Text
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: -YJ N U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 40 - AB2, 633, 9 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
- 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shieldinq)?
D-405
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 40 - AB2, 633, 9 Scaffold in area - above safety dischargetail pipes - OK
- 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?
Comments Evaluated by: 4_-k-*%George G Thomas Date: 10/18/12
- 4,- Neda Stoeva 10/18/12 D-406
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Area Walk-By Checklist (AWC)
Area 40 -
rWUIZUi 4 D-407
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7 N U Area Walk-By Checklist (AWC)
D-408
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-* N U Area Walk-By Checklist (AWC)
D-409
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Area Walk-By Checklist (AWC)
I I P9191302 D-410
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Area Walk-By Checklist (AWC) 40-D-411
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y j-J U (AWC)
Area Walk-By Checklist Location (Bldg, Elev, Room/Area): Area 41 - TB2, 591, 49 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Strainer2-PW-245-2 Support - lack of thread engagement on 2 bolts on front saddle - has been evaluatedby engineering (tag) and is OK by DOC# 01019028
- 2. Does anchorage of equipment in the area appear to be free of No significant degraded conditions?
Support above valve 2-WMO-753 for control air tubing not well anchored,unistrutcoming off the wall and does not have top bolt (does not look like it ever did) - AR 2012-11936 was issued.
- 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
- 5. Does it appear that the area is free of potentially adverse seismic No interactions that could cause flooding or spray in the area?
Approximately 1.5" threadedfire protection pressurizedpipe is rod hung and can leak and/orimpact othersupports in area and may break
- AR 2012-11738
- 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
D-412
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y UN-U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 41 - TB2, 591, 49
- 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 D-413 I
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y [-* U Area Walk-By Checklist (AWC)
D-414
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ¶NIJ U Area Walk-By Checklist (AWC)
Area 41 - TB2, 591, 49 D-415
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y IU Area Walk-By Checklist (AWC)
Area 41 - TB2, 591, 49 D-416
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ] U Area Walk-By Checklist (AWC)
D-417
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 42 - TB2, 591, 51 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
- 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
D-418
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-1 N U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 42 - TB2, 591, 51
- 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?
Comments George G Thomas Evaluated by: Date: 10/18/12 Neda Stoeva 10/18/12 P9191358 D-419
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Area Walk-By Checklist (AWC)
Area 42 - T D-420
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [* N U Area Walk-By Checklist (AWC) 4,
ýýIlIlOIJ D-421
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Area Walk-By Checklist (AWC)
Area 42 - TB2, 591, 51 P9191369 D-422
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 42 - TB2, 591, 51 D-423
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[ U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 43 - SHI, 591, 670 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
OK for a non-safety area
- 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
Some minor rust on most components
- 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
OK for an area that is NOT safety related
- 4. Does it appear that the area is free of potentially adverse seismic No spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Not a safety related area - AR 2012-11762 and AR 2012-11767 were issued.
- 5. Does it appear that the area is free of potentially adverse seismic No interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
D-424
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ] U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 43 - SH1, 591, 670 Not safety related area - AR 2012-11762 and AR 2012-11767 were issued. Fireextinguishers on short hooks.
- 8. Have you looked for and found no other seismic conditions that could No adversely affect the safety functions of the equipment in the area?
Not a safety related area - AR 2012-11762 and AR 2012-11767 were issued.
Comments Evaluated by: George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 P9191394 D-425
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ¶-] U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 43 - SHI, 591, 670 D-426
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y l U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 43 - SHI, 591, 670 P9191402 1*3UI Al Ii D-427
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 44 - SH2, 591, 136 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.
The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Junction box U bolted (3places)to guard rail of plafform
- 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
- 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic A Yes interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shieldinq)?
D-428
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Area Walk-By Checklist (AWC)
Location (Bldg, Elev, Room/Area): Area 44 - SH2, 591, 136
- 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?
Twisted angle on top of instrument rack seems to serve no purpose -
OK Comments Evaluated by: George G Thomas Date: 10/18/12 6ý4 Neda Stoeva 10/18/12 P9090065 P9090066 D-429
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Area Walk-By Checklist (AWC)
Location (BIda. Elev. Room/Area): Area 44- SH2, 591, 136 D-430
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Area Walk-By Checklist (AWC)
Location Bid Elev, Room/Area: Area 44 - SH2, 591, 136 P9090073 P9090074 P9090075 P9090076 P9090077 P9090078 D-431
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [ N U Area Walk-By Checklist (AWC)
Location (Blda. Elev. Room/Area): Area 44 - SH2, 591, 136 D-432
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Table D-3: Summary of Area Walk-By Checklists Outage DCCNP1 Walkdown Area Elevation Pg Page Nmer Room - Area - Desc.
Number 40 AUXILIARY BUILDING UNIT 1 - ROOM 29 591 D-433 41 CONTAINMENT BUILDING UNIT 1 - ROOM 60 612 D-441 42 CONTAINMENT BUILDING UNIT 1 - ROOM 62 617 D-446 43 CONTAINMENT BUILDING UNIT 1 - ROOM 63 617/612 D-450 44 CONTAINMENT BUILDING UNIT 1 - ROOM 66 612 D-454 45 CONTAINMENT BUILDING UNIT I - ROOM 81 650 D-458 46 AUXILIARY BUILDING UNIT 1 - ROOM 609 609 D-465 Note: Pages D-433 through D-469 are all new pages in Revision 1 of this Report.
D-433
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ N[D UDi Area Walk-By Checklist (AWC)
Location: Bldg. ABI Floor El. 591 Room. Area 1 29 (Sys - BD)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YZ NEi UE' N/AE potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Facing Containment,the lower left bolt on the lower left brace below 1-CPN-38, does not have full thread engagement (1 threadshy of full engagement). PerDC-D-3053S-430, only 50%
threadengagement is requiredfor full tensile capacity of concrete anchorbolts. Therefore the brace is seismically adequate. - AR 2013-4499 was issued Bolt is backed out of 1-CPN-38, however there is full thread engagement and the nut is tack welded in place - AR 2013-4500 was issued
- 2. Does anchorage of equipment in the area appear to be free of significant YN NE] UE- N/AE degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit YE NE UE- N/AE raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial YZ NE UE N/AE interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
D-434
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NO uD Area Walk-By Checklist (AWC)
Location: Bldg. ABI Floor El. 591 Room, Area' 29 (Sys - BD)
- 5. Does it appear that the area is free of potentially adverse seismic Y9 NE U[I N/A[
interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic Y[ NEI UW N/A-interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YE NE UW N/AO interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- 8. Have you looked for and found no other seismic conditions that could YE NO UW--
adversely affect the safety functions of the equipment in the area?
Comments(Additional pages may be added as necessary)
Area walk-by performed on March 29, 2013 Evaluated by: Tyler Blosser Date: 6/26/2013 Lindsay Yates M At 6/26/2013 D-435
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[ Nr-- U-Area Walk-By Checklist (AWC)
Location: Bldg. ABI Floor El. 591 Room, Area 1 29 (Sys - BD)
Photographs rNote: txtension cora nung tor unit i Lycie zo Note:
Outage (P3280091)
D-436
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NEI UD Area Walk-By Checklist (AWC)
Location: Bldg. AB1 Floor 1 Room, Area1 29 D-437
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13
'Note:
D-438
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:(P3280099) Note: Lower left bolt on brace with less than requiredthread engagement (P3280100)
D-439
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note: Backed out bolt on 1-( PNote:(t-',JzU iUo)
(P3280102)
D-440
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:(P3280106)
D-441
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[K ND U[l-Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 612 Room, Area 2 60 (Sys - Containment)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YE ND UD N/A[
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant YN ND ULI N/AD degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit YZ ND UD N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial YM NDI UD- N/AD interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
2 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
D-442
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1,09/12/13 Status: Y[Z N[-- uD (AWC)
Area Walk-By Checklist Location: Bldg. CONI Floor El. 612 Room, Area 2 60 (Sys - Containment)
- 5. Does it appear that the area is free of potentially adverse seismic YN NDI UD N/AD interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic YM NDI UDI N/AD interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YZ NDI UD N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Lead shielding temporarilyhung and staged for the outage
- 8. Have you looked for and found no other seismic conditions that could YO NDI U adversely affect the safety functions of the equipment in the area?
Comments(Additional pages may be added as necessary)
Area walkby performed on April 1, 2013.
Evaluated by: Tyler Blosset Date: 6/26/2013 Lindsay Yat.es I~ -6/26/2013 D-443
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[ NR Ur-Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 612 Room, Area 2 60 (Sys - Containment)
Note:(P4010124) Note:
Note:(P4010127) Note: Cable hung tor Unit 1 Cycle 25 Outage (P4010128)
D-444
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note: Lead shieldini Outage(P4010133)
D-445
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note:(P4010134) Note:
INote: Leaa snleliang sragea Tor unit 7 uycie zo INote: (t-4U7U7Jtf)
Outage (P4010137)
D-446
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NO UD Area Walk-By Checklist (AWC)
Location: Bldg. CON1 Floor El. 617 Room, Area 3 62 (Sys - RCS)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YN ND U['D N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant Y] NEI U-- N/AD degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI UD N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEI UD N/AD interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
D-447
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ N-- Uti Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 617 Room, Area3 62 (Sys - RCS)
- 5. Does it appear that the area is free of potentially adverse seismic Y9 NEI Ur- N/AD interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic Y[Z ND ULI N/AD interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic Y[ NDI UD N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffolding and lead shielding hung for the Unit I Cycle 25 Outage. These are not normally present during normal operation.
- 8. Have you looked for and found no other seismic conditions that could YZ NEI UM adversely affect the safety functions of the equipment in the area?
Conmnients(Additional pages may be added as necessary)
Area Walk-By performed on April 1, 2013.
Evaluated by: Tyler Bloss Date: 7/8/2013 Lindsay Yates * 'f J 7/8/20 13 D-448
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YM N- uV-Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 617 Roomr, Area' 62 (Svs - RCS)
Note: j Note: (P5081526) INote:(t D-449
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note: Red foreign materialexclusion (FME) Note: Hecl I-M- cover in place cover in place for the Unit I Cycle 25 Outage Cycle 25 Outage (P5081552)
(P5081550)
D-450
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NEI uLI Area Walk-By Checklist (AWC)
Location: Bldg. CONY Floor El. 617/612 Room, Area 4 63 (Sys-RCS/CNTMT)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YZ ND U- N/AD-I potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant YE ND UD N/AD degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit YE NEI UD N/A-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial YZ ND UD- N/A--
interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
4 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
D-451
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YV N[- U--
Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 617/612 Room, Area 4 63 (Sys-RCS/CNTM7l
- 5. Does it appear that the area is free of potentially adverse seismic YZ NWi Ur-W N/A[
interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic YCK N[ UW N/AW interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YE NE UW N/AW interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffolding and lead shielding hung for the Unit I Cycle 25 Outage. These are not present during normal operation.
- 8. Have you looked for and found no other seismic conditions that could YZ NWI UW-adversely affect the safety functions of the equipment in the area?
Comments(Additional pages may be added as necessary)
Area Walk-By performed on April 1, 2013.
Evaluated by: Tyler Blosser ' Date: 7/8/2013 Lindsay Yates 7/8/2013 D-452
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1,09/12/13 Status: YZ NEI ULI Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 617/612 Room, Area 4 63 (Sys-RCS/CNTMT)
NOute: I Uffillildflulu UUX Wiui (;Uvuv JWIIJUV.L the Unit 1 Cycle 25 Outage (P5081544)
D-453
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Note: Cover removed from termination box for the Unit 1 Cycle 25 Outage (P5081545)
D-454
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YE Nj U-]
Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 612 Room, Area 5 66 (Svs - CVCS)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. Tile space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YE] NZ U[-- N/AE]
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
There is insufficient thread engagement on an anchorbolt for a pipe support (1-GCS-R751) near 1-QRV-160 - AR 2013-4779 was issued Missing bolt on a single angle conduit support for conduits attachedto 1-QRV-160 - AR 2013-4815 was issued
- 2. Does anchorage of equipment in the area appear to be free of significant YN NEI U[] N/AD degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit Y[Z NEI U[] N/AE-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area isffree of potentially adverse seismic spatial YN NE UE-] N/A[]
interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
D-455
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YD NM U[-]
Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 612 Room, Area 5 66 (SYs - C
- 5. Does it appear that the area is free of potentially adverse seismic YE NEI UD- N/AD interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic Y[l NEI ULI N/AD interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YN Nr-D Ur- N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- 8. Have you looked for and found no other seismic conditions that could YZ N[-]UD adversely affect the safety functions of the equipment in the area?
Comments(Additional pages may be added as necessary)
Initial walkdown peformed priorto lead shielding being hung and a second walkdown was performed after the lead shielding was hung.
Area walk-by performed on April 1, 2013.
Evaluated by: Tyler Blossetr * * ---
- Date: 6/26/2013 Lindsay Yates 6/26/2013 D-456
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YE-] N[*U[--
Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 612 Room, Area 5 66 (Sys - CVCS)
IN I0tC:(t
.I D-457
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 INote: IVUT Wi Note: cord stagec tor IacliatlonIrotectn (P4010154) remote coverage for the Unit 1 Cycle 25 Outage (P4010155)
Note: Single (P4010169)
D-458
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1,09/12/13 Status: YZ N[-' U[D Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 650 Room, Area 6 81 (Sys - RCS)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YE N[-] U[I N/A[
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant YM NEI UD N/AZ degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit YZ ND U-- N/AZ raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Cable/conduitraceways and HVAC ducting have no missing bolts or nuts.
Gratinghas no missing bolts or nuts.
- 4. Does it appear that the area is free of potentially adverse seismic spatial YZ ND U[-- N/AZ interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
6If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judginent, e.g., on the order of about 35 feet from the SWEL item.
D-459
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[ NEI UF]
Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 650 Room, Area 6 81 (Sys - RCS)
- 5. Does it appear that the area is free of potentially adverse seismic YZ NWl UW N/A[W interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic YE NEI UW N/AW interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic Y[K NE U[W] N/AW interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
White bag tied off near 1-NMO-151 which is only staged there for the outage and is not present during unit operation.
- 8. Have you looked for and found no other seismic conditions that could Y[K NWI UW adversely affect the safety functions of the equipment in the area?
Comments(Additional pages may be added as necessary)
No missing bolts and nuts in the grating Area walk-by performed on March 29, 2013.
Evaluated by: Tyler Blosset - "*q* Date: 6/26/2013 Lindsay Yates 6/26/2013 D-460
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[ NEI U-Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 650 Room, Area6 81 (Sys - RCS)
Phot.
Note:(
D-461
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[ ND-1 U-Area Walk-By Checklist (AWC)
Location: Bldg. CONI Floor El. 650 Room, Area6 81 Sys - RCS Note Note:,
D-462
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 iNote: IIIziUldliUll Wdz.; IUuttI( UllWIl[P/Ju. IVUL d1 1,40m(r-';
seismic concern; insignificant weight and no soft targets below (P3280049)
D-463
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 nlote: vviie oay ilea on /or unn / (.ye Outage (P3280058)
D-464
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: YZ NO U-Area Walk-By Checklist (AWC)
Location: Bldg. ABI Floor El. 609 Room, Area7 609 (Sys - 600AC)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YZ NEI U-- N/AZ potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant Y[ NEI Ur- N/AZ degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit Y[9 NE UD N/AZ-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Conduit well supported with trapeze supports
- 4. Does it appear that the area is free of potentially adverse seismic spatial YS NZ U-1 N/AZ interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
7 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
D-465
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[ N]-- Ur-]
Area Walk-By Checklist (AWC)
Location: Bldg. ABI Floor El. 609 Room, Area' 609 (Sys - 600AC)
- 5. Does it appear that the area is free of potentially adverse seismic Y[ NEI UrI N/AW interactions that could cause flooding or spray in the area?
Fire Protectionsprinklerabove 1-AZ-BC, adequately supported
- 6. Does it appear that the area is free of potentially adverse seismic YZ NW UW1 N/AWI interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YN NW UW N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
RP storage cabinet on wall -8 ft from 1-AZ-BC is not bolted down but the location was evaluated by Engineeringand deemed okay.
Maintenance equipment staged for Unit I Cycle 25 outage and is tied down per Cook Plant's procedures.
Eyewash and shower station by 1-AZV-A is tied off and restrained.
Boric acid storage location is in the area but does not pose any seismic concems and does not exceed floor loading criteria.
- 8. Have you looked for and found no other seismic conditions that could YN NEIUF adversely affect the safety functions of the equipment in the area?
Comments(Additional pages may be added as necessary)
Area walk-by performed on April 5, 2013 Evaluated by: Tyler Blosser
- Date: 6/26/2013 Lindsay Yates gwý "tjw'w- 6/26/2013 D-466
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1,09/12/13 Status: YZ NO uD-Area Walk-By Checklist (AWC)
Location: Bldg. ABI Floor El. 609 Room, Area' 609 (Sys - 600AC)
Photographs D-467
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y[ NF- U-Area Walk-By Checklist (AWC)
Location: Bldg. AB1 Floor El. 609 Room. Area 7 609 (Svs - 600AC)
Note: ivore accepring me iocarion ot me f/-I Note:(P4050280) storage cabinetper Engineering(P4050279) 1'iore:(j D-468
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13
.Note: Maintenance equipmenr sragea tor fne Unit 1 Cycle 25 Outage and properly tied off (P4050287)
'Note:(t-ý D-469
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 D-470
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 E
Plan for Future Seismic Walkdown of Inaccessible Equipment Due to the completion of the DCCNP1 outage walkdown, all equipment included on the DCCNP1 SWELl and SWEL2 have been completed. There are 16 items that have been deferred in DCCNP2. Six of these items were located in Containment inside the Shield Wall and could not be included in the walkdown when the units were at power. There were nine electrical equipment items that could not be opened during the walkdown due to safety reasons.
The remaining item was in an enclosure that also could not be opened for safety reasons in the Auxiliary Building. The electrical equipment items will be inspected at the next service outage for this equipment. The items in Containment and the item in the enclosure in Auxiliary Building will be inspected during the Unit 2 Outage in Fall 2013. Table E-1 summarizes the reasons each item is inaccessible during normal plant operation.
The Area Walk-Bys associated with the items in Containment will be performed concurrently with the component walkdowns. Area Walk-Bys in accessible areas of the plant were performed and are included in this report revision that includes areas containing electrical equipment not accessible for internal inspection.
E-1
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Table E-1. Summary of Inaccessible Equipment for DCCNP2 SWELl Component Description Building and Plan for Future Reason for List ID Location Walkdown Inaccessibility Item #
Walkdown to be Electrical performed next Equipment 2-21C(1l scheduled could not be 6 600V BUS SWITCHGEAR AB2, EL.
609', Rm. 204 outage for equipment.
opened for safety A
reasons.
Walkdown to be Electrical WEST ESSENTIAL performed next Equipment 8 2-T21A511) SERVICE WATER AB2, EL. scheduled could not be PUMP PP-7W 609', Rm. 140 outage for opened for SUPPLY equipment. safety reasons.
Walkdown to be Electrical 600V MOTOR performed next Equipment 9 2-21C6(1 ) CONTROL CENTER AB2, EL. scheduled could not be EZC-C SUPPLY 609', Rm. 204 outage for opened for BREAKER equipment. safety reasons.
Walkdown to be Electrical WEST MOTOR performed next Equipment 10 2-T21A2(1,2) DRIVEN AUXILIARY AB2, EL. scheduled could not be FEEDWATER PUMP 609', Rm. 140 outage for opened for PP-3W equipment. safety reasons.
Walkdown to be Electrical 600VAC MOTOR performed next Equipment CONTROL CENTER AB2, EL. scheduled could not be ABD-C SUPPLY 609', Rm. 204 outage for opened for BREAKER equipment. safety reasons.
Walkdown to be Electrical 600V BUS 21A performed next Equipment 31 2-TR21A(l) SUPPLY AB2, EL. scheduled could not be TRANSFORMER 609', Rm. 140 outage for opened for equipment. safety reasons.
E-2
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1,09/12/13 Table E-1. Summary of Inaccessible Equipment for DCCNP2 SWELl Component Description Building and Plan for Future Reason for List ID Location Walkdown Inaccessibility Item #
Walkdown to be Item in Primary PRESSURIZER performed Containment.
RELIEF VALVE NRV- CON2, EL. during next Walkdown 151 UPSTREAM 650', Rm. 81 RFO for cannot be SHUTOFF DCCNP2. performed with unit at power.
Walkdown to be Item in Primary PRESSURIZER performed Containment.
44 2-NRV-151 TRAIN 'B' CON2, EL. during next Walkdown PRESSURE RELIEF 650', Rm. 81 RFO for cannot be VALVE DCCNP2. performed with unit at power.
Walkdown to be Item in Primary PRESSURIZER performed Containment.
45 2-NRV-152 TRAIN 'B' CON2, EL. during next Walkdown PRESSURE RELIEF 650', Rm. 81 RFO for cannot be VALVE DCCNP2. performed with unit at power.
STEAM Walkdown to be Equipment GENERATOR #2 performed enclosure 58 2-XSO-321 BLOWDOWN AB2, EL. during next could not be CONTAINMENT 591', Rm. 29 RFO for opened for ISOLATION DCCNPI. safety reasons.
Walkdown to be Item in Primary REACTOR COOLANT performed Containment.
60 2-NTR-230 LOOP #3 COLD LEG CON2, EL. during next Walkdown WIDE RANGE 617', Rm. 62 RFO for cannot be DCCNP2. performed with unit at power.
Walkdown to be Item in Primary REACTOR COOLANT performed Containment.
61 2-NTR-240 LOOP #4 COLD LEG CON2, EL. during next Walkdown WIDE RANGE 617', Rm. 63 RFO for cannot be DCCNP2. performed with unit at power.
LOWER Walkdown to be Item in Primary CONTAINMENT performed Containment.
67 2-NLI-320(C) TRAIN'B'WATER CON2, EL. during next Walkdown LEVEL INDICATOR 617', Rm. 60 RFO for cannot be TRANSMITTER DCCNP2. performed with unit at power.
E-3
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Table E-1. Summary of Inaccessible Equipment for DCCNP2 SWELl Component Description Building and Plan for Future Reason for List ID Location Walkdown Inaccessibility Item #
Walkdown to be Electrical PLANT BATTERY performed next Equipment 2-BCTC- CHARGERS BC-AB1 AB2, EL. scheduled could not be 80 AB(2) AND BC-AB2 613', Rm. 205 outage for opened for TRANSFER equipment. safety reasons.
Walkdown to be Electrical 250VDC performed next Equipment 82 2-MCAB(2) DISTRIBUTION AB2, EL. scheduled could not be PANEL MCAB 609', Rm. 200 outage for opened for equipment. safety reasons.
Walkdown to be Electrical performed next Equipment 83 2-TDAB(1,2) 250VDC TRAIN 'B' AB2, EL. scheduled could not be TRANSFER CABINET 609', Rm. 200 outage for opened for equipment. safety reasons.
Notes: (1) These equipment items require anchorage documentation verification.
(2) These items have Seismic Walkdown Checklists (SWCs) in Appendix C. The interaction questions were answered.
E-4
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 F
Peer Review Checklist Peer Review Checklist for SWEL - D. C. Cook Unit I and Unit 2 Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings. Additional space is provided at the end of this checklist for documenting other comments.
- 1. Were the five safety functions adequately represented in the SWELl selection? YN NEI The basis for how selection of equipment for the SWEL I is describedin the SWEL Scope Development document and the basis includes a descriptionthat indicates that the 5 safety functions are represented. However, the information provided on the SWEL does not include the safety function(s) supported by each item.
- 2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
- a. Various types of systems? YI NO
- b. Major new and replacement equipment?
The basis for how selection of equipment for the SWEL I is described in the SWEL Scope Development document and the basis includes a description that indicates that modified and new equipment is considered. However, the information provided on the SWEL does not indicate if the equipment is new or has been modified.
- c. Various types of equipment? YZ NO
- d. Various environments? YZ NEI Itappears that the equipment on the SWEL is located in various environments.
Ak F-1
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Peer Review Checklist for SWEL - D. C. Cook Unit I and Unit 2
- e. Equipment enhanced based on the findings of the IPEEE (or equivalent) Y] NEI program?
- f. Were risk insights considered in the development of SWEL 1? YM Nil
- 3. For SWEL 2:
- a. Were spent fuel pool related items considered, and if applicable included in YN NEI SWEL 2?
- b. Was an appropriate justification documented for spent fuel pool related YO Nil items not included in SWEL 2?
- 4. Provide any other comments related to the peer review of the SWELs.
None.
- 5. Have all peer review comments been adequately addressed in the final SWEL? YO NWl Peer Reviewer #1: T K, Ram_ Date: 08/15/2013 Peer Reviewer #2: WalterDjordjevic_ Date: 08/15/2013 F-2