IR 05000275/2017403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17080A109
| number = ML17080A109
| issue date = 03/20/2017
| issue date = 03/20/2017
| title = Diablo Canyon Power Plant, Units 1 and 2 - NRC Security Inspection Report 05000275/2017403 and 05000323/2017403
| title = NRC Security Inspection Report 05000275/2017403 and 05000323/2017403
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES rch 20, 2017
[[Issue date::March 20, 2017]]


Mr. Edward D. Halpin, Senior Vice President,
==SUBJECT:==
 
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2017403 AND 05000323/2017403
Generation and Chief Nuclear Officer Pacific Gas and Electric Company
 
Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
 
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2017403 AND 05000323/2017403


==Dear Mr. Halpin:==
==Dear Mr. Halpin:==
On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security  
On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Diablo Canyon Power Plant, Units 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. J. Welsch, Vice President, Nuclear Generation, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
 
inspection at your Diablo Canyon Power Plant, Units 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. J. Welsch, Vice President, Nuclear Generation, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.


No NRC-identified or self-revealing findings were identified during this inspection.
No NRC-identified or self-revealing findings were identified during this inspection.
Line 40: Line 32:
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Diablo Canyon Power Plants, Units 1 and 2.
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Diablo Canyon Power Plants, Units 1 and 2.


This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, and Requests for Withholding." However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
 
Sincerely,/RA/
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82
 
Nonpublic
 
===Enclosure:===
Inspection Report 05000275/2017403 and 05000323/2017403
 
===w/Attachment:===
Supplemental Information
 
cc w/o enclosure:
Electronic Distribution for Diablo Canyon


ML17080A093 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17080A109 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1 NAME AMeyen RLanfear MHaire JGroom MHaire SIGNATURE /RA/ /RA/ email /RA/ RDA for /RA/
Sincerely,
/RA/
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 Nonpublic Enclosure:
Inspection Report 05000275/2017403 and 05000323/2017403 w/Attachment:
Supplemental Information cc w/o enclosure:
Electronic Distribution for Diablo Canyon ML17080A093 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17080A109 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: Yes No Publicly Available Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1 NAME AMeyen RLanfear MHaire JGroom MHaire SIGNATURE /RA/ /RA/ email /RA/ RDA for /RA/
DATE 3/1/2017 3/1/2017 3/9/2017 3/20/2017 3/20/2017
DATE 3/1/2017 3/1/2017 3/9/2017 3/20/2017 3/20/2017
}}
}}

Latest revision as of 05:34, 30 October 2019

NRC Security Inspection Report 05000275/2017403 and 05000323/2017403
ML17080A109
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/20/2017
From: Mark Haire
Plant Support Branch-1
To: Halpin E
Pacific Gas & Electric Co
References
IR 2017403
Download: ML17080A109 (3)


Text

UNITED STATES rch 20, 2017

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2017403 AND 05000323/2017403

Dear Mr. Halpin:

On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Diablo Canyon Power Plant, Units 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. J. Welsch, Vice President, Nuclear Generation, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

No NRC-identified or self-revealing findings were identified during this inspection.

However, the inspector documented one licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Diablo Canyon Power Plants, Units 1 and 2.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 Nonpublic Enclosure:

Inspection Report 05000275/2017403 and 05000323/2017403 w/Attachment:

Supplemental Information cc w/o enclosure:

Electronic Distribution for Diablo Canyon ML17080A093 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17080A109 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: Yes No Publicly Available Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1 NAME AMeyen RLanfear MHaire JGroom MHaire SIGNATURE /RA/ /RA/ email /RA/ RDA for /RA/

DATE 3/1/2017 3/1/2017 3/9/2017 3/20/2017 3/20/2017