ML17215A253: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/17/1984
| issue date = 02/17/1984
| title = Provides Justification for Revising Schedule Change for Implementation of Upgraded Emergency Operating Procedures, Per Suppl 1 to NUREG-0737
| title = Provides Justification for Revising Schedule Change for Implementation of Upgraded Emergency Operating Procedures, Per Suppl 1 to NUREG-0737
| author name = WILLIAMS J W
| author name = Williams J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = EISENHUT D G
| addressee name = Eisenhut D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000335, 05000389
| docket = 05000335, 05000389
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 4
| page count = 4
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:REGULATORY          FORMATION DISTRIBUTION        S  'EM      (RIDS)
ACCESSION NBR08402170258                              DOCSDATEo  84/02/17      NOTARIZED!    NO              DOCKET
    ,FACIL:50 385 'St', Lucia Plenty Uni:t 50 389 'St, Lucie'1 anti Uni t 2< Flor ida Power ii  Florida Power      8 8
Light Light Co, Co.
05000335 05000389 AUTH ~ NAME'UTHOR AFFIL'IATION WILLIAMS'>W~                        Flor,ida Power. 8 Light Co,
      'RECIP ~ NAME;                      REC/PIKNT AFFILIATION EI SENHUT'< D o 6,                  0 i v i sf on of Ls censi ng
==SUBJECT:==
Provides"Justification for revising schedule                              change for-,
                  'implementation of upgraded                      emer gency    operating procedures'g per 'Suppl 1 to NUREG 0737, DISTRISUTION 'CODE-'0030,'COPIES tRECE'IVED:L'TR J'ENCL
    ,NOTES'    OR/Licensing                  Submittal'uppl        1  to  NUREG  0737(Gene'ric Ltr 82 33)
SIZE'ITLE:
RECIPIENT'D
                                                      ~COPIES              RECIPIENT            ,COPIES CODE/NAME.              L.TTR EN L~      "ID CODE/NAME          LTTR ENCL''
NRR ORB3 'BC                          "7              NRR ORB3    BC
=INTERNALS -=IK/DEPER/EPB                                                NRR PAULSONgW                        1 NRR/DHFS/HFEB                            .5            NRR/DHFS/PSRB                        1 NRR/DL/ORAB                                            NRR/DL/ORB5                      ~
5 NRR/DSI/CPB                              1            NRR/DS I/ICSB                        1 NRR/DS              I/METB                1            NRR/      /RAB                      1 NRR/DSI/RS8                              1                G 'FIL                            1 RGN2                                      1 EXT<<RNAL'o"    LPDR                                                    NRC~.PDR
                                'SIC NTIS
  'TOTAl  NUMBER OF COPIES                      REQUIRED ~" lTTR      41    ENCL
(c,<'L          I),      3          ~'>sf [if iiI                                iT<',I          >]Cps F>Qt'".>fp                    <
                                                                                                                                                                      ''>>>i74                          j>)>'i    <
l
~>>  r,<  I.p <<                  i>vi            .'" 1% l <I'< t'<pl                                                                                        )>i "p                                            )  C~ ~'~" < ~  '~''I pfkf,i'i    j    ~    o~p,~~ '<            i,l                  roof j          >  J    P    r    ii1i    >                                      R f  ") ',,f      .9c''>.k.                        'l:,3I >><<
f>)i$ i fp                  ,e,)          9t<.>i J          ~    'p'p8'p'lI          1>'                      l>p  f                f rntjl >4ppfpf                                          ',) f 'P I'.i "
                                                                                                                                                                                                " ''ll/j I."Ig  ll',  p    0 )4 1j              '1A                                                                                  pf TiipA
                                                                                                              ~  (i, lI            r,    I      '~      'il'j'J0p              ~    f>f,fg<<II ~                          i      i  .4q      c"',, A J  II 1 2
(~'f,
                                                                                                                            ~jf I"Is  7 ll~              3  l>>                        I    pf,pl    <,~                                i>i<<i>,"ll,p <'I pf                                    >fr.                                                                  j(', g,<
II'q'r,>>>
y              II    f>y            1,            CK/1 i]f>  p~g  ~
i ( ppi><)tI,p~~                                                                          >  r Ckg,                  if,      f I>>L',,          i"'      f'g            '1
                                            )  1'    1~rp  f  pP) it'      p'Q)
                                                                                          !'>>i>>')ggg)>gi+$
p>>      II                p    I,, )      j,        >i      <<ilii          )i,        fp    > r
                                                                                                                                    ,V>>-'><1                    <<',9              "~
                            .>>  Yi,,'g g~ 1') f t              <',    <<[ f, g                        . C    (it,'~      ",  'i(,    3    I,            'j,HAPP    PI>><'l, c'-.~~l a4 l        .')      C  1    ~".p')7(.b >'-<<                  i    '"                                    f  I ]p ll',p 'f              c    'tfpfa',      )'> f /f>'pg r                    .) i>p<    1
                          ")7    <'11                                        >  j,>1    /,)                                                                                                                f    i, ll' > C
                              ~  7 1.1                                    X,f> pp')                                                                                                                <<>)i/i, IW i
ge,                                                              ~,i 1
                                                                        ',g >if>i >>                                                                            Ji,                                          I+    p>>>  l'"pXii Je                                                                                                                                                                                                                        >>0i  I t >> It  i  q"'l                                        Jt                                                                            XXe' (i
i>>>'i!i I
x,Jg,)      >>            )I >
L
                                                                                                                                                                                                                                                          ",JI,'I'>[ 3  1 >i 1f  t                                                                                                            J "ii II  pI
                                                                  ~i 1  P",,<                        ~I          'Ii    II      i          t'll lit'>>'                      i    .'1i
FLORIDA POWER 8 LIGHT COMPANY Office of Nuclear Reactor Regul ation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
==Dear Mr. Ei senhut:==
Re:    St. Lucie Unit    1 8 2 Docket No. 50-335 and 389 Supplement 1 to NUREG 0737-U  rade of Emer enc 0 erati n      Procedures Our  letter  L-83-236, dated April 15, 1983, presented a schedule for implementing upgraded Emergency Operating Procedures (EOP's) by July 1, 1984, with a plant specific procedures generation package submitted by November 1, 1983. The purpose of this letter is to present justification for revising the schedule change for implementation of the upgraded EOP's.
The Combustion Engineering Owner's Group (GEOG) Technical Guideline document was resubmitted to the NRC on November 1, 1982 as CEN-152 Rev.          l. Your Safety Evaluation of CEN-152 Rev. 1 was transmitted to the GEOG by D.G.            Eisenhut's letter dated July 29, 1983. Section 4.3, Longer Term Needs, identified 12 major areas of concern consisting of 32 specific items which have been adressed by the GEOG Operations Subcommittee.        In addition to these long term items, the    GEOG  is  addressing the "Automatic Trip of Reactor Coolant Pumps" in accordance with D.G. Eisenhuts Generic Letter No. 83-10a, dated February 8, 1983.
As a  result of these NRC required revisions to CEN-152, the        GEOG  is submitting Revision 2 to CEN-152 on April 1, 1984. This revision will          address  the  RCP trip  issue, the reactor vessel level monitoring system issue        and  four long term issues.      The  GEOG  Operations Subcommittee has scheduled a meeting with the NRC Procedures and Test Review Group on February 23, 1984 to review the remaining 28 long term issues. The meeting should provide the necessary information to schedule technical work needed to address the remaining long term i ssues.
Therefore, based      upon the additional work yet to be performed by the GEOG, and approvals  needed  from the NRC, we will del@ the upgrade of the EOP's until July 1, 1985. The latest guidelines will be used to revise the St. Lucie Units 1 and 2 EOP's in accordance with the St. Lucie Plant Procedures Generation Package submitted in accordance to our proposed schedule.
8402i70258 8402i7 PDR ADOCK  05000335
(                    PDR                                                    PEOPLE... SERVING PEOPLE
While  we  are delaying the  final upgrading of the EOP's,  it should  be noted that the St. Lucie Plant's    EOP's have already undergone an  initial  upgrade.
The  St. Lucie Pl ant Unit  2 EOP's were revised and approved  during the early part of 1983 prior to the issuance the of Unit 2 Operating License. The latest technical information from CEN-152 Rev. 1 was used, and the technical content was verified by the Combustion Engineering personnel who helped prepare CEN-152 Rev. 1. Later in 1983, Unit 1 EOP's were revised using Unit 2 procedures as a guide. Even though the currently implemented procedures meet the "short term review requirements" they. will be revised to comply with ch'anges made to CEN 152 technical guidelines.
Very  truly yours,
    . Will '
Vice Pr      dent Nucl ear Energy JWW/JEM/djc cc:    Mr. James P. O'Reilly, Region  II Harold F. Reis, Esquire}}

Latest revision as of 14:06, 4 February 2020

Provides Justification for Revising Schedule Change for Implementation of Upgraded Emergency Operating Procedures, Per Suppl 1 to NUREG-0737
ML17215A253
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/17/1984
From: Williams J
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8402170258
Download: ML17215A253 (4)


Text

REGULATORY FORMATION DISTRIBUTION S 'EM (RIDS)

ACCESSION NBR08402170258 DOCSDATEo 84/02/17 NOTARIZED! NO DOCKET

,FACIL:50 385 'St', Lucia Plenty Uni:t 50 389 'St, Lucie'1 anti Uni t 2< Flor ida Power ii Florida Power 8 8

Light Light Co, Co.

05000335 05000389 AUTH ~ NAME'UTHOR AFFIL'IATION WILLIAMS'>W~ Flor,ida Power. 8 Light Co,

'RECIP ~ NAME; REC/PIKNT AFFILIATION EI SENHUT'< D o 6, 0 i v i sf on of Ls censi ng

SUBJECT:

Provides"Justification for revising schedule change for-,

'implementation of upgraded emer gency operating procedures'g per 'Suppl 1 to NUREG 0737, DISTRISUTION 'CODE-'0030,'COPIES tRECE'IVED:L'TR J'ENCL

,NOTES' OR/Licensing Submittal'uppl 1 to NUREG 0737(Gene'ric Ltr 82 33)

SIZE'ITLE:

RECIPIENT'D

~COPIES RECIPIENT ,COPIES CODE/NAME. L.TTR EN L~ "ID CODE/NAME LTTR ENCL

NRR ORB3 'BC "7 NRR ORB3 BC

=INTERNALS -=IK/DEPER/EPB NRR PAULSONgW 1 NRR/DHFS/HFEB .5 NRR/DHFS/PSRB 1 NRR/DL/ORAB NRR/DL/ORB5 ~

5 NRR/DSI/CPB 1 NRR/DS I/ICSB 1 NRR/DS I/METB 1 NRR/ /RAB 1 NRR/DSI/RS8 1 G 'FIL 1 RGN2 1 EXT<<RNAL'o" LPDR NRC~.PDR

'SIC NTIS

'TOTAl NUMBER OF COPIES REQUIRED ~" lTTR 41 ENCL

(c,<'L I), 3 ~'>sf [if iiI iT<',I >]Cps F>Qt'".>fp <

>>>i74 j>)>'i <

l

~>> r,< I.p << i>vi .'" 1% l <I'< t'<pl )>i "p ) C~ ~'~" < ~ '~I pfkf,i'i j ~ o~p,~~ '< i,l roof j > J P r ii1i > R f ") ',,f .9c>.k. 'l:,3I >><<

f>)i$ i fp ,e,) 9t<.>i J ~ 'p'p8'p'lI 1>' l>p f f rntjl >4ppfpf ',) f 'P I'.i "

" ll/j I."Ig ll', p 0 )4 1j '1A pf TiipA

~ (i, lI r, I '~ 'il'j'J0p ~ f>f,fg<<II ~ i i .4q c"',, A J II 1 2

(~'f,

~jf I"Is 7 ll~ 3 l>> I pf,pl <,~ i>i<,"ll,p <'I pf >fr. j(', g,<

II'q'r,>>>

y II f>y 1, CK/1 i]f> p~g ~

i ( ppi><)tI,p~~ > r Ckg, if, f I>>L',, i"' f'g '1

) 1' 1~rp f pP) it' p'Q)

!'>>i>>')ggg)>gi+$

p>> II p I,, ) j, >i <<ilii )i, fp > r

,V>>-'><1 <<',9 "~

.>> Yi,,'g g~ 1') f t <', <<[ f, g . C (it,'~ ", 'i(, 3 I, 'j,HAPP PI>><'l, c'-.~~l a4 l .') C 1 ~".p')7(.b >'-<< i '" f I ]p ll',p 'f c 'tfpfa', )'> f /f>'pg r .) i>p< 1

")7 <'11 > j,>1 /,) f i, ll' > C

~ 7 1.1 X,f> pp') <<>)i/i, IW i

ge, ~,i 1

',g >if>i >> Ji, I+ p>>> l'"pXii Je >>0i I t >> It i q"'l Jt XXe' (i

i>>>'i!i I

x,Jg,) >> )I >

L

",JI,'I'>[ 3 1 >i 1f t J "ii II pI

~i 1 P",,< ~I 'Ii II i t'll lit'>>' i .'1i

FLORIDA POWER 8 LIGHT COMPANY Office of Nuclear Reactor Regul ation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Ei senhut:

Re: St. Lucie Unit 1 8 2 Docket No. 50-335 and 389 Supplement 1 to NUREG 0737-U rade of Emer enc 0 erati n Procedures Our letter L-83-236, dated April 15, 1983, presented a schedule for implementing upgraded Emergency Operating Procedures (EOP's) by July 1, 1984, with a plant specific procedures generation package submitted by November 1, 1983. The purpose of this letter is to present justification for revising the schedule change for implementation of the upgraded EOP's.

The Combustion Engineering Owner's Group (GEOG) Technical Guideline document was resubmitted to the NRC on November 1, 1982 as CEN-152 Rev. l. Your Safety Evaluation of CEN-152 Rev. 1 was transmitted to the GEOG by D.G. Eisenhut's letter dated July 29, 1983. Section 4.3, Longer Term Needs, identified 12 major areas of concern consisting of 32 specific items which have been adressed by the GEOG Operations Subcommittee. In addition to these long term items, the GEOG is addressing the "Automatic Trip of Reactor Coolant Pumps" in accordance with D.G. Eisenhuts Generic Letter No.83-10a, dated February 8, 1983.

As a result of these NRC required revisions to CEN-152, the GEOG is submitting Revision 2 to CEN-152 on April 1, 1984. This revision will address the RCP trip issue, the reactor vessel level monitoring system issue and four long term issues. The GEOG Operations Subcommittee has scheduled a meeting with the NRC Procedures and Test Review Group on February 23, 1984 to review the remaining 28 long term issues. The meeting should provide the necessary information to schedule technical work needed to address the remaining long term i ssues.

Therefore, based upon the additional work yet to be performed by the GEOG, and approvals needed from the NRC, we will del@ the upgrade of the EOP's until July 1, 1985. The latest guidelines will be used to revise the St. Lucie Units 1 and 2 EOP's in accordance with the St. Lucie Plant Procedures Generation Package submitted in accordance to our proposed schedule.

8402i70258 8402i7 PDR ADOCK 05000335

( PDR PEOPLE... SERVING PEOPLE

While we are delaying the final upgrading of the EOP's, it should be noted that the St. Lucie Plant's EOP's have already undergone an initial upgrade.

The St. Lucie Pl ant Unit 2 EOP's were revised and approved during the early part of 1983 prior to the issuance the of Unit 2 Operating License. The latest technical information from CEN-152 Rev. 1 was used, and the technical content was verified by the Combustion Engineering personnel who helped prepare CEN-152 Rev. 1. Later in 1983, Unit 1 EOP's were revised using Unit 2 procedures as a guide. Even though the currently implemented procedures meet the "short term review requirements" they. will be revised to comply with ch'anges made to CEN 152 technical guidelines.

Very truly yours,

. Will '

Vice Pr dent Nucl ear Energy JWW/JEM/djc cc: Mr. James P. O'Reilly, Region II Harold F. Reis, Esquire