment Class:

(18) Instruments on Racks Equipment

Description:

PRESSURIZER OME-4 PROTECTION CHANNEL 3 LEVEL Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 612.00 ft, 67 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Only one U-bolt around pipe verify with dwgs - Pictures show that a single U-bolt in conjuction with a weld are used - OK - Documents FCN 49030-006, 2-5581J-E049030.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-647

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-NLP-153 Equipment Class:

(18) Instruments on Racks Equipment

Description:

PRESSURIZER OME-4 PROTECTION CHANNEL 3 LEVEL Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

AUOJ Lindsay M. Yates Date:

08/15/2013 Neda Stoeva 08/15/2013 Photos C-648

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 1Y1] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

inmantnfarc=prinfinn" 2-N LP-1 53 (18) Instruments on Racks PRESSURIZER OME-4 PROTECTION CHANNEL 3 LEVEL C-649

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(18) In, 2-N LP-1 53 struments on Racks OME-4 PROTECTION CHANNEL 3 LEVEL C-650

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-N LP-1 R

3 (18) Instruments on Racks OME-4 PROTECTION CHANNEL 3 LEVEL C-651

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-NPS-111 Equipment Class:

(18) Instruments on Racks Equipment

Description:

REACTOR VESSEL TRAIN 'B' WIDE RANGE PRESSURE Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 612.00 ft, 12 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Welded plate to tube steel

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

At base of rack

5.

Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-652

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-NPS-1 11 Equipment Class:

(18) Instruments on Racks Equipment

Description:

REACTOR VESSEL TRAIN 'B' WIDE RANGE PRESSURE Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

'4.

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-653

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LYII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

nmmnf Ilmaprintinn-2-NPS-1 11 (18) Instruments on Racks REACTOR VESSEL TRAIN 'B' WII C-654

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(18) In, 2-NPS-111 struments on Racks TRAIN 'B' WIDE RANGE PRESSURE C-655

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-OME-150-AB-EN Equipment Class:

(17) Engine-Generators Equipment

Description:

AB EMERGENCY DIESEL GENERATOR ENGINE Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 2-AEP-WORT-W-501812AT

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Thread engagement on middle bolt behind generator OK - evaluated by CR# 03139102

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes ootentiallv adverse seismic conditions?

C-656

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [j]

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-OME-1 50-AB-EN Equipment Class:

(17) Engine-Generators Equipment

Description:

AB EMERGENCY DIESEL GENERATOR ENGINE Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-657

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: ED N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-OMi Equipment Class:

(17) Engine-Generators

+ flAonrnCnr AD OLAIZDf=KIC'V flIoCQ E-150-AB-EN C-658

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-OME Equipment Class:

(17) Engine-Generators E-150-AB-EN C-659

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-OME-150-AB-EN (17) Enqine-Generators

'Y DIEB C-660

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class: (17) En 2-OME-150-AB-EN gine-Generators

'AY DIESEL GENERATOR ENGINE C-661

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-OME-34W Equipment Class:

(0) Other Equipment

Description:

WEST ESSENTIAL SERVICE WATER STRAINER OME-34W Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

SH2, 591.00 ft, 136 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3684 REV14

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes I bolt has full thread engagement but does not stick out over nut

3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-662

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-OME-34W Equipment Class:

(0) Other Equipment

Description:

WEST ESSENTIAL SERVICE WATER STRAINER OME-34W Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety fuhctions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-663

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(0) Other 1~= =air~nm!nf rMmetrrnfitnn.

\\AII4Z:_T r-:4:_

2-OME-34W ENTIAL SERVI(

tU*:UUul C-664

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(0) Other F:ntinment DPe.rintinn:

WFST ER 2-OME-34W SER C-665

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-lOW Equipment Class:

(5) Horizontal Pumps Equipment

Description:

WEST COMPONENT COOLING WATER PUMP Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 609 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3286-9 & 12-3285-24

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-666

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-1 OW Equipment Class:

(5) Horizontal Pumps Eauipment Descrirtion:

WEST COMPONENT COOLING WATER PUMP Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Fire piping well supported Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva' 10/18/12 C-667

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-10W Equipment Class:

(5) Horizontal Pumps Equipment

Description:

WEST COMPONENT COOLING WATER PUMP P9100062 C-668

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-lOW Equipment Class:

(5) Horizontal Pumps r COMPONENT C C-669

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-26S Equipment Class:

(5) Horizontal Pumps Equipment

Description:

SOUTH SAFETY INJECTION PUMP Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 43 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG-2-PP-26S REV. I

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

PA IN TED

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-670

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-26S Equipment Class:

(5) Horizontal Pumps Eauipment

Description:

SOUTH SAFETY INJECTION PUMP Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall with grate - DWG 12-4026, Wall W-I1

9.

Do attached lines have adequate flexibility to avoid damage?

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

08/15/2013 Neda Stoeva 08/15/2013 Photos C-671

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-26S Equipment Class:

(5) Horizontal Pumps C-672

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-26S Equipment Class:

(5) Horizontal Pumps ITH SAFETY INJECTION PL C-673

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FV N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-35W Equipment Class:

(6) Vertical Pumps Equipment

Description:

WEST RESIDUAL HEAT REMOVAL PUMP Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 573.00 ft, 55 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-PP-35W, REV. 1

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-674

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-35W Equipment Class:

(6) Vertical Pumps Equipment

Description:

WEST RESIDUAL HEAT REMOVAL PUMP Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall - DWG 12-4025, Wall W-24

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

08/15/2013 Neda Stoeva 08/15/2013 Photos C-675

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-35W Equipment Class:

(6) Vertical Pumps

.1" C-676

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-35W Equipment Class:

(6) Vertical Pumps HEAT RI C-677

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-3W Equipment Class:

(5) Horizontal Pumps Equipment

Description:

WEST MOTOR DRIVEN AUXILIARY FEEDWATER PUMP Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

TB2, 591.00 ft, 51 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is provided at the end of this checklist for documentina other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-678

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Lii] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-3W Equipment Class:

(5) Horizontal Pumps Eauipment

Description:

WEST MOTOR DRIVEN AUXILIARY FEEDWATER PUMP Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-679

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: r-Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-3W Equipment Class:

(5) Horizontal Pumps IE C-680

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-3W Equipment Class: (5) Horizontal Pumps r

AIrC"T FAn-TCD I"%DlrIKl Al IVII IADV ICr'Fl

\\AIATIrrD DI IM~AD C-681

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-4 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

TURBINE DRIVEN AUXILIARY FEED PUMP Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

TB2, 591.00 ft, 49 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-PP-4 REVO

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-682

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-4 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

TURBINE DRIVEN AUXILIARY FEED PUMP Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapseonto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

'*"i George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-683

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-4 Equipment Class:

(5) Horizontal Pumps quipment

Description:

TURBINE DRIVEN AUXI C-684

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-4 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

TURBINE DRIVEN AUXILIARY FEED PUMP C-685

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-4 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

TURBINE DRIVEN AUXILIARY FEED PUMP wu 10 Iff C-686

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-50W Equipment Class:

(5) Horizontal Pumps Equipment

Description:

WEST CENTRIFUGAL CHARGING PUMP Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 41 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is provided at the end of this checklist.for documentinqi other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-687

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LT] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-50W Equipment Class:

(5) Horizontal Pumps Equipment

Description:

WEST CENTRIFUGAL CHARGING PUMP Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-688

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-50W Equipment Class:

(5) Horizontal Pumps Eauiment DescriDtion:

WEST CENTRIFUGAL CHARGING PUMP C-689

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-50W Equipment Class:

(5) Horizontal Pumps VVt~b I UItI' I I-(11-UU.AL UNAKU(.INU I-UMV C-690

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-7W Equipment Class:

(6) Vertical Pumps Equipment

Description:

WEST ESSENTIAL SERVICE WATER PUMP Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

SH2, 591.00 ft, 136 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3684 REV14

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-691

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-7W Equipment Class:

(6) Vertical Pumps Equipment

Description:

WEST ESSENTIAL SERVICE WATER PUMP Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Permanent Scaffold - Ref DWG 2-3113C. General Notes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Light rod hung

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-692

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-7W Equipment Class:

(6) Vertical Pumps Equipment

Description:

WEST ESSENTIAL SERVICE WATER PUMP C-693

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-7W Equipment Class:

(6) Vertical Pumps Equipment

Description:

WEST ESSENTIAL SERVICE WATER PUMP P

C-694

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: E-1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-7W Equipment Class:

(6) Vertical Pumps

)n: WEST ESSENTIAL SERVICE WATER PUMP C-695

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-9W Equipment Class:

(6) Vertical Pumps Eauinment

Description:

WEST CONTAINMENT SPRAY PUMP Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 573.00 ft, 52 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinjs. Additional space is provided at the end of this checklist for documentinq other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-696

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-9W Equipment Class:

(6) Vertical Pumps Eauirment

Description:

WEST CONTAINMENT SPRAY PUMP Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall behind pump - DWG 12-4025, Wall W-22

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-697

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-9W Equipment Class:

(6) Vertical Pumps C-698

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-9W Equipment Class:

(6) Vertical Pumps EauiDment DescriDtion:

WEST CONTAINMENT SPRAY PUMP C-699

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PP-9W Equipment Class:

(6) Vertical Pumps EauiDment DescriDtion:

WEST CONTAINMENT SPRAY PUMP C-700

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PS-A Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER PS-A Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

SH2, 594.00 ft, 221 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-PS-A REVO

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-701

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PS-A Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER PS-A Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-702

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PS-A Equipment Class:

(1) Motor Control Centers CONT C-703

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EZ] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-PS-A Equipment Class:

(1) Motor Control Centers E ui ment Descri tion:

600VAC MOTOR CONTROL CENTER PS-A P9191377 P9191378 P9191379 C-704

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-1 06-AB2 Equipment Class:

(0) Other Eauioment

Description:

AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #2 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 126 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2.

Is the anchorage free of bent, broken, missing or loose hardware?

No Yes Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

PA IN TED

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-705

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-1 06-AB2 Equipment Class:

(0) Other Equipment

Description:

AB EMERGENCY DIESEL FUEL OIL TRANSFER PUMP #2 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments: Pumps 2-QT-106-AB1 and 2-QT-106-AB2 were inspected during the walkdowns.

Evaluated by:

George G Thomas Date:

08/15/2013 Neda Stoeva 08/15/2013 Photos C-706

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: LZI1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-106-AB2 Equipment Class:

(0) Other XICY DIE C-707

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-106-AB2 Equipment Class:

(0) Other C-708

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-1 07-AB Equipment Class:

(21) Tanks and Heat Exchangers EauiDment

Description:

AB EMERGENCY DIESEL FUEL OIL DAY TANK Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-709

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-1 07-AB Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

AB EMERGENCY DIESEL FUEL OIL DAY TANK Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall all the way around - reinforced - DWG 2-0436, Wall W-3

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-710

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FI-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

oment Descriotion:

2-QT-107-AB (21) Tanks and Heat Exchangers AB EMERGENCY DIESEL FUEL OIL DAY TANK C-711

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FYj N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-QT-1 07-AB (21) Tanks and Heat Exchangers RGENCY DIESEL FUEL OIL DAY TANK C-712

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-107-AB Equipment Class:

(21) Tanks and Heat Exchangers CY DIE A

M PH1 C-713

DC Cook Unit I & Unit 2 SD-121023-001 R'ev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-130-AB2 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

AB EMERGENCY DIESEL JACKET WATER PUMP #2 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-714

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: IY N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-1 30-AB2 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

AB EMERGENCY DIESEL JACKET WATER PUMP #2 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-715

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-130-AB2 Equipment Class:

(5) Horizontal Pumps C-716

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: E* N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-130-AB2 Equipment Class:

(5) Horizontal Pumps (I

C-717

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-141-ABI Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

AB EMERGENCY DIESEL STARTING AIR RECEIVER #1 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-QT-141-ABI REVO

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-718

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-141-ABI '

Equipment Class:

(21) Tanks and Heat Exchangers Eauipment

Description:

AB EMERGENCY DIESEL STARTING AIR RECEIVER #1 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 J

Neda Stoeva 10/18/12 Photos C-719

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-141-ABI Equipment Class:

(21) Tanks and Heat Exchangers EAuinment Descrintion:

AR EMERGENCY DIESEL STARTING AIR RECEIVER #1 P9130412 C-720

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-141-ABI Equipment Class:

(21) Tanks and Heat Exchangers JCY DIESEL STARTING F

P9130417 C-721

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-QT-141-AB1 Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

AB EMERGENCY DIESEL STARTING AIR RECEIVER #1 C-722