DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y L[- U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-QT-142-AB2 Equipment Class:
(12) Air Compressors Equipment
Description:
AB EMERGENCY DIESEL STARTING AIR COMPRESSOR #2 Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 587.00 ft, 121 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
DWG 12-3462, Rev. 33
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the Yes anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-723
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y EN-U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-QT-142-AB2 Equipment Class:
(12) Air Compressors Equipment
Description:
AB EMERGENCY DIESEL STARTING AIR COMPRESSOR #2 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Fire extinguishers on short hooks - AR 2012-11669 was issued.
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
No Yes Yes No Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
08/15/2013 Neda Stoeva 08/15/2013 Photos C-724
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y L-II U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-Q Equipment Class:
(12) Air Compressors r-142-AB2 l'*V C-725
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y L-E U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
(12) Ai 2-QT-142-AB2 AB EM r Compressors ERGENCY DIE C-726
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-QT-506 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
TURBINE DRIVEN AUXILIARY FEED PUMP PP-4 TRIP AND Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
TB2, 591.00 ft, 49 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is provided at the end of this checklist for documentinq other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-727
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-QT-506 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
TURBINE DRIVEN AUXILIARY FEED PUMP PP-4 TRIP AND Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-728
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-QT-506 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves DRIVEN Al IAPV PPn1f PI IRAP 3PPA T9 C-729
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-QT-506 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Pniiinmant fIlnarintinn" TI IPRIKlF I-*l\\/[:Kl Al IYII IARY Fil::n P1 IMP PP-4 TRIP Awln C-730
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RC Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
REACTOR CONTROL RODS CONTROL PANEL Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 633.00 ft, 123 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
SQUG 2-RC REVO
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?
Welded to embedded plate through shims
- 5.
Is the anchorage configuration consistent with plant documentation?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-731
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RC Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
REACTOR CONTROL RODS CONTROL PANEL Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles - Ceiling tiles OK per DWG 12-4070
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-732
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [7 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RC Equipment Class:
(20) Instrumentation and Control Panels and Cabinets CONTROL
~r-C-733
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-J N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RC Equipment Class:
(20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion:
REACTOR CONTROL RODS CONTROL PANEL C-734
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPS-B Equipment Class:
(20) Instrumentation and Control Panels and Cabinets REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN 'B' Equipment
Description:
CABINET Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 633.00 ft, 123 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Welded to embedded plate
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free of potentiallv adverse seismic conditions?
Yes C-735
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Ecuipment
Description:
2-RPS-B (20) Instrumentation and Control Panels and Cabinets REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN 'B' CABINET Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles - Ceiling tiles OK per DWG 12-4070
- 9.
Do attached lines have adequate flexibility to avoid damage?.
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Loose internal nut at top right side of 2-RPS-B (Output bay) - will not result in adverse condition. Internal RPS-B (logic cabinet) - 2nd from top 15-48V DC power supply - screw head missing - would not affect seismic performance of component Comments Evaluated by:
George G Thomas Date:
08/15/2013 Neda Stoeva 08/15/2013 C-736
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
2-RPS-B (20) Instrumentation and Control Panels and Cabinets REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN 'B' CABINET I
I I
r' lo1 I I4 C-737
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPS-B Equipment Class:
(20) Instrumentation and Control Panels and Cabinets REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN 'B' Eauinment Descrintion:
CABINET C-738
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPS-B Equipment Class:
(20) Instrumentation and Control Panels and Cabinets REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN 'B' IP:ninmant )l,=gt-riintinn" PAPIKIPT
"*1011*1-C-739
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y -l] U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPST-B Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
REACTOR PROTECTION AND SAFEGUARD ACTUATION Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 633.00 ft, 123 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
DWG 2-5542E-2
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?
Welded to embedded plate
- 5.
Is the anchorage configuration consistent with plant documentation?
No (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
SQUG documents identify 2-RPST-B but label it as 2-RPSX-B. AR 2012-12911 and AR 2012-12913 were issued to address documentation discrepancies found. Component has the wrong location description in INDUS, AR 2012-12458 issued to correct data base.
- 6.
Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
C-740
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y N-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPST-B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles - Ceiling tiles OK per DWG 12-4070
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
-George G Thomas Date:
08/15/2013 Neda Stoeva 08/15/2013 Photos C-741
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y N-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPST-B Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
REACTOR PROTECTION AND SAFEGUARD ACTUATION C-742
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y FE] U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPST-B Equipment Class:
(20) Instrumentation and Control Panels and Cabinets I-~JI0i 16(
C-743
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y L-N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPSX-B Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
REACTOR PROTECTION AND SAFEGUARD ACTUATION Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 633.00 ft, 123 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
SQUG 2-RPSX-B REVO
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?
Panel welded to shim plates welded to embedded plates
- 5.
Is the anchorage configuration consistent with plant documentation?
No (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Documents identify 2-RPST-B but label it as 2-RPSX-B. AR 2012-12911 and AR 2012-12913 were issued to address documentation issue. Component has the wrong location description in INDUS, AR 2012-12458 issued to correct data base.
- 6.
Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
C-744
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y jN U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPSX-B Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
REACTOR PROTECTION AND SAFEGUARD ACTUATION Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles - Ceiling tiles OK per DWG 12-4070
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
08/15/2013 Neda Stoeva 08/15/2013 Photos C-745
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y WII U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPSX-B Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
REACTOR PROTECTION AND SAFEGUARD ACTUA rFil 10 114.
C-746
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y F U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-RPSX-B Equipment Class:
(20) Instrumentation and Control Panels and Cabinets "ACTOR PROTECTION AND SAFEGUARD ACTL C-747
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SG Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
STEAM GENERATOR AND AUXILIARY FEED PUMP CONTROL Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 633.00 ft, 123 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Cannot see all welds on back because of wires in the way
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Welded to embedded plates
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-748
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SG Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
STEAM GENERATOR AND AUXILIARY FEED PUMP CONTROL Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles - Ceiling tiles OK per DWG 12-40 70
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-749
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SG Equipment Class:
(20) Instrumentation and Control Panels and Cabinets TOR AND C-750
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SG Equipment Class:
(20) Instrumentation and Control Panels and Cabinets JERATOR At C-751
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SG Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
STEAM GENERATOR AND AUXILIARY FEED PUMP CONTROL P9181074 C-752
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [Y N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SIS Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
SAFETY INJECTION CONTROL PANEL Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 633.00 ft, 123 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is provided at the end of this checklist for documentina other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Welded to embedded plate
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-753
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: []
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SIS Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
SAFETY INJECTION CONTROL PANEL Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles - Ceiling tiles OK per DWG 12-4070
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-754
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: [-ý N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SIS Equipment Class: (20) Instrumentation and Control Panels and Cabinets 1;rTV IlW DN CONTROL PA C-755
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
2-SIS (20) Instrumentation and Control Panels and Cabinets MTION CONTROL PANEL C-756
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EL] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SIS Equipment Class:
(20) Instrumentation and Control Panels and Cabinets r',,;r M~e m-*
OACCrTV IM I~r-/'*Inkl e'*nklTrDnl DAMMr' F-- I I'.JI/1.
.JIl~
I t-C-757
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
V] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SIS Equipment Class:
(20) Instrumentation and Control Panels and Cabinets EauiDment
Description:
SAFETY INJECTION CONTROL PANEL C-758
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SPY Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CONTAINMENT SPRAY CONTROL PANEL Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 633.00 ft, 123 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
SQUG 2-SPY REVO
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?
Welded to embedded plate with shims
- 5.
Is the anchorage configuration consistent with plant documentation?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-759
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SPY Equipment Class:
(20) Instrumentation and Control Panels and Cabinets EauiDment
Description:
CONTAINMENT SPRAY CONTROL PANEL Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Ceiling tiles - possibly metal - resolution of ceiling tile clips/snaps -
Ceiling tiles OK per DWG 12-4070 - Fire extinguisher hook OK
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-760
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SPY Equipment Class:
(20) Instrumentation and Control Panels and Cabinets "c"
MIT
.NT SPRAY CONTROL PANEL C-761
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SPY Equipment Class:
(20) Instrumentation and Control Panels and Cabinets 4iT SPRAY CONTROL PANEL C-762
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SPY Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CONTAINMENT SPRAY CONTROL PANEL C-763
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-SPY Equipment Class:
(20) Instrumentation and Control Panels and Cabinets T SPRAY CC C-764
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y N E-i-Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-T21A2 Equipment Class:
(3) Medium Voltage Switchgear Equipment
Description:
WEST MOTOR DRIVEN AUXILIARY FEEDWATER PUMP PP-3W Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 609.00 ft, 140 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the Yes anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Can only look at one breaker, 2nd from left T21A2 - of 12 components
- 6.
Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
C-765
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y N I-U--
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-T21 A2 Equipment Class:
(3) Medium Voltage Switchgear Equipment
Description:
WEST MOTOR DRIVEN AUXILIARY FEEDWATER PUMP PP-3W Could not open back to see anchorage on drawings. Verifird 2 puddle welds in front comers of T21A2.
Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
08/15/2013 Samantha Justice per teleconference withSamantha Justice on 8/7/2013 08/15/2013 C-766
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y N E---
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-T21A2 Equipment Class:
(3) Medium Voltage Switchgear Equipment
Description:
WEST MOTOR DRIVEN AUXILIARY FEEDWATER PUMP PP-3W C-767
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y N -U-Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-T21A2 Equipment Class:
(3) Medium Voltage Switchgear Enifinment 1t-,rrintinn:
WFRT MOTOR DlRIVFN A[IXII IARY FFF:rWATFR P1 IMP PP-SW V
i C-768
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y N 0 Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-T21A2 Equipment Class:
(3) Medium Voltage Switchgear M -* -A-l+-
QT hAnrTtnD I'DlI\\/-IlKI A[ IVII IADV *If*lr-%AIATI::D DI MAD DD.2AAI C-769
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y N -U--
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-T21A2 Equipment Class:
(3) Medium Voltage Switchgear r-...
~...
r
%.Airc'"r IAi-rrn r'lIlIrkl Al
~ll lAr r-r-r-rnAiA-rr-r-I Irl M-nM r^%A#
VVI-O I IVIi.
I UMI¶ LJUIVr-IN '4UAIL C-770
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y N j-j-Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-TDAB Equipment Class:
(14) Distribution Panels Equipment
Description:
250VDC TRAIN 'B' TRANSFER CABINET Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 609.00 ft, 200 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of No' the 50% of SWEL items requiring such verification)?
CANNOT OPEN - CAN'T SEE ANCHORAGE
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Unknown
- 3.
Is the anchorage free of corrosion that is more than mild surface Unknown oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the Unknown anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
CANNOT VERIFY - CANNOT OPEN - CAN'T SEE ANCHORAGE
- 6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
C-771
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y N Ei1 Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-TDAB Equipment Class:
(14) Distribution Panels Equipment
Description:
250VDC TRAIN 'B' TRANSFER CABINET Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
CANNOT OPEN Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-772
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y N --]
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-TDAB Equipment Class: (14) Distribution Panels pment
Description:
25OVDC TRAIN 'B' TRANS C-773
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-704 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
WEST ESSENTIAL SERVICE WATER PUMP PP-7W DISCH S/0 Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
SH2, 591.00 ft, 136 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinc-other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-774
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-704 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
WEST ESSENTIAL SERVICE WATER PUMP PP-7W DISCH S/0 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-775
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-704 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
WEST ESSENTIAL SERVICE WATER PUMP PP-7W DISCH S/O C-776
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-716 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 633.00 ft, 633 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinci other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-777
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-716 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Yes Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Lights on stand by valve can tip - moved on the spot by personnel, but would not have been damaging anyway
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-778
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-716 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Eauinment Descrintion:
WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL DAn4 Aria nn C-779
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y jN-U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-718 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 609.00 ft, 609 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentina other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-780
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y j-U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-718 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves EauiDment
Description:
WEST CONTAINMENT SPRAY HEAT EXCHANGER ESSENTIAL Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Fire extinguishers by 2-WMO-718 on short hooks - AR 2012-11669 was issued.
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
No Yes Yes No Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-781
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y F U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-718 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves
%J1 C-782
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-744 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ESSENTIAL SERVICE WATER TO WEST MOTOR DRIVEN Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
TB2, 591.00 ft, 51 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is provided at the end of this checklist for documentinq other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-783
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: 7 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-744 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ESSENTIAL SERVICE WATER TO WEST MOTOR DRIVEN Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-784
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: I--I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
2-WMO-744 (8) Motor-Operated and Solenoid-Operated Valves
)mere uescrl i::*
1::1*11 IAL *1-1-<
t ui ment Descri tion:
tbtN IHAL bt VICE WATER TO WE, C-785
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y j-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-753 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
EMERGENCY ESSENTIAL SERVICE WATER SUPPLY TO TDAFP Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
TB2, 591.00 ft, 49 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is rwovided at the end of this checklist for documentina other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-786
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y N-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-753 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
EMERGENCY ESSENTIAL SERVICE WATER SUPPLY TO TDAFP Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Support (unistrut abovevalve) very shaky, not well anchored -
removed from the wall at top side. Unistrut not attached at top end of support. - AR 2012-11936 was issued.
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes No Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
=
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-787
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y
] U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WMO-753 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
EMERGENCY ESSENTIAL SERVICE WATER SUPPLY TO TDAFP P9191318 C-788
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y [-` U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WPA-703 Equipment Class:
(18) Instruments on Racks Equipment
Description:
E ESSENTIAL SERVICE WTR PP PP-7E DISCH LOW PRES Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
SH2, 591.00 ft, 135 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Dwg. 12-5637A.
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Bolts look to be 3/8" - 4 on each plate at bottom, I on each side on top.
- 3.
Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the Yes anchors?
Top right bolt has a larger hole in concrete, bu instrument rack OK on rest of supports.
- 5.
Is the anchorage configuration consistent with plant documentation?
No (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
AR 2012-11301 written to correct plant documentation that was not consistent with installation
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-789
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y LiN U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WPA-703 Equipment Class:
(18) Instruments on Racks Equipment
Description:
E ESSENTIAL SERVICE WTR PP PP-7E DISCH LOW PRES Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
08/15/2013 Neda Stoeva 08/15/2013 Photos C-790
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y NI-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WPA-703 Equipment Class:
(18) Instruments on Racks r*..
I; r--
r I~f r T
£r7 E3F*
7I" r'lC'f"J I f'ClAI rDD--M VI%.jL VV I F'% rr rr-i L: IJIO'.jol L.
vv r-1XLO%
C-791
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y ¶--j U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
P:n= ifnminnt 1"azenrinfinn-2-WPA-703 (18) Instruments on Racks E ESSENTIAL SERVICE WTR PP PP-7E DISCH LOW PRES C-792
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y L-NI U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WPA-703 Equipment Class:
(18) Instruments on Racks E~~,;,,,.,.M Mn.
r ECOMkITIAI oC D\\/ItIr IArl"D DO D0 "7M r-10tLU I f"%IAI DDO M C-793
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F]
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WRV-768 Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
E ESW PP PP-7W DISCH STN WEST BASKET BAN INLET S/0 Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
SH2, 591.00 ft, 135 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is provided at the end of this checklist for documentina other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-794
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WRV-768 Equipment Class:
(7) Fluid-Operated Valves Eauipment
Description:
E ESW PP PP-7W DISCH STN WEST BASKET B/W INLET S/0 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes.
Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-795
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-WRV-768 Equipment Class:
(7) Fluid-Operated Valves
- niiinmantnflgprrininn F F.q\\AI PP PPP_7XAI fr3l(l-I qTMl \\AI:T RPAZVIZT IAAI Ill F:T.I/C W V I I
I l
I V V I,,,/l*.,,P%,/l l C-796
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: T] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-XPC-211 Equipment Class:
(18) Instruments on Racks AB EMER DIESEL STARTING AIR RECEIVER QT-141-AB1 PRESSURE Equipment
Description:
XMTR Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 587.00 ft, 121 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
REFERENCE MANUAL 00809-0100-4808 REVCA JUNE 2008
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?
Unistrut mounted to bracket/moount
- 5.
Is the anchorage configuration consistent with plant documentation?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-797
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
2-XPC-211 (18) Instruments on Racks AB EMER DIESEL STARTING AIR RECEIVER QT-141-AB1 PRESSURE XMTR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes
'Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 C-798
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: EY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-XPC-211 Equipment Class:
(18) Instruments on Racks AB EMER DIESEL STARTING AIR RECEIVER QT-141-AB1 PRESSURE Equipment
Description:
XMTR C-799
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: FY] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
2-XPC-211 (18) Instruments on Racks AB EMER DIESEL STARTING AIR RECEIVER QT-141-AB1 PRESSURE XMTR týulju4tf C-800
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: F] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-XRV-222 Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
AB EMERGENCY DIESEL REAR BANK STARTING AIR SHUTOFF Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 587.00 ft, 121 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-801
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status:
Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-XRV-222 Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
AB EMERGENCY DIESEL REAR BANK STARTING AIR SHUTOFF Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-802
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: El-!
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-XRV-222 Equipment Class:
(7) Fluid-Operated Valves Eauioment Descrintion:
AB EMERGENCY DIESEL REAR BANK STARTING AIR SHUTOFF C-803
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Table C-3 Summary of Seismic Walkdown Checklists for DCCNP1 Outage Walkdowns COMPONENT DESCRIPTION Anchorage PAGE ID Verification Confirmed 1-11B 600 VAC Bus 11 B Switchgear Y
C-805 1-AZ-BC 600 VAC Motor Control Center AZ-N C-81 0 BC 1-AZ-BC-3B Essential Service Water to Turbine y
C-816 Driven 1-BCTC-AB Plant Battery Chargers BC-AB1 &
y C-820 BC-AB2 Transfer 1-MCAB 250 VDC Distribution Panel MCAB Y
C-825 1-NLI-320 Lower Containment Train 'B' Water N
C-831 Level Indicator XMTR 1-NMO-151 Pressureizer Relief Valve NRV-151 N/A 0-836 Upstream Shutoff 1-NRV-151 Pressurizer Train 'B' Pressure N/A C-840 Relief Valve 1-NRV-152 Pressurizer Train 'B' Pressure N/A C-845 Relief Valve 1-NTR-230 Reactor Coolant Loop #3 Cold Leg N/A C-850 Wide Range 1-NTR-240 Reactor Coolant Loop #4 Cold Leg N/A C-854 Wide Range Excess Letdown Heat Exchanger 1-QRV-170 HE-13 Outlet Pressure Control N/A C-857 Valve 1-T11A1 South Safety Injection Pump PP-Y C-862 26S Supply Breaker 1-T11A5 West Essential Service Water Y
C-868 Pump PP-7W Supply 1-TDAB 250 VDC Train 'B' Transfer Cabinet N
C-874 1-XSO-321 Steam Generator #2 Blowdown N
C-880 Containment Isolation C-804
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI UE]
Seismic Walkdown Checklist (SWC)
Equipment ID No.
1-11B Equip. Class (02) Low Voltage Switch-gear Equipment Description 600 VAC Bus 11B Switch gear Location: Bldg. ABI Floor El. 609 Room, Area 204 (Sys - 600AC)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YE N]
of the 50% of SWEL items requiring such verification)?
SQUG-1-11B
- 2. Is the anchorage firee of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YO NE UW N/AW YZ NW UW N/AW YZ NWI UW-N/AW YM NW UW N/AW YM NE UW C-805
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N-- U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-11B Equip. Class (02) Low Voltage Switch gear Equipment Description 600 VAC Bus 11B Switchqgear Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YN NEI UI-N/A[
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[
N[-] UW N/AW and masonry block walls not likely to collapse onto the equipment?
Overhead cable trays and conduit well supported on trapeze supports.
Overhead lighting is rod hung and adequately secured.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YN NWI UW-] N/A[-]
YE NEI UW Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y9 N[
UW Comments(Additional pages may be added as necessary)
Status control stantion has minimal self-weight, a weighted base with a low center of gravity, and are interconnected. Therefore, any potential impacts from the stantion during a seismic event would be insignificant and would not cause damage or imapir the function of the MCC. In addition, chatter is not a concern with breakers. This assesment is in agreement with conclusions drawn in seismic house keeping procedure PMP-5020-RTM-001.
Walkdown performed on 4/7/2013.
Evaluated by: Tyler Blossei Date: 6/26/2013 Lindsay Yates
- 6/26/2013 C-806
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N[-- U[-
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-11B Equip. Class (02) Low Voltage Switchcqear Equipment Description 600 VAC Bus 11B Switch-gear Note:(P4071426)
Note:
C-807
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 IN Ole: (I Note:()
Note: (P4071442)
C-808
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 numpe (
C-809
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-AZ-BC Equip. Class (01) Motor Control Centers Equipment Description 600 VAC Motor Control Center AZ-BC Location: Bldg. ABI Floor El. 609 Room, Area 609 (Sys - 600AC)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora2e
- 1. Is the anchorage configuration verification required (i.e., is tile item one YDI NE of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
YM NEI UD-N/AD YZ NEI UD] N/AD
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YN ND] UDI N/AD-
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YD-NDI UD-N/A[K YZ ND-] UD--
C-810
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-AZ-BC Equip. Class (01) Motor Control Centers Equipment Description 600 VAC Motor Control Center AZ-BC Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YZ NDI UD-N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN ND UD1 N/ADl and masonry block walls not likely to collapse onto the equipment?
All overhead and wall mounted conduit piping is adequately supported.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YN ND UD N/AD Y[I NEI UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y] ND-I Ur-W adversely affect the safety functions of the equipment?
Comments(Additional pages may be added as necessary)
Walkdown performed on 4/5/2013.
Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsay Yates iLA 6/26/2013 C-811
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NR U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-AZ-BC Equip. Class (01) Motor Control Centers Equipment Description 600 VAC Motor Control Center AZ-BC Photographs iN ote: (t-4u4uzd~t)
C-812
DC Cook Unit 1 & Unit 2
)23-001 Rev. 2, 01/13/14 IOle:(i C-813
DC Cook Unit 1 & Unit 2
)23-001 Rev. 2, 01/13/14 I'Mote: (r'tuf LQ3O,)
n utfe:(f Note:
C-814
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Note:
b C-815
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ ND] uD Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-AZ-BC-3B Equip. Class (01) Motor Control Centers Equipment Description Essential Service Water to Turbine Driven Location: Bldg. ABI Floor El. 609 Room, Area 609 (SVs - 600AC)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YO NE of the 50% of SWEL items requiring such verification)?
SQUG-1-AZ-BC, Rule of the box
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YZ N[
UW N/A[
YZ NWI UW N/AW YN NW UW-N/AW YZ NWI U[-W N/A[W YO NE UW C-816
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NEI UD Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-AZ-BC-3B Equip. Class (01) Motor Control Centers Equipment Description Essential Service Water to Turbine Driven Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y[
NEI UD N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM N[:] U[-] N/AD and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ NDI UD N/AD YN ND UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y[K ND UD adversely affect the safety functions of the equipment?
Comments(Additional pages may be added as necessary)
Evaluated by: Tyler Blosse Date: 4/5/2013 Lindsay Yates 4/5/2013 C-817
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NO U-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-AZ-BC-3B Equip. Class (01) Motor Control Centers EauiDment Description Essential Service Water to Turbine Driven Note:
C-818
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO Ui-Seismic Walkdown Checklist (SWC)
Equip. Class (01) Motor Control Centers
'Water to Turbine Driven I-.
C-819
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NE u-lI Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-BCTC-AB Equip. Class (14) Distribution Panels & Aut Equipment Description Plant Battery Chargers BC-AB1 & BC-AB2 Transfer Location: Bldg. ABI Floor El. 613 Room, Area 205 (Sys - 250D)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YE NE of the 50% of SWEL items requiring such verification)?
SQUG 1-BCTC-AB, Rev. 0
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YN N[1 UWI N/AW YZ NW-1 UW N/AW YN NW UW N/AWl YO NW UW N/AW YO NE U-1 C-820
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
N[-- UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No.
1-BCTC-AB Equip. Class (14) Distribution Panels & Aut Equipment Description Plant Battery Chargers BC-ABI & BC-AB2 Transfer Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y[
NDI UL-N/ADI
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDI UD-N/ADl and masonry block walls not likely to collapse onto the equipment?
There are two battery lights mounted to the wall approximately 4 ft behind the battery charger. Both are bolted down and not a seismic concern.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE N[D] UDl N/AD YE NEI UF1 Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YZ NDI UD-adversely affect the safety functions of the equipment?
Comments(Additional pages may be added as necessary)
Seismic walkdown performed on March 28, 2013.
Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsay Yates 0 A. AtJu&A 6/26/2013 C-821
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
ND-- U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-BCTC-AB Equip. Class (14) Distribution Panels & Aut Equipment Description Plant Battery Charers BC-AB1 & BC-AB2 Transfer Photoaraphs I Iote:Ancnor DOlfS C-822
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 note:1 Note Note: Battery lights mounted on wall behindpanel and adequately secured (P3280430)
C-823
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2. 01/13/14 C-824
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
ND U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-MCAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Distribution Panel MCAB Location: Bldg. ABI Floor El. 609 Room, Area 200 (Sys - 250D)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
SQUG-1-MCAB
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
YO N-] UD N/AD YZ N[:] U[D] N/AD
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YM NE] UD N/AD
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YZ ND UD N/AD YN ND UD-C-825
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N[-- UD Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-MCAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Distribution Panel MCAB Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y[
N[l UD N/AD-
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead cable trays are welded to their trapeze supports.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE N[-I UD-N/AD YE ND Ur-- N/AD Y[
N[-D UD-]
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y[
NDI UD adversely affect the safety functions of the equipment?
Comments(Additional pages may be added as necessary)
Walkdown performed on 4/4/2013.
r~5~
Evaluated by: Tyler Blosse Date: 6/26/2013 Lindsay Yates 6/26/2013 C-826
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO U-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-MCAB Equip. Class (14) Distribution Panels & Aut Equipment Description 250 VDC Distribution Panel MCAB PhotoraDhs Note:(P4041401)
C-827
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO U[-'
Seismic Walkdown Checklist (SWC)
Equip. Class (14) Distribution Panels & Aut Wtion Panel MCAB El' Note: Upper2 (P4041402)
Note:Lower left anchor bolt of 1-MCAB(P4041403)
C-828
DC Cook Unit 1 & Unit 2
)23-001 Rev. 2, 01/13/14 Note:Lower right anchor bolt of 1-MCAB(P4041404)
Note: Upper right anchor bolt of 1-MCAB (P4041405) iNote:(/-'4U474U()
.Note:.4 C-829
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Note:
C-830
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO] UD Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NLI-320 Equip. Class (18) Instrument Racks Equipment Description Lower Containment Train 'B' Water Level Indicator XMTR Location: Bldg. CON1 Floor El. 612 Room, Area 60 (Sys - Containment)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment onl the SWEL. The space below each of the following questionsmay be used to record the results ofjudglnents and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one Yr-NZ of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corTosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YM ND UD N/AD YM NDI UD-N/AD1 YM ND UD N/AD YD ND UD N/AZ YM NND UD C-831
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ Ni-1 U-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NLI-320 Equip. Class (18) Instrument Racks Equipment Description Lower Containment Train 'B' Water Level Indicator XMTR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YE ND-- UD[ N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[
ND Ur-N/AD and masonry block walls not likely to collapse onto the equipment?
Temporary lighting and zip ties hung for Unit I Cycle 25 outage -
not present during normal operation
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YN ND-- UD N/AD YZ NEI UDI Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YN NEI UD-1 Comments(Additional pages may be added as necessary)
Walkdown performed on 4/1/2013.
Evaluated by: Tyler Blosser Date: 6/26/2013 Lindsay Yates a 6/26/2013 C-832
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ Nr-] UD-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NLI-320 Equip. Class (18) Instrument Racks Equipment Description Lower Containment Train 'B' Water Level Indicator XMTR Photographs Note: Debis Interceptoron the floor Note: Cord hung for temporary lighting for Unit (P4010111) 1 Cycle 25 refueling outage. (P4010112)
Note: Or5 hfung tor temporary lighting for unit Note:
2Ord rfung for temporary lighting tor unit 1 Cycle 25 refueling outage. (P4010113) 1 Cycle 25 refueling outage. (P4010114)
C-833
DC Cook Unit 1 & Unit 2
)23-001 Rev. 2, 01/13/14 Inote:wip ties supporting corus nung tor temporary lighting for Unit 1 Cycle 25 refueling outage. (P4010115) iNote:
b C-834
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 C-835
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NO UD-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NMO-151 Equip. Class (8) Motor Operated & Solenoid Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff Location: Bldg. CON1 Floor El. 650 Room, Area 81 (Sys - RCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YEI NZ of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YE NE UE N/AZ Y[E] NE UE N/AZ YE-1 NE UE N/AM YE-1 NEI UE NMAN Y[
NE UE C-836
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ NR U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NMO-151 Equip. Class (8) Motor Operated & Solenoid Equipment Description Pressureizer Relief Valve NRV-151 Upstream Shutoff Interaction Effects
- 7. Are soft targets fiee from impact by nearby equipment or structures?
YZ NDI UD-N/AD-]
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND] UD N/AD and masonry block walls not likely to collapse onto the equipment?
Overhead ventilation ductwork adequately supported Abandoned hanger above, however no concern - more than adequate thread engagement on the anchor
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y9 ND UD N/AD YM NND UD Other Adverse Conditions 1i.
Have you looked for and found no other seismic conditions that could Y[
NDI UDI adversely affect the safety functions of the equipment?
Comments(Additional pages may be added as necessary)
Walkdown performed on 3/29/2013.
Evaluated by: Tyler Blosse, Date: 6/26/2013 w
Lindsay Yates 0A 6/26/2013 C-837
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ Nn U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NMO-151 Equip. Class (8) Motor Operated & Solenoid Eauipment Description Pressureizer Relief Valve NRV-151 Ubstream Shutoff (P3te28-0007)i U(JlltM (P3280007)
C-838
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Note:VUCt intaKe/exhaust opening, no flange installed, bolts not required. (P3280010)
C-839
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YZ N[-- UD--
Seismic Walkdown Checklist (SWC)
Equipment ID No.
1-NRV-151 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Location: Bldg. CONI Floor El. 650 Room, Area 81 (Sys - RCS)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questionsmay be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YLI NZ of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage firee of corrosion that is more than mild surface oxidation?
YE-NEI U[] N/A[O YW NEI U] N/AN
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YrI NEI U-N/AN
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YW NW] UW N/AZ YO NE UI1 C-840
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YE N-- U[D Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NRV-151 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Interaction Effects
- 7. Are soft targets free firom impact by nearby equipment or structures?
Y9 NDI UD N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[
ND] UD-N/ADl and masonry block walls not likely to collapse onto the equipment?
Overhead ductwork is adequately supported.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YZ ND UD N/AD YZ ND UDI Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YE Nil UD Comments(Additional pages may be added as necessary)
Walkdown performed on 3/29/2013.
Evaluated by: Tyler Blosser Date: 6/26/2013 Lindsay Yates i Afr°ua 6/26/2013 C-841
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: Y[
NO U[-D Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NRV-151 Equip. Class (7) Pneumatic Operated Valves Equipment Description Pressurizer Train 'B' Pressure Relief Valve Photographs C-842
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 Status: YN N-- U-Seismic Walkdown Checklist (SWC)
Equipment ID No. 1-NRV-151 Equipment Description Pressurk Equip. Class (7) 1
'B' Pressure Rel C-843
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 2, 01/13/14 1'lormopir ily LWii (r-3;--oLIJ) iNO[;fVrq iIdoU UUshe
- Wmeta, scUew (lp3 I2l0 required for sheet metal screws. (P3280026)
C-844