(5 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 04/24/2013 | | | issue date = 04/24/2013 |
| | title = F1045 B. Watson Presentation - Decommissioning Process - PSDAR Mtg | | | title = F1045 B. Watson Presentation - Decommissioning Process - PSDAR Mtg |
| | author name = Watson B A | | | author name = Watson B |
| | author affiliation = NRC/FSME/DWMEP/DURLD/RDB | | | author affiliation = NRC/FSME/DWMEP/DURLD/RDB |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000305 | | | docket = 05000305 |
| | license number = DPR-043 | | | license number = DPR-043 |
| | contact person = Feintuch K D | | | contact person = Feintuch K |
| | case reference number = TAC MF1045 | | | case reference number = TAC MF1045 |
| | package number = ML13168A570 | | | package number = ML13168A570 |
Line 15: |
Line 15: |
| | page count = 20 | | | page count = 20 |
| | project = TAC:MF1045 | | | project = TAC:MF1045 |
| | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:The US NRC's Power Reactor Decommissioning ProcessBruce A. Watson, CHPDivision Waste Management and EnvironmentalProtectionEnvironmental Protection Office of Federal and State Material Safety and Environmental Management ProgramsU.S. Nuclear Regulatory Commission NRC Regulations*10 CFR Part 20 Subpart E "License Termination Rule was implemented in 1997*10 CFR Part 50 -Operating License*10 CFR Part 72 -Independent Spent Fuel Storage Installation License (ISFSI)2 Reactor Decommissioning Options*DECON: Equipment, structures, etc. removed or decontaminated to a level that permits release*SAFSTOR: Plant placed in a safe, stable condition and maintained in that state until it is subsequently decontaminated to levels that qypermits release*ENTOMB:Plantisencasedinastructurallylong-livedsubstancetoENTOMB: Plant is encased in a structurally longlived substance to allow decay until levels permit unrestricted release (not currently available)3 US NRC Decommissioning 12810124602199819992000200120022003200420052006200220032004200520062007200820092010201120122013Power ReactorsRTRsMaterials Sites4 Power Reactor DecommissioningDecommissioning Process*Licenseenotifies(certifies)NRCwithin30daysofpermanently*Licensee notifies (certifies) NRC within 30 days of permanently ceasing operationsCtifitilidthflhbtl*Certification also required once the fuel has been permanently removed from the reactor vessel*Licensee submits Post Shutdown Decommissioning Activities Report (PSDAR) prior to or within 2 years of cessation of operations 5 Power Reactor DecommissioningDecommissioning Process*LicenseeperformssitedecommissioningLicensee performs site decommissioning*NRC continues to conduct on-site inspections*Licensee submits License Termination Plan (LTP) at least 2 years prior to requesting license termination*NRC notices LTP in the FederalRegister*NRC holds a Public Meeting to discuss LTP6 License Termination PlanContentsPlan Contents*Site characterization information*Identification of remaining dismantlement activities*PlansforsiteremediationPlans for site remediation*Detailed plans for the final radiation survey*Updated site-specific cost estimate*Supplemental environmental report, if any changes7 Power Reactor DecommissioningDecommissioning ProcessNRC review of the LTP*Acceptance review*Technical reviewAdditiliftiif*Additional information, if necessary*Public Meetings/Opportunity for Hearing8 Power Reactor DecommissioningDecommissioning Process*NRC approves LTP by amending the licenseppyg*Licensee performs remaining decommissioning activities*NRC performs in-process inspections*Decommissioningmustbecompletedwithin60yearsDecommissioning must be completed within 60 years9 Power Reactor DecommissioningDecommissioning Process*LicenseesubmitsFinalStatusSurveyReport(FSSR)Licensee submits Final Status Survey Report (FSSR)*NRC Reviews/approves FSSR*NRC performs confirmatory surveys, if needed*NRCterminateslicense*NRC terminates license10 Power Reactor CurrentStatusCurrent Status*10 licenses Terminated, 7 under the License Termination Rule*4 Units in active DECON (decommissioning) without an approved License Termination Planpp*8 Units in SAFSTOR, principally at multi-unit operating sites11 12 Power Reactors in SAFSTOR*Dresden 1*Fermi 1*GEVallecitios*Indian Point 1*Millstone 1*PeachBottom1GE Vallecitios*NS Savannah | | {{#Wiki_filter:The US NRCs Power Reactor Decommissioning Process Bruce A. Watson, CHP Division Waste Management and Environmental Protection Office of Federal and State Material Safety and Environmental Management Programs U.S. Nuclear Regulatory Commission |
| *Three Mile Island Unit 2* *Peach Bottom 1*San Onofre 113 Fermi 1 BackinSAFSTOR2013Back in SAFSTOR 201314 San Onofre 1 -PartialSiteRelease"SAFSTOR"Partial Site Release SAFSTOR 15 Power Reactors Decommissioned2005-2010Decommissioned 20052010*Trojan -2005*Maine Yankee -2005*Big Rock Point -2007*Pathfinder -2007 | | |
| *Yankee Rowe -2007*ConnecticutYankee2007*Connecticut Yankee -2007*Rancho Seco -2009 16 Maine Yankee -200517 Yankee Rowe -200718 Big Rock Point -200719 Thank You!Please visit our public website for additional information:http://www.nrc.gov/Click on "About NRC"Click on "How We Regulate"Click on "Decommissioning" in the text20 | | NRC Regulations |
| }} | | * 10 CFR Part 20 Subpart E License Termination Rule was implemented in 1997 |
| | * 10 CFR Part 50 - Operating License |
| | * 10 CFR Part 72 - Independent Spent Fuel Storage Installation License (ISFSI) 2 |
| | |
| | Reactor Decommissioning Options |
| | * DECON: Equipment, structures, etc. removed or decontaminated to a level that permits release |
| | * SAFSTOR: Plant placed in a safe, stable condition and maintained in that state until it is subsequently q y decontaminated to levels that permits release |
| | * ENTOMB: Plant is encased in a structurally long-lived long lived substance to allow decay until levels permit unrestricted release (not currently available) 3 |
| | |
| | US NRC Decommissioning 12 10 8 |
| | 6 4 |
| | 2 0 |
| | 1998199920002001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Power Reactors 2012 2013 RTRs Materials Sites 4 |
| | |
| | Power Reactor Decommissioning Process |
| | * Licensee notifies (certifies) NRC within 30 days of permanently ceasing operations |
| | * Certification C tifi ti also l required i d once the th ffuell h has b been permanently tl removed from the reactor vessel |
| | * Licensee submits Post Shutdown Decommissioning Activities Report (PSDAR) prior to or within 2 years of cessation of operations 5 |
| | |
| | Power Reactor Decommissioning Process |
| | * Licensee performs site decommissioning |
| | * NRC continues to conduct on-site inspections |
| | * Licensee submits License Termination Plan (LTP) at least 2 years prior to requesting license termination |
| | * NRC notices LTP in the Federal Register |
| | * NRC holds a Public Meeting to discuss LTP 6 |
| | |
| | License Termination Plan Contents |
| | * Site characterization information |
| | * Identification of remaining dismantlement activities |
| | * Plans for site remediation |
| | * Detailed plans for the final radiation survey |
| | * Updated site-specific cost estimate |
| | * Supplemental environmental report, if any changes 7 |
| | |
| | Power Reactor Decommissioning Process NRC review of the LTP |
| | * Acceptance review |
| | * Technical review |
| | * Additi Additional l information, i f ti if necessary |
| | * Public Meetings/Opportunity for Hearing 8 |
| | |
| | Power Reactor Decommissioning Process |
| | * NRC approves pp LTP by y amendingg the license |
| | * Licensee performs remaining decommissioning activities |
| | * NRC performs in-process inspections |
| | * Decommissioning must be completed within 60 years 9 |
| | |
| | Power Reactor Decommissioning Process |
| | * Licensee submits Final Status Survey Report (FSSR) |
| | * NRC Reviews/approves FSSR |
| | * NRC performs confirmatory surveys, if needed |
| | * NRC terminates license 10 |
| | |
| | Power Reactor Current Status |
| | * 10 licenses Terminated, 7 under the License Termination Rule |
| | * 4 Units in active DECON (decommissioning) without an approved pp License Termination Plan |
| | * 8 Units in SAFSTOR, principally at multi-unit operating sites 11 |
| | |
| | 12 Power Reactors in SAFSTOR |
| | * Dresden 1 |
| | * Fermi 1 |
| | * GE Vallecitios |
| | * Indian Point 1 |
| | * NS Savannah |
| | * Millstone 1 |
| | * Three Mile Island Unit 2* |
| | * Peach Bottom 1 |
| | * San Onofre 1 13 |
| | |
| | Fermi 1 Back in SAFSTOR 2013 14 |
| | |
| | San Onofre 1 - |
| | Partial Site Release SAFSTOR SAFSTOR 15 |
| | |
| | Power Reactors Decommissioned 2005-2010 2005 2010 |
| | * Trojan - 2005 |
| | * Maine Yankee - 2005 |
| | * Big Rock Point - 2007 |
| | * Pathfinder - 2007 |
| | * Yankee Rowe - 2007 |
| | * Connecticut Yankee - 2007 |
| | * Rancho Seco - 2009 16 |
| | |
| | Maine Yankee - 2005 17 |
| | |
| | Yankee Rowe - 2007 18 |
| | |
| | Big Rock Point - 2007 19 |
| | |
| | Thank You! |
| | Please visit our public website for additional information: |
| | http://www.nrc.gov/ |
| | Click on About NRC Click on How We Regulate Click on Decommissioning in the text 20}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML12312A0182012-11-0202 November 2012 Certification of Permanent Cessation of Power Operations Project stage: Request ML13063A2482013-02-26026 February 2013 Redacted - Kewaunee Power Station, Post-Shutdown Decommissioning Activities Report Project stage: Other ML13100A1732013-02-28028 February 2013 TAC MF1045 - Record of Receipt of Kewaunee PSDAR on February 28, 2013, as Per 10 CFR 50.82(a)(4)(ii) Project stage: Other ML13079A4882013-03-21021 March 2013 Fr Notice - Notice of Public Meeting on Receipt of Post-Shutdown Decommissioning Activities Report (PSDAR) and Availability of the PSDAR for Public Comment Project stage: Meeting ML13091A1872013-04-0505 April 2013 MF1045 Kewaunee Decom PSDAR Public Mtg on 24 Apr 13 2013-03-29-1358 Project stage: Other ML13112A8462013-04-22022 April 2013 PSDAR Meeting Public Participation Ground Rules Project stage: Meeting ML13112A8122013-04-22022 April 2013 Oversight Presentation, Reactor Decommissioning Inspection Program Project stage: Other ML13112A7682013-04-22022 April 2013 Power Reactor Decommissioning Process Project stage: Other ML13112A7632013-04-22022 April 2013 Post-Shutdown Decommissioning Activities Report Project stage: Other ML13112A6812013-04-22022 April 2013 Public Meeting to Discuss the Decommissioning of the Kewaunee Power Station Project stage: Meeting ML13168A5582013-04-24024 April 2013 MF1045 - Transcript of April 24, 2013 Public Meeting Decommissioning of Kewaunee Power Station. Pp. 1-79 Project stage: Meeting ML13191B2632013-04-24024 April 2013 F1045 B. Watson Presentation - Decommissioning Process - PSDAR Mtg Project stage: Other ML13170A4022013-04-24024 April 2013 PSDAR Public Meeting List of Attendees, Speakers, Call-in Attendees Project stage: Meeting ML13170A5212013-04-24024 April 2013 MF1045 Kewaunee Public Meeting 24 April 2013 Index of Public Comments in Transcript Project stage: Meeting ML13171A1522013-06-24024 June 2013 April 24, 2013, Summary of Public Meeting in City of Kewaunee to Make Post-Shutdown Decommissioning of Activities Report (PSDAR) Available for Public Comment Project stage: Meeting ML15036A5282015-04-10010 April 2015 Post - Shutdown Decommissioning Activities Report Project stage: Other 2013-04-22
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML13204A1382013-06-25025 June 2013 2012 End-of-Cycle Slides ML13191B2632013-04-24024 April 2013 F1045 B. Watson Presentation - Decommissioning Process - PSDAR Mtg ML13112A8122013-04-22022 April 2013 Oversight Presentation, Reactor Decommissioning Inspection Program ML13112A7682013-04-22022 April 2013 Power Reactor Decommissioning Process ML13112A7632013-04-22022 April 2013 Post-Shutdown Decommissioning Activities Report ML13112A6812013-04-22022 April 2013 Public Meeting to Discuss the Decommissioning of the Kewaunee Power Station ML13112A8462013-04-22022 April 2013 PSDAR Meeting Public Participation Ground Rules ML13066A3312013-03-0707 March 2013 Regulatory Conference Presentation 3-12-2013 ML1113904092011-05-26026 May 2011 NRC EOC Slide Presentation for Public Meeting ML1013104192010-05-18018 May 2010 Draft Supplement Environmental Impact Statement Meeting Slides March 24, 2010 ML1011304432010-04-21021 April 2010 NRC Slides for Kewaunee End-Of-Cycle Meeting ML0926000182009-09-15015 September 2009 Handout 1 - GSI-191 Resolution for Kewaunee Power Station ML0926003762009-09-15015 September 2009 Handout 2 - Drawings, Analyzed RCS - Not Limiting Break ML0926006432009-09-15015 September 2009 Handout 3 - Kewaunee Power Station, Agenda Setting Meeting 09/15/09 ML0916904622009-06-17017 June 2009 Powerpoint Presentation for NRC Briefing Graded Exercise June 23, 2009 ML0913301112009-05-12012 May 2009 Technical Specifications Project Meeting Handouts ML0911904992009-04-28028 April 2009 Meeting Slides, Kewaunee Power Station - Annual Assessment Meeting, Reactor Oversight Program - 2008 ML0901601132009-01-15015 January 2009 Pre-Application Meeting Re. a Future Amendment to Convert the Technical Specifications to ITS Format ML0901601222009-01-15015 January 2009 Pre-application Meeting Re. a Future Amendment to Convert the Kewaunee Technical Specifications to the ITS Format ML0830505892008-10-22022 October 2008 License Renewal Public Meeting Presentation Slides ML0727805042007-10-0404 October 2007 Presentation Slides for Kewaunee Public Meeting ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0721904612007-08-0909 August 2007 Appeal of FAQ 69.2 - Emergency Diesel Generator Fuel Oil Line Filling Failure ML0712902162007-05-0808 May 2007 Public Meeting Presentation Slides, Kewaunee Power Station Cross-Cutting Issues. ML0634604952006-11-30030 November 2006 Slides, Internal Flooding Risk Reduction Activities, from Kewaunee Regulatory Public Meeting ML0604003522006-01-31031 January 2006 Enclosure 2 - Slides on Application of Dominion Safety & Core Design Methods to Kewaunee Power Station (KPS) ML0531903272005-11-0808 November 2005 Regulatory Conference Kewaunee Turbine Building Flooding Issues ML0527102572005-08-0909 August 2005 EOC 2004 Slides ML0513202602005-04-20020 April 2005 Presentation to NRC - Enclosure 2 to Acknowledgement of Receipt of Letter and Summary of Public Meeting Conducted to Discuss Commitments for the Kewaunee Nuclear Plant Letter ML0434900602004-11-30030 November 2004 NMC Slides for 11/30/04 Public Meeting ML0413803782004-05-0707 May 2004 NMC New Fuel Supplier Development Initiative ML0331603312003-11-0606 November 2003 ,Kewaunee & Hatch Meeting Handout Re Planned License Amendment Requests Using Alternate Source Term ML0331603242003-11-0606 November 2003 Praire Island Meeting Handout Re Planned License Amendment Requests Using Alternate Source Term ML0315307202003-04-18018 April 2003 April 18, 2003 - RIC 2003 Presentation - F2 - Chris Bakken - Region III Breakout ML0223406082002-08-0808 August 2002 Meeting Handouts Knpp/Nrc Meeting Covering: Licensing Submittals for Fuel Transition and Power Uprates (Mur and Stretch) ML0210100402002-04-0909 April 2002 EOC Meeting Slides 2013-06-25
[Table view] Category:Slides and Viewgraphs
MONTHYEARML19260E6952019-09-24024 September 2019 Final 9/24/2019 NEIMA Meeting Slides - Kewaunee ML16190A3462016-06-28028 June 2016 Agenda and Presentation, June 28, 2016, Public Meeting with Dominion, Inc ML13150A1792013-11-19019 November 2013 Void Testing for KPS SI Void to Anderson Lin ML13204A1382013-06-25025 June 2013 2012 End-of-Cycle Slides ML13191B2632013-04-24024 April 2013 F1045 B. Watson Presentation - Decommissioning Process - PSDAR Mtg ML13112A8122013-04-22022 April 2013 Oversight Presentation, Reactor Decommissioning Inspection Program ML13112A7682013-04-22022 April 2013 Power Reactor Decommissioning Process ML13112A7632013-04-22022 April 2013 Post-Shutdown Decommissioning Activities Report ML13112A6812013-04-22022 April 2013 Public Meeting to Discuss the Decommissioning of the Kewaunee Power Station ML13112A8462013-04-22022 April 2013 PSDAR Meeting Public Participation Ground Rules ML13066A3312013-03-0707 March 2013 Regulatory Conference Presentation 3-12-2013 ML1113904092011-05-26026 May 2011 NRC EOC Slide Presentation for Public Meeting ML1013104192010-05-18018 May 2010 Draft Supplement Environmental Impact Statement Meeting Slides March 24, 2010 ML1011304432010-04-21021 April 2010 NRC Slides for Kewaunee End-Of-Cycle Meeting ML0926000182009-09-15015 September 2009 Handout 1 - GSI-191 Resolution for Kewaunee Power Station ML0926006432009-09-15015 September 2009 Handout 3 - Kewaunee Power Station, Agenda Setting Meeting 09/15/09 ML0921006032009-07-28028 July 2009 LRA Review - Slides Public Meeting July 28, 2009 ML0913301112009-05-12012 May 2009 Technical Specifications Project Meeting Handouts ML0911904992009-04-28028 April 2009 Meeting Slides, Kewaunee Power Station - Annual Assessment Meeting, Reactor Oversight Program - 2008 ML0901601222009-01-15015 January 2009 Pre-application Meeting Re. a Future Amendment to Convert the Kewaunee Technical Specifications to the ITS Format ML0830505892008-10-22022 October 2008 License Renewal Public Meeting Presentation Slides ML0809405302008-04-0101 April 2008 Meeting Slides for the Kewaunee End-of-Cycle Public Meeting, Reactor Oversight Program - 2007 ML0809405542008-04-0101 April 2008 Meeting Slides, 2007 NRC End-of-Cycle Plant Performance Assessment Meeting Kewaunee Power Station. ML0727805042007-10-0404 October 2007 Presentation Slides for Kewaunee Public Meeting ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0721904612007-08-0909 August 2007 Appeal of FAQ 69.2 - Emergency Diesel Generator Fuel Oil Line Filling Failure ML0712902162007-05-0808 May 2007 Public Meeting Presentation Slides, Kewaunee Power Station Cross-Cutting Issues. ML0709403952007-03-29029 March 2007 EOC Summary Meeting Slides - 2007, Reactor Oversight Program - Cy 2006 ML0705701032007-02-26026 February 2007 Slides, Summary of January 25, 2007 ML0634604952006-11-30030 November 2006 Slides, Internal Flooding Risk Reduction Activities, from Kewaunee Regulatory Public Meeting ML0631802732006-10-25025 October 2006 Slides for Kewaunee 10/25/06 Summary Meeting ML0618405872006-06-22022 June 2006 Public Meeting Kewaunee - Dominion Presentation Slides - to Discuss Improvement Initiatives ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0604003522006-01-31031 January 2006 Enclosure 2 - Slides on Application of Dominion Safety & Core Design Methods to Kewaunee Power Station (KPS) ML0531903402005-11-0808 November 2005 Kewaunee Management Meeting - Dominion Slides ML0531903272005-11-0808 November 2005 Regulatory Conference Kewaunee Turbine Building Flooding Issues ML0531903382005-11-0808 November 2005 Notice of Meeting with Dominion, Kewaunee Flooding Regulatory Conference Slides ML0527102572005-08-0909 August 2005 EOC 2004 Slides ML0513103532005-05-10010 May 2005 Licensee Slides for Meeting to Discuss AFW Amendment Request and Internal Flooding Design Basis ML0513202602005-04-20020 April 2005 Presentation to NRC - Enclosure 2 to Acknowledgement of Receipt of Letter and Summary of Public Meeting Conducted to Discuss Commitments for the Kewaunee Nuclear Plant Letter ML0508805182005-03-17017 March 2005 NRC Meeting Presentation (Attachment 3) ML0508805102005-03-17017 March 2005 NMC Meeting Presentation (Attachment 2) ML0434900602004-11-30030 November 2004 NMC Slides for 11/30/04 Public Meeting ML0416901562004-06-0202 June 2004 Public Meeting Slides, Kewaunee 2003 End-of-cycle Assessment ML0320305902003-07-18018 July 2003 Submittal of Supplemental Information & Slides from Pre-Decisional Enforcement Conference on 07/16/03 ML0319903322003-07-0303 July 2003 Point Beach/Kewaunee Meeting Summary Slides, Nuclear Management Company'S Reactor Pressure Vessel Head Replacement Project ML0315307202003-04-18018 April 2003 April 18, 2003 - RIC 2003 Presentation - F2 - Chris Bakken - Region III Breakout ML0309205232003-04-0202 April 2003 Public Meeting, Kewaunee Re EOC, Slides ML0210100402002-04-0909 April 2002 EOC Meeting Slides 2019-09-24
[Table view] |
Text
The US NRCs Power Reactor Decommissioning Process Bruce A. Watson, CHP Division Waste Management and Environmental Protection Office of Federal and State Material Safety and Environmental Management Programs U.S. Nuclear Regulatory Commission
NRC Regulations
- 10 CFR Part 20 Subpart E License Termination Rule was implemented in 1997
Reactor Decommissioning Options
- DECON: Equipment, structures, etc. removed or decontaminated to a level that permits release
- SAFSTOR: Plant placed in a safe, stable condition and maintained in that state until it is subsequently q y decontaminated to levels that permits release
- ENTOMB: Plant is encased in a structurally long-lived long lived substance to allow decay until levels permit unrestricted release (not currently available) 3
US NRC Decommissioning 12 10 8
6 4
2 0
1998199920002001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Power Reactors 2012 2013 RTRs Materials Sites 4
Power Reactor Decommissioning Process
- Licensee notifies (certifies) NRC within 30 days of permanently ceasing operations
- Certification C tifi ti also l required i d once the th ffuell h has b been permanently tl removed from the reactor vessel
- Licensee submits Post Shutdown Decommissioning Activities Report (PSDAR) prior to or within 2 years of cessation of operations 5
Power Reactor Decommissioning Process
- Licensee performs site decommissioning
- NRC continues to conduct on-site inspections
- Licensee submits License Termination Plan (LTP) at least 2 years prior to requesting license termination
- NRC notices LTP in the Federal Register
- NRC holds a Public Meeting to discuss LTP 6
License Termination Plan Contents
- Site characterization information
- Identification of remaining dismantlement activities
- Plans for site remediation
- Detailed plans for the final radiation survey
- Updated site-specific cost estimate
- Supplemental environmental report, if any changes 7
Power Reactor Decommissioning Process NRC review of the LTP
- Additi Additional l information, i f ti if necessary
- Public Meetings/Opportunity for Hearing 8
Power Reactor Decommissioning Process
- NRC approves pp LTP by y amendingg the license
- Licensee performs remaining decommissioning activities
- NRC performs in-process inspections
- Decommissioning must be completed within 60 years 9
Power Reactor Decommissioning Process
- Licensee submits Final Status Survey Report (FSSR)
- NRC Reviews/approves FSSR
- NRC performs confirmatory surveys, if needed
- NRC terminates license 10
Power Reactor Current Status
- 10 licenses Terminated, 7 under the License Termination Rule
- 4 Units in active DECON (decommissioning) without an approved pp License Termination Plan
- 8 Units in SAFSTOR, principally at multi-unit operating sites 11
12 Power Reactors in SAFSTOR
- Three Mile Island Unit 2*
Fermi 1 Back in SAFSTOR 2013 14
San Onofre 1 -
Partial Site Release SAFSTOR SAFSTOR 15
Power Reactors Decommissioned 2005-2010 2005 2010
Maine Yankee - 2005 17
Yankee Rowe - 2007 18
Big Rock Point - 2007 19
Thank You!
Please visit our public website for additional information:
http://www.nrc.gov/
Click on About NRC Click on How We Regulate Click on Decommissioning in the text 20