IR 05000341/2020011

From kanterella
Jump to navigation Jump to search
Triennial Fire Protection Inspection Report 05000341/2020011
ML20220A668
Person / Time
Site: Fermi 
Issue date: 08/07/2020
From: Richard Skokowski
NRC/RGN-III
To: Peter Dietrich
DTE Electric Company
References
IR 2020011
Download: ML20220A668 (10)


Text

August 07, 2020

SUBJECT:

FERMI POWER PLANT, UNIT 2 - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000341/2020011

Dear Mr. Dietrich:

On July 23, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Fermi Power Plant, Unit 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Richard A. Skokowski, Chief Engineering Branch 3 Division of Reactor Safety

Docket No. 05000341 License No. NPF-43

Enclosure:

As stated

Inspection Report

Docket Number:

05000341

License Number:

NPF-43

Report Number:

05000341/2020011

Enterprise Identifier: I-2020-011-0040

Licensee:

DTE Electric Company

Facility:

Fermi Power Plant, Unit 2

Location:

Newport, MI

Inspection Dates:

June 29, 2020 to July 23, 2020

Inspectors:

J. Benjamin, Senior Reactor Inspector

I. Hafeez, Reactor Inspector

A. Shaikh, Senior Reactor Inspector

Approved By:

Richard A. Skokowski, Chief

Engineering Branch 3

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Fermi Power Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be performed remotely.

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

Structures, Systems and Components Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown (SSD) Review (IP Section 03.01)===

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample.

(1)

  • High Pressure Core Injection (HPCI) Pumps (2)
  • Electric Fire Pump (3)
  • Alternate Diesel Fire Pump (4)
  • Halon Suppression System for Cable Spreading Room and Relay Room

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis that the licensees Fire Protection Program (FPP)contains adequate procedures to implement the selected administrative control.

(1)

  • Combustible Control Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

For the selected change/modifications, the inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the safe shutdown analysis (SSA)have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, fire hazards analysis (FHA) or SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1)

  • Lack of Fire-Stopping in Diesel Fire Pump Room (2)
  • Evaluation of Temporary Removal of Penetration Seal I-8822

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 23, 2020, the inspectors presented the triennial fire protection inspection results to Mr. P. Dietrich, Senior VP and Chief Nuclear Officer and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05 Calculations

DC 5713 Volume

I

Hydraulic Evaluation of the Upgraded Fire Distribution

Loop

F

EDP-31880

Base Design Calculation DC-5702 Vol.1

Corrective Action

Documents

10-26551

CR Computer Room Above Main Halon Discharged to CR

Computer Room

07/30/2010

2-23394

Fire Protection Issue

04/17/2012

17-25804

Gallon Oil Drum Found Stored on Pallet

07/05/2017

18-22470

Used Oil Tanks Found in New Position and Top Cap

Unsecured

03/23/2018

18-25017

DC-5702 VOL I "Fire Loading Calculation" Does Not

Included PVC Components for Condenser Water Box

Down System

06/28/2018

20-23610

Tools and Power Cord in Transient Combustible Exclusion

Area

04/01/2020

20-23880

Halon Auto Function Failed to Initiate

04/05/2020

Corrective Action

Documents

Resulting from

Inspection

20-28178

20 NRC Triennial Fire Protection Inspection - 28.503.05

Damper Location Needs to be Revised

Drawings

21-0300-LD-8

Fire Detection Panel P82-P430 Logic Diagram for

Auxiliary Building

21-0300-PA

Fire Detection Panel P82-P430 Logic Diagram for

Auxiliary Building

06/08/1982

51721-3044-004

Instrument Loop Diagram Halon Fire Protection System

Relay Room Auxiliary Building Zone 8

05/13/2013

5I721-3044-001

Instrument Loop Diagram Halon Fire Protection System

Relay Room Auxiliary Building Zone 8

A

61721-3044-018

Instrument Loop Diagram CO2 Fire Protection System

MCC/SWGR RM 3RD FLR Zone 14

09/30/2005

6A721-2401

Fire Protection Evaluation Reactor Building Subbasement

Plan El 540'-0"

L

6I721-2221-06

Schematic Diagram HPCI SYS-Test Return Line to

Z

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Condensate Storage Valves F008 & F011

6M721-2035

High Pressure Coolant Injection System

BO

6M721-2043

High Pressure Coolant Injection Sys Barometric Cndr

AJ

6M721-4548

Fire Protection Diagrams CO2, Halon & FM - 200 Systems S

6M721-5708-1

High Pressure Coolant Injection System Functional

Operating Sketch

AR

6M721-5721-1

Condensate Storage and Transfer System Functional

Operating Sketch

AE

6M721-5733-3

CO2, Halon & FM-200 Fire Detection Sys Functional

Operating Sketch

N

Engineering

Evaluations

DC-4921 Vol 1

Appendix R Calculations

FPEE 13-0001

Lack of Fire Stopping in Diesel Fire Pump Room

2/08/2013

FPEE 18-0001

Evaluation of Temporary Removal of Penetration Seal I-

22

01/18/2018

FPEE 19-0002

Evaluation of TM-19-0014 Rev. 0 Temporary Diesel Fire

Pump

09/17/2019

FPEE 19-0003

TR LCO 3.0.3 Evaluation for Non-Functional Diesel Fire

Pump TRM Section TR 3.12.2

09/11/2019

FPEE 19-0004

TR LCO 3.0.3 Evaluation for Continued Operation with

One Fire Pump TRM Section 3.12.2

11/28/2019

FPEE 19-0018

Winterization of Temporary Alternate Diesel Fire Pump

11/26/2019

FPEE 20-0006

Evaluation of CARD 10-26551, Procedure Change for

Halon Test

Fire Plans

FP-AB-2-8

Relay Room, Zone 8, El. 613'6"

FP-RB-B-4d

Reactor Building Basement Southeast Corner Room Zone

4, El. 562'0"

FP-RB-B-5c

Reactor Building Basement Corridors Zone 5, El. 562'0"

and El. 564'0"

FP-RB-SB-4a

High Pressure Coolant Injection Pump and Turbine Room,

Zone 4

Miscellaneous

ANSI/ASTM D

975 - 78

Standard Specification for Diesel Fuel Oils

1978

ASTM D975-07b

Standard Specifications for Diel Fuel Oils

07/15/2007

Catalog Number

Pyrotronics Switch Model SM-30

04/01/1979

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

3162

Lab Number

C5034084

SGS Fermi 2 DFP FO Storage Tank Fuel Oil Sample

Results

04/14/2020

NFPA 12A

Halogenerated Fire Extinguishing Agent Systems

2009

NFPA 72D

Watchman, Fire Alarm and Supervisory Service

1975

NFPA 12A

Halogenated Fire Extinguishing Agent Systems

1977

NFPA 72E

Automatic Fire Detectors

1974

VMB11-21

Chemetron Vendor Manual 1301 Halon Fire Protection

Systems

Procedures

20.000.13

Shutdown from Outside the Control Room

20.000.18

Control of the Plant from the Dedicated Shutdown Panel

20.000.18

Control of The Plant From The Dedicated Shutdown Panel 56

20.000.22

Plant Fires

20.000.22

Plant Fires

23.501.01

Fire Water Suppression System

27.000.09

Time Critical Actions Validation and Verification

28.501.02

Fire Suppression Water System and Spray/Sprinkler

Systems Valve Lineup Verification

28.501.13

Sprinkler System Simulated Automatic Actuation Test

24A

28.501.14

Sprinkler System Integrity Inspection

28.503.01

Halon Valve Lineup Verifications

28.503.04

Halon Fire Suppression System Functional Test Zone 8 -

Relay Room

28.505.04

Fire Detection Zone 4 Operability Test RB Bmt and Sbmt

SE

28.505.08

Fire Detection Zone 8 Operability Test AB 2nd Fl Relay

Room - BOP

29.100.01

Emergency Operating Procedure RPV Control

77.000.67

Particulate Contamination in Fuel Oil

ARP 16D27

Fire Alarm

ARP 7D10

Alarm Response Procedure Electric Fire Pump Auto Start

ARP 7D6

Alarm Response Procedure Diesel Fire Pump Auto Start

MES35

Fire Protection Program

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

MMA26

Fermi 2 Maintenance Conduct Manual Troubeshooting

7A

MOP01

Operations Conduct Manual

ODE-20

Operations Department Expectations (Protected

Equipment)

TMTRM

Fermi 2 Technical Requirements Manual

2

Work Orders

26821051

Perform 28.503.04 Zone 8 Relay Room Halon Fire

Suppression Functional Test

08/05/2009

31553104

28.503.04 Zone 8 Pre-discharge

08/16/2010

31653104

PMT 28.503.04 Zone 8 Pre-discharge Horns

08/16/2010

36956069

27.000.09 Time Critical Actions

08/09/2012

2305928

Perform Fire Suppression Water System Functional Flow

Test

2/12/2018

46491209

Perform Fire Suppression Water System Simulated Auto

Actuation Test (Electric Fire Pump)

11/22/2019

48331571

Perform 28.507.01 Fire Barrier Inspection (Mode 1,2,3)

01/02/2019

48782869

Perform 28.501.04 Fire Suppression and Sprinkler System

Valve Operability Test

04/29/2019

49336625

Perform 28.503.06 Zone 13 Control Room Halon Fire

Suppression Functional Test

05/09/2019

274935

Perform 28.501.13 Sprinkler Simulated Auto Test HPCI,

RCIC, Torus, Bsmnt

01/24/2020

50675328

Perform 28.505.04 Zone 4 RBB & RBSB-SE Fire

Detection Operability & Functional

10/10/2019

51651909

Perform 28.501.14 Sprinkler System Integrity Verification

Test

01/24/2020

280814

Perform 28.503.05 Zone 11 Cable Spreading Rm Halon

Functional Test

04/12/2020

295498

Perform 28.503.04 Zone 8 Relay Room Halon Fire

Suppression Functional Test

05/28/2020

53639048

Perform 28.501.04 Fire Suppression and Sprinkler System

Valve Operability Test

08/08/2019