ML12312A018

From kanterella
Jump to navigation Jump to search

Certification of Permanent Cessation of Power Operations
ML12312A018
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/02/2012
From: Heacock D
Dominion, Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
12-684
Download: ML12312A018 (2)


Text

Dominion Energy Kewaunee, Inc.

0 5000 Dominion Boulevard, Glen Allen, VA 23060 nion November 2, 2012 U. S. Nuclear Regulatory Commission Serial No.12-684 Attention: Document Control Desk LIC/CDS/R0 Washington, DC 20555 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE, INC.

KEWAUNEE POWER STATION CERTIFICATION OF PERMANENT CESSATION OF POWER OPERATIONS Pursuant to 10 CFR 50.82(a)(1)(i), Dominion Energy Kewaunee, Inc. (DEK) hereby certifies to the NRC that it has decided to permanently cease power operation of Kewaunee Power Station (KPS).

Pending a grid reliability review by the Midwest Independent Transmission System Operator, Inc. (MISO), DEK expects to cease power operation of KPS in the second quarter of 2013.

A specific date for permanent cessation of operations has not yet been determined. After MISO has completed a grid reliability review, DEK will submit a supplement to this letter specifying the specific date that KPS will cease power operations. The MISO review is expected to be completed within six months.

If you have any questions or require additional information, please contact Mr. Craig Sly at 804-273-2784.

Sincerely, David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

COMMONWEALTH OF VIRGINIA

))

COUNTY OF HENRICO

)

The foregoing document was acknowledged before me, in and for the County and State aforesaid, today by David A. Heacock, who is President and Chief Nuclear Officer of Dominion Energy Kewaunee, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief. ral Acknowledged before me this day of A"_,u-, 2012.

My Commission Expires:

1-20 5

  • Ary Publico

Serial No.12-684 Certification Of Permanent Cessation Of Power Operations Page 2 of 2 Commitments made in this letter:

1. After MISO has completed a grid reliability review, DEK will submit a supplement to this letter specifying the specific date that the Kewaunee Power Station will cease power operations.

cc:

Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-H4A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station Public Service Commission of Wisconsin Electric Division P.O. Box 7854 Madison, WI 53707