Letter Confirming a 07/19/1974 Conversation Concerning Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3
ML17252A516
Person / Time
Site: Dresden Constellation icon.png
Issue date: 07/19/1974
From: Stephenson B
Commonwealth Edison Co
To: O'Leary J
US Atomic Energy Commission (AEC)
References
Download: ML17252A516 (1)


Text

USAEC HQS GTWN I

,:A'

,.. ~-n'..

. '.+

197 4 JUL 20 MA.. *

~-. 4 0 USAEC HQS GTWN WU WSH

, 5*

  • AToi11c ENERGY coM~,
  • T W X UH.!T
  • " ;,J L-;;....

';cii;i~

.TLXA l 38 WAE182<1558><1-030871C200~Pb 07/19/74 1548 ICS IPMVEIC MVN.

03258 TOVE MORRIS IL 112 07-19 1137A CDT PMS J F O'LEARY DIRECTOR WUT-.

DIRECTORATE OF LICENSING' US ATOMI.C ENERGY COMISSION

/

WASH DC 20 545 so-249

~BJECT DPR-25.DRESDEN NUCLEAR POWER STATION UNIT 3. THIS WILL

  • CONFIRM A CONVERSATION WITH F MAURA QF.YOUR OFFICE 1050 HOURS lliIS DATE CONCERNING HPCI HIGH STREAM FLO~ ICELATION SWITCH

~IS 3-2352 FOUND OUT OF FLEX. AS FriUND SET'POINt 6URING ROUTEIN~

~LIBRATION WAS 283 INCHES OF WATER WHICH IS GREAT THAN ALLWED

~TABLE 3.2.1. TF THE TECHNICAL SPECI~ATIONS. THE SWITCH WAS IMMEDIATELY RESET TO OPERATE AT 146* 5 INCHES OF WATER INCREASE

~IS 3-2353 WAS ALSO CHECKED AND FOUND\\ TO OPERATE WITH IN ITCHNICAL SPECIFICATION LIMITS* ADDITIONAL DETAILS ARE FORTH COMING*

IN _THE FORM OF A 10 DAY LETTER B B STPHENSON SUPERINTENDENT

~ESDEN NUCLEAR POWER STATION COMMONWEALTH NUCLEAR EDISON CO RR 1 MORRIS IL 60450 MINN 431P EDT+