| issue date = 11/06/1972
| issue date = 11/06/1972
| title = Letter Confirming a 11/06/1972 Conversation Concerning HPCI System Inoperability - Dresden Unit 3
| title = Letter Confirming a 11/06/1972 Conversation Concerning HPCI System Inoperability - Dresden Unit 3
| author name = Worden W P
| author name = Worden W
| author affiliation = Commonwealth Edison Co
| author affiliation = Commonwealth Edison Co
| addressee name = Giambusso A
| addressee name = Giambusso A
Line 12: Line 12:
| document type = Letter, Note to File incl Telcon Record, Verbal Comm
| document type = Letter, Note to File incl Telcon Record, Verbal Comm
| page count = 1
| page count = 1
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:RB TWX NR 673 USAEC HQS GTWN WU WSH
* _                                      50-'249 TLXA240 WAF182C1932)(1~033079C311)PD 11/06/72 1931 Ics~IPMVEIG MVN                                                '
ZCZC 00290 TOVE MORRIS ILL 114 11-06 346P CST              *R~gulatory      file Cy.
PMS MR A GIAMBUss6 DEPUTY DIRECTOR FOR REACTOR PROJECTS DI~ECTORATE OF LICE~SING US ATOMIC ENERGY COMMISSION WASHINGTON DC 20545        .                        ,
SUBJECT DPR-25 DRESDEN NUCLEAR POWER STATION UNIT 3 THIS WILL CONFIRM A CO~VERSATION WITH MR H DL~NCE OF YOUR OFFI6E AT 1430 HOURS THIS DATE* CONCERNING HPCI SYSTEM INOPERABILIJY. AT 0240 NOVEMBER 6 1972, WHILE CONDUCTING POST MAINTENANCE SURVEILLANCE DURING UNIT START~UP,.tHE HPCI STEAM VALVE 2-2301-4 IN THE DRY WELL WOULD NOT OPEN. ALTHOUGH THE START-UP AND HEAT-UP WERE. HALTED AT .. THIS TIM~, THE REACTOR PRESSURE DRIFTED UP TO ABOUT 100 LBS DU~ING INVESTIAGION OF THE
  .VALVE PROBLEM. AT 0330, TH~ SHIFT BEGAN' A SHUT DOWN OF THE UNIT.
AT 0405 , WITH REACTOR PRESSURE 77PSIG AND SUB-CRITICAL VALVE
- TESTED SATISFACTORILY AT 0415 RESUMED START-UP
* SATISFACTORtLY TESTED HPCI AT P730 AT MINIMUM ST.E.AM PRESSURE OF 110 PSI        .. - - -
* W P WORDEN SUPERINTENDENT *DRESDEN NUCLEAR POWER STATION COMMONWEAL TH ED I SON RURAL ROUTE. 1 MORRIS ILLINOIS
                                                /
E 800-AEST USAEC HQS GTWN                                                    6096'}}

Latest revision as of 11:56, 4 February 2020

Letter Confirming a 11/06/1972 Conversation Concerning HPCI System Inoperability - Dresden Unit 3
ML17252B015
Person / Time
Site: Dresden Constellation icon.png
Issue date: 11/06/1972
From: Worden W
Commonwealth Edison Co
To: Giambusso A
US Atomic Energy Commission (AEC)
References
Download: ML17252B015 (1)


Text

RB TWX NR 673 USAEC HQS GTWN WU WSH

  • _ 50-'249 TLXA240 WAF182C1932)(1~033079C311)PD 11/06/72 1931 Ics~IPMVEIG MVN '

ZCZC 00290 TOVE MORRIS ILL 114 11-06 346P CST *R~gulatory file Cy.

PMS MR A GIAMBUss6 DEPUTY DIRECTOR FOR REACTOR PROJECTS DI~ECTORATE OF LICE~SING US ATOMIC ENERGY COMMISSION WASHINGTON DC 20545 . ,

SUBJECT DPR-25 DRESDEN NUCLEAR POWER STATION UNIT 3 THIS WILL CONFIRM A CO~VERSATION WITH MR H DL~NCE OF YOUR OFFI6E AT 1430 HOURS THIS DATE* CONCERNING HPCI SYSTEM INOPERABILIJY. AT 0240 NOVEMBER 6 1972, WHILE CONDUCTING POST MAINTENANCE SURVEILLANCE DURING UNIT START~UP,.tHE HPCI STEAM VALVE 2-2301-4 IN THE DRY WELL WOULD NOT OPEN. ALTHOUGH THE START-UP AND HEAT-UP WERE. HALTED AT .. THIS TIM~, THE REACTOR PRESSURE DRIFTED UP TO ABOUT 100 LBS DU~ING INVESTIAGION OF THE

.VALVE PROBLEM. AT 0330, TH~ SHIFT BEGAN' A SHUT DOWN OF THE UNIT.

AT 0405 , WITH REACTOR PRESSURE 77PSIG AND SUB-CRITICAL VALVE

- TESTED SATISFACTORILY AT 0415 RESUMED START-UP

  • SATISFACTORtLY TESTED HPCI AT P730 AT MINIMUM ST.E.AM PRESSURE OF 110 PSI .. - - -
  • W P WORDEN SUPERINTENDENT *DRESDEN NUCLEAR POWER STATION COMMONWEAL TH ED I SON RURAL ROUTE. 1 MORRIS ILLINOIS

/

E 800-AEST USAEC HQS GTWN 6096'