Final Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML14035A351
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/29/2014
From: Gebbie J
American Electric Power, Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14035A350 List:
References
AEP-NRC-2014-08
Download: ML14035A351 (4)


Text

z INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant p13WER One Cook Place Bridgman, MI 49106 A unit of American Electric Power Indiana Michiga nPower.com January 29, 2014 AEP-NRC-2014-08 10 CFR 50.54(f)

Docket Nos.:

50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1& 2 Final Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. Letter from E. J. Leeds and M. R. Johnson, United States Nuclear Regulatory Commission (NRC) to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012, ML12053A340.
2. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated November 26, 2012, ADAMS Accession Number ML12340A442.
3. Letter from Q. S. Lies, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Unit 1 and Unit 2, Revised Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated September 13, 2013, ADAMS Accession Number ML13267A315.
4. Letter from T. J. Wengert, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Unit 1 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident (TAC No. MF0114)," Dated December 9, 2013, ML13331A540.

On March 12, 2012, the United States Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic.

U. S. Nuclear Regulatory Commission AEP-NRC-2014-08 Page 2 Reference 2 provided the 180-day response to Reference 1 for Recommendation 2.3 for Seismic for Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP)

Units 1 and 2. In Reference 2, I&M made three commitments:

1. CNP Unit 1 - Complete seismic walkdowns and area walkbys for components listed in Table E-1 of the Seismic Walkdown Report.
2. CNP Unit 2 - Complete seismic walkdowns and area walkbys for remaining components listed in Table E-2 of the Seismic Walkdown Report.
3. Update the Seismic Walkdown Report and provide it to the NRC.

Reference 3 provided an updated Seismic Walkdown Report that documented completion of Commitment 1 for CNP Unit 1. Reference 3 was approved by the NRC in Reference 4. This letter and Enclosure 2 complete commitments 2 and 3.

Changes to the Seismic Walkdown Report subsequent to the transmittal of Reference 3 are annotated with change bars.

There are no new or revised commitments in this letter. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.

Sincerely, Joel P. Gebbie Site Vice President JJV/amp

Enclosures:

1. Affirmation
2. Donald C. Cook Nuclear Plant Units 1 and 2 Seismic Walkdown Report, Revision 2 c:

J. T. King, MPSC S. M. Krawec, AEP Ft. Wayne, w/o enclosures MDEQ - RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region III T. J. Wengert, NRC Washington, DC

Enclosure I to AEP-NRC-2014-08 AFFIRMATION I, Joel P. Gebbie, being duly sworn, state that I am Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.

Indiana Michigan Power Company Joel P. Gebbie Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS _____

DAY OF 2014 Notary PubliQ_

My Commission Expires I__

Q__)_R TO AEP-NRC-2014-08 Donald C. Cook Nuclear Plant Units 1 and 2 Seismic Walkdown Report, Revision 2