ML17252A491

From kanterella
Jump to navigation Jump to search
Letter Confirming a 08/28/1974 Conversation Concerning a Failure to Maintain the 3A Core Spray Discharge Header in a Filled Condition - Dresden Unit 3
ML17252A491
Person / Time
Site: Dresden 
Issue date: 10/23/1974
From: Stephenson B
Commonwealth Edison Co
To: James Keppler
US Atomic Energy Commission (AEC)
References
Download: ML17252A491 (2)


Text

A.

B.

UNITED STATES ATOMIC ENERGY COMMISSION DIRECTORATE OF REGULATORY OPERATIONS REGION Ill 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 80137 RO Inspection Report No.

Transmittal Date Distribution:

RO Chief, FS&EB RO:HQ (5)

Distribution:

RO Chief, FS&EB RO:HQ (4)

~- ~..

TELEPHONE (312) 858-2860 DR Central Files Regulatory Standards (3)

\\.

L:D/D for Fuels & Mate'rials DR Central Files Licensing (13)

RO Files RO Inquiry Report.No.

Transmittal Date Distribution:

RO.Chief, FS&EB RO:HQ (5)

DR Central Files Regulatory Standards Licensing (13)

RO Files (3)

RO Files Distribution:

RO Chief, FS&EB RO:HQ DR Central Files RO Files C.

Incident Notification From: Commonwealth Edison Co.

Docket NO. 50-249 (Licensee & Docket No. (or Licerise No.)

Transmittal Date Distribution:

RO Chief, FS&EB

. RO :HQ (4)

Licensing (4)

DR Central Files RO Files October 23, 1974 Distribution:

RO Chief, FS&EB

. RO:HQ (4)

L:D/D for Fuels & Materials DR Central Files RO Files

(

c

(

~:.. **

19/11 IJUG 28 PM ~: -32.

VEE305C 1833> C l-040888C240> PD 08/2817 4 1829 ICS IPMVEIA MVN 01317 PDC TOVE MORRIS IL 144 08-28 330P CDT

  • PMS JAMES G KEPPLER REGIONAL DIRECTOR TELEPHONE NBR... ::; I~ -B.5A-;-Q000 DIRECTORATE OD REGULATOR

~PERATI~N.

1'SLEPHONED To,...5f11_

y,l/{o REGION 3 WUX

"'TE DLD ____ £)d1:TIME q~5J4

~:9A:~~!~v!:~R:~ cmrssm

_:::~~

GLENN ELLY~ ILL 60137 -RTE 'llf!A 1 lti ft.

SUBJECT:

DPR-25, DRESDEN.NUCLEAR POWER STATION UNIT 3 THIS WILL CONFIRM A CONVERSATION ~ITH F. MAURA ~F YOUR OFFICE

\\.

AT 1420 HOUR THIS DATE CONCERNING* A-FAILURE TO MAINTAIN THE 3A CORE SPRAY DISCHARGE HEADE~ IN A FILLED CONbITION AS

(

    • 8,...1201mtflRED BY SPECIFICATON 3.5.H OF THE TECHINIDAL SPECIFICATIONS

(... _

~- *_

c-(;

0

~

  • ON 8-28-74 AT APPROXIMATELY SAM FOLLOWI~G THE COMPLETION OF A

. CORE SPRAY PUMP SURVEIL 1

~AN~E TEST CON~UCTED IN *.

ANTICIPATION OF A PL~ANED DIESEL GENERATOR INSPECTION IT WAS NOTED THAT THE PRESSURE INDICATED ON THE 3A CORE SPRAY DISCHAGE HEADER WAS BELOW THE *NORMAL 80 PSIG. INVESTIGATION REVEALED THAT THE PUM? DISCHARGE STOP CHECK HAS APPARENTLY NOT SEATED FULLY ALL01NING THE HEADER TO DE-PRESSURIZE THE SITUATION WAS RECTIFIED BY lOAM ON 8-28-74 AND THE HEADER VENTED THE PRESSURIZED NORMALLY ADDITIONAL DETAILS ARE FORTHCOMING IN THE FORM OF A 10 DAY LETTER.*

8 8 STEPHENSON SUPERTENDENT DRESDEN NUCLEAR POWER STAT ION c sF-1201C'O'MMONWEALTH ED DISON CO RR 1 _.

MORRIS IL 60450 NNNN

.. )

  • ... /

0.

0

.. -*--: