Category:Drawing
MONTHYEARML24159A1672024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 10, Figures ML24159A2172024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 8, Figures ML24159A2052024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Figures 14.3.1-1A to 14.3.3-8 (Unit 2) ML24159A2132024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1) ML24159A1792024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.1, Figures 14.1.0-1 to 14.1.12-2 (Unit 2) ML24159A2002024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.2, Figures 14.2.5-1 to 14.2.8-8 (Unit 2) ML24159A1772024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.2, Figures 14.2.5-1 to 14.2.7-6 (Unit 1) ML24159A1722024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 3, Figures (Unit 1) ML24159A1712024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 2, Figures ML24159A1752024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 7, Figures ML24159A1742024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.4, Figures 14.4.2-1 to 14.4.9-2 (Unit 2) ML24159A1822024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 5, Figures (Redacted) ML24159A2202024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 4, Figures ML24159A1642024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 6, Figures ML24159A1702024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 11, Figures ML24159A1632024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Figures 14.3.4-76 to 14.3.9-25 (Unit 1) ML24159A2382024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 1, Figures (Redacted) ML24159A2222024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1) ML24159A2252024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 3, Figures (Unit 2) ML24159A1962024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) ML24159A1902024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.1, Figures 14.1-1 to 14.1.13-6 (Unit 1) ML24159A2102024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Figure 14.3.7-1 (Unit 2) ML24159A2152024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 9, Figures ML22340A1342022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Figures ML22340A1522022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 5, Figures (Redacted) ML22340A1892022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Figures ML22340A1692022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) ML22340A1872022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1) ML22340A1292022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Figures ML22340A1842022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figure 14.3.7-1 (Unit 2) ML22340A1422022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 1) ML22340A1942022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 4, Figures ML22340A2152022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted) ML22340A1912022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 8, Figures ML22340A1382022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Figure 2024-05-30
[Table view] Category:Photograph
MONTHYEARAEP-NRC-2020-71, Indiana Michigan Power Co., Supplement to Request for Relief Related to American Society of Mechanical Engineers (Asme)Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-042020-10-0909 October 2020 Indiana Michigan Power Co., Supplement to Request for Relief Related to American Society of Mechanical Engineers (Asme)Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-04 ML18220A6252018-08-0808 August 2018 Photograph, Plate IIA-9, Aerial Photograph. ML14035A3572014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-232 Through Page C-353 ML14035A3532014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-1 Through Page C-114 ML14035A3552014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-405 Through End ML14035A3562014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-115 Through Page C-231 AEP-NRC-2014-08, SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-322 Through Page D-4042014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-322 Through Page D-404 ML14035A3592014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-354 Through Page C-468 ML14035A3602014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-469 Through Page C-583 ML14035A3612014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-584 Through Page C-722 ML14035A3622014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-723 Through Page C-844 ML14035A3632014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-845 Through Page C-962 ML14035A3642014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-1 Through Page D-91 ML14035A3662014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-92 Through Page D-169 ML14035A3672014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-170 Through Page D-240 ML14035A3682014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-241 Through Page D-321 ML0825200272008-08-29029 August 2008 Attachment 6 to AEP-NRC-2008-17, Cold Galvanizing Compound Testing Photographs AEP-NRC-2008-17, Final Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors and Associated Request for Additional Information2008-08-29029 August 2008 Final Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors and Associated Request for Additional Information ML0807704002008-02-29029 February 2008 AEP:NRC:8054-02, Attachment 4, Figure A4-1, General Arrangement of Recirculation Sump to Attachment 5, Figure A5-40, Scotch 77 Fire Retardant Tape Test 1 Pre-Test Picture. ML0512402882005-04-22022 April 2005 G20050125 - Supplement Dated 04/22/05 to 2.206 Petition Requesting Backup Power Supplies to Emergency Notification Systems 2020-10-09
[Table view] Category:Report
MONTHYEARML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24159A2702024-05-30030 May 2024 R1900-0024-001, Rev. 16, NFPA 805 Nuclear Safety Capability Assessment AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1992022-11-30030 November 2022 Report of Changes, Tests, Experiments Pursuant to 10 CFR 50.59(d)(2) ML22340A2132022-11-30030 November 2022 R1900-0024-001, Revision 13, NFPA 805 Nuclear Safety Capability Assessment ML22340A1762022-11-30030 November 2022 Commitment Change Summary October 2020 to May 2022 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report2021-08-12012 August 2021 Form OAR-1, Owner'S Activity Report ML21125A5582021-04-19019 April 2021 Report 2019, Commitment Change Summary, May 2019 to October 2020 ML21125A5392021-04-19019 April 2021 Report of Changes, Tests, Experiments Pursuant to 10 CFR 50.59(d)(2), Boration System Functionality Requirement Change in Mode 4 EA-21-024, Notice of Enforcement Discretion2021-03-0404 March 2021 Notice of Enforcement Discretion for Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2021-07, Supplement to Report Per Technical Specification 5.6.6, Lnoperability of Unit 1, Post Accident Monitoring, Containment Water Level2021-01-28028 January 2021 Supplement to Report Per Technical Specification 5.6.6, Lnoperability of Unit 1, Post Accident Monitoring, Containment Water Level AEP-NRC-2020-28, CFR 72.48(d)(2) Summary Report of Completed Changes, Tests, and Experiments 1O CFR 72.48 Evaluations2020-05-0606 May 2020 CFR 72.48(d)(2) Summary Report of Completed Changes, Tests, and Experiments 1O CFR 72.48 Evaluations AEP-NRC-2020-23, Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2020-04-30030 April 2020 Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML20108E9992020-03-0505 March 2020 Enclosure 7 - LTR-SCS-19-50, Revision 0, D.C. Cook Unit 1 Low Temperature Overpressure Protection System (Ltops) Analysis for 48 EFPY, Dated March 5, 2020, Attachment 2 Only (Non-Proprietary) ML20108F0002020-02-28028 February 2020 Enclosure 5 - WCAP-18455-NP, Revision 1, D.C. Cook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation, Westinghouse Electric Company, February 2020. (Non-Proprietary) ML18274A0952018-09-30030 September 2018 WCAP-18394-NP, Revision 1, Fatigue Crack Growth Evaluations of D. C. Cook Units 1 and 2 RHR, Accumulator, and Safety Injection Lines Supporting Expanded Scope Leak-Before-Break, September 2018 (Non-Proprietary) ML18334A2712018-09-30030 September 2018 WCAP-18394-NP, Revision 1, Fatigue Crack Growth Evaluations of D.C. Cook, Units 1 and 2 RHR, Accumulator, and Safety Injection Lines Supporting Expanded Scope Leak-Before-Break. AEP-NRC-2018-36, Notification of Initial Renewable Operating Permit2018-05-0909 May 2018 Notification of Initial Renewable Operating Permit AEP-NRC-2018-21, 30-Day Report of Changes to or Errors in an Evaluation Model2018-05-0404 May 2018 30-Day Report of Changes to or Errors in an Evaluation Model ML18026A8822018-02-0505 February 2018 Staff Assessment of Flooding Focused Evaluation ML18334A2702018-01-31031 January 2018 WCAP-18309-NP, Revision 0, Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis for D.C. Cook, Units 1 and 2, Using Leak-Before-Break Methodology. ML18334A2692018-01-31031 January 2018 WCAP-18302-NP, Revision 0, Technical Justification for Eliminating Residual Heat Removal Line Rupture as the Structural Design Basis for D.C. Cook Units 1 and 2, Using Leak-Before-Break Methodology. ML18334A2682018-01-31031 January 2018 WCAP-18295-NP, Revision 0, Technical Justification for Eliminating Accumulator Line Rupture as the Structural Design Basis for D.C. Cook Units 1 and 2, Using Leak-Before-Break Methodology (Non-Proprietary) ML17151A9672017-06-14014 June 2017 Flood Hazard Mitigation Strategies Assessment ML16313A1172016-10-10010 October 2016 1BTl1V001-RPT-01, Donald C. Cook Focused Scope Peer Review - Pre-Initiator Human Reliability Analysis. ML16127A3352016-05-0606 May 2016 Reactor Oversight Process Task Force FAQ Log-April 13, 2016 ML16113A1982016-04-20020 April 2016 Precursor Screening Analysis- Reject ML16169A1182016-03-31031 March 2016 RWA-1313-015, Rev. 1, AST Radiological Analysis Technical Report. ML15308A0932015-10-15015 October 2015 Pressurized Water Reactor Owners Group (Pwrog), 15066-NP, Revision 1, Responses to Follow-Up NRC RAI 2 on the D.C. Cook, Units 1 and 2, Reactor Internals Aging Management Program. AEP-NRC-2015-83, Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-10-0101 October 2015 Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML15233A0242015-08-19019 August 2015 Transmittal of Annual Report of Loss-of-Coolant Accident Evaluation Model Changes ML14253A3172014-09-0404 September 2014 Enclosure 2: I&M CAP Document AR 2010-1804-10, Root Cause Evaluation Attachment, Rx Vessel Core Support Lug Bolting Anomalies ML14147A3292014-06-18018 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14181A5382014-06-0505 June 2014 Enclosure 5 to AEP-NRC-2014-42, Attachment #2 (NP-Attachment) of Westinghouse Letter, LTR-PL-14-22, Westinghouse Responses to NRC, Request for Additional Information on the Application for Amendment to Restore.. ML14073A7592014-03-31031 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14092A3302014-03-17017 March 2014 Document No. 13Q3208-RPT-003, Revion 1, Seismic Hazard and Screening Report for the Cook Nuclear Plant (Cnp), Enclosure 2 to AEP-NRC-2014-25 AEP-NRC-2014-15, 30 Day Report of Changes to or Errors in an Evaluation Model2014-02-27027 February 2014 30 Day Report of Changes to or Errors in an Evaluation Model ML13337A3252014-01-24024 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) AEP-NRC-2014-08, SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-322 Through Page D-4042014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-322 Through Page D-404 ML14035A3632014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-845 Through Page C-962 ML14035A3682014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-241 Through Page D-321 ML14035A3672014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-170 Through Page D-240 ML14035A3662014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-92 Through Page D-169 ML14035A3642014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-1 Through Page D-91 ML14035A3522014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Cover Through Page B-312 ML14035A3532014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page C-1 Through Page C-114 ML14035A3552014-01-13013 January 2014 SD-121023-001, Rev. 2, in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the D. C. Cook Unit 1 and 2, Page D-405 Through End 2024-07-25
[Table view] Category:Miscellaneous
MONTHYEARML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report2021-08-12012 August 2021 Form OAR-1, Owner'S Activity Report ML21125A5582021-04-19019 April 2021 Report 2019, Commitment Change Summary, May 2019 to October 2020 ML21125A5392021-04-19019 April 2021 Report of Changes, Tests, Experiments Pursuant to 10 CFR 50.59(d)(2), Boration System Functionality Requirement Change in Mode 4 EA-21-024, Notice of Enforcement Discretion2021-03-0404 March 2021 Notice of Enforcement Discretion for Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2020-28, CFR 72.48(d)(2) Summary Report of Completed Changes, Tests, and Experiments 1O CFR 72.48 Evaluations2020-05-0606 May 2020 CFR 72.48(d)(2) Summary Report of Completed Changes, Tests, and Experiments 1O CFR 72.48 Evaluations AEP-NRC-2018-36, Notification of Initial Renewable Operating Permit2018-05-0909 May 2018 Notification of Initial Renewable Operating Permit AEP-NRC-2018-21, 30-Day Report of Changes to or Errors in an Evaluation Model2018-05-0404 May 2018 30-Day Report of Changes to or Errors in an Evaluation Model ML18026A8822018-02-0505 February 2018 Staff Assessment of Flooding Focused Evaluation ML17151A9672017-06-14014 June 2017 Flood Hazard Mitigation Strategies Assessment ML16127A3352016-05-0606 May 2016 Reactor Oversight Process Task Force FAQ Log-April 13, 2016 ML16113A1982016-04-20020 April 2016 Precursor Screening Analysis- Reject AEP-NRC-2015-83, Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-10-0101 October 2015 Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML15233A0242015-08-19019 August 2015 Transmittal of Annual Report of Loss-of-Coolant Accident Evaluation Model Changes ML14181A5382014-06-0505 June 2014 Enclosure 5 to AEP-NRC-2014-42, Attachment #2 (NP-Attachment) of Westinghouse Letter, LTR-PL-14-22, Westinghouse Responses to NRC, Request for Additional Information on the Application for Amendment to Restore.. ML14073A7592014-03-31031 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident AEP-NRC-2014-15, 30 Day Report of Changes to or Errors in an Evaluation Model2014-02-27027 February 2014 30 Day Report of Changes to or Errors in an Evaluation Model ML12324A4182012-12-20020 December 2012 Review of the 2011 Refueling Outage Steam Generator Tube Inservice Inspection Results AEP-NRC-2012-86, Flooding Walkdown Report in Response to the 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding for the D.C. Cook Nuclear Power Plant2012-11-13013 November 2012 Flooding Walkdown Report in Response to the 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding for the D.C. Cook Nuclear Power Plant ML12362A0762012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-268 Through C-353 AEP-NRC-2012-87, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-437 Through C-4862012-11-0505 November 2012 Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-437 Through C-486 ML12362A0772012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-354 Through C-436 ML12362A0752012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-200 Through C-267 ML12362A0582012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-487 Through C-548 ML12362A0592012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-549 Through C-620 ML12362A0612012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-698 Through C-776 ML12362A0742012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-157 Through C-199 ML12362A0732012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-113 Through C-156 ML12362A0722012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-47 Through C-112 ML12362A0712012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Appendix C, Page C-46 ML12362A0692012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-388 Through End ML12362A0682012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-337 Through Page D-387 ML12362A0672012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-276 Through Page D-336 ML12362A0662012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-220 Through Page D-275 ML12362A0602012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-621 Through C-697 ML12362A0622012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-777 Through Appendix D, Page ML12362A0632012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-54 Through Page D-114 ML12362A0642012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-115 Through Page D-175 ML12362A0652012-11-0505 November 2012 Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-176 Through Page D-219 AEP-NRC-2012-83, Communications Assessment Requested by Nuclear Regulatory Commission Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendation 2.1, 2.3, and 9.3.2012-10-31031 October 2012 Communications Assessment Requested by Nuclear Regulatory Commission Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendation 2.1, 2.3, and 9.3. AEP-NRC-2012-38, Response to Request for Information, 10 CFR 50.46 Report for Emergency Core Cooling System Model Change or Error Associated with Thermal Conductivity Degradation2012-06-11011 June 2012 Response to Request for Information, 10 CFR 50.46 Report for Emergency Core Cooling System Model Change or Error Associated with Thermal Conductivity Degradation AEP-NRC-2009-25, Small Break Loss-of-Coolant Accident Evaluation Model Reanalysis2009-03-30030 March 2009 Small Break Loss-of-Coolant Accident Evaluation Model Reanalysis ML0807400532008-02-29029 February 2008 Response to Request for Additional Information Regarding Reanalysis of Small Break Loss-Of-Coolant Accident ML0807703952008-02-29029 February 2008 AEP:NRC:8054-02, Attachment 1, References, Through Attachment 3, Supplemental Response to GL 2004-02 and Request for Additional Information. ML0807200622008-02-29029 February 2008 License Amendment Request to Revise Ice Condenser Licensing Basis ML0807703962008-02-29029 February 2008 AEP:NRC:8054-02, Attachment 3, I&M Response to Information Item 3.f.4, to NRC Information Item 3 - Conclusions. ML0807704002008-02-29029 February 2008 AEP:NRC:8054-02, Attachment 4, Figure A4-1, General Arrangement of Recirculation Sump to Attachment 5, Figure A5-40, Scotch 77 Fire Retardant Tape Test 1 Pre-Test Picture. ML0807704042008-02-29029 February 2008 AEP:NRC:8054-02, Attachment 5, Figure A5-41, Scotch 77 Fire Retardant Tape Test 1 Post-Test Picture to Attachment 7, Regulatory Commitments. 2024-07-25
[Table view] |