March 20, 2017
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY
INSPECTION REPORT 05000275/2017403 AND 05000323/2017403
Dear Mr. Halpin:
On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Diablo Canyon Power Plant, Units 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. J. Welsch, Vice President, Nuclear Generation, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
No NRC-identified or self-revealing findings were identified during this inspection.
However, the inspector documented one licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Diablo Canyon Power Plants, Units 1 and 2.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding.
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Mark S. Haire
Chief, Plant Support Branch 1
Division of Reactor
Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82
Nonpublic Enclosure:
Inspection Report 05000275/2017403 and 05000323/2017403 w/Attachment:
Supplemental Information
cc w/o enclosure:
Electronic Distribution for Diablo Canyon
ML17080A093 Entire Report:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By:
Yes No Publicly Available Sensitive _______MD 3.4 A.3
ADAMS ACCESSION NUMBER: ML17080A109 Cover Letter Only:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By:
Yes No Publicly Available Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1
NAME AMeyen RLanfear MHaire JGroom MHaire
SIGNATURE
/RA/
/RA/
/RA/ RDA for
/RA/
DATE 3/1/2017 3/1/2017 3/9/2017 3/20/2017 3/20/2017