September 21, 2017
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY
INSPECTION REPORT 05000275/2017404 AND 05000323/2017404
Dear Mr. Halpin:
On August 10, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Diablo Canyon Power Plant, Units 1 and 2, and the NRC inspectors discussed the results of this inspection with Mr. J. Welsch, Vice President, Nuclear Generation, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
No NRC-identified or self-revealing findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390"
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Jeremy R. Groom, Chief
Plant Support Branch 1
Division of Reactor
Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82
Nonpublic Enclosure:
Inspection Report 05000275/2017404 and 05000323/2017404 w/Attachment: Supplemental Information
cc w/o enclosure: Electronic Distribution
ML17265A768 Entire Report:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: JLB Yes No Publicly Available Sensitive _______MD 3.4 A.3
ADAMS ACCESSION NUMBER: ML17265A770 Cover Letter Only:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: JLB Yes No Publicly Available Sensitive NRC-002 OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1
NAME JBuchanan MChambers JGroom MHaire JGroom
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
DATE 9/18/17 9/19/17 9/20/17 9/20/17 9/21/17