==Inspection Report==
==Inspection Report==
Docket Number: 05000341 License Number: NPF-43 Report Number: 05000341/2020003 Enterprise Identifier: I-2020-003-0028 Licensee: DTE Electric Company Facility: Fermi Power Plant, Unit 2 Location: Newport, MI Inspection Dates: July 01, 2020 to September 30, 2020 Inspectors: T. Briley, Senior Resident Inspector M. Holmberg, Senior Reactor Inspector J. Park, Reactor Inspector T. Taylor, Resident Inspector Approved By: Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects Enclosure
Docket Number:
05000341  
 
License Number:
NPF-43  
 
Report Number:
05000341/2020003  
 
Enterprise Identifier: I-2020-003-0028  
 
Licensee:
DTE Electric Company  
 
Facility:
Fermi Power Plant, Unit 2  
 
Location:
Newport, MI  
 
Inspection Dates:
July 01, 2020 to September 30, 2020  
 
Inspectors:
T. Briley, Senior Resident Inspector  
 
M. Holmberg, Senior Reactor Inspector  
 
J. Park, Reactor Inspector  
 
T. Taylor, Resident Inspector  
 
Approved By:
Néstor J. Féliz Adorno, Chief
Branch 4
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
Line 44: Line 82:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


===Additional Tracking Items===
===Additional Tracking Items===
Type     Issue Number               Title                           Report Section Status LER       05000341/2020-001-00       LER 2020-001-00 for Fermi       71153          Closed 2 Power Plant, Secondary Containment Inoperable Due to Both Airlock Doors Open
Type Issue Number Title Report Section Status LER 05000341/2020-001-00 LER 2020-001-00 for Fermi 2 Power Plant, Secondary Containment Inoperable Due to Both Airlock Doors Open 71153 Closed


=PLANT STATUS=
=PLANT STATUS=
Line 60: Line 97:


==REACTOR SAFETY==
==REACTOR SAFETY==
==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment==
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) High pressure coolant injection (HPCI) system while the reactor core isolation cooling (RCIC) system was out of service for maintenance during the week ending August 22, 2020
: (1) High pressure coolant injection (HPCI) system while the reactor core isolation cooling (RCIC) system was out of service for maintenance during the week ending August 22, 2020
: (2) Division 1 emergency equipment cooling water (EECW) system while the Division 2 EECW system was out of service for maintenance during the week ending
: (2) Division 1 emergency equipment cooling water (EECW) system while the Division 2 EECW system was out of service for maintenance during the week ending September 26, 2020


===September 26, 2020 Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated system configurations during a complete walkdown of the standby liquid control system during the week ending September 26, 2020
: (1) The inspectors evaluated system configurations during a complete walkdown of the standby liquid control system during the week ending September 26, 2020


==71111.05 - Fire Protection==
==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (10 Samples)===
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (10 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
Line 84: Line 118:
: (8) Auxiliary building third floor, Division 2 switchgear room during the week ending September 30, 2020
: (8) Auxiliary building third floor, Division 2 switchgear room during the week ending September 30, 2020
: (9) Auxiliary building third floor, direct current motor control center room during the week ending September 30, 2020
: (9) Auxiliary building third floor, direct current motor control center room during the week ending September 30, 2020
: (10) Auxiliary building third floor, ventilation area during the week ending
: (10) Auxiliary building third floor, ventilation area during the week ending September 30, 2020


===September 30, 2020 Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the onsite fire brigade training and performance during an announced tabletop fire drill on September 18, 2020
: (1) The inspectors evaluated the onsite fire brigade training and performance during an announced tabletop fire drill on September 18, 2020


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
 
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (3 Samples)
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(3 Samples)
: (1) The inspectors observed and evaluated licensed operator performance in the control room during power maneuvers (pulling control rods and adjusting turbine bypass valves for pressure increases) on July 30, 2020
: (1) The inspectors observed and evaluated licensed operator performance in the control room during power maneuvers (pulling control rods and adjusting turbine bypass valves for pressure increases) on July 30, 2020
: (2) The inspectors observed and evaluated licensed operator performance in the control room during a manual main turbine trip due to elevated vibrations on August 5, 2020
: (2) The inspectors observed and evaluated licensed operator performance in the control room during a manual main turbine trip due to elevated vibrations on August 5, 2020
: (3) The inspectors observed and evaluated licensed operator performance in the control room following an earthquake on August 21, 2020
: (3) The inspectors observed and evaluated licensed operator performance in the control room following an earthquake on August 21, 2020  


===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)===
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)===
Line 102: Line 134:


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
===Quality Control (IP Section 03.02) (1 Sample)===
===Quality Control (IP Section 03.02) (1 Sample)===
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following structures, systems, and components (SSCs) remains capable of performing its intended function:
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following structures, systems, and components (SSCs) remains capable of performing its intended function:
Line 108: Line 139:


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
Line 116: Line 146:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (7 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (7 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
Line 128: Line 157:


==71111.19 - Post-Maintenance Testing==
==71111.19 - Post-Maintenance Testing==
===Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)===
===Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)===
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
Line 137: Line 165:


==71111.20 - Refueling and Other Outage Activities==
==71111.20 - Refueling and Other Outage Activities==
===Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated refueling outage 20 (began March 21, 2020) activities that continued during the inspection period through August 5, 2020.


===Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated refueling outage 20 (began March 21, 2020) activities that          continued during the inspection period through August 5, 2020.
==71111.22 - Surveillance Testing==
==71111.22 - Surveillance Testing==
 
The inspectors evaluated the following surveillance tests:  
The inspectors evaluated the following surveillance tests:


===Surveillance Tests (other) (IP Section 03.01)===
===Surveillance Tests (other) (IP Section 03.01)===
Line 150: Line 177:
: (3) HPCI low pressure testing during the week ending August 1, 2020
: (3) HPCI low pressure testing during the week ending August 1, 2020
: (4) Recirculation system performance data collection and speed limiter setpoint determination during the week ending August 22, 2020
: (4) Recirculation system performance data collection and speed limiter setpoint determination during the week ending August 22, 2020
: (5) Reactor water cleanup area temperature and isolation logic testing during the week ending September 30, 2020
: (5) Reactor water cleanup area temperature and isolation logic testing during the week ending September 30, 2020  


===Inservice Testing (IP Section 03.01) (2 Samples)===
===Inservice Testing (IP Section 03.01) (2 Samples)===
Line 157: Line 184:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
The inspectors verified licensee performance indicators submittals listed below:  
MS08: Heat Removal Systems (IP Section 02.07) ===
 
MS08: Heat Removal Systems (IP Section 02.07)===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
: (1) Unit 2 (July 2019 - June 2020)
: (1) Unit 2 (July 2019 - June 2020)  


===MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)===
===MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)===
: (1) Unit 2 (July 2019 - June 2020)
: (1) Unit 2 (July 2019 - June 2020)  


===MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)===
===MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)===
Line 170: Line 199:


==71152 - Problem Identification and Resolution==
==71152 - Problem Identification and Resolution==
===Semiannual Trend Review (IP Section 02.02) (1 Sample)===
===Semiannual Trend Review (IP Section 02.02) (1 Sample)===
: (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in plant configuration control that might be indicative of a more significant safety issue
: (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in plant configuration control that might be indicative of a more significant safety issue  


===Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)===
===Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)===
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Nuclear material control and accounting of traverse in-core probes not marked as radioactive material stored in warehouse B during the week ending July 25, 2020
: (1) Nuclear material control and accounting of traverse in-core probes not marked as radioactive material stored in warehouse B during the week ending July 25, 2020
: (2) Reactor core isolation cooling system exhaust vacuum breaker line check valve surveillance test failure due to repeat test line plugging during the week ending August 22, 2020
: (2) Reactor core isolation cooling system exhaust vacuum breaker line check valve surveillance test failure due to repeat test line plugging during the week ending August 22, 2020  


===71153 - Followup of Events and Notices of Enforcement Discretion Event Followup (IP Section 03.01) ===
===71153 - Followup of Events and Notices of Enforcement Discretion Event Followup (IP Section 03.01)===
{{IP sample|IP=IP 71153|count=1}}
{{IP sample|IP=IP 71153|count=1}}
: (1) The inspectors evaluated the licensee's immediate actions following a Division 2 loss of offsite power and Division 2 emergency diesel generator 13 and 14 automatic actuation as a result of a mayfly infestation in the 345-kilovolt switchyard (NRC event notification 54761) during the week ending July 4, 2020
: (1) The inspectors evaluated the licensee's immediate actions following a Division 2 loss of offsite power and Division 2 emergency diesel generator 13 and 14 automatic actuation as a result of a mayfly infestation in the 345-kilovolt switchyard (NRC event notification 54761) during the week ending July 4, 2020  


===Event Report (IP Section 03.02) (1 Sample)===
===Event Report (IP Section 03.02) (1 Sample)===
Line 188: Line 216:


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Observation: Adverse Configuration Control Trend                                       71152 Controlling plant configuration of SSCs is an important aspect to maintaining plant design functions and defense-in-depth (e.g., multiple trains or divisions of SSCs or multiple SSCs to perform the same design function). A mispositioned SSC has the potential to adversely impact plant equipment resulting in problems that could cause initiating events or impact the availability and functional capability of mitigating SSCs or barriers. During calendar year 2020, the licensee identified a continuation of an adverse trend of configuration control issues, often referred to as plant status control or component mispositioning. The licensee entered the trend into their corrective action program along with the various individual configuration control issues. Some configuration control event examples included, but were not limited to:
Observation: Adverse Configuration Control Trend 71152 Controlling plant configuration of SSCs is an important aspect to maintaining plant design functions and defense-in-depth (e.g., multiple trains or divisions of SSCs or multiple SSCs to perform the same design function). A mispositioned SSC has the potential to adversely impact plant equipment resulting in problems that could cause initiating events or impact the availability and functional capability of mitigating SSCs or barriers. During calendar year 2020, the licensee identified a continuation of an adverse trend of configuration control issues, often referred to as plant status control or component mispositioning. The licensee entered the trend into their corrective action program along with the various individual configuration control issues. Some configuration control event examples included, but were not limited to:
* On January 20, 2020, a licensed operator placed drywell cooling fan #2 CMC switch in run vice auto during a planned dedicated shutdown panel surveillance test. A peer check (informal concurrent verification) by another licensed operator did not ensure the procedure was followed. There were no adverse plant impacts as the drywell cooling fan was being manipulated off and on during a planned surveillance test and was turned on as desired but with the switch not in the intended position. [CARD 20-20646]
* On January 20, 2020, a licensed operator placed drywell cooling fan #2 CMC switch in run vice auto during a planned dedicated shutdown panel surveillance test. A peer check (informal concurrent verification) by another licensed operator did not ensure the procedure was followed. There were no adverse plant impacts as the drywell cooling fan was being manipulated off and on during a planned surveillance test and was turned on as desired but with the switch not in the intended position. [CARD 20-20646]
* On February 27, 2020, a non-licensed operator re-installed the electric fire pump contactor in the closed position (vice open) to restore the system from planned maintenance and the electric fire pump automatically started. The procedures for system restoration did not provide specific guidance to ensure the contactor was open prior to installation. There were no adverse impacts to the plant as the electric fire pump had not yet been declared functional and an auto-start of the electric fire pump does not impair the ability of the fire protection system to perform its intended function. [CARD 20-22199]
* On February 27, 2020, a non-licensed operator re-installed the electric fire pump contactor in the closed position (vice open) to restore the system from planned maintenance and the electric fire pump automatically started. The procedures for system restoration did not provide specific guidance to ensure the contactor was open prior to installation. There were no adverse impacts to the plant as the electric fire pump had not yet been declared functional and an auto-start of the electric fire pump does not impair the ability of the fire protection system to perform its intended function. [CARD 20-22199]
* On March 26, 2020, a non-licensed operator opened a 120 volt alternating current (VAC) circuit breaker in the incorrect panel - H11P926 instead of H11P927 (both 120 VAC balance of plant distribution panels for the integrated plant computer system
* On March 26, 2020, a non-licensed operator opened a 120 volt alternating current (VAC) circuit breaker in the incorrect panel - H11P926 instead of H11P927 (both 120 VAC balance of plant distribution panels for the integrated plant computer system  
        [IPCS]) - while performing a clearance and tagging evolution to provide worker protection for the IPCS replacement project. The operators in the field did not perform a concurrent verification as discussed during the pre-job brief. There were no adverse plant impacts as the plant was in hot shutdown (Mode 3) and the plant computer was planned to be removed from service for planned replacement. [CARD 20-23288]
[IPCS]) - while performing a clearance and tagging evolution to provide worker protection for the IPCS replacement project. The operators in the field did not perform a concurrent verification as discussed during the pre-job brief. There were no adverse plant impacts as the plant was in hot shutdown (Mode 3) and the plant computer was planned to be removed from service for planned replacement. [CARD 20-23288]
* On May 29, 2020, instrumentation and control technicians installed a jumper in the incorrect auxiliary trip unit (D11K607B for off-gas radiation monitor 'B' instead of D11K607C for radwaste effluent radiation monitor) during planned radwaste effluent monitor functional testing. The result was the off-gas radiation monitor 'B' was rendered non-functional instead of the radwaste effluent monitor. The technicians did not perform a proper concurrent verification to ensure they were on the correct component. There were no adverse plant impacts as the off-gas system was out-of-service and the off-gas radiation monitor was not required while the plant was defueled (no mode). [CARD 20-26280]
* On May 29, 2020, instrumentation and control technicians installed a jumper in the incorrect auxiliary trip unit (D11K607B for off-gas radiation monitor 'B' instead of D11K607C for radwaste effluent radiation monitor) during planned radwaste effluent monitor functional testing. The result was the off-gas radiation monitor 'B' was rendered non-functional instead of the radwaste effluent monitor. The technicians did not perform a proper concurrent verification to ensure they were on the correct component. There were no adverse plant impacts as the off-gas system was out-of-service and the off-gas radiation monitor was not required while the plant was defueled (no mode). [CARD 20-26280]
* On July 28, 2020, instrumentation and control technicians lifted an electrical lead and installed two jumpers in the incorrect panel (Panel H11P613 (Division 1) instead of Panel H11P612 (Division 2)) in the relay room during Division 2 anticipated transient without scram and safety relief valve low-low set reactor vessel pressure functional surveillance testing. The technicians did not perform a concurrent verification as required to ensure they were on the correct component. There were no adverse impacts on plant operation as the plant was in cold shutdown (Mode 4) and outside the Modes of applicability for the associated technical specifications for the specified components. [CARD 20-28744]
* On July 28, 2020, instrumentation and control technicians lifted an electrical lead and installed two jumpers in the incorrect panel (Panel H11P613 (Division 1) instead of Panel H11P612 (Division 2)) in the relay room during Division 2 anticipated transient without scram and safety relief valve low-low set reactor vessel pressure functional surveillance testing. The technicians did not perform a concurrent verification as required to ensure they were on the correct component. There were no adverse impacts on plant operation as the plant was in cold shutdown (Mode 4) and outside the Modes of applicability for the associated technical specifications for the specified components. [CARD 20-28744]
* On August 7, 2020, the main turbine lube oil upper heat exchanger inlet valve was discovered open allowing bypass flow around the lower heat exchanger that was in-service. The main turbine lube oil system valve line up procedure did not contain sufficient guidance to ensure the associated general service water system valves were in the correct position. As a result, while operating at approximately 35 percent rated thermal power, the turbine lube oil temperature control valve controller indicated full open with turbine lube oil temperatures higher than expected given plant conditions at reduced power. There were no adverse impacts on main turbine operation as the lube oil temperature did not exceed procedural limits.
* On August 7, 2020, the main turbine lube oil upper heat exchanger inlet valve was discovered open allowing bypass flow around the lower heat exchanger that was in-service. The main turbine lube oil system valve line up procedure did not contain sufficient guidance to ensure the associated general service water system valves were in the correct position. As a result, while operating at approximately 35 percent rated thermal power, the turbine lube oil temperature control valve controller indicated full open with turbine lube oil temperatures higher than expected given plant conditions at reduced power. There were no adverse impacts on main turbine operation as the lube oil temperature did not exceed procedural limits.


        [CARD 20-29105]
[CARD 20-29105]  
 
The inspectors noted several additional examples that were not formally classified as plant status control events per licensee procedure MOP 05, Control of Equipment, (did not meet threshold for various reasons) but indicated continued challenges with configuration control.
The inspectors noted several additional examples that were not formally classified as plant status control events per licensee procedure MOP 05, Control of Equipment, (did not meet threshold for various reasons) but indicated continued challenges with configuration control.


Line 205: Line 234:
There were no adverse impacts to plant operation as the system was under maintenance and not required while the plant was defueled. [CARD 20-24552]
There were no adverse impacts to plant operation as the system was under maintenance and not required while the plant was defueled. [CARD 20-24552]
* On April 25, 2020, a shorting link was discovered installed across the incorrect terminal block terminals on a 24-volt direct current power supply for the replacement IPCS. The issue was believed to have occurred during reassembly and installation of the terminal blocks during refueling outage 20 (began March 21, 2020). There were no adverse impacts to plant operation as IPCS was out-of-service for planned replacement while the plant was defueled. [CARD 20-25183]
* On April 25, 2020, a shorting link was discovered installed across the incorrect terminal block terminals on a 24-volt direct current power supply for the replacement IPCS. The issue was believed to have occurred during reassembly and installation of the terminal blocks during refueling outage 20 (began March 21, 2020). There were no adverse impacts to plant operation as IPCS was out-of-service for planned replacement while the plant was defueled. [CARD 20-25183]
* On April 30, 2020, a temporary HVAC vent valve was discovered in the open position that partially drained chill water from an in-service cooler in support of temporary torus area ventilation. The component was believed to have been bumped. There were no adverse impacts to plant operation as there were multiple temporary HVAC systems for the torus which was out of service for planned maintenance while the plant was defueled. [CARD 20-25470]
* On April 30, 2020, a temporary HVAC vent valve was discovered in the open position that partially drained chill water from an in-service cooler in support of temporary torus area ventilation. The component was believed to have been bumped. There were no adverse impacts to plant operation as there were multiple temporary HVAC systems for the torus which was out of service for planned maintenance while the plant was defueled. [CARD 20-25470]  
 
The inspectors noted most configuration control issues involved human performance errors in not following a procedure or process. Not performing concurrent verifications properly was a common contributor. These contributors were similar to those associated with the previously identified adverse configuration control trend documented in NRC Integrated Inspection Report 2019004 (ADAMS Accession: ML20038A340). The previous corrective actions included additional configuration control questions embedded into pre-job briefings. At the end of this inspection period, a common cause evaluation of the various configuration control events was in-progress as a corrective action to address the adverse trend.
The inspectors noted most configuration control issues involved human performance errors in not following a procedure or process. Not performing concurrent verifications properly was a common contributor. These contributors were similar to those associated with the previously identified adverse configuration control trend documented in NRC Integrated Inspection Report 2019004 (ADAMS Accession: ML20038A340). The previous corrective actions included additional configuration control questions embedded into pre-job briefings. At the end of this inspection period, a common cause evaluation of the various configuration control events was in-progress as a corrective action to address the adverse trend.


Line 216: Line 246:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation       Description or Title                                     Revision or
Inspection
Procedure                                                                                                Date
Procedure
71111.04   Drawings         M-2035           HPCI Reactor Building                                     BO
Type
71111.04   Drawings         M-2043           Barometric Condenser (HPCI) Reactor Building             AJ
Designation
71111.04   Drawings         M-2082           Standby Liquid Control System                             AB
Description or Title
71111.04   Drawings         M-2979-1         Standby Liquid Control Pump Discharge Line to Drywell     M
Revision or
Date
71111.04
Drawings
M-2035
HPCI Reactor Building
BO
71111.04
Drawings
M-2043
Barometric Condenser (HPCI) Reactor Building
AJ
71111.04
Drawings
M-2082
Standby Liquid Control System
AB
71111.04
Drawings
M-2979-1
Standby Liquid Control Pump Discharge Line to Drywell
Penetration and Test Tank Piping Isometric
Penetration and Test Tank Piping Isometric
71111.04   Drawings         M-3361-1         Standby Liquid Control Pump Suction Piping Isometric     P
M
71111.04   Drawings         M-5704           Standby Liquid Control System Functional Operating       J
71111.04
Drawings
M-3361-1
Standby Liquid Control Pump Suction Piping Isometric
P
71111.04
Drawings
M-5704
Standby Liquid Control System Functional Operating
Sketch
Sketch
71111.04   Drawings         M-5729-1         Emergency Equipment Cooling Water (Division 1) FOS       BL
J
71111.04   Procedures       23.127 Attachment Div 1 EECW Valve Lineup                                  06/22/2020
71111.04
Drawings
M-5729-1
Emergency Equipment Cooling Water (Division 1) FOS
BL
71111.04
Procedures
23.127 Attachment
1A
1A
71111.04   Procedures       23.139           Standby Liquid Control System                             51
Div 1 EECW Valve Lineup
71111.04   Procedures       24.139.02         SLC Pump and Check Valve Operability Test                 51
06/22/2020
71111.05   Corrective Action 06-24957         CO2 Actuation Zone 9A Cable Tray Area                     07/31/2006
71111.04
Procedures
23.139
Standby Liquid Control System
71111.04
Procedures
24.139.02
SLC Pump and Check Valve Operability Test
71111.05
Corrective Action
Documents
06-24957
CO2 Actuation Zone 9A Cable Tray Area
07/31/2006
71111.05
Corrective Action
Documents
Documents
71111.05  Corrective Action 20-28405         Fire Brigade Annual Live Burn Requirement will go         07/20/2020
20-28405
Documents                          Overdue due to COVID-10 on 08/22/2020
Fire Brigade Annual Live Burn Requirement will go
71111.05   Corrective Action 20-28932          Zone 9A Fire Alarm                                        08/03/2020
Overdue due to COVID-10 on 08/22/2020
07/20/2020
71111.05
Corrective Action
Documents
Documents
71111.05  Corrective Action 20-29684          Exclusion Zone Evaluation                                08/27/2020
20-28932
Zone 9A Fire Alarm
08/03/2020
71111.05
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.05   Engineering       FPEE-04-0009     Reactor Building First Floor Drywell Access and Valve     0
20-29684
Evaluations                        Room
Exclusion Zone Evaluation
71111.05   Fire Plans       FB-AB-5-16D       Auxiliary Building Division 1 Control Center Heating,     3
08/27/2020
71111.05
Engineering
Evaluations
FPEE-04-0009
Reactor Building First Floor Drywell Access and Valve
Room
71111.05
Fire Plans
FB-AB-5-16D
Auxiliary Building Division 1 Control Center Heating,
Ventilating, and Air Conditioning System Equipment Room,
Ventilating, and Air Conditioning System Equipment Room,
Zone 16, El. 677' 6"
Zone 16, El. 677' 6"
71111.05   Fire Plans       FP-AB-2-2M-9A     Auxiliary Building, Second Floor Mezzanine, Zone 9A, El. 7
71111.05
Fire Plans
FP-AB-2-2M-9A
Auxiliary Building, Second Floor Mezzanine, Zone 9A, El.
631'0"
631'0"
71111.05   Fire Plans       FP-AB-3-14E       Auxiliary Building, Division II Switchgear Room, Zone 14, 3
71111.05
El. 643' 6"
Fire Plans
Inspection Type             Designation   Description or Title                                       Revision or
FP-AB-3-14E
Procedure                                                                                              Date
Auxiliary Building, Division II Switchgear Room, Zone 14,
71111.05   Fire Plans       FP-AB-3-14F   Auxiliary Building, DC Motor Control Center (MCC) Room,     6
El. 643' 6"  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.05
Fire Plans
FP-AB-3-14F
Auxiliary Building, DC Motor Control Center (MCC) Room,
Zone 14, El. 643' 6"
Zone 14, El. 643' 6"
71111.05   Fire Plans       FP-AB-4-16C   Auxiliary Building Ventilation Equipment Room, Zone 16,     5
71111.05
Fire Plans
FP-AB-4-16C
Auxiliary Building Ventilation Equipment Room, Zone 16,
El. 659' 6"
El. 659' 6"
71111.05   Fire Plans       FP-AB-5-16A   Auxiliary Building North Standby Gas Treatment (SGTS)       4
71111.05
Fire Plans
FP-AB-5-16A
Auxiliary Building North Standby Gas Treatment (SGTS)
Room, Zone 16, El. 677' 6"
Room, Zone 16, El. 677' 6"
71111.05   Fire Plans       FP-AB-5-16B   Auxiliary Building South Standby Gas Treatment System       3
71111.05
                                          (SGTS) Room, Zone 16, El. 677' 6"
Fire Plans
71111.05   Fire Plans       FP-AB-5-16E   Auxiliary Building Division 2 Control Center Heating,       2
FP-AB-5-16B
Auxiliary Building South Standby Gas Treatment System  
(SGTS) Room, Zone 16, El. 677' 6"
71111.05
Fire Plans
FP-AB-5-16E
Auxiliary Building Division 2 Control Center Heating,
Ventilating, and Air Conditioning System Equipment Room,
Ventilating, and Air Conditioning System Equipment Room,
Zone 16, El. 677' 6"
Zone 16, El. 677' 6"
71111.05   Fire Plans       FP-AB-5-16F   Auxiliary Building, Fifth Floor Ventilation Equipment Room, 4
71111.05
Fire Plans
FP-AB-5-16F
Auxiliary Building, Fifth Floor Ventilation Equipment Room,
Zone 16, El. 677' 0"
Zone 16, El. 677' 0"
71111.05   Fire Plans       FP-TB         Turbine Building                                           11
71111.05
71111.05   Miscellaneous   DBD P80/P82-00 Design Basis Document for Fire Protection/Detection         E
Fire Plans
FP-TB
Turbine Building
71111.05
Miscellaneous
DBD P80/P82-00
Design Basis Document for Fire Protection/Detection
Systems
Systems
71111.05   Miscellaneous   LP-FP-940-1123 Fire Drill (Tabletop / Walkthrough) Reactor Feed Pump       0
E
71111.05
Miscellaneous
LP-FP-940-1123
Fire Drill (Tabletop / Walkthrough) Reactor Feed Pump
Lube Oil Reservoir, 1st Floor Turbine Building, El. 583'-
Lube Oil Reservoir, 1st Floor Turbine Building, El. 583'-
6"/Zone 19/Class B
6"/Zone 19/Class B
71111.05   Procedures       MES35         Fire Protection                                             11
71111.05
71111.05   Procedures       MOP10         Fire Brigade                                               11
Procedures
71111.11Q Corrective Action 20-29519      Fermi 2 Site Experienced a Seismic Event                    08/21/2020
MES35
Fire Protection
71111.05
Procedures
MOP10
Fire Brigade
71111.11Q Corrective Action
Documents
Documents
71111.11Q Miscellaneous     SS-OP-202-2028 Classification of Emergency Event #3                       1
20-29519
71111.11Q Miscellaneous     SS-OP-202-2029 Classification of Emergency Event #4                       1
Fermi 2 Site Experienced a Seismic Event
71111.11Q Procedures       20.000.01     Acts of Nature                                             55
08/21/2020
71111.11Q Procedures       20.109.01     Turbine/Generator Trip                                     20
71111.11Q Miscellaneous
71111.11Q Procedures       20.300.SBO     Loss of Onsite and Offsite Power                           29
SS-OP-202-2028
71111.11Q Procedures       22.000.02     Plant Startup to 25% Power                                 104
Classification of Emergency Event #3
71111.11Q Procedures       23.109         Turbine Operating Procedure                                 95
71111.11Q Miscellaneous
71111.11Q Procedures       23.118         Main Generator and Generator Excitation                     69
SS-OP-202-2029
71111.11Q Procedures       23.612         Seismic Monitoring                                         20A
Classification of Emergency Event #4
71111.11Q Procedures       23.623         Reactor Manual Control System                               74
71111.11Q Procedures
71111.11Q Procedures       EP-101         Classification of Emergencies                               43A
20.000.01
Inspection Type             Designation   Description or Title                                       Revision or
Acts of Nature
Procedure                                                                                              Date
71111.11Q Procedures
71111.11Q Procedures         SS-OP-202-2004 Licensed Operator Training Simulator Lesson Plan           0
20.109.01
71111.12   Corrective Action 20-20577      CARD 18-20491 not Completed per MQA11 Expectations        01/17/2020
Turbine/Generator Trip
71111.11Q Procedures
20.300.SBO
Loss of Onsite and Offsite Power
71111.11Q Procedures
2.000.02
Plant Startup to 25% Power
104
71111.11Q Procedures
23.109
Turbine Operating Procedure
71111.11Q Procedures
23.118
Main Generator and Generator Excitation
71111.11Q Procedures
23.612
Seismic Monitoring
20A
71111.11Q Procedures
23.623
Reactor Manual Control System
71111.11Q Procedures
EP-101
Classification of Emergencies
43A  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.11Q Procedures
SS-OP-202-2004
Licensed Operator Training Simulator Lesson Plan
71111.12
Corrective Action
Documents
Documents
71111.12   Corrective Action 20-20769       NQA Audit Deficiency - Issues Identified with Augmented   01/23/2020
20-20577
Documents                        Quality Procurements
CARD 18-20491 not Completed per MQA11 Expectations
71111.12   Corrective Action 20-21093       NQA Audit Deficiency- PQCE Non-Safety-Related             01/30/2020
01/17/2020
Documents                        Justification Inadequate for IRM G Connector Assembly
71111.12
71111.12   Corrective Action 20-22088       Program Oversight Intrusiveness not Sufficient to Detect   02/25/2020
Corrective Action
Documents                        Degrading Standards Affecting the Quality and Availability
Documents
20-20769
NQA Audit Deficiency - Issues Identified with Augmented
Quality Procurements
01/23/2020
71111.12
Corrective Action
Documents
20-21093
NQA Audit Deficiency-PQCE Non-Safety-Related
Justification Inadequate for IRM G Connector Assembly
01/30/2020
71111.12
Corrective Action
Documents
20-22088
Program Oversight Intrusiveness not Sufficient to Detect
Degrading Standards Affecting the Quality and Availability
of Safety-Related Parts
of Safety-Related Parts
71111.12   Engineering       100290741     Technical Evaluation Document for Part Number 1573-       05/17/2020
2/25/2020
Evaluations                      R61AV000
71111.12
71111.12   Engineering       100333561     Technical Evaluation Document for Disc Retaining Gag       04/21/2020
Engineering
Evaluations                      Device
Evaluations
71111.12   Engineering       53375119       Application Evaluation Document for Part Number           03/21/2019
100290741
Evaluations                      Amphenol MS3106 A 28-21
Technical Evaluation Document for Part Number 1573-
71111.12   Engineering       56469285       Application Evaluation Document for Part Number DC-113     01/28/2020
R61AV000
Evaluations                      or NC-711
05/17/2020
71111.12   Engineering       DC-6731       Reactor Pressure Vessel Water Inventory Control Drain     0
71111.12
Evaluations                      Times
Engineering
71111.13   Corrective Action 20-27421       HCU 30-51 will not Charge Water Side of Cylinder           06/29/2020
Evaluations
100333561
Technical Evaluation Document for Disc Retaining Gag
Device
04/21/2020
71111.12
Engineering
Evaluations
53375119
Application Evaluation Document for Part Number
Amphenol MS3106 A 28-21
03/21/2019
71111.12
Engineering
Evaluations
56469285
Application Evaluation Document for Part Number DC-113
or NC-711
01/28/2020
71111.12
Engineering
Evaluations
DC-6731
Reactor Pressure Vessel Water Inventory Control Drain
Times
71111.13
Corrective Action
Documents
20-27421
HCU 30-51 will not Charge Water Side of Cylinder
06/29/2020
71111.13
Corrective Action
Documents
Documents
71111.13  Corrective Action 20-27548       CECO QA Level Classification for HCU CRD Charging         07/02/2020
20-27548
Documents                        Water Isolation Valves Incorrect
CECO QA Level Classification for HCU CRD Charging
71111.13   Corrective Action 20-29298      Loss of Recirc System DCS                                  08/13/2020
Water Isolation Valves Incorrect
07/02/2020
71111.13
Corrective Action
Documents
Documents
71111.13  Corrective Action 20-30180      Abnormal Speed Changes on South RFPT                      09/13/2020
20-29298
Loss of Recirc System DCS
08/13/2020
71111.13
Corrective Action
Documents
Documents
71111.13   Drawings         M-2081         Control Rod Drive Hydraulic System Reactor Building Part   AX
20-30180
Abnormal Speed Changes on South RFPT
09/13/2020
71111.13
Drawings
M-2081
Control Rod Drive Hydraulic System Reactor Building Part
of 2
of 2
71111.13   Drawings         M-5810-1       Classification Boundary Drawing Control Rod Drive ISI-CH- AA
AX
71111.13   Miscellaneous     DBD B31-00     Design Basis Document for the Reactor Recirculation       B
71111.13
Drawings
M-5810-1
Classification Boundary Drawing Control Rod Drive ISI-CH-
AA
71111.13
Miscellaneous
DBD B31-00
Design Basis Document for the Reactor Recirculation
System
System
Inspection Type             Designation   Description or Title                                       Revision or
B
Procedure                                                                                              Date
 
71111.13   Procedures       20.107.01     Loss of Feedwater or Feedwater Control                     31
Inspection
71111.13   Procedures       23.106         Control Rod Drive Hydraulic System                         117
Procedure
71111.13   Procedures       MMA26002       Troubleshooting Plan for CARD 20-30180                     2
Type
71111.13   Procedures       MMR Appendix H On-line Core Damage Risk Management Guidelines             15
Designation
71111.13   Procedures       MMR12         Equipment Out-of-Service Risk Management                   20A
Description or Title
71111.13   Procedures       MWC15001       Risk Management Plan: Visual Inspection of SRFP           09/23/2020
Revision or
Date
71111.13
Procedures
20.107.01
Loss of Feedwater or Feedwater Control
71111.13
Procedures
23.106
Control Rod Drive Hydraulic System
117
71111.13
Procedures
MMA26002
Troubleshooting Plan for CARD 20-30180
71111.13
Procedures
MMR Appendix H
On-line Core Damage Risk Management Guidelines
71111.13
Procedures
MMR12
Equipment Out-of-Service Risk Management
20A
71111.13
Procedures
MWC15001
Risk Management Plan: Visual Inspection of SRFP
Governor Linkage After Cover Removal
Governor Linkage After Cover Removal
71111.13   Work Orders       57845891       HCU 30-51 will not Charge Water Side of Cylinder           07/01/2020
09/23/2020
71111.15   Calculations     DC-4921 Vol I Appendix R Calculations                                   I
71111.13
71111.15   Corrective Action 20-21597       EDG 14 Lube Oil Sump Level High                           02/12/2020
Work Orders
57845891
HCU 30-51 will not Charge Water Side of Cylinder
07/01/2020
71111.15
Calculations
DC-4921 Vol I
Appendix R Calculations
I
71111.15
Corrective Action
Documents
20-21597
EDG 14 Lube Oil Sump Level High
2/12/2020
71111.15
Corrective Action
Documents
20-25697
Fire Barrier Inspection Procedure 28.507.01 does not Fully
Align with DC-4921 Rev 1
05/12/2020
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action 20-25697      Fire Barrier Inspection Procedure 28.507.01 does not Fully 05/12/2020
20-25829
Documents                        Align with DC-4921 Rev 1
Cable Trays Require Covers Installed
71111.15  Corrective Action 20-25829      Cable Trays Require Covers Installed                       05/16/2020
05/16/2020
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action 20-26717       Roll up CARD for Torus Structural Repairs Past Operability 06/09/2020
20-26717
Roll up CARD for Torus Structural Repairs Past Operability
06/09/2020
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action 20-27443       Torus Vent Header Inspection                               06/29/2020
20-27443
Torus Vent Header Inspection
06/29/2020
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action 20-27717       EDG 14 Oil Sump Level HOOS                                 07/07/2020
20-27717
EDG 14 Oil Sump Level HOOS
07/07/2020
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action 20-28865       Div 2 Drywell Temperature High Alarm due to Point 5       08/01/2020
20-28865
Div 2 Drywell Temperature High Alarm due to Point 5
08/01/2020
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action 20-28899       Received Annunciator 8D41, Division 1 Drywell             08/03/2020
20-28899
Documents                        Temperature High
Received Annunciator 8D41, Division 1 Drywell
71111.15   Corrective Action 20-28926      Secondary Containment Isolation                            08/03/2020
Temperature High
08/03/2020
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action 20-29126      Unable to Download CTP to PRNM                            08/09/2020
20-28926
Secondary Containment Isolation
08/03/2020
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action 20-29142      Div 2 Drywell Temperature High in and Clear for Point 8    08/09/2020
20-29126
Unable to Download CTP to PRNM
08/09/2020
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action 20-29828      Evaluate Alarm Set Point Change for Hi Drywell Temps      09/01/2020
20-29142
Div 2 Drywell Temperature High in and Clear for Point 8
08/09/2020
71111.15
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection Type              Designation    Description or Title                                    Revision or
20-29828
Procedure                                                                                            Date
Evaluate Alarm Set Point Change for Hi Drywell Temps
09/01/2020
 
Inspection
Inspection
71111.15   Drawings         I-2045-01     Internal/External Wiring Diagram Process Rad. Monitoring P
Procedure
Type
Designation
Description or Title
Revision or
Date
Inspection
71111.15
Drawings
I-2045-01
Internal/External Wiring Diagram Process Rad. Monitoring
Rack H11P604
Rack H11P604
71111.15   Drawings         I-2185-01     Process Radiation Monitoring Distribution               AE
P
71111.15   Drawings         M-5734         Emergency Diesel Generator System Functional Operating   BL
71111.15
Drawings
I-2185-01
Process Radiation Monitoring Distribution
AE
71111.15
Drawings
M-5734
Emergency Diesel Generator System Functional Operating
Sketch
Sketch
71111.15   Drawings         SD-2530-17     48/24V DC Instrumentation Battery Distribution           AM
BL
71111.15   Engineering       EFA-T23-20-002 Evaluation of Vent Header RF-20 As-Left Condition on     0
71111.15
Evaluations                      Torus Systems
Drawings
71111.15   Miscellaneous     DBD D11-00     Design Basis Document for the Process Radiation         B
SD-2530-17
48/24V DC Instrumentation Battery Distribution
AM
71111.15
Engineering
Evaluations
EFA-T23-20-002
Evaluation of Vent Header RF-20 As-Left Condition on
Torus Systems
71111.15
Miscellaneous
DBD D11-00
Design Basis Document for the Process Radiation
Monitoring System
Monitoring System
71111.15   Procedures       28.507.01     Fire Barrier Inspection                                 13
B
71111.15   Work Orders       57425028       Cable Trays Require Covers Installed                     07/08/2020
71111.15
71111.19   Corrective Action 20-27171       Indication Found in Bay 10 of Torus Proper               06/23/2020
Procedures
28.507.01
Fire Barrier Inspection
71111.15
Work Orders
57425028
Cable Trays Require Covers Installed
07/08/2020
71111.19
Corrective Action
Documents
20-27171
Indication Found in Bay 10 of Torus Proper
06/23/2020
71111.19
Corrective Action
Documents
20-27699
IPCS Points not Outputting as Expected
07/06/2020
71111.19
Corrective Action
Documents
20-27738
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/07/2020
71111.19
Corrective Action
Documents
20-27751
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/07/2020
71111.19
Corrective Action
Documents
20-27754
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/07/2020
71111.19
Corrective Action
Documents
20-27755
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/07/2020
71111.19
Corrective Action
Documents
20-27756
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/07/2020
71111.19
Corrective Action
Documents
20-27757
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/07/2020
71111.19
Corrective Action
Documents
20-27758
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/07/2020
71111.19
Corrective Action
Documents
20-27759
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/07/2020
71111.19
Corrective Action
20-27762
RF20 ASME Section XI Torus Vent Header Unacceptable
07/07/2020
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Indication
71111.19
Corrective Action
Documents
20-27763
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27764
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27765
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27767
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27768
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27769
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27770
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27771
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27772
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27773
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27774
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27775
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27776
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27777
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27778
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27779
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
20-27780
RF20 ASME Section XI Torus Vent Header Unacceptable
07/08/2019
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Indication
71111.19
Corrective Action
Documents
20-27781
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27782
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27817
RF20 ASME Section XI Torus Vent Header Reportable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27818
RF20 ASME Section XI Torus Vent Header Reportable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27819
RF20 ASME Section XI Torus Vent Header Reportable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27820
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/08/2020
71111.19
Corrective Action
Documents
20-27827
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/09/2020
71111.19
Corrective Action
Documents
20-27828
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/09/2020
71111.19
Corrective Action
Documents
20-27829
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/09/2020
71111.19
Corrective Action
Documents
20-27830
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication
07/09/2020
71111.19
Corrective Action
Documents
20-27836
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication Bay 5
07/09/2020
71111.19
Corrective Action
Documents
20-27838
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication Bay 5
07/09/2020
71111.19
Corrective Action
Documents
20-27839
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication Bay 5
07/09/2020
71111.19
Corrective Action
Documents
20-27845
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication Bay 5
07/09/2020
71111.19
Corrective Action
Documents
20-27846
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication Bay 5
07/09/2020
71111.19
Corrective Action
Documents
Documents
71111.19   Corrective Action 20-27699      IPCS Points not Outputting as Expected                  07/06/2020
20-27849
RF20 ASME Section XI Torus Vent Header Unacceptable
Indication Bay 5
07/09/2020
71111.19
Corrective Action
20-27850
RF20 ASME Section XI Torus Vent Header Unacceptable
07/09/2020  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Documents
71111.19  Corrective Action 20-27738      RF20 ASME Section XI Torus Vent Header Unacceptable      07/07/2020
Indication Bay 5
Documents                        Indication
71111.19
71111.19   Corrective Action 20-27751      RF20 ASME Section XI Torus Vent Header Unacceptable      07/07/2020
Corrective Action
Documents                        Indication
Documents
71111.19  Corrective Action 20-27754      RF20 ASME Section XI Torus Vent Header Unacceptable      07/07/2020
20-27856
Documents                       Indication
RF20 ASME Section XI Torus Vent Header Unacceptable
71111.19  Corrective Action 20-27755      RF20 ASME Section XI Torus Vent Header Unacceptable      07/07/2020
Indication
Documents                        Indication
07/09/2020
71111.19  Corrective Action 20-27756      RF20 ASME Section XI Torus Vent Header Unacceptable      07/07/2020
71111.19
Documents                        Indication
Corrective Action
71111.19  Corrective Action 20-27757      RF20 ASME Section XI Torus Vent Header Unacceptable      07/07/2020
Documents
Documents                        Indication
20-27861
71111.19  Corrective Action 20-27758      RF20 ASME Section XI Torus Vent Header Unacceptable      07/07/2020
RF20 ASME Section XI Torus Vent Header Unacceptable
Documents                        Indication
Indication
71111.19  Corrective Action 20-27759      RF20 ASME Section XI Torus Vent Header Unacceptable      07/07/2020
07/09/2020
Documents                        Indication
71111.19
71111.19  Corrective Action 20-27762      RF20 ASME Section XI Torus Vent Header Unacceptable      07/07/2020
Corrective Action
Inspection Type              Designation Description or Title                                Revision or
Documents
Procedure                                                                                    Date
20-27865
Documents                    Indication
RF20 ASME Section XI Torus Vent Header Unacceptable
71111.19  Corrective Action 20-27763    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Indication Bay 4
Documents                    Indication
07/09/2020
71111.19  Corrective Action 20-27764    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
71111.19
Documents                    Indication
Corrective Action
71111.19  Corrective Action 20-27765    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Documents
Documents                    Indication
20-28040
71111.19  Corrective Action 20-27767    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Leakage Identified during RF20 RPV System Leakage VT-2
Documents                    Indication
Examination E1150F608 RHR SDC Suction
71111.19  Corrective Action 20-27768    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
07/11/2020
Documents                    Indication
71111.19
71111.19  Corrective Action 20-27769    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Corrective Action
Documents                    Indication
Documents
71111.19  Corrective Action 20-27770    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
20-28042
Documents                    Indication
Leakage Identified during RF20 RPV System Leakage VT-2
71111.19  Corrective Action 20-27771    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Examination E1150F009 RHR Shutdown Cooling
Documents                    Indication
07/11/2020
71111.19  Corrective Action 20-27772    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
71111.19
Documents                    Indication
Corrective Action
71111.19  Corrective Action 20-27773    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Documents
Documents                    Indication
20-28106
71111.19  Corrective Action 20-27774    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
CCHVAC D2 Purge Skid Troubleshooting Installed Piercing
Documents                    Indication
Valves
71111.19  Corrective Action 20-27775    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
08/10/2020
Documents                    Indication
71111.19
71111.19  Corrective Action 20-27776    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Corrective Action
Documents                    Indication
Documents
71111.19  Corrective Action 20-27777    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
20-28401
Documents                    Indication
Damaged Coatings External to Vent Header in Areas of
71111.19  Corrective Action 20-27778    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Welds
Documents                    Indication
07/19/2020
71111.19  Corrective Action 20-27779    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
71111.19
Documents                    Indication
Drawings
71111.19  Corrective Action 20-27780    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2019
I-2042-10
Inspection Type              Designation Description or Title                                Revision or
Transient Monitoring System
Procedure                                                                                    Date
M
Documents                    Indication
71111.19
71111.19  Corrective Action 20-27781    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Drawings
Documents                    Indication
I-2042-15
71111.19  Corrective Action 20-27782    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Transient Monitoring System
Documents                    Indication
N
71111.19  Corrective Action 20-27817    RF20 ASME Section XI Torus Vent Header Reportable  07/08/2020
71111.19
Documents                    Indication
Drawings
71111.19  Corrective Action 20-27818    RF20 ASME Section XI Torus Vent Header Reportable  07/08/2020
I-2042-18
Documents                    Indication
Transient Monitoring System
71111.19  Corrective Action 20-27819    RF20 ASME Section XI Torus Vent Header Reportable  07/08/2020
Q
Documents                    Indication
71111.19
71111.19  Corrective Action 20-27820    RF20 ASME Section XI Torus Vent Header Unacceptable 07/08/2020
Drawings
Documents                    Indication
I-2225-05
71111.19  Corrective Action 20-27827    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
HPSI System Instr. Loop Diagram Turbine Control
Documents                    Indication
AC
71111.19   Corrective Action 20-27828    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
71111.19
Documents                    Indication
Drawings
71111.19  Corrective Action 20-27829    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
M-4325
Documents                     Indication
Water Side and MISC Chiller INST Control Center A/C
71111.19  Corrective Action 20-27830    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
Documents                    Indication
71111.19  Corrective Action 20-27836    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
Documents                    Indication Bay 5
71111.19  Corrective Action 20-27838    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
Documents                    Indication Bay 5
71111.19  Corrective Action 20-27839    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
Documents                    Indication Bay 5
71111.19   Corrective Action 20-27845    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
Documents                    Indication Bay 5
71111.19  Corrective Action 20-27846    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
Documents                     Indication Bay 5
71111.19  Corrective Action 20-27849    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
Documents                    Indication Bay 5
71111.19  Corrective Action 20-27850    RF20 ASME Section XI Torus Vent Header Unacceptable 07/09/2020
Inspection Type              Designation Description or Title                                    Revision or
Procedure                                                                                        Date
Documents                    Indication Bay 5
71111.19  Corrective Action 20-27856    RF20 ASME Section XI Torus Vent Header Unacceptable    07/09/2020
Documents                    Indication
71111.19   Corrective Action 20-27861    RF20 ASME Section XI Torus Vent Header Unacceptable    07/09/2020
Documents                    Indication
71111.19  Corrective Action 20-27865    RF20 ASME Section XI Torus Vent Header Unacceptable    07/09/2020
Documents                     Indication Bay 4
71111.19  Corrective Action 20-28040   Leakage Identified during RF20 RPV System Leakage VT-2 07/11/2020
Documents                    Examination E1150F608 RHR SDC Suction
71111.19   Corrective Action 20-28042   Leakage Identified during RF20 RPV System Leakage VT-2 07/11/2020
Documents                    Examination E1150F009 RHR Shutdown Cooling
71111.19   Corrective Action 20-28106   CCHVAC D2 Purge Skid Troubleshooting Installed Piercing 08/10/2020
Documents                    Valves
71111.19   Corrective Action 20-28401   Damaged Coatings External to Vent Header in Areas of   07/19/2020
Documents                    Welds
71111.19   Drawings         I-2042-10   Transient Monitoring System                             M
71111.19   Drawings         I-2042-15   Transient Monitoring System                             N
71111.19   Drawings         I-2042-18   Transient Monitoring System                             Q
71111.19   Drawings         I-2225-05   HPSI System Instr. Loop Diagram Turbine Control         AC
71111.19   Drawings         M-4325     Water Side and MISC Chiller INST Control Center A/C     AF
System
System
71111.19   Engineering       EDP 80159  Installation of Shrader Valves to T4100B008            0
AF
71111.19
Engineering
Changes
Changes
71111.19   Miscellaneous     19-022     ASME Section XI Repair/Replacement Program/Plan         2
EDP 80159
71111.19   Miscellaneous     A11-3.1     Welding Procedure Specification                         4
Installation of Shrader Valves to T4100B008
71111.19   NDE Reports       20-056     Vent Header Indication Data Sheet for Bay No. 8         07/07/2020
71111.19
71111.19   NDE Reports       20-057     Vent Header Indication Data Sheet for Bay No. 7         07/07/2020
Miscellaneous
71111.19   NDE Reports       20-058     Vent Header Indication Data Sheet for Bay No. 9         07/08/2020
19-022
71111.19   NDE Reports       20-059     Vent Header Indication Data Sheet for Bay No. 5         07/09/2020
ASME Section XI Repair/Replacement Program/Plan
71111.19   NDE Reports       20-060     Vent Header Indication Data Sheet for Bay No. 3         07/09/2020
71111.19
71111.19   NDE Reports       20-061     Vent Header Indication Data Sheet for Bay No. 4         07/09/2020
Miscellaneous
71111.19   NDE Reports       20-062     Vent Header Indication Data Sheet for Bay No. 12       07/09/2020
A11-3.1
71111.19   NDE Reports       20-063     Vent Header Indication Data Sheet for Bay No. 13       07/10/2020
Welding Procedure Specification
Inspection Type             Designation Description or Title                                     Revision or
71111.19
Procedure                                                                                        Date
NDE Reports
71111.19   NDE Reports       20-064     Vent Header Indication Data Sheet for Bay No. 14         07/10/2020
20-056
71111.19   NDE Reports       20-065     Vent Header Indication Data Sheet for Bay No. 11         07/10/2020
Vent Header Indication Data Sheet for Bay No. 8
71111.19   NDE Reports       20-066     Vent Header Indication Data Sheet for Bay No. 15         07/10/2020
07/07/2020
71111.19   NDE Reports       20-067     Vent Header Indication Data Sheet for Bay No. 1         07/10/2020
71111.19
71111.19   NDE Reports       20-068     Vent Header Indication Data Sheet for Bay No. 6         07/12/2020
NDE Reports
71111.19   NDE Reports       20-069     Vent Header Indication Data Sheet for Bay No. 2         07/13/2020
20-057
71111.19   NDE Reports       20-070     Vent Header Indication Data Sheet for Bay No. 10         07/13/2020
Vent Header Indication Data Sheet for Bay No. 7
71111.19   NDE Reports       20-071     Vent Header Indication Data Sheet for Bay No. 16         07/13/2020
07/07/2020
71111.19   Procedures       23.413     Control Center HVAC                                     1
71111.19
71111.19   Procedures       43.000.005 Visual Examination of Piping and Components (VT-2)       37
NDE Reports
71111.19   Procedures       MES49       Evaluation and Control of Leakage from Class 1, 2, and 3 9
20-058
Vent Header Indication Data Sheet for Bay No. 9
07/08/2020
71111.19
NDE Reports
20-059
Vent Header Indication Data Sheet for Bay No. 5
07/09/2020
71111.19
NDE Reports
20-060
Vent Header Indication Data Sheet for Bay No. 3
07/09/2020
71111.19
NDE Reports
20-061
Vent Header Indication Data Sheet for Bay No. 4
07/09/2020
71111.19
NDE Reports
20-062
Vent Header Indication Data Sheet for Bay No. 12
07/09/2020
71111.19
NDE Reports
20-063
Vent Header Indication Data Sheet for Bay No. 13
07/10/2020  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.19
NDE Reports
20-064
Vent Header Indication Data Sheet for Bay No. 14
07/10/2020
71111.19
NDE Reports
20-065
Vent Header Indication Data Sheet for Bay No. 11
07/10/2020
71111.19
NDE Reports
20-066
Vent Header Indication Data Sheet for Bay No. 15
07/10/2020
71111.19
NDE Reports
20-067
Vent Header Indication Data Sheet for Bay No. 1
07/10/2020
71111.19
NDE Reports
20-068
Vent Header Indication Data Sheet for Bay No. 6
07/12/2020
71111.19
NDE Reports
20-069
Vent Header Indication Data Sheet for Bay No. 2
07/13/2020
71111.19
NDE Reports
20-070
Vent Header Indication Data Sheet for Bay No. 10
07/13/2020
71111.19
NDE Reports
20-071
Vent Header Indication Data Sheet for Bay No. 16
07/13/2020
71111.19
Procedures
23.413
Control Center HVAC
71111.19
Procedures
43.000.005
Visual Examination of Piping and Components (VT-2)
71111.19
Procedures
MES49
Evaluation and Control of Leakage from Class 1, 2, and 3
Piping Systems
Piping Systems
71111.19   Procedures       QCP-9.1.6- Torus Class MC Metal Containment Examination - RF20     0
71111.19
NUC2019138  prior to Recoat
Procedures
71111.19   Work Orders       52140857    Perform 43.000.005 Visual Exam (VT-2) during Reactor     7/11/2020
QCP-9.1.6-
NUC2019138
Torus Class MC Metal Containment Examination - RF20
prior to Recoat
71111.19
Work Orders
2140857
Perform 43.000.005 Visual Exam (VT-2) during Reactor
Vessel System Leakage Test
Vessel System Leakage Test
71111.19   Work Orders       57452929   EDP-37536 Troubleshoot IPCS inputs                       07/22/2020
7/11/2020
71111.19   Work Orders       57773492   Torus - Bay 10 Shell Repair (CARD 20-27171)             07/04/2020
71111.19
71111.19   Work Orders       58039078   Perform partial 46.206.001 RCIC Turbine Gov Control Cal 07/22/2020
Work Orders
71111.19   Work Orders       58063561   Implement EDP 80159, Shrader Valves for T4100B008       07/23/2020
57452929
                                        (CCHVAC South Division 2 Air Cond
EDP-37536 Troubleshoot IPCS inputs
71111.20   Corrective Action 20-28723    Unsat SRV Inspection                                    07/28/2020
07/22/2020
71111.19
Work Orders
57773492
Torus - Bay 10 Shell Repair (CARD 20-27171)
07/04/2020
71111.19
Work Orders
58039078
Perform partial 46.206.001 RCIC Turbine Gov Control Cal
07/22/2020
71111.19
Work Orders
58063561
Implement EDP 80159, Shrader Valves for T4100B008  
(CCHVAC South Division 2 Air Cond
07/23/2020
71111.20
Corrective Action
Documents
Documents
71111.20  Corrective Action 20-28507    Inadequate Card Closure                                  07/22/2020
20-28723
Unsat SRV Inspection
07/28/2020
71111.20
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.20  Corrective Action 20-28715    NRC Torus Closeout Inspection                            07/27/2020
20-28507
Inadequate Card Closure
07/22/2020
71111.20
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.20  Corrective Action 20-28753    Results of the Drywell Closeout Walkdown                07/28/2020
20-28715
NRC Torus Closeout Inspection
07/27/2020
71111.20
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection Type             Designation     Description or Title                                     Revision or
20-28753
Procedure                                                                                              Date
Results of the Drywell Closeout Walkdown
07/28/2020
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Inspection
Inspection
71111.20   Engineering       Reactivity       BOC21 Reactor Startup                                   1
71111.20
Evaluations      Maneuvering Plan
Engineering
71111.20   Engineering       Rod Pull Sheet  Sequence A002                                            04/22/2020
Evaluations
Reactivity
Maneuvering Plan
BOC21 Reactor Startup
71111.20
Engineering
Evaluations
Evaluations
71111.20   Miscellaneous     57851037         High Risk FME Plan                                       1
Rod Pull Sheet
71111.20   Miscellaneous     BOC21 Reactor   Reactivity Maneuvering Plan                              1
Sequence A002
04/22/2020
71111.20
Miscellaneous
57851037
High Risk FME Plan
71111.20
Miscellaneous
BOC21 Reactor
Startup
Startup
71111.20   Procedures       22.000.02       Plant Startup to 25% Power                               104
Reactivity Maneuvering Plan
71111.20   Procedures       22.000.05       Pressure/Temperature Monitoring during Heat-up and       52
71111.20
Procedures
2.000.02
Plant Startup to 25% Power
104
71111.20
Procedures
2.000.05
Pressure/Temperature Monitoring during Heat-up and
Cooldown
Cooldown
71111.20   Procedures       23.623           Reactor Manual Control System                           74
71111.20
71111.20   Procedures       24.603.02       SRM/IRM/APRM Overlap Verification                       30
Procedures
71111.20   Procedures       NFWI-130         Estimated Critical Position Beginning of Cycle 21       2
23.623
71111.22   Corrective Action 20-28134         Evaluate LOP/LOCA 24.307.04 Overlap with High Speed     07/13/2020
Reactor Manual Control System
Documents                          MDCT Breaker 72ED-2B
71111.20
71111.22   Corrective Action 20-30653        1D70 Unexpected Alarm during 44.020.159                  09/28/2020
Procedures
24.603.02
SRM/IRM/APRM Overlap Verification
71111.20
Procedures
NFWI-130
Estimated Critical Position Beginning of Cycle 21
71111.22
Corrective Action
Documents
20-28134
Evaluate LOP/LOCA 24.307.04 Overlap with High Speed
MDCT Breaker 72ED-2B
07/13/2020
71111.22
Corrective Action
Documents
Documents
71111.22   Procedures       24.202.01       HPCI Pump and Valve Operability Test at 1025 PSI         121
20-30653
71111.22   Procedures       24.202.02       HPCI Flow Rate Test at 165 PSIG Reactor Steam           50
1D70 Unexpected Alarm during 44.020.159
71111.22   Procedures       24.206.01       RCIC System Pump and Valve Operability Test             87
09/28/2020
71111.22   Procedures       24.206.04       RCIC System Automatic Actuation and Flow Test           56
71111.22
71111.22   Procedures       24.307.04       Emergency Diesel Generator 14- Loss of Offsite Power and 53
Procedures
24.202.01
HPCI Pump and Valve Operability Test at 1025 PSI
21
71111.22
Procedures
24.202.02
HPCI Flow Rate Test at 165 PSIG Reactor Steam
71111.22
Procedures
24.206.01
RCIC System Pump and Valve Operability Test
71111.22
Procedures
24.206.04
RCIC System Automatic Actuation and Flow Test
71111.22
Procedures
24.307.04
Emergency Diesel Generator 14-Loss of Offsite Power and
ECCS Start with Loss of Offsite Power Test
ECCS Start with Loss of Offsite Power Test
71111.22   Procedures       42.307.05       Emergency Diesel Generator-Auto Load Sequence Timer     33
71111.22
Procedures
2.307.05
Emergency Diesel Generator-Auto Load Sequence Timer
Calibration
Calibration
71111.22   Procedures       44.020.159       NSSSS-RWCU Area NRHX Discharge Temperature,             45
71111.22
Procedures
44.020.159
NSSSS-RWCU Area NRHX Discharge Temperature,
Division 2, Calibration/Functional
Division 2, Calibration/Functional
71111.22   Procedures       57.000.15       Reactor Recirculation System Performance Data Collection 27
71111.22
Procedures
57.000.15
Reactor Recirculation System Performance Data Collection
and Speed Limiter Setpoint Determination
and Speed Limiter Setpoint Determination
71151     Miscellaneous                     Fermi 2 RCIC Performance Indicators                     July 2019 to
71151
Miscellaneous
Fermi 2 RCIC Performance Indicators
July 2019 to
June 2020
June 2020
71151     Miscellaneous                     Fermi 2 RHR and RHRSW Performance Indicators             July 2019 to
71151
June 2020
Miscellaneous
Inspection Type             Designation Description or Title                                       Revision or
Fermi 2 RHR and RHRSW Performance Indicators
Procedure                                                                                          Date
July 2019 to
71151     Procedures       MSPI       Mitigating Systems Performance Index (MSPI) Basis         8
June 2020  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71151
Procedures
MSPI
Mitigating Systems Performance Index (MSPI) Basis
Document
Document
71152     Corrective Action 07-27634    RCIC Vacuum Breaker Check Valves not Opening              11/26/2007
71152
Corrective Action
Documents
Documents
71152      Corrective Action 19-23602    Station Leaders Have not Corrected Worker Behaviors        05/09/2019
07-27634
Documents                    Affecting Plant Status Control
RCIC Vacuum Breaker Check Valves not Opening
71152      Corrective Action 20-20646    Mispositioned Component DWCF #2 CMC Switch                01/20/2020
11/26/2007
71152
Corrective Action
Documents
Documents
71152      Corrective Action 20-22199    Mispositioned Electric Fire Pump Contactor Closed during  02/27/2020
19-23602
Documents                    Restoration
Station Leaders Have not Corrected Worker Behaviors
71152      Corrective Action 20-23221    Receipt of Radioactive Material - Radiation Protection not 03/25/2020
Affecting Plant Status Control
Documents                    Notified in Accordance with MMM10
05/09/2019
71152      Corrective Action 20-23288    Mispositioned Component H11P926 Ckt 4 Incorrectly De-      03/26/2020
71152
Documents                    Energized While Performing Clearance
Corrective Action
71152      Corrective Action 20-24552    Inadvertent Equipment Bump                                04/15/2020
Documents
Documents
71152      Corrective Action 20-25183    H11P919 Digital Input Termination Blocks Have Shorting    04/25/2020
20-20646
Documents                    Links Installed Incorrectly
Mispositioned Component DWCF #2 CMC Switch
71152      Corrective Action 20-26280    Jumper Installed Incorrectly                              05/29/2020
01/20/2020
71152
Corrective Action
Documents
Documents
71152      Corrective Action 20-26335    Effectiveness Review Measures for PSC will not be Met      05/30/2020
20-22199
Mispositioned Electric Fire Pump Contactor Closed during
Restoration
2/27/2020
71152
Corrective Action
Documents
Documents
71152      Corrective Action 20-26340    Plant Status Control Performance Trend                    05/30/2020
20-23221
Receipt of Radioactive Material - Radiation Protection not
Notified in Accordance with MMM10
03/25/2020
71152
Corrective Action
Documents
Documents
71152      Corrective Action 20-28464    Post Training Effectiveness Metric not Met for TR 2019-   07/21/2020
20-23288
Documents                    186, Training on Operations Plant Status Control
Mispositioned Component H11P926 Ckt 4 Incorrectly De-
71152      Corrective Action 20-28744    Work Performed in Incorrect Panel                          07/28/2020
Energized While Performing Clearance
03/26/2020
71152
Corrective Action
Documents
Documents
71152      Corrective Action 20-29105    Turbine Lube Oil TCV Controlling at 100% Open              08/07/2020
20-24552
Inadvertent Equipment Bump
04/15/2020
71152
Corrective Action
Documents
Documents
71152     Corrective Action 20-29346   RCIC Turbine Exhaust Line Vacuum Breaker Check Valves     08/16/2020
20-25183
Documents                    Failed to Open
H11P919 Digital Input Termination Blocks Have Shorting
71152      Corrective Action 20-29954   Plant Status Control Committee Meeting did not Meet       09/04/2020
Links Installed Incorrectly
Documents                    Standards
04/25/2020
Inspection Type             Designation     Description or Title                                     Revision or
71152
Procedure                                                                                              Date
Corrective Action
71152     Corrective Action MOP05           Control of Equipment                                     57
Documents
20-26280
Jumper Installed Incorrectly
05/29/2020
71152
Corrective Action
Documents
20-26335
Effectiveness Review Measures for PSC will not be Met
05/30/2020
71152
Corrective Action
Documents
20-26340
Plant Status Control Performance Trend
05/30/2020
71152
Corrective Action
Documents
20-28464
Post Training Effectiveness Metric not Met for TR 2019-
186, Training on Operations Plant Status Control
07/21/2020
71152
Corrective Action
Documents
20-28744
Work Performed in Incorrect Panel
07/28/2020
71152
Corrective Action
Documents
20-29105
Turbine Lube Oil TCV Controlling at 100% Open
08/07/2020
71152
Corrective Action
Documents
20-29346
RCIC Turbine Exhaust Line Vacuum Breaker Check Valves
Failed to Open
08/16/2020
71152
Corrective Action
Documents
20-29954
Plant Status Control Committee Meeting did not Meet
Standards
09/04/2020  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71152
Corrective Action
Documents
MOP05
Control of Equipment
71152
Corrective Action
Documents
Documents
71152      Corrective Action 20-21142        NRC Observation Adverse Trend in Configuration Control    02/11/2020
Documents                          Events
Resulting from
Resulting from
Inspection
Inspection
71152      Corrective Action 20-29959        NRC Observation - Plant Status Control (PSC) Committee    09/04/2020
20-21142
Documents                         Meeting
NRC Observation Adverse Trend in Configuration Control
Events
2/11/2020
71152
Corrective Action
Documents
Resulting from
Resulting from
Inspection
Inspection
71152     Drawings         M-5709-1         Reactor Core Isolation Cooling (RCIC) System Functional   AO
20-29959
NRC Observation - Plant Status Control (PSC) Committee
Meeting
09/04/2020
71152
Drawings
M-5709-1
Reactor Core Isolation Cooling (RCIC) System Functional
Operating Sketch
Operating Sketch
71152     Miscellaneous     ANSI N15.8-2009 Methods of Nuclear Material Control - Material Control   R2015
AO
71152
Miscellaneous
ANSI N15.8-2009
Methods of Nuclear Material Control - Material Control
Systems - Special Nuclear Material Control and Accounting
Systems - Special Nuclear Material Control and Accounting
Systems for Nuclear Power Plants
Systems for Nuclear Power Plants
71152     Miscellaneous     NRC Inspection  NRC Material Control and Accounting Program Inspection   09/13/2018
R2015
Report          Report
71152
Miscellaneous
NRC Inspection
Report
05000341/2018413
05000341/2018413
71152     Procedures       20-25470         Torus Temporary HVAC System Cooling Coil Valve           04/30/2020
NRC Material Control and Accounting Program Inspection
Report
09/13/2018
71152
Procedures
20-25470
Torus Temporary HVAC System Cooling Coil Valve
Mispositioned
Mispositioned
71152     Procedures       27.206.01       RCIC Vacuum Breaker Check Valve Test                     34
04/30/2020
71152     Procedures       MES32           Conduct of Fuel and Special Nuclear Material Management   23
71152
71153     Corrective Action 20-22433         Airlock door on RB5/AUX not Functioning as Designed       03/05/2020
Procedures
27.206.01
RCIC Vacuum Breaker Check Valve Test
71152
Procedures
MES32
Conduct of Fuel and Special Nuclear Material Management
71153
Corrective Action
Documents
20-22433
Airlock door on RB5/AUX not Functioning as Designed
03/05/2020
71153
Corrective Action
Documents
Documents
71153      Corrective Action 20-27543         Engineering Evaluation and DCR Needed to Support         07/02/2020
20-27543
Documents                          Leaving Lighting Circuit Off
Engineering Evaluation and DCR Needed to Support
71153      Corrective Action 20-27545        Loss of 345kv due to Mayfly Infestation                  07/02/2020
Leaving Lighting Circuit Off
07/02/2020
71153
Corrective Action
Documents
Documents
71153     Drawings         SD-2500-01       One Line Diagram Plant 4160V and 480V System Service     BU
20-27545
71153     Engineering       ERE-47112       Protected, Vital, and Owner Controlled Areas Pole Mounted C
Loss of 345kv due to Mayfly Infestation
Evaluations                        Light Fixtures and Bracket Replacement
07/02/2020
71153     Miscellaneous     LER 05000341-   Secondary Containment Inoperable due to Both Airlock     04/22/2020
71153
20-001        Doors Open
Drawings
71153      Procedures       27.322           Mayfly Infestation Preparation Plan                       17
SD-2500-01
Inspection Type       Designation Description or Title                               Revision or
One Line Diagram Plant 4160V and 480V System Service
Procedure                                                                            Date
BU
71153     Procedures MES42       Equivalent Replacement Process                     26A
71153
71153     Procedures MOP01       Operations Conduct Manual - Chapter 1 - Conduct of 40
Engineering
Evaluations
ERE-47112
Protected, Vital, and Owner Controlled Areas Pole Mounted
Light Fixtures and Bracket Replacement
C
71153
Miscellaneous
LER 05000341-
20-001
Secondary Containment Inoperable due to Both Airlock
Doors Open
04/22/2020
71153
Procedures
27.322
Mayfly Infestation Preparation Plan  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71153
Procedures
MES42
Equivalent Replacement Process
26A
71153
Procedures
MOP01
Operations Conduct Manual - Chapter 1 - Conduct of
Operations
Operations
23
40
}}
}}

Latest revision as of 14:05, 29 November 2024

Integrated Inspection Report 05000341/2020003
ML20308A755
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/03/2020
From: Nestor Feliz-Adorno
Reactor Projects Region 3 Branch 4
To: Peter Dietrich
DTE Electric Company
References
IR 2020003
Download: ML20308A755 (25)


Text

November 3, 2020

SUBJECT:

FERMI POWER PLANT, UNIT 2 - INTEGRATED INSPECTION REPORT 05000341/2020003

Dear Mr. Dietrich:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Fermi Power Plant, Unit 2. On October 20, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects

Docket No. 05000341 License No. NPF-43

Enclosure:

As stated

Inspection Report

Docket Number:

05000341

License Number:

NPF-43

Report Number:

05000341/2020003

Enterprise Identifier: I-2020-003-0028

Licensee:

DTE Electric Company

Facility:

Fermi Power Plant, Unit 2

Location:

Newport, MI

Inspection Dates:

July 01, 2020 to September 30, 2020

Inspectors:

T. Briley, Senior Resident Inspector

M. Holmberg, Senior Reactor Inspector

J. Park, Reactor Inspector

T. Taylor, Resident Inspector

Approved By:

Néstor J. Féliz Adorno, Chief

Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Fermi Power Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000341/2020-001-00 LER 2020-001-00 for Fermi 2 Power Plant, Secondary Containment Inoperable Due to Both Airlock Doors Open 71153 Closed

PLANT STATUS

Unit 2 began the inspection period shut down for a planned refueling outage. Following completion of refueling and other maintenance activities, the reactor was restarted and taken critical on July 30, 2020. The main generator was synchronized to the power grid on August 5, 2020. The unit reached full power operation on August 12, 2020. On August 21, 2020, the unit was down powered to 68 percent rated thermal power for a planned control rod pattern adjustment. The unit was returned to rated thermal power the following day. The unit remained at or near rated thermal power for the remainder off the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week and during that time conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities, and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) High pressure coolant injection (HPCI) system while the reactor core isolation cooling (RCIC) system was out of service for maintenance during the week ending August 22, 2020
(2) Division 1 emergency equipment cooling water (EECW) system while the Division 2 EECW system was out of service for maintenance during the week ending September 26, 2020

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the standby liquid control system during the week ending September 26, 2020

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (10 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Reactor building first floor, drywell airlock area during the week ending August 29, 2020
(2) Auxiliary building second floor mezzanine, cable tray area during the week ending September 19, 2020
(3) Auxiliary building fifth floor, Division 1 control center heating, ventilating, and air conditioning (HVAC) system equipment room during the week ending September 30, 2020
(4) Auxiliary building fifth floor, Division 2 control center HVAC system equipment room during the week ending September 30, 2020
(5) Auxiliary building fifth floor, Division 1 standby gas treatment (SBGT) room during the week ending September 30, 2020
(6) Auxiliary building fifth floor, Division 2 SBGT room during the week ending September 30, 2020
(7) Auxiliary building fourth floor, ventilation equipment room during the week ending September 30, 2020
(8) Auxiliary building third floor, Division 2 switchgear room during the week ending September 30, 2020
(9) Auxiliary building third floor, direct current motor control center room during the week ending September 30, 2020
(10) Auxiliary building third floor, ventilation area during the week ending September 30, 2020

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an announced tabletop fire drill on September 18, 2020

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (3 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the control room during power maneuvers (pulling control rods and adjusting turbine bypass valves for pressure increases) on July 30, 2020
(2) The inspectors observed and evaluated licensed operator performance in the control room during a manual main turbine trip due to elevated vibrations on August 5, 2020
(3) The inspectors observed and evaluated licensed operator performance in the control room following an earthquake on August 21, 2020

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)

(1) The inspectors observed and evaluated simulator training on station blackout condition response on September 15, 2020
(2) The inspectors observed and evaluated a senior reactor operator emergency action level simulator evaluation on September 25, 2020

71111.12 - Maintenance Effectiveness

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following structures, systems, and components (SSCs) remains capable of performing its intended function:

(1) Root cause evaluation on supply chain and procurement engineering quality controls during the week ending September 26, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Planned hydraulic control unit 30-51 charging water header isolation valve maintenance involving freeze seal application following valve failure during the week ending July 4, 2020
(2) Emergent work on recirculation pump digital control system following identification of failed communication modules during the week ending August 15, 2020
(3) Emergent maintenance on the south reactor feedwater pump following identification of speed oscillations during the week ending September 26, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (7 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Operability and functionality of the torus structure following identification of multiple structural indications, as documented in condition assessment resolution document (CARD) 20-26717
(2) Operability and functionality of emergency diesel generator 14 following high lube oil sump levels due to lube oil sump fill manual bypass valve not fully closed, as documented in CARD 20-27717
(3) Operability and functionality of 3D Monicore and average power range monitoring system following an on-demand communication failure, as documented in CARD 20-29126
(4) Operability and functionality of structures, systems, and components inside the drywell following multiple momentary high drywell temperature alarms, as documented in CARD 20-29828
(5) Operability, functionality, and technical requirements manual (TRM) implementation of various fire rated assemblies (cable trays and associated SSCs) and TRM surveillance requirement 3.0.3 following never performed TRM surveillance 3.12.8.5 for multiple cable trays, as documented in CARDs 20-25697 and 20-25829
(6) Operability and functionality of torus ventilation header following identification of degraded coating and various structural indications, as documented in CARD 20-27443
(7) Operability and functionality of 48/24 volt neutron monitoring system following unexpected secondary containment isolation during planned maintenance, as documented in CARD 20-28926

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) Torus vent header structural indication weld repairs following identification of multiple structural indications during the week ending July 10, 2020
(2) Reactor pressure vessel hydrostatic testing following reactor reassembly after refueling and planned maintenance during the week ending July 11, 2020
(3) HPCI and RCIC system governor calibrations following abnormal integrated plant computer system replacement isolator voltage outputs for HPCI and RCIC turbine governor controls during the week ending August 15, 2020
(4) Division 2 control center HVAC system testing following condenser and purge compressor Shrader valve installation to resolve abnormal condenser pressure and purge unit operation during the week ending August 15, 2020

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated refueling outage 20 (began March 21, 2020) activities that continued during the inspection period through August 5, 2020.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Division 2 loss of offsite power and loss of coolant accident (LOP/LOCA) testing during the week ending July 18, 2020
(2) RCIC low pressure testing during the week ending August 1, 2020
(3) HPCI low pressure testing during the week ending August 1, 2020
(4) Recirculation system performance data collection and speed limiter setpoint determination during the week ending August 22, 2020
(5) Reactor water cleanup area temperature and isolation logic testing during the week ending September 30, 2020

Inservice Testing (IP Section 03.01) (2 Samples)

(1) RCIC system pump and valve operability testing during the week ending August 8, 2020
(2) HPCI system pump and valve operability testing during the week ending August 8,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS08: Heat Removal Systems (IP Section 02.07)===

(1) Unit 2 (July 2019 - June 2020)

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1) Unit 2 (July 2019 - June 2020)

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) Unit 2 (July 2019 - June 2020)

71152 - Problem Identification and Resolution

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in plant configuration control that might be indicative of a more significant safety issue

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Nuclear material control and accounting of traverse in-core probes not marked as radioactive material stored in warehouse B during the week ending July 25, 2020
(2) Reactor core isolation cooling system exhaust vacuum breaker line check valve surveillance test failure due to repeat test line plugging during the week ending August 22, 2020

71153 - Followup of Events and Notices of Enforcement Discretion Event Followup (IP Section 03.01)

(1) The inspectors evaluated the licensee's immediate actions following a Division 2 loss of offsite power and Division 2 emergency diesel generator 13 and 14 automatic actuation as a result of a mayfly infestation in the 345-kilovolt switchyard (NRC event notification 54761) during the week ending July 4, 2020

Event Report (IP Section 03.02) (1 Sample)

The inspectors evaluated the following licensee event reports (LERs):

(1) LER 2020-001: Secondary Containment Inoperable Due to Both Airlock Doors Open (ADAMS Accession No. ML20114E190). The inspectors determined that the cause of the condition described in the LER was not reasonably within the licensees ability to foresee and correct and therefore was not reasonably preventable. No performance deficiency nor violation of NRC requirements was identified. Secondary containment was restored within the Technical Specification required timeframe and secondary containment pressure remained with the Technical Specification operability limits.

INSPECTION RESULTS

Observation: Adverse Configuration Control Trend 71152 Controlling plant configuration of SSCs is an important aspect to maintaining plant design functions and defense-in-depth (e.g., multiple trains or divisions of SSCs or multiple SSCs to perform the same design function). A mispositioned SSC has the potential to adversely impact plant equipment resulting in problems that could cause initiating events or impact the availability and functional capability of mitigating SSCs or barriers. During calendar year 2020, the licensee identified a continuation of an adverse trend of configuration control issues, often referred to as plant status control or component mispositioning. The licensee entered the trend into their corrective action program along with the various individual configuration control issues. Some configuration control event examples included, but were not limited to:

  • On January 20, 2020, a licensed operator placed drywell cooling fan #2 CMC switch in run vice auto during a planned dedicated shutdown panel surveillance test. A peer check (informal concurrent verification) by another licensed operator did not ensure the procedure was followed. There were no adverse plant impacts as the drywell cooling fan was being manipulated off and on during a planned surveillance test and was turned on as desired but with the switch not in the intended position. [CARD 20-20646]
  • On February 27, 2020, a non-licensed operator re-installed the electric fire pump contactor in the closed position (vice open) to restore the system from planned maintenance and the electric fire pump automatically started. The procedures for system restoration did not provide specific guidance to ensure the contactor was open prior to installation. There were no adverse impacts to the plant as the electric fire pump had not yet been declared functional and an auto-start of the electric fire pump does not impair the ability of the fire protection system to perform its intended function. [CARD 20-22199]
  • On March 26, 2020, a non-licensed operator opened a 120 volt alternating current (VAC) circuit breaker in the incorrect panel - H11P926 instead of H11P927 (both 120 VAC balance of plant distribution panels for the integrated plant computer system

[IPCS]) - while performing a clearance and tagging evolution to provide worker protection for the IPCS replacement project. The operators in the field did not perform a concurrent verification as discussed during the pre-job brief. There were no adverse plant impacts as the plant was in hot shutdown (Mode 3) and the plant computer was planned to be removed from service for planned replacement. [CARD 20-23288]

  • On May 29, 2020, instrumentation and control technicians installed a jumper in the incorrect auxiliary trip unit (D11K607B for off-gas radiation monitor 'B' instead of D11K607C for radwaste effluent radiation monitor) during planned radwaste effluent monitor functional testing. The result was the off-gas radiation monitor 'B' was rendered non-functional instead of the radwaste effluent monitor. The technicians did not perform a proper concurrent verification to ensure they were on the correct component. There were no adverse plant impacts as the off-gas system was out-of-service and the off-gas radiation monitor was not required while the plant was defueled (no mode). [CARD 20-26280]
  • On July 28, 2020, instrumentation and control technicians lifted an electrical lead and installed two jumpers in the incorrect panel (Panel H11P613 (Division 1) instead of Panel H11P612 (Division 2)) in the relay room during Division 2 anticipated transient without scram and safety relief valve low-low set reactor vessel pressure functional surveillance testing. The technicians did not perform a concurrent verification as required to ensure they were on the correct component. There were no adverse impacts on plant operation as the plant was in cold shutdown (Mode 4) and outside the Modes of applicability for the associated technical specifications for the specified components. [CARD 20-28744]
  • On August 7, 2020, the main turbine lube oil upper heat exchanger inlet valve was discovered open allowing bypass flow around the lower heat exchanger that was in-service. The main turbine lube oil system valve line up procedure did not contain sufficient guidance to ensure the associated general service water system valves were in the correct position. As a result, while operating at approximately 35 percent rated thermal power, the turbine lube oil temperature control valve controller indicated full open with turbine lube oil temperatures higher than expected given plant conditions at reduced power. There were no adverse impacts on main turbine operation as the lube oil temperature did not exceed procedural limits.

[CARD 20-29105]

The inspectors noted several additional examples that were not formally classified as plant status control events per licensee procedure MOP 05, Control of Equipment, (did not meet threshold for various reasons) but indicated continued challenges with configuration control.

Examples included but were not limited to:

  • On April 15, 2020, the breaker switch for the Division 2 battery room east exhaust fan was bumped from the on position to the off position while contract electricians were attempting to open the door to the associated motor control center to perform component phase rotation checks. This resulted in the fan being de-energized.

There were no adverse impacts to plant operation as the system was under maintenance and not required while the plant was defueled. [CARD 20-24552]

  • On April 25, 2020, a shorting link was discovered installed across the incorrect terminal block terminals on a 24-volt direct current power supply for the replacement IPCS. The issue was believed to have occurred during reassembly and installation of the terminal blocks during refueling outage 20 (began March 21, 2020). There were no adverse impacts to plant operation as IPCS was out-of-service for planned replacement while the plant was defueled. [CARD 20-25183]
  • On April 30, 2020, a temporary HVAC vent valve was discovered in the open position that partially drained chill water from an in-service cooler in support of temporary torus area ventilation. The component was believed to have been bumped. There were no adverse impacts to plant operation as there were multiple temporary HVAC systems for the torus which was out of service for planned maintenance while the plant was defueled. [CARD 20-25470]

The inspectors noted most configuration control issues involved human performance errors in not following a procedure or process. Not performing concurrent verifications properly was a common contributor. These contributors were similar to those associated with the previously identified adverse configuration control trend documented in NRC Integrated Inspection Report 2019004 (ADAMS Accession: ML20038A340). The previous corrective actions included additional configuration control questions embedded into pre-job briefings. At the end of this inspection period, a common cause evaluation of the various configuration control events was in-progress as a corrective action to address the adverse trend.

The inspectors did not identify any violations of regulatory requirements or performance deficiencies of more than minor significance based on the circumstances stated above.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 20, 2020, the inspectors presented the integrated inspection results to Mr. P. Dietrich, Senior VP and Chief Nuclear Officer and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Drawings

M-2035

HPCI Reactor Building

BO

71111.04

Drawings

M-2043

Barometric Condenser (HPCI) Reactor Building

AJ

71111.04

Drawings

M-2082

Standby Liquid Control System

AB

71111.04

Drawings

M-2979-1

Standby Liquid Control Pump Discharge Line to Drywell

Penetration and Test Tank Piping Isometric

M

71111.04

Drawings

M-3361-1

Standby Liquid Control Pump Suction Piping Isometric

P

71111.04

Drawings

M-5704

Standby Liquid Control System Functional Operating

Sketch

J

71111.04

Drawings

M-5729-1

Emergency Equipment Cooling Water (Division 1) FOS

BL

71111.04

Procedures

23.127 Attachment

1A

Div 1 EECW Valve Lineup

06/22/2020

71111.04

Procedures

23.139

Standby Liquid Control System

71111.04

Procedures

24.139.02

SLC Pump and Check Valve Operability Test

71111.05

Corrective Action

Documents

06-24957

CO2 Actuation Zone 9A Cable Tray Area

07/31/2006

71111.05

Corrective Action

Documents

20-28405

Fire Brigade Annual Live Burn Requirement will go

Overdue due to COVID-10 on 08/22/2020

07/20/2020

71111.05

Corrective Action

Documents

20-28932

Zone 9A Fire Alarm

08/03/2020

71111.05

Corrective Action

Documents

Resulting from

Inspection

20-29684

Exclusion Zone Evaluation

08/27/2020

71111.05

Engineering

Evaluations

FPEE-04-0009

Reactor Building First Floor Drywell Access and Valve

Room

71111.05

Fire Plans

FB-AB-5-16D

Auxiliary Building Division 1 Control Center Heating,

Ventilating, and Air Conditioning System Equipment Room,

Zone 16, El. 677' 6"

71111.05

Fire Plans

FP-AB-2-2M-9A

Auxiliary Building, Second Floor Mezzanine, Zone 9A, El.

631'0"

71111.05

Fire Plans

FP-AB-3-14E

Auxiliary Building, Division II Switchgear Room, Zone 14,

El. 643' 6"

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05

Fire Plans

FP-AB-3-14F

Auxiliary Building, DC Motor Control Center (MCC) Room,

Zone 14, El. 643' 6"

71111.05

Fire Plans

FP-AB-4-16C

Auxiliary Building Ventilation Equipment Room, Zone 16,

El. 659' 6"

71111.05

Fire Plans

FP-AB-5-16A

Auxiliary Building North Standby Gas Treatment (SGTS)

Room, Zone 16, El. 677' 6"

71111.05

Fire Plans

FP-AB-5-16B

Auxiliary Building South Standby Gas Treatment System

(SGTS) Room, Zone 16, El. 677' 6"

71111.05

Fire Plans

FP-AB-5-16E

Auxiliary Building Division 2 Control Center Heating,

Ventilating, and Air Conditioning System Equipment Room,

Zone 16, El. 677' 6"

71111.05

Fire Plans

FP-AB-5-16F

Auxiliary Building, Fifth Floor Ventilation Equipment Room,

Zone 16, El. 677' 0"

71111.05

Fire Plans

FP-TB

Turbine Building

71111.05

Miscellaneous

DBD P80/P82-00

Design Basis Document for Fire Protection/Detection

Systems

E

71111.05

Miscellaneous

LP-FP-940-1123

Fire Drill (Tabletop / Walkthrough) Reactor Feed Pump

Lube Oil Reservoir, 1st Floor Turbine Building, El. 583'-

6"/Zone 19/Class B

71111.05

Procedures

MES35

Fire Protection

71111.05

Procedures

MOP10

Fire Brigade

71111.11Q Corrective Action

Documents

20-29519

Fermi 2 Site Experienced a Seismic Event

08/21/2020

71111.11Q Miscellaneous

SS-OP-202-2028

Classification of Emergency Event #3

71111.11Q Miscellaneous

SS-OP-202-2029

Classification of Emergency Event #4

71111.11Q Procedures

20.000.01

Acts of Nature

71111.11Q Procedures

20.109.01

Turbine/Generator Trip

71111.11Q Procedures

20.300.SBO

Loss of Onsite and Offsite Power

71111.11Q Procedures

2.000.02

Plant Startup to 25% Power

104

71111.11Q Procedures

23.109

Turbine Operating Procedure

71111.11Q Procedures

23.118

Main Generator and Generator Excitation

71111.11Q Procedures

23.612

Seismic Monitoring

20A

71111.11Q Procedures

23.623

Reactor Manual Control System

71111.11Q Procedures

EP-101

Classification of Emergencies

43A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11Q Procedures

SS-OP-202-2004

Licensed Operator Training Simulator Lesson Plan

71111.12

Corrective Action

Documents

20-20577

CARD 18-20491 not Completed per MQA11 Expectations

01/17/2020

71111.12

Corrective Action

Documents

20-20769

NQA Audit Deficiency - Issues Identified with Augmented

Quality Procurements

01/23/2020

71111.12

Corrective Action

Documents

20-21093

NQA Audit Deficiency-PQCE Non-Safety-Related

Justification Inadequate for IRM G Connector Assembly

01/30/2020

71111.12

Corrective Action

Documents

20-22088

Program Oversight Intrusiveness not Sufficient to Detect

Degrading Standards Affecting the Quality and Availability

of Safety-Related Parts

2/25/2020

71111.12

Engineering

Evaluations

100290741

Technical Evaluation Document for Part Number 1573-

R61AV000

05/17/2020

71111.12

Engineering

Evaluations

100333561

Technical Evaluation Document for Disc Retaining Gag

Device

04/21/2020

71111.12

Engineering

Evaluations

53375119

Application Evaluation Document for Part Number

Amphenol MS3106 A 28-21

03/21/2019

71111.12

Engineering

Evaluations

56469285

Application Evaluation Document for Part Number DC-113

or NC-711

01/28/2020

71111.12

Engineering

Evaluations

DC-6731

Reactor Pressure Vessel Water Inventory Control Drain

Times

71111.13

Corrective Action

Documents

20-27421

HCU 30-51 will not Charge Water Side of Cylinder

06/29/2020

71111.13

Corrective Action

Documents

20-27548

CECO QA Level Classification for HCU CRD Charging

Water Isolation Valves Incorrect

07/02/2020

71111.13

Corrective Action

Documents

20-29298

Loss of Recirc System DCS

08/13/2020

71111.13

Corrective Action

Documents

20-30180

Abnormal Speed Changes on South RFPT

09/13/2020

71111.13

Drawings

M-2081

Control Rod Drive Hydraulic System Reactor Building Part

of 2

AX

71111.13

Drawings

M-5810-1

Classification Boundary Drawing Control Rod Drive ISI-CH-

AA

71111.13

Miscellaneous

DBD B31-00

Design Basis Document for the Reactor Recirculation

System

B

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.13

Procedures

20.107.01

Loss of Feedwater or Feedwater Control

71111.13

Procedures

23.106

Control Rod Drive Hydraulic System

117

71111.13

Procedures

MMA26002

Troubleshooting Plan for CARD 20-30180

71111.13

Procedures

MMR Appendix H

On-line Core Damage Risk Management Guidelines

71111.13

Procedures

MMR12

Equipment Out-of-Service Risk Management

20A

71111.13

Procedures

MWC15001

Risk Management Plan: Visual Inspection of SRFP

Governor Linkage After Cover Removal

09/23/2020

71111.13

Work Orders

57845891

HCU 30-51 will not Charge Water Side of Cylinder

07/01/2020

71111.15

Calculations

DC-4921 Vol I

Appendix R Calculations

I

71111.15

Corrective Action

Documents

20-21597

EDG 14 Lube Oil Sump Level High

2/12/2020

71111.15

Corrective Action

Documents

20-25697

Fire Barrier Inspection Procedure 28.507.01 does not Fully

Align with DC-4921 Rev 1

05/12/2020

71111.15

Corrective Action

Documents

20-25829

Cable Trays Require Covers Installed

05/16/2020

71111.15

Corrective Action

Documents

20-26717

Roll up CARD for Torus Structural Repairs Past Operability

06/09/2020

71111.15

Corrective Action

Documents

20-27443

Torus Vent Header Inspection

06/29/2020

71111.15

Corrective Action

Documents

20-27717

EDG 14 Oil Sump Level HOOS

07/07/2020

71111.15

Corrective Action

Documents

20-28865

Div 2 Drywell Temperature High Alarm due to Point 5

08/01/2020

71111.15

Corrective Action

Documents

20-28899

Received Annunciator 8D41, Division 1 Drywell

Temperature High

08/03/2020

71111.15

Corrective Action

Documents

20-28926

Secondary Containment Isolation

08/03/2020

71111.15

Corrective Action

Documents

20-29126

Unable to Download CTP to PRNM

08/09/2020

71111.15

Corrective Action

Documents

20-29142

Div 2 Drywell Temperature High in and Clear for Point 8

08/09/2020

71111.15

Corrective Action

Documents

Resulting from

20-29828

Evaluate Alarm Set Point Change for Hi Drywell Temps

09/01/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Inspection

71111.15

Drawings

I-2045-01

Internal/External Wiring Diagram Process Rad. Monitoring

Rack H11P604

P

71111.15

Drawings

I-2185-01

Process Radiation Monitoring Distribution

AE

71111.15

Drawings

M-5734

Emergency Diesel Generator System Functional Operating

Sketch

BL

71111.15

Drawings

SD-2530-17

48/24V DC Instrumentation Battery Distribution

AM

71111.15

Engineering

Evaluations

EFA-T23-20-002

Evaluation of Vent Header RF-20 As-Left Condition on

Torus Systems

71111.15

Miscellaneous

DBD D11-00

Design Basis Document for the Process Radiation

Monitoring System

B

71111.15

Procedures

28.507.01

Fire Barrier Inspection

71111.15

Work Orders

57425028

Cable Trays Require Covers Installed

07/08/2020

71111.19

Corrective Action

Documents

20-27171

Indication Found in Bay 10 of Torus Proper

06/23/2020

71111.19

Corrective Action

Documents

20-27699

IPCS Points not Outputting as Expected

07/06/2020

71111.19

Corrective Action

Documents

20-27738

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/07/2020

71111.19

Corrective Action

Documents

20-27751

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/07/2020

71111.19

Corrective Action

Documents

20-27754

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/07/2020

71111.19

Corrective Action

Documents

20-27755

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/07/2020

71111.19

Corrective Action

Documents

20-27756

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/07/2020

71111.19

Corrective Action

Documents

20-27757

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/07/2020

71111.19

Corrective Action

Documents

20-27758

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/07/2020

71111.19

Corrective Action

Documents

20-27759

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/07/2020

71111.19

Corrective Action

20-27762

RF20 ASME Section XI Torus Vent Header Unacceptable

07/07/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Indication

71111.19

Corrective Action

Documents

20-27763

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27764

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27765

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27767

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27768

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27769

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27770

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27771

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27772

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27773

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27774

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27775

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27776

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27777

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27778

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27779

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

20-27780

RF20 ASME Section XI Torus Vent Header Unacceptable

07/08/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Indication

71111.19

Corrective Action

Documents

20-27781

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27782

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27817

RF20 ASME Section XI Torus Vent Header Reportable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27818

RF20 ASME Section XI Torus Vent Header Reportable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27819

RF20 ASME Section XI Torus Vent Header Reportable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27820

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/08/2020

71111.19

Corrective Action

Documents

20-27827

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/09/2020

71111.19

Corrective Action

Documents

20-27828

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/09/2020

71111.19

Corrective Action

Documents

20-27829

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/09/2020

71111.19

Corrective Action

Documents

20-27830

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/09/2020

71111.19

Corrective Action

Documents

20-27836

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication Bay 5

07/09/2020

71111.19

Corrective Action

Documents

20-27838

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication Bay 5

07/09/2020

71111.19

Corrective Action

Documents

20-27839

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication Bay 5

07/09/2020

71111.19

Corrective Action

Documents

20-27845

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication Bay 5

07/09/2020

71111.19

Corrective Action

Documents

20-27846

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication Bay 5

07/09/2020

71111.19

Corrective Action

Documents

20-27849

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication Bay 5

07/09/2020

71111.19

Corrective Action

20-27850

RF20 ASME Section XI Torus Vent Header Unacceptable

07/09/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Indication Bay 5

71111.19

Corrective Action

Documents

20-27856

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/09/2020

71111.19

Corrective Action

Documents

20-27861

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication

07/09/2020

71111.19

Corrective Action

Documents

20-27865

RF20 ASME Section XI Torus Vent Header Unacceptable

Indication Bay 4

07/09/2020

71111.19

Corrective Action

Documents

20-28040

Leakage Identified during RF20 RPV System Leakage VT-2

Examination E1150F608 RHR SDC Suction

07/11/2020

71111.19

Corrective Action

Documents

20-28042

Leakage Identified during RF20 RPV System Leakage VT-2

Examination E1150F009 RHR Shutdown Cooling

07/11/2020

71111.19

Corrective Action

Documents

20-28106

CCHVAC D2 Purge Skid Troubleshooting Installed Piercing

Valves

08/10/2020

71111.19

Corrective Action

Documents

20-28401

Damaged Coatings External to Vent Header in Areas of

Welds

07/19/2020

71111.19

Drawings

I-2042-10

Transient Monitoring System

M

71111.19

Drawings

I-2042-15

Transient Monitoring System

N

71111.19

Drawings

I-2042-18

Transient Monitoring System

Q

71111.19

Drawings

I-2225-05

HPSI System Instr. Loop Diagram Turbine Control

AC

71111.19

Drawings

M-4325

Water Side and MISC Chiller INST Control Center A/C

System

AF

71111.19

Engineering

Changes

EDP 80159

Installation of Shrader Valves to T4100B008

71111.19

Miscellaneous19-022

ASME Section XI Repair/Replacement Program/Plan

71111.19

Miscellaneous

A11-3.1

Welding Procedure Specification

71111.19

NDE Reports20-056

Vent Header Indication Data Sheet for Bay No. 8

07/07/2020

71111.19

NDE Reports20-057

Vent Header Indication Data Sheet for Bay No. 7

07/07/2020

71111.19

NDE Reports20-058

Vent Header Indication Data Sheet for Bay No. 9

07/08/2020

71111.19

NDE Reports20-059

Vent Header Indication Data Sheet for Bay No. 5

07/09/2020

71111.19

NDE Reports20-060

Vent Header Indication Data Sheet for Bay No. 3

07/09/2020

71111.19

NDE Reports20-061

Vent Header Indication Data Sheet for Bay No. 4

07/09/2020

71111.19

NDE Reports20-062

Vent Header Indication Data Sheet for Bay No. 12

07/09/2020

71111.19

NDE Reports20-063

Vent Header Indication Data Sheet for Bay No. 13

07/10/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.19

NDE Reports20-064

Vent Header Indication Data Sheet for Bay No. 14

07/10/2020

71111.19

NDE Reports20-065

Vent Header Indication Data Sheet for Bay No. 11

07/10/2020

71111.19

NDE Reports20-066

Vent Header Indication Data Sheet for Bay No. 15

07/10/2020

71111.19

NDE Reports20-067

Vent Header Indication Data Sheet for Bay No. 1

07/10/2020

71111.19

NDE Reports20-068

Vent Header Indication Data Sheet for Bay No. 6

07/12/2020

71111.19

NDE Reports20-069

Vent Header Indication Data Sheet for Bay No. 2

07/13/2020

71111.19

NDE Reports20-070

Vent Header Indication Data Sheet for Bay No. 10

07/13/2020

71111.19

NDE Reports20-071

Vent Header Indication Data Sheet for Bay No. 16

07/13/2020

71111.19

Procedures

23.413

Control Center HVAC

71111.19

Procedures

43.000.005

Visual Examination of Piping and Components (VT-2)

71111.19

Procedures

MES49

Evaluation and Control of Leakage from Class 1, 2, and 3

Piping Systems

71111.19

Procedures

QCP-9.1.6-

NUC2019138

Torus Class MC Metal Containment Examination - RF20

prior to Recoat

71111.19

Work Orders

2140857

Perform 43.000.005 Visual Exam (VT-2) during Reactor

Vessel System Leakage Test

7/11/2020

71111.19

Work Orders

57452929

EDP-37536 Troubleshoot IPCS inputs

07/22/2020

71111.19

Work Orders

57773492

Torus - Bay 10 Shell Repair (CARD 20-27171)

07/04/2020

71111.19

Work Orders

58039078

Perform partial 46.206.001 RCIC Turbine Gov Control Cal

07/22/2020

71111.19

Work Orders

58063561

Implement EDP 80159, Shrader Valves for T4100B008

(CCHVAC South Division 2 Air Cond

07/23/2020

71111.20

Corrective Action

Documents

20-28723

Unsat SRV Inspection

07/28/2020

71111.20

Corrective Action

Documents

Resulting from

Inspection

20-28507

Inadequate Card Closure

07/22/2020

71111.20

Corrective Action

Documents

Resulting from

Inspection

20-28715

NRC Torus Closeout Inspection

07/27/2020

71111.20

Corrective Action

Documents

Resulting from

20-28753

Results of the Drywell Closeout Walkdown

07/28/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Inspection

71111.20

Engineering

Evaluations

Reactivity

Maneuvering Plan

BOC21 Reactor Startup

71111.20

Engineering

Evaluations

Rod Pull Sheet

Sequence A002

04/22/2020

71111.20

Miscellaneous

57851037

High Risk FME Plan

71111.20

Miscellaneous

BOC21 Reactor

Startup

Reactivity Maneuvering Plan

71111.20

Procedures

2.000.02

Plant Startup to 25% Power

104

71111.20

Procedures

2.000.05

Pressure/Temperature Monitoring during Heat-up and

Cooldown

71111.20

Procedures

23.623

Reactor Manual Control System

71111.20

Procedures

24.603.02

SRM/IRM/APRM Overlap Verification

71111.20

Procedures

NFWI-130

Estimated Critical Position Beginning of Cycle 21

71111.22

Corrective Action

Documents

20-28134

Evaluate LOP/LOCA 24.307.04 Overlap with High Speed

MDCT Breaker 72ED-2B

07/13/2020

71111.22

Corrective Action

Documents

20-30653

1D70 Unexpected Alarm during 44.020.159

09/28/2020

71111.22

Procedures

24.202.01

HPCI Pump and Valve Operability Test at 1025 PSI

21

71111.22

Procedures

24.202.02

HPCI Flow Rate Test at 165 PSIG Reactor Steam

71111.22

Procedures

24.206.01

RCIC System Pump and Valve Operability Test

71111.22

Procedures

24.206.04

RCIC System Automatic Actuation and Flow Test

71111.22

Procedures

24.307.04

Emergency Diesel Generator 14-Loss of Offsite Power and

ECCS Start with Loss of Offsite Power Test

71111.22

Procedures

2.307.05

Emergency Diesel Generator-Auto Load Sequence Timer

Calibration

71111.22

Procedures

44.020.159

NSSSS-RWCU Area NRHX Discharge Temperature,

Division 2, Calibration/Functional

71111.22

Procedures

57.000.15

Reactor Recirculation System Performance Data Collection

and Speed Limiter Setpoint Determination

71151

Miscellaneous

Fermi 2 RCIC Performance Indicators

July 2019 to

June 2020

71151

Miscellaneous

Fermi 2 RHR and RHRSW Performance Indicators

July 2019 to

June 2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71151

Procedures

MSPI

Mitigating Systems Performance Index (MSPI) Basis

Document

71152

Corrective Action

Documents

07-27634

RCIC Vacuum Breaker Check Valves not Opening

11/26/2007

71152

Corrective Action

Documents

19-23602

Station Leaders Have not Corrected Worker Behaviors

Affecting Plant Status Control

05/09/2019

71152

Corrective Action

Documents

20-20646

Mispositioned Component DWCF #2 CMC Switch

01/20/2020

71152

Corrective Action

Documents

20-22199

Mispositioned Electric Fire Pump Contactor Closed during

Restoration

2/27/2020

71152

Corrective Action

Documents

20-23221

Receipt of Radioactive Material - Radiation Protection not

Notified in Accordance with MMM10

03/25/2020

71152

Corrective Action

Documents

20-23288

Mispositioned Component H11P926 Ckt 4 Incorrectly De-

Energized While Performing Clearance

03/26/2020

71152

Corrective Action

Documents

20-24552

Inadvertent Equipment Bump

04/15/2020

71152

Corrective Action

Documents

20-25183

H11P919 Digital Input Termination Blocks Have Shorting

Links Installed Incorrectly

04/25/2020

71152

Corrective Action

Documents

20-26280

Jumper Installed Incorrectly

05/29/2020

71152

Corrective Action

Documents

20-26335

Effectiveness Review Measures for PSC will not be Met

05/30/2020

71152

Corrective Action

Documents

20-26340

Plant Status Control Performance Trend

05/30/2020

71152

Corrective Action

Documents

20-28464

Post Training Effectiveness Metric not Met for TR 2019-

186, Training on Operations Plant Status Control

07/21/2020

71152

Corrective Action

Documents

20-28744

Work Performed in Incorrect Panel

07/28/2020

71152

Corrective Action

Documents

20-29105

Turbine Lube Oil TCV Controlling at 100% Open

08/07/2020

71152

Corrective Action

Documents

20-29346

RCIC Turbine Exhaust Line Vacuum Breaker Check Valves

Failed to Open

08/16/2020

71152

Corrective Action

Documents

20-29954

Plant Status Control Committee Meeting did not Meet

Standards

09/04/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152

Corrective Action

Documents

MOP05

Control of Equipment

71152

Corrective Action

Documents

Resulting from

Inspection

20-21142

NRC Observation Adverse Trend in Configuration Control

Events

2/11/2020

71152

Corrective Action

Documents

Resulting from

Inspection

20-29959

NRC Observation - Plant Status Control (PSC) Committee

Meeting

09/04/2020

71152

Drawings

M-5709-1

Reactor Core Isolation Cooling (RCIC) System Functional

Operating Sketch

AO

71152

Miscellaneous

ANSI N15.8-2009

Methods of Nuclear Material Control - Material Control

Systems - Special Nuclear Material Control and Accounting

Systems for Nuclear Power Plants

R2015

71152

Miscellaneous

NRC Inspection

Report

05000341/2018413

NRC Material Control and Accounting Program Inspection

Report

09/13/2018

71152

Procedures

20-25470

Torus Temporary HVAC System Cooling Coil Valve

Mispositioned

04/30/2020

71152

Procedures

27.206.01

RCIC Vacuum Breaker Check Valve Test

71152

Procedures

MES32

Conduct of Fuel and Special Nuclear Material Management

71153

Corrective Action

Documents

20-22433

Airlock door on RB5/AUX not Functioning as Designed

03/05/2020

71153

Corrective Action

Documents

20-27543

Engineering Evaluation and DCR Needed to Support

Leaving Lighting Circuit Off

07/02/2020

71153

Corrective Action

Documents

20-27545

Loss of 345kv due to Mayfly Infestation

07/02/2020

71153

Drawings

SD-2500-01

One Line Diagram Plant 4160V and 480V System Service

BU

71153

Engineering

Evaluations

ERE-47112

Protected, Vital, and Owner Controlled Areas Pole Mounted

Light Fixtures and Bracket Replacement

C

71153

Miscellaneous

LER 05000341-

20-001

Secondary Containment Inoperable due to Both Airlock

Doors Open

04/22/2020

71153

Procedures

27.322

Mayfly Infestation Preparation Plan

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71153

Procedures

MES42

Equivalent Replacement Process

26A

71153

Procedures

MOP01

Operations Conduct Manual - Chapter 1 - Conduct of

Operations

40