ML17208A992: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(9 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/06/1980
| issue date = 09/06/1980
| title = Forwards Monthly Operating Repts for Aug 1980
| title = Forwards Monthly Operating Repts for Aug 1980
| author name = SCHMIDT A D
| author name = Schmidt A
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 21
| page count = 21
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:REGULA 'RY INFOR lATION      OISTRIBUTIO                SYSTE'l (R [DS)
      '/
ACCESS IOiV "EBB :8009170279                  OOC.DATEs 80/09/06              NOTARIZED: No                DOCKET 4 F AC  IL: 50  250 Turkey          Point Planti Unit 3E Florida Power and Light                        C  05000250 50-251 Turkey Point Planti Unit 4E Florida Power and Light                                  C  05000251 50 335 St      ~ Lucie Planti Unit 1E Florida Power 8 Light Co                          ~      0 AU TH ~ tlAHE                AUTHOR    AFFILIATION SCHt'.IDTE    A ~ D ~        Florida Power 8 Light Co        ~
REC  IP ~ 4A'<E            RECIP IEVT AFF ILIATIOV Office of '4lanagement and Program Analysis SUBJECT;        Forwards monthly ooeratina reots for Aug 1980 ISUTIO    I  CODE;    AOOSS    COPIES  RECEIVED;LTR TITl.E: Annual'emi Annus'l,i, Monthly Ooerating Reoorts
                                                                                /EVCL      J'IIE:
                                                                                          'ISTR (OL Stag NOTESt RECI~! EV T              COPIES            REC      I P IEVT                CUTIES ID C3OE/VA'1E              LTTR ENCL      IO CODE/NAvTE                    LTTR ENCL ACTIOiv.'ARGAES              ~        04        7    7    CLARKERD                  04          7    7 INTERNAl.:      AEOO                            1    1    D/9 IR g AU~i          F AC07          1    1 OIR HU" FAC 08                  1    1    ICE                        06          2    2 R)A                    13        2    2    NRC    POR                02          1    1 EX EVAL BR09                1    1    OR    ASSESS          BR  10          1,    1 REG    F II.E        01        1    1 UTERI'vAL; ACRS                                            B R O:3 I', 'H A V E V                      1 LPDR                  03                  VSIC                      05        1      1
                                                                                        'gy      gs~s~o TJ'I KL  y  J""E      1=          RRE CI=OS    i.ll l=D: LT T" ~        EVCL
()/Of ~i )
P.O. BOX 529100, MIAMI,FL 33162 yllgi
                                                      ',:.i:~. i5:-,=  Ji A~ eiXi FLORIDA POWER    8 LIGHT COMPANY September        6, l980 Office of  Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the August, 1980, Operating Status Reports for Turkey Point Unit Nos. 3 and 4. and St. Lucie Unit No. l.
Very  truly yours, A. D. Schmidt Vice President Power Resources VTC/ddc cc:  Mr. James P. O'Reilly Robert Lowenstein, Esquire
/DOER'i  1o~~/
PEOPLE... SERVING PEOPLE
I 4
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
COMPLETED IIY      V. T. Chilson TELEPHONE MONTH          AUGUSTA          1980 DAY        AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER LEVEL (MWe.Net)                                                    (MWe-Net)
I                        643                                  l7                      653 639                                  IS 63                                  19                      647 637                                  20                      653 646                                                          647 12 503                                  23                      652 664                                  24 658                                  25                      657 l0                        655                                  26                      652 658                                  27 656                                  2S                      642 l3                        656                                  29                      643 l4                        656                                  30                      644 IS                        649                                  31                      648 656 16 NOTE:        Average        daily power level greater than 646 MWe due to cooler condenser          cooling INSTRUCTIONS water.
On this format. list the average daily unit power (evel in MWe Net for each day in the reporting ntonth. Compute to the nearest whole megawatt.
(')(77)
                                                  . OPERATING DATA REPORT DOCKET NO.
oATE SeSs~.            980  .
COMPLETED BY        J~~hilson TELEPHONE      4851~2-3824
      'OPERATING STATUS
: 1. Unit Name:                Turke  'oint Unit No.        3          Notes    Unit No. 3 operated
: 2. Reporting Period:
at  approximately 1008 R.P.>
: 3. Licensed Thermal Power (MWt):
except    for  outage      of  Aug.
760                  6-7,  1980
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):            693
: 6. Maximum Dependable Capacity (Gross MWe):              680
: 7. Maximum Dependable Capacity (Net MWe):
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Maximum De endable Ca              acit    Gross MWe has been rerated to the mbst restricted                        seasonal conditions (summer) experienced. Maximum Dependable Capacity (Net                                MWe)    has been rerated accordingly.
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions, IfAny:
This Month            Yr:to-Date            Cumulative
: 11. Hours In Reporting Period                                                                        7    6 6
: 12. Number Of Hours Reactor Was Critical                744. 0            4 979.7                52 249.2
~
: 13. Reactor Reserve Shutdown Hours                                                  0                  213. 4
: 14. Hours Generator On. Line                            737.9              4 809.4                50 499;6
: 15. Unit Reserve Shutdown Hours                                                                        121.8
: 16. Gross Thermal Energy Ge'nerated (MWH)            1 613 090            10 "410 368          101 879 002
: 17. Gross Electrical Energy Generated (MWH)              503  570          3 275 415              32 356 415
: 18. Net Electrical Energy Generated (MWH)                478 174            3 104 278              30 626 372
: 19. Unit Service Factor                                  99.2                  82.1                    74.4
: 20. Unit Availability Factor                              99.2                  82.1                    74.6
: 21. Unit Capacity Factor (Using MDC Net)                  99.5                  '2.1                    70.2
: 22. Unit Capacity Factor (Using DER Net)                                        76.5                    65.1
: 23. Unit Forced Outage Rate                                0.8                    1.3                    2.5
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
P o ram  Oct. 5  Nov. 1            1980.
: 25. IfShut Down At End Of Report Period, Esthnated Date      of Startup:
: 26. Units ln Test Status (Prior to Commercial Operation):                        Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77)
O.
DOCKETNO. 50 250 UNITSHUTDOWNS AND POWER REDUCTIONS rl          Q ~
Q                            R~CI Vl                        Liccnscc    4l Cl    Q Cause  4 Corrective No.          Date          ~ J      IA Event        'n                                Action to L
Q Report    cn  G      O                    Prevent Recurrence
                                                ~ CA                                Cr 16        80-08-06  F      6.1 :                              N/A      CB    MOTOR X    Unit  No. 3 was removed from service due  to low oil level in reactor coolant pump motor No. 3C. Cor-rective actions included adding oil.  (Nuclear System) 3                              4 F: Forced        Reason:                                            Method:                          Exhibit G - Instructions S: Scheduled      A-Equipment Failure (Explain)                      I-Manual                          for Preparation of Data B.Maintenance oi Test  ~
2.Manual Scram.                  Entry Sheets for Licensee C-Refueling                                        3-Automatic Scram.                Event Report (LER) File (NUREG-D.Regulatory Restriction                            4-Other (Explain)                OI 6 I )
E-Operator Training 8r, Liccnsc Examination F-Administrative                                                                  5 G-Operational Error (Explain)                                                        Exhibit I - Sante Source
<<I/v7)              II.Other (Explain)
0 AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
COMPLETED BY          V- T. ChilSon MONTH        AUGUST          1980 DAY        AVERAGE DAILYPOWER LEVEL                              DAY        AVERAGE DAILYPOWER LEVEL (MWe-Net)                                                      (MWe.Net )
I                        633                                    17                    639 18                    634 635                                  19                      635 630                                  20                      634 633                                  21                      635 640                                  22                      636 644                                                            638 8                        645                                  24                      640 644                                  25                      642 10                                                                26                      634 27                      630 12                                                                28                      632 13                          640                                    >9 14                          641                                  30                      636 l5                          639                                  31 16                          640 INSTRUCTIONS On this format. list the'average daily unit I>>>wer levt.l in MWe.Net for each day i>> the reporting >n>>nth. C>>n>pute to the nearest whole megawat t.
('t(77)
OPERATING DATAREPORT DOCKET NO.
DATE
                                                                                                      ~~2L M~~980 COMPLETED BY      2LZ~~son TELEPHONE
                                                  ~
OPERATING STATUS Turke    Point Unit No.      4          Notes  Unit    No. 4 operated
: 1. Unit Name:
Reporting Period        AU ust    1980                            at approximately      100%    R.P.
: 3. I.icensed Thermal Power (MWt):                2200
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
e
: 7. Maximum De ndable Ca p acit y(Net MWe:  )              646
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Maximum De endable Ca            acit    (Grass MWe) has been rerated to the most                restricted seasonal conditions summer ex erienced. Maximum                      De  endable  Ca  acit    Net  MWe      has been rerated accordingly.
: 9. Power Level To Which Restricted, If Any (Net MWe):          NONE
: 10. Reasons For Restrictions, If Any:
This Month          Yr.-to-Date          Cumula tive
: 11. Hours In Reporting Period                                                                  6X 584.0
: 12. Number Of Hours Reactor Was Critical                744.0                                    5 3 9.
: 13. Reactor Reserve Shutdown Hours                                          12 03                166.6
: 14. Hours Generator On-Line                                                                    43 627;3
: 15. Unit Reserve Shutdown Hours                                            12.3                  31 '
: 16. Gross Thermal Energy Ge'nerated (MWH)            1 633 024            9 629 136            90 .848 116
: 17. Gross Electrical Energy Generated (MWH)                                2 997 355            28 900 833 2 5
: 19. Unit Service Factor                                                          75.9                  70.8
: 20. Unit Availability Factor                            100.0                76.1                  70.9
: 21. Unit Capacity Factor (Using MDC Net)                  98'.6                "75.1                  69.0
: 22. Unit Capacity Factor (Using DER Net)                  92.0                  70.0                  64.1
: 23. Unit Forced Outage Rate                                                  0.3                    3.0
: 24. Shutdowns Scheduled Over Next 6 Months(Type, Date, and Duration of Each):
maintenance and ins ections  Nov. 9 1980  Jan.                    10, 1981.
: 25. If Shut Down At End Of Report Period, Estimated Date    of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                      Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (lp/77)
r UNIT SHUTDOWNS AND POWER REDUCTIONS                                          nit No.4 REPORT hiONTH AUGUST, 1980                            305    552- 82 AJ                  i~        CJ~
Cause  & Corrective Ih                  a      Liccnscc  CP  4)        CJ No.          Date 4
Event        o      Q            Action to Report ~  ~G        C ~    Prevent Recurrence
                                                ~ C/7 $
N    0    N F: Forced          Reason:                                          Method:              Exhibit G - instructions S: Schedu!ed        A.Equipment Failure (Explain)                    I -Manual            for Preparation of Data B.Maintenance or Test                            2-Manual Scram.      Entry Sheets for Licensee C-Refueling.                                    3-Automatic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction                        4-Other (Explain)    OI 6 I )
EZperator Training &. License Examination F-Administrative G-Operational Error (Explain)                                        Exlwbrt I - Same Source
(')/77)                II.Other (Explain)
AVERAGE DAII.YUNIT POWER LEVEL DOCKET NO.
II"""
St. Lucre COMPLETEDIIY        V- T. Chilson MONTH            AUGUST          1980 DAY        AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER LEVEL (MWe.Net)                                                    (MWe-Net)
I                          75                                17 794                                  18                      673 796                                  19                      787 77                                  20                      786 770                                21                      725 792                                  22                      783 791                                  23                      78 790                                  24 791                                  25                      782 10                                                              26                      757 11                        798                                  27                      759 797                                  28                      781 13                        718                                                          779 14                        126                                  30                      780 15                        255                                  31                      749 16                        394                                NOTE:        Average        daily power level greater than 777    MWe    due    to cooler condenser cooling water.
INSTRUCTIONS On this format. list the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megawatt.
I')/77)
OPERATING DATA REPORT DOCKETNO.
DATE COMPLETED BY
                                                                                                      ~~
MI~~980 T Chilson TELEPHONE        05 552-3824 OPERATING STATUS
: l. Unit Name:                St. Lucie Unit No.        1              Notes  - Unit  operated at
: 2. Reporting Period:                                                    approximately 100% R.P.,
: 3. Licensed Thermal Power (MWt):                  2560                except for outages of Aug.
: 4. Nameplate Rating (Gross MWe):                    850                14, 14-15, and 16-18, 1980, 802                and reduced load operation
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):                  22 of Aug.14-18, 1980.
: 7. Maximum Dependable Capacity (Net MWe):
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):          NONE
: 10. Reasons For Restrictions, If Any:
This Month          Yr:to-Date            Cumulative
: 11. Hours In Reporting Period                            744.0            5  855.0            32 399.0-
: 12. Number Of Hours Reactor Was Critical                  720.0            4    0.2            2
: 13. Reactor Reserve Shutdown Hours                            ~                              129.5
: 14. Hours Generator On-Line                              701.4            3  889.7            24 719;7
: 15. Unit Reserve Shutdown Hours                              7 ~3                7.3                  39.3
: 17. Gross Electrical Energy Generated (MWH)                551 240          3 101    490        19 395 990
: 18. Net Electrical Energy Generated (MWH)                  519 201          2 915 036            18 242 932
: 19. Unit Service Factor                                      94.3                66.4                  76.3
: 20. Unit Availability Factor 64;1                  72.5
: 22. Unit Capacity Factor (Using DER Net)                    87.0                62.1                  '70.2
: 23. Unit Forced Outage Rate                                                                          6.4
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration    of Each):
: 25. IfShut Down At End Of Report Period, Estimated Date of Startup:      N/A
: 26. Units ln Test Status (Prior to Commercial Operation):                      Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (u/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS                        DOCKET NO.
No.l Page 1 of  2 80 l30Sl  552-3824 I
Q~
tS    Llccllscc                  Cl                Cause  & Corrective No.                                          c  5  tx.'    Event C ~
Action to C/I      Rcport-                    Q                    Prevent Recurrcncc Cr 80-08-14  S      10.7        A                      N/A          EG      TRANSF  Unit  was removed from          service to isolate  main power transformer No. 1B  to repair oil leak. Cor-rective actions included installing new  bushing.    (Non-nuclear system) 12        80-08-14                B                      N/A          EG      TRANSF  Load was limited to the capacity              of main transformer No. 1A. (Non-nuclear system) 13        80-08-14          7.3 F                      N/A          EG      TRANSP  Unit  was removed from          service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No. 1B.            (Non-nuclear system)
I                                                                        3                              4 F: Forced        Reason:                                              Method:                            Exhibit G - Instructions S: Schedu!ed      A-Equipment Failure (Explain)                          I-Manual                          for Preparation of Data B-Maintenance oi Test .                                2-Manual Scram.                  Entry Sheets Ior Licensee C.Refueling                                          3-Automatic Scram.                Event Report (LER) File (NUREG-D Regulatory Restriction                              4-Other (Explain)                  016I )
E-Operator Training Sc Liccnsc Examination F-Administrative G-Operational Error (Explain)                                                            Exhibit  I - Same Source
('I/77)              II-Other (Explain)
Ni).
rl MI UNIT SHUTDOWNS AND POWER REDUCTIONS Page 2 Llcenscc Event of CP 2
CJ C
80 o ~
COMPLETED BY Cause I
Ec Corrective Action to Jl MI Report =      cn  G      E ~                Prevent Recurrence Unit was removed from service to 14          80-08-'17            24. 6-    B                    N/A          EG      TRANSF install new bushing 'and return main power transformer No. 1B to service.
(Non-nuclear system)
F: Forced              Reason:                                              h(ethod:                          Exhibit G - Instructions .
S: Scheduled          A.Equipment Failure (Explain)                        I-Manual                        for Preparation of Data B-hlaintenance or Test .                            2-h(anuai Scram.                  Entry Sheets for Licensee C-Refueling                                          3-Automatic Scranl.              Event Report (LER) File (NUREG.
D Regulatory Restriction                            4-Other (Explain)                OI 6I )
E-Operator Training Ec License Examination F-Administrative G-Operational Error (Explain)                                                          Exhibit  I- Salnc Source
('>/77)                    H-Other (Explairt)
P.O. BOX 529100, MIAMI,FL 33162
                                                                    +<Illy~
l,==
FLORIDA POWER 8 LIGHT COMPANY September        6, l980 Office of  Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very  truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc:  Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE
'L
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50  -  250 Turkey Point UNIT    Unit  No. 3 DATE    Se  t. 6, 1980 COMPLETED BY      V.. T. Chilson TELEPHONE      (305) 552-. 3824 REPORT MONTH      AUGUST, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of Aug. 6-7, 1980. Refer to "Unit Shutdowns and'ower Reductions" section of August, 1980, Operating Status Report for additional infor-mation.
Major Safety-'related maintenance    activities  performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578  are continuing.
Florida Power a Light Company commitments for NUREG-0578  implementation are continuing. Refer to correspondence between FPL and. NRC for ad-ditional information.
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50  '251 Turkey Point UNIT  Unit  No. 4 DATE  Sept. 6, 1980 COMPLETED BY    V. T. Chilson TELEPHONE      (305) 552-3824 REPORT MONTH      AUGUST  1980 Unit No. 4 operated at approximately 100%. R.P. Refer to "Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report  for additional information.
Major Safety-related maintenance activities performed duning the    month included:
Inspections and requirements  of IE Bulletins and NUREG-0578 in progress.
Florida Power a Light Company commitments for NUREG-'0578 implementation are continuning. Refer to correspondence between FPL and NRC for ad-ditional information.
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50  -  335 St. Lucie UNIT    Unit No. 1 DATE    Se  t. 6  1980 COMPLETED BY      V. T. Chilson TELEPHONE      ('305) 552-3824 REPORT MONTH Unit operated at approximately 100% R.P., except for outages of August 14, 14-15, and 16.-18, 1980, and reduced load operation of August 14-18, 1980. Refer to "Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power 6 Light Company Commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.}}

Latest revision as of 16:05, 4 February 2020

Forwards Monthly Operating Repts for Aug 1980
ML17208A992
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 09/06/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML17208A993 List:
References
NUDOCS 8009170279
Download: ML17208A992 (21)


Text

REGULA 'RY INFOR lATION OISTRIBUTIO SYSTE'l (R [DS)

'/

ACCESS IOiV "EBB :8009170279 OOC.DATEs 80/09/06 NOTARIZED: No DOCKET 4 F AC IL: 50 250 Turkey Point Planti Unit 3E Florida Power and Light C 05000250 50-251 Turkey Point Planti Unit 4E Florida Power and Light C 05000251 50 335 St ~ Lucie Planti Unit 1E Florida Power 8 Light Co ~ 0 AU TH ~ tlAHE AUTHOR AFFILIATION SCHt'.IDTE A ~ D ~ Florida Power 8 Light Co ~

REC IP ~ 4A'<E RECIP IEVT AFF ILIATIOV Office of '4lanagement and Program Analysis SUBJECT; Forwards monthly ooeratina reots for Aug 1980 ISUTIO I CODE; AOOSS COPIES RECEIVED;LTR TITl.E: Annual'emi Annus'l,i, Monthly Ooerating Reoorts

/EVCL J'IIE:

'ISTR (OL Stag NOTESt RECI~! EV T COPIES REC I P IEVT CUTIES ID C3OE/VA'1E LTTR ENCL IO CODE/NAvTE LTTR ENCL ACTIOiv.'ARGAES ~ 04 7 7 CLARKERD 04 7 7 INTERNAl.: AEOO 1 1 D/9 IR g AU~i F AC07 1 1 OIR HU" FAC 08 1 1 ICE 06 2 2 R)A 13 2 2 NRC POR 02 1 1 EX EVAL BR09 1 1 OR ASSESS BR 10 1, 1 REG F II.E 01 1 1 UTERI'vAL; ACRS B R O:3 I', 'H A V E V 1 LPDR 03 VSIC 05 1 1

'gy gs~s~o TJ'I KL y J""E 1= RRE CI=OS i.ll l=D: LT T" ~ EVCL

()/Of ~i )

P.O. BOX 529100, MIAMI,FL 33162 yllgi

',:.i:~. i5:-,= Ji A~ eiXi FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the August, 1980, Operating Status Reports for Turkey Point Unit Nos. 3 and 4. and St. Lucie Unit No. l.

Very truly yours, A. D. Schmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire

/DOER'i 1o~~/

PEOPLE... SERVING PEOPLE

I 4

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

COMPLETED IIY V. T. Chilson TELEPHONE MONTH AUGUSTA 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe-Net)

I 643 l7 653 639 IS 63 19 647 637 20 653 646 647 12 503 23 652 664 24 658 25 657 l0 655 26 652 658 27 656 2S 642 l3 656 29 643 l4 656 30 644 IS 649 31 648 656 16 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling INSTRUCTIONS water.

On this format. list the average daily unit power (evel in MWe Net for each day in the reporting ntonth. Compute to the nearest whole megawatt.

(')(77)

. OPERATING DATA REPORT DOCKET NO.

oATE SeSs~. 980 .

COMPLETED BY J~~hilson TELEPHONE 4851~2-3824

'OPERATING STATUS

1. Unit Name: Turke 'oint Unit No. 3 Notes Unit No. 3 operated
2. Reporting Period:

at approximately 1008 R.P.>

3. Licensed Thermal Power (MWt):

except for outage of Aug.

760 6-7, 1980

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe): 680
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Maximum De endable Ca acit Gross MWe has been rerated to the mbst restricted seasonal conditions (summer) experienced. Maximum Dependable Capacity (Net MWe) has been rerated accordingly.

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr:to-Date Cumulative

11. Hours In Reporting Period 7 6 6
12. Number Of Hours Reactor Was Critical 744. 0 4 979.7 52 249.2

~

13. Reactor Reserve Shutdown Hours 0 213. 4
14. Hours Generator On. Line 737.9 4 809.4 50 499;6
15. Unit Reserve Shutdown Hours 121.8
16. Gross Thermal Energy Ge'nerated (MWH) 1 613 090 10 "410 368 101 879 002
17. Gross Electrical Energy Generated (MWH) 503 570 3 275 415 32 356 415
18. Net Electrical Energy Generated (MWH) 478 174 3 104 278 30 626 372
19. Unit Service Factor 99.2 82.1 74.4
20. Unit Availability Factor 99.2 82.1 74.6
21. Unit Capacity Factor (Using MDC Net) 99.5 '2.1 70.2
22. Unit Capacity Factor (Using DER Net) 76.5 65.1
23. Unit Forced Outage Rate 0.8 1.3 2.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

P o ram Oct. 5 Nov. 1 1980.

25. IfShut Down At End Of Report Period, Esthnated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77)

O.

DOCKETNO. 50 250 UNITSHUTDOWNS AND POWER REDUCTIONS rl Q ~

Q R~CI Vl Liccnscc 4l Cl Q Cause 4 Corrective No. Date ~ J IA Event 'n Action to L

Q Report cn G O Prevent Recurrence

~ CA Cr 16 80-08-06 F 6.1 : N/A CB MOTOR X Unit No. 3 was removed from service due to low oil level in reactor coolant pump motor No. 3C. Cor-rective actions included adding oil. (Nuclear System) 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B.Maintenance oi Test ~

2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Explain) OI 6 I )

E-Operator Training 8r, Liccnsc Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Sante Source

<9 14 641 30 636 l5 639 31 16 640 INSTRUCTIONS On this format. list the'average daily unit I>>>wer levt.l in MWe.Net for each day i>> the reporting >n>>nth. C>>n>pute to the nearest whole megawat t.

('t(77)

OPERATING DATAREPORT DOCKET NO.

DATE

~~2L M~~980 COMPLETED BY 2LZ~~son TELEPHONE

~

OPERATING STATUS Turke Point Unit No. 4 Notes Unit No. 4 operated

1. Unit Name:

Reporting Period AU ust 1980 at approximately 100% R.P.

3. I.icensed Thermal Power (MWt): 2200
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

e

7. Maximum De ndable Ca p acit y(Net MWe: ) 646
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Maximum De endable Ca acit (Grass MWe) has been rerated to the most restricted seasonal conditions summer ex erienced. Maximum De endable Ca acit Net MWe has been rerated accordingly.

9. Power Level To Which Restricted, If Any (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumula tive

11. Hours In Reporting Period 6X 584.0
12. Number Of Hours Reactor Was Critical 744.0 5 3 9.
13. Reactor Reserve Shutdown Hours 12 03 166.6
14. Hours Generator On-Line 43 627;3
15. Unit Reserve Shutdown Hours 12.3 31 '
16. Gross Thermal Energy Ge'nerated (MWH) 1 633 024 9 629 136 90 .848 116
17. Gross Electrical Energy Generated (MWH) 2 997 355 28 900 833 2 5
19. Unit Service Factor 75.9 70.8
20. Unit Availability Factor 100.0 76.1 70.9
21. Unit Capacity Factor (Using MDC Net) 98'.6 "75.1 69.0
22. Unit Capacity Factor (Using DER Net) 92.0 70.0 64.1
23. Unit Forced Outage Rate 0.3 3.0
24. Shutdowns Scheduled Over Next 6 Months(Type, Date, and Duration of Each):

maintenance and ins ections Nov. 9 1980 Jan. 10, 1981.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (lp/77)

r UNIT SHUTDOWNS AND POWER REDUCTIONS nit No.4 REPORT hiONTH AUGUST, 1980 305 552- 82 AJ i~ CJ~

Cause & Corrective Ih a Liccnscc CP 4) CJ No. Date 4

Event o Q Action to Report ~ ~G C ~ Prevent Recurrence

~ C/7 $

N 0 N F: Forced Reason: Method: Exhibit G - instructions S: Schedu!ed A.Equipment Failure (Explain) I -Manual for Preparation of Data B.Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling. 3-Automatic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Explain) OI 6 I )

EZperator Training &. License Examination F-Administrative G-Operational Error (Explain) Exlwbrt I - Same Source

(')/77) II.Other (Explain)

AVERAGE DAII.YUNIT POWER LEVEL DOCKET NO.

II"""

St. Lucre COMPLETEDIIY V- T. Chilson MONTH AUGUST 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe-Net)

I 75 17 794 18 673 796 19 787 77 20 786 770 21 725 792 22 783 791 23 78 790 24 791 25 782 10 26 757 11 798 27 759 797 28 781 13 718 779 14 126 30 780 15 255 31 749 16 394 NOTE: Average daily power level greater than 777 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megawatt.

I')/77)

OPERATING DATA REPORT DOCKETNO.

DATE COMPLETED BY

~~

MI~~980 T Chilson TELEPHONE 05 552-3824 OPERATING STATUS

l. Unit Name: St. Lucie Unit No. 1 Notes - Unit operated at
2. Reporting Period: approximately 100% R.P.,
3. Licensed Thermal Power (MWt): 2560 except for outages of Aug.
4. Nameplate Rating (Gross MWe): 850 14, 14-15, and 16-18, 1980, 802 and reduced load operation
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 22 of Aug.14-18, 1980.
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumulative

11. Hours In Reporting Period 744.0 5 855.0 32 399.0-
12. Number Of Hours Reactor Was Critical 720.0 4 0.2 2
13. Reactor Reserve Shutdown Hours ~ 129.5
14. Hours Generator On-Line 701.4 3 889.7 24 719;7
15. Unit Reserve Shutdown Hours 7 ~3 7.3 39.3
17. Gross Electrical Energy Generated (MWH) 551 240 3 101 490 19 395 990
18. Net Electrical Energy Generated (MWH) 519 201 2 915 036 18 242 932
19. Unit Service Factor 94.3 66.4 76.3
20. Unit Availability Factor 64;1 72.5
22. Unit Capacity Factor (Using DER Net) 87.0 62.1 '70.2
23. Unit Forced Outage Rate 6.4
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (u/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

No.l Page 1 of 2 80 l30Sl 552-3824 I

Q~

tS Llccllscc Cl Cause & Corrective No. c 5 tx.' Event C ~

Action to C/I Rcport- Q Prevent Recurrcncc Cr 80-08-14 S 10.7 A N/A EG TRANSF Unit was removed from service to isolate main power transformer No. 1B to repair oil leak. Cor-rective actions included installing new bushing. (Non-nuclear system) 12 80-08-14 B N/A EG TRANSF Load was limited to the capacity of main transformer No. 1A. (Non-nuclear system) 13 80-08-14 7.3 F N/A EG TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No. 1B. (Non-nuclear system)

I 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Schedu!ed A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance oi Test . 2-Manual Scram. Entry Sheets Ior Licensee C.Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 016I )

E-Operator Training Sc Liccnsc Examination F-Administrative G-Operational Error (Explain) Exhibit I - Same Source

('I/77) II-Other (Explain)

Ni).

rl MI UNIT SHUTDOWNS AND POWER REDUCTIONS Page 2 Llcenscc Event of CP 2

CJ C

80 o ~

COMPLETED BY Cause I

Ec Corrective Action to Jl MI Report = cn G E ~ Prevent Recurrence Unit was removed from service to 14 80-08-'17 24. 6- B N/A EG TRANSF install new bushing 'and return main power transformer No. 1B to service.

(Non-nuclear system)

F: Forced Reason: h(ethod: Exhibit G - Instructions .

S: Scheduled A.Equipment Failure (Explain) I-Manual for Preparation of Data B-hlaintenance or Test . 2-h(anuai Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scranl. Event Report (LER) File (NUREG.

D Regulatory Restriction 4-Other (Explain) OI 6I )

E-Operator Training Ec License Examination F-Administrative G-Operational Error (Explain) Exhibit I- Salnc Source

('>/77) H-Other (Explairt)

P.O. BOX 529100, MIAMI,FL 33162

+<Illy~

l,==

FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.

Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE

'L

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 - 250 Turkey Point UNIT Unit No. 3 DATE Se t. 6, 1980 COMPLETED BY V.. T. Chilson TELEPHONE (305) 552-. 3824 REPORT MONTH AUGUST, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of Aug. 6-7, 1980. Refer to "Unit Shutdowns and'ower Reductions" section of August, 1980, Operating Status Report for additional infor-mation.

Major Safety-'related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power a Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and. NRC for ad-ditional information.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 '251 Turkey Point UNIT Unit No. 4 DATE Sept. 6, 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH AUGUST 1980 Unit No. 4 operated at approximately 100%. R.P. Refer to "Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.

Major Safety-related maintenance activities performed duning the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power a Light Company commitments for NUREG-'0578 implementation are continuning. Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 - 335 St. Lucie UNIT Unit No. 1 DATE Se t. 6 1980 COMPLETED BY V. T. Chilson TELEPHONE ('305) 552-3824 REPORT MONTH Unit operated at approximately 100% R.P., except for outages of August 14, 14-15, and 16.-18, 1980, and reduced load operation of August 14-18, 1980. Refer to "Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power 6 Light Company Commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.