ML033100270
ML033100270 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 08/19/2002 |
From: | O'Connell R Office of Nuclear Material Safety and Safeguards |
To: | |
References | |
FOIA/PA-2003-0395, NMSS-02-A-0002 | |
Download: ML033100270 (1) | |
Similar Documents at Dresden | |
---|---|
Category:Note to File incl Telcon Record
MONTHYEARML17252B4162017-09-0909 September 2017
[Table view]Letter Confirming a Conversation Concerning the Report of an Empty Spent Fuel Shipping Cask Which Had Some Areas of Removable Surface Contamination ML17252B4142017-09-0909 September 2017 Letter Confirming a Conversation Concerning the Failure of HPCI Valve Mo 2-2301-8 During a Maintenance Outage and the Discovery of a Broken Stem ML0528500652005-10-24024 October 2005 Minutes of Conference Call Regarding Dresden MSSV Setpoint Tolerance (Response to License Condition 4 from July 30, 2004 Amendment) ML0331002702002-08-19019 August 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331002432002-08-0707 August 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001982002-05-0808 May 2002 Noie to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001842002-05-0707 May 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001972002-05-0707 May 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001732002-04-25025 April 2002 Note to Telephone Conversation - Robert O'Connell - NMSS 2002-A-0002 ML17252B4171976-12-0606 December 1976 Letter Confirming a 12/06/1976 Conversation Concerning the Receipt of an Empty Spent Fuel Shipping Cask Which Had Some Areas of Removeable Surface Contamination ML17252B4181976-12-0303 December 1976 Letter Confirming a Conversation Concerning Information Received That Indicates the R.W.M. Should Remain in Service or a Qualified Person Must Verify All Control Rod Movement Through 20% Power ML17252B4191976-12-0202 December 1976 Letter Confirming a 12/02/1976 Conversation Concerning Receipt of an Empty Spent Fuel Shipping Cask from GE Morris Operation Which Had Some Areas of Removable Surface Contamination ML17252B4571975-11-17017 November 1975 Letter Confirming a Conversation Concerning Quarterly Closure Timing of IC Main Steam Isolation Valve in Which the Closure Time Was Found at 2.7 Seconds ML17252B4581975-11-0404 November 1975 Letter Confirming a Conversation Concerning Discovery of High Level in the Torus While Running a HPCI Surveillance Check ML17252A4461975-07-31031 July 1975 Incident Notification Concerning Location of Broken Tack Welds on Jet Pump Restrainer Clamp Bolt Keepers During Tv Camera Examination of Unit 3 Jet Pumps - Dresden Unit 3 ML17252A9121975-04-25025 April 1975 Letter Confirming a 04/25/1975 Conversation Concerning Excessive Leakage Through Torus to Drywell Vacuum Breaker 3-1601-32B During Refuel Outage Local Leak Testing - Dresden Unit 3 ML17252A9131975-04-23023 April 1975 Letter Confirming a 04/23/1975 Conversation Concerning Failure of Feedwater Check Valves, 3-220-58A and 62A, and 3A Feedwater Line to Pass Local Leak Rate Test During Refuel Outage Surveillance - Dresden Unit 3 ML17252A7871975-03-19019 March 1975 Note to Confirm a Conversation Concerning Routine Main Steamline High Radiation Monitor Surveillance in Which the a and B Monitors Were Found to Have Set Points in Excess of Technical Specification Values - Dresden Unit 3 ML17252A7891975-03-19019 March 1975 Note to Confirm a Conversation Concerning Routine Main Steamline High Radiation Monitor Surveillance in Which the a and B Monitors Were Found to Have Set Points Exceeding the Techspec Value of 3 Times Background - Dresden Unit 3 ML17252A8241975-02-18018 February 1975 Note to Confirm a Conversation Concerning Discovery of a Leaking Containment Inerting Isolation Valve A03-1601-21 During Local Leak Rate Testing - Dresden Unit 3 ML17252A8251975-02-18018 February 1975 Note Confirming a Conversation Concerning Failure of Bergen Patterson Piping Restraint Number 19 on the Unit 3 HPCI Main Steam Line in the Dry-Well - Dresden Unit 3 ML17252B0291975-02-10010 February 1975 Letter Confirming a 02/10/1975 Conversation Concerning a Leak in a 3/4 Inch Vent Line at Weld on 3C Reactor Feed Pump Casing - Dresden Unit 3 ML17252A8231975-02-10010 February 1975 Note to Confirm a Conversation Concerning a Leak in a 3/4 Inch Vent Line at a Well on 3C Reactor Feed Pump Casing - Dresden Unit 3 ML17252A8371975-01-0707 January 1975 Note Confirming a Conversation Concerning a Xenon Transient Experienced on Unit 3 During a Control Rod Pattern Alteration - Dresden Unit 3 ML17252B0281975-01-0606 January 1975 Letter Confirming a 01/06/1975 Conversation Concerning Excess Chloride Content in Reactor Coolant Water During an Extended Reactor Cleanup System Maintenance Outage - Dresden Unit 3 ML17252A8321975-01-0606 January 1975 Note to Confirm a Conversation Concerning Excess Chloride Content in Unit 3 Reactor Coolant Water During a Extended Reactor Cleanup System Maintenance Outage - Dresden Unit 3 ML17252A4841974-12-0606 December 1974 Letter Confirming a 12/02/1974 Conversation Concerning the Discovery of Minor Leaks on the Minimum Flow Lines for 3A and 3B Reactor Feed Pumps - Dresden Unit 3 ML17252A4911974-10-23023 October 1974 Letter Confirming a 08/28/1974 Conversation Concerning a Failure to Maintain the 3A Core Spray Discharge Header in a Filled Condition - Dresden Unit 3 ML17252A4951974-10-0404 October 1974 Letter Confirming a 10/04/1974 Conversation Concerning the Discovery of DPI83-2352 with a Setpoint Greater than the Technical Specification ML17252A4971974-09-30030 September 1974 Letter Confirming a 09/30/1974 Conversation Concerning Discovery of Lits 3-263-72A and the Set Points Exceeding Technical Specifications ML17252A5001974-09-24024 September 1974 Letter Confirming a 09/24/1974 Conversation Concerning a Through Wall Crack Discovered on Torus Purge Inlet Line 3-8506-18 - Dresden Unit 3 ML17252A5011974-09-24024 September 1974 Letter Confirming a 09/21/1974 Conversation Concerning a Minor Leak from Feed Water Pressure Tap 3241-12A - Dresden Unit 3 ML17252A5051974-09-0909 September 1974 Letter Confirming a 09/09/1974 Conversation Concerning Failure of E Tip Valve to Close - Dresden Unit 3 ML17252B0311974-08-28028 August 1974 Letter Confirming a 08/23/1974 Conversation Concerning a Failure to Maintain the 3A Core Spray Discharge Header in a Filled Condition as Required by Technical Specifications - Dresden Unit 3 ML17252A5071974-08-14014 August 1974 Letter Confirming a 08/08/1974 Conversation Concerning a Failure of the Solenoid Operated Isolation Valve Associated with the 3B Traversing Encore Probe to Close - Dresden Unit 3 ML17252A5081974-08-0606 August 1974 Letter Confirming a 07/26/1974 Conversation Concerning Failure of the Seat Material of the Air Operated Primary Containment Isolation Valve A03-1601-22 - Dresden Unit 3 ML17252A5111974-07-29029 July 1974 Letter Confirming a 07/29/1974 Conversation Concerning Failure of the Seat Material of Air Operated Isolation Valve AO-3-1601-21 - Dresden Unit 3 ML17252A5121974-07-29029 July 1974 Letter Confirming a 07/26/1974 Conversation Concerning the Failure of the Seat Material of Air Operated Primary Containment Valve A03-1601-22 - Dresden Unit 3 ML17252A5151974-07-23023 July 1974 Letter Confirming a 07/19/1974 Conversation Concerning the Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3 ML17252A5161974-07-19019 July 1974 Letter Confirming a 07/19/1974 Conversation Concerning Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3 ML17252A5171974-07-16016 July 1974 Letter Confirming a 07/16/1974 Conversation Concerning the Failure to Reach the Required Containment Oxygen Concentration of 4 Percent within 24 Hours of Placing Mode Switch in Run Position - Dresden Unit 3 ML17252A5271974-07-0505 July 1974 Letter Confirming a 05/24/1974 Conversation Concerning the Discovery of a Set Point Drift of L.I.T.S. 3-263-72A Beyond the Technical Specification - Dresden Unit 3 ML17252A5261974-06-24024 June 1974 Letter Confirming a 06/24/1974 Conversation Concerning a Failure of the Air Supply to the Feed Water Regulating Valve on 06/23/1974 - Dresden Unit 3 ML17252A5291974-06-24024 June 1974 Letter Confirming a 06/24/1974 Conversation Concerning a Failure of the Air Supply to the Feed Water Regulating Valve on 06/23/1974 - Dresden Unit 3 ML17252A5251974-06-17017 June 1974 Letter Confirming a 06/17/1974 Conversation Concerning the Failure of Main Steam Drain Valve M03-220-2 to Operate Properly on 05/22/1974 - Dresden Unit 3 ML17252A5361974-06-17017 June 1974 Letter Confirming a 06/17/1974 Conversation Concerning a Failure of Main Steam Valve M03-220-2 to Operate on 05/22/1974 - Dresden Unit 3 ML17252A5241974-06-12012 June 1974 Letter Confirming a 06/12/1974 Conversation Concerning the Discovery of 2 Reactor High Pressure Scram Switches (PS-3-263-55A and C) with Set Points Above the Technical Specification Limit - Dresden Unit 3 ML17252A5231974-06-11011 June 1974 Letter Confirming a 06/11/1974 Conversation Concerning a Small Leak in Line 3-3037B - Dresden Unit 3 ML17252A5401974-06-11011 June 1974 Letter Confirming a 06/11/1974 Conversation Concerning a Small Leak in Line 3-3037B - Dresden Unit 3 ML17252B0321974-06-10010 June 1974 Letter Confirming a 06/10/1974 Conversation Concerning a Failure of a Three Quarter Inch Nipple on Reactor Feed Pump Dispatch Line 3-3201-24 - Dresden Unit 3 2017-09-09 Category:Verbal Comm MONTHYEARML17252B4162017-09-0909 September 2017
[Table view]Letter Confirming a Conversation Concerning the Report of an Empty Spent Fuel Shipping Cask Which Had Some Areas of Removable Surface Contamination ML17252B4142017-09-0909 September 2017 Letter Confirming a Conversation Concerning the Failure of HPCI Valve Mo 2-2301-8 During a Maintenance Outage and the Discovery of a Broken Stem ML0528500652005-10-24024 October 2005 Minutes of Conference Call Regarding Dresden MSSV Setpoint Tolerance (Response to License Condition 4 from July 30, 2004 Amendment) ML0331002702002-08-19019 August 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331002432002-08-0707 August 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001982002-05-0808 May 2002 Noie to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001842002-05-0707 May 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001972002-05-0707 May 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001732002-04-25025 April 2002 Note to Telephone Conversation - Robert O'Connell - NMSS 2002-A-0002 ML17252B4171976-12-0606 December 1976 Letter Confirming a 12/06/1976 Conversation Concerning the Receipt of an Empty Spent Fuel Shipping Cask Which Had Some Areas of Removeable Surface Contamination ML17252B4181976-12-0303 December 1976 Letter Confirming a Conversation Concerning Information Received That Indicates the R.W.M. Should Remain in Service or a Qualified Person Must Verify All Control Rod Movement Through 20% Power ML17252B4191976-12-0202 December 1976 Letter Confirming a 12/02/1976 Conversation Concerning Receipt of an Empty Spent Fuel Shipping Cask from GE Morris Operation Which Had Some Areas of Removable Surface Contamination ML17252B4571975-11-17017 November 1975 Letter Confirming a Conversation Concerning Quarterly Closure Timing of IC Main Steam Isolation Valve in Which the Closure Time Was Found at 2.7 Seconds ML17252B4581975-11-0404 November 1975 Letter Confirming a Conversation Concerning Discovery of High Level in the Torus While Running a HPCI Surveillance Check ML17252A4461975-07-31031 July 1975 Incident Notification Concerning Location of Broken Tack Welds on Jet Pump Restrainer Clamp Bolt Keepers During Tv Camera Examination of Unit 3 Jet Pumps - Dresden Unit 3 ML17252A9121975-04-25025 April 1975 Letter Confirming a 04/25/1975 Conversation Concerning Excessive Leakage Through Torus to Drywell Vacuum Breaker 3-1601-32B During Refuel Outage Local Leak Testing - Dresden Unit 3 ML17252A9131975-04-23023 April 1975 Letter Confirming a 04/23/1975 Conversation Concerning Failure of Feedwater Check Valves, 3-220-58A and 62A, and 3A Feedwater Line to Pass Local Leak Rate Test During Refuel Outage Surveillance - Dresden Unit 3 ML17252A7871975-03-19019 March 1975 Note to Confirm a Conversation Concerning Routine Main Steamline High Radiation Monitor Surveillance in Which the a and B Monitors Were Found to Have Set Points in Excess of Technical Specification Values - Dresden Unit 3 ML17252A7891975-03-19019 March 1975 Note to Confirm a Conversation Concerning Routine Main Steamline High Radiation Monitor Surveillance in Which the a and B Monitors Were Found to Have Set Points Exceeding the Techspec Value of 3 Times Background - Dresden Unit 3 ML17252A8241975-02-18018 February 1975 Note to Confirm a Conversation Concerning Discovery of a Leaking Containment Inerting Isolation Valve A03-1601-21 During Local Leak Rate Testing - Dresden Unit 3 ML17252A8251975-02-18018 February 1975 Note Confirming a Conversation Concerning Failure of Bergen Patterson Piping Restraint Number 19 on the Unit 3 HPCI Main Steam Line in the Dry-Well - Dresden Unit 3 ML17252B0291975-02-10010 February 1975 Letter Confirming a 02/10/1975 Conversation Concerning a Leak in a 3/4 Inch Vent Line at Weld on 3C Reactor Feed Pump Casing - Dresden Unit 3 ML17252A8231975-02-10010 February 1975 Note to Confirm a Conversation Concerning a Leak in a 3/4 Inch Vent Line at a Well on 3C Reactor Feed Pump Casing - Dresden Unit 3 ML17252A8371975-01-0707 January 1975 Note Confirming a Conversation Concerning a Xenon Transient Experienced on Unit 3 During a Control Rod Pattern Alteration - Dresden Unit 3 ML17252B0281975-01-0606 January 1975 Letter Confirming a 01/06/1975 Conversation Concerning Excess Chloride Content in Reactor Coolant Water During an Extended Reactor Cleanup System Maintenance Outage - Dresden Unit 3 ML17252A8321975-01-0606 January 1975 Note to Confirm a Conversation Concerning Excess Chloride Content in Unit 3 Reactor Coolant Water During a Extended Reactor Cleanup System Maintenance Outage - Dresden Unit 3 ML17252A4841974-12-0606 December 1974 Letter Confirming a 12/02/1974 Conversation Concerning the Discovery of Minor Leaks on the Minimum Flow Lines for 3A and 3B Reactor Feed Pumps - Dresden Unit 3 ML17252A4911974-10-23023 October 1974 Letter Confirming a 08/28/1974 Conversation Concerning a Failure to Maintain the 3A Core Spray Discharge Header in a Filled Condition - Dresden Unit 3 ML17252A4951974-10-0404 October 1974 Letter Confirming a 10/04/1974 Conversation Concerning the Discovery of DPI83-2352 with a Setpoint Greater than the Technical Specification ML17252A4971974-09-30030 September 1974 Letter Confirming a 09/30/1974 Conversation Concerning Discovery of Lits 3-263-72A and the Set Points Exceeding Technical Specifications ML17252A5001974-09-24024 September 1974 Letter Confirming a 09/24/1974 Conversation Concerning a Through Wall Crack Discovered on Torus Purge Inlet Line 3-8506-18 - Dresden Unit 3 ML17252A5011974-09-24024 September 1974 Letter Confirming a 09/21/1974 Conversation Concerning a Minor Leak from Feed Water Pressure Tap 3241-12A - Dresden Unit 3 ML17252A5051974-09-0909 September 1974 Letter Confirming a 09/09/1974 Conversation Concerning Failure of E Tip Valve to Close - Dresden Unit 3 ML17252B0311974-08-28028 August 1974 Letter Confirming a 08/23/1974 Conversation Concerning a Failure to Maintain the 3A Core Spray Discharge Header in a Filled Condition as Required by Technical Specifications - Dresden Unit 3 ML17252A5071974-08-14014 August 1974 Letter Confirming a 08/08/1974 Conversation Concerning a Failure of the Solenoid Operated Isolation Valve Associated with the 3B Traversing Encore Probe to Close - Dresden Unit 3 ML17252A5081974-08-0606 August 1974 Letter Confirming a 07/26/1974 Conversation Concerning Failure of the Seat Material of the Air Operated Primary Containment Isolation Valve A03-1601-22 - Dresden Unit 3 ML17252A5111974-07-29029 July 1974 Letter Confirming a 07/29/1974 Conversation Concerning Failure of the Seat Material of Air Operated Isolation Valve AO-3-1601-21 - Dresden Unit 3 ML17252A5121974-07-29029 July 1974 Letter Confirming a 07/26/1974 Conversation Concerning the Failure of the Seat Material of Air Operated Primary Containment Valve A03-1601-22 - Dresden Unit 3 ML17252A5151974-07-23023 July 1974 Letter Confirming a 07/19/1974 Conversation Concerning the Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3 ML17252A5161974-07-19019 July 1974 Letter Confirming a 07/19/1974 Conversation Concerning Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3 ML17252A5171974-07-16016 July 1974 Letter Confirming a 07/16/1974 Conversation Concerning the Failure to Reach the Required Containment Oxygen Concentration of 4 Percent within 24 Hours of Placing Mode Switch in Run Position - Dresden Unit 3 ML17252A5271974-07-0505 July 1974 Letter Confirming a 05/24/1974 Conversation Concerning the Discovery of a Set Point Drift of L.I.T.S. 3-263-72A Beyond the Technical Specification - Dresden Unit 3 ML17252A5261974-06-24024 June 1974 Letter Confirming a 06/24/1974 Conversation Concerning a Failure of the Air Supply to the Feed Water Regulating Valve on 06/23/1974 - Dresden Unit 3 ML17252A5291974-06-24024 June 1974 Letter Confirming a 06/24/1974 Conversation Concerning a Failure of the Air Supply to the Feed Water Regulating Valve on 06/23/1974 - Dresden Unit 3 ML17252A5251974-06-17017 June 1974 Letter Confirming a 06/17/1974 Conversation Concerning the Failure of Main Steam Drain Valve M03-220-2 to Operate Properly on 05/22/1974 - Dresden Unit 3 ML17252A5361974-06-17017 June 1974 Letter Confirming a 06/17/1974 Conversation Concerning a Failure of Main Steam Valve M03-220-2 to Operate on 05/22/1974 - Dresden Unit 3 ML17252A5241974-06-12012 June 1974 Letter Confirming a 06/12/1974 Conversation Concerning the Discovery of 2 Reactor High Pressure Scram Switches (PS-3-263-55A and C) with Set Points Above the Technical Specification Limit - Dresden Unit 3 ML17252A5231974-06-11011 June 1974 Letter Confirming a 06/11/1974 Conversation Concerning a Small Leak in Line 3-3037B - Dresden Unit 3 ML17252A5401974-06-11011 June 1974 Letter Confirming a 06/11/1974 Conversation Concerning a Small Leak in Line 3-3037B - Dresden Unit 3 ML17252B0321974-06-10010 June 1974 Letter Confirming a 06/10/1974 Conversation Concerning a Failure of a Three Quarter Inch Nipple on Reactor Feed Pump Dispatch Line 3-3201-24 - Dresden Unit 3 2017-09-09 |
Text
August 19, 2002 NOTE OF TELEPHONE CALL RECEIVED BY: Bob O'Connell
SUBJECT:
NMSS-2002-A-0002 On August 19, 2002, the alleger contacted me by phone. He wanted to know whether we had received his previous phone message, since the voicemail memory had run out. I indicated that the'staff involved in review of his concerns had been away from the office, but that NMSS would be reviewing the information we had received. He then proceeded into a long and complex discussion of technical issues he had raised and which he said the staff was misunderstanding.
He said he does not understand how the staff can say the allegation is closed, because design control was lost, and that needs to be addressed as a nuclear safety issue. I asked him to put his concerns in writing and send them to us so that the staff could have them to consider as part of our review. He said he would do so, probably in an email. He particularly wanted it pointed out that the staff should look at the design calculations from Holtec, which Corn Ed was supposed to review but did not review.
In addition, he wanted to know the status of the staff's review of concerns he had raised regarding seismic issues related to MOVs, and about Zion shaving calculations. He said he had raised them with Ril, and that Rill had said they were being transferred to HQ. I said I would ask Rill or NRR to contact him regarding those matters.
LjO c~-
Ahoil'