ML20065K172: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20065K172
| number = ML20065K172
| issue date = 04/15/1994
| issue date = 04/15/1994
| title = Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual.
| title = Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual
| author name =  
| author name =  
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_    _  _
I' . .
Attachment to'TXX-94071 April 15, 1994 Page 1 of 2 CPSES - TECHNICAL REQUIREMENTS MANUAL (TRM)
AMENDMENT / REVISION 15 DETAILED DESCRIPTION TR Page (as amended)          Group Description                                                      ,
4-1                          4    Changes the reference to technical specification section from 3.8.4 to 3/4.8.4.
Editorial        :
This is an editorial change to identify the complete technical specification reference applicable to this part of the TRM.
Change Request Number          : TR-93-12.5 Commitment Register Number :
Related SER : 8.4.1      SSER :22 8.3 SER/SSER Impact                : No 4-5                          2      See Sheet No(s) :6,18 and 19 Deletes 51M2 relays associated with the Reactor Coolant Pumps from surveillance requirements for containment electrical penetration conductor                    ;
overcurrent protective devices.
Revision          :
The primary protection for the containment RCP electrical penetration conductor is provided by relays 50M1-51 and the backup. protection by relay 51M3. A1+ hcugh the relay 51M2 provides additional protection for RCP penetration conductor during            ;
Modes 1, 2 and 3, the sole purpose cf the relay'is        I to provide RCP motor protection during hot loop operation.
Chauge Request Number          : TR-93-15.1                    ,
Commitment Reglster Number :
Related SER.: 8.4.1      SSER :22 8.3 SER/SSER Impact                : No                          .l 4-11                        2    Deletes from surveillance requirements, breakers                j pertaining to the motor operated valves-1-HV-4782              l and 1-8811A.                                                    j Revision          :
Containment isolation tanks CP1-CTAVT-01 and CP1-RHATVT-01 located outside the containment used to be part of the containment barrier and the associated valves 1-HV-4782 and 1-8811A.are installed inside the respective tanks and therefore
,                                                the electrical protection devices for.the valves were considered as containment penetration conductor
                                                                                ~
overcurrent protective devices. However the tanks were later declassified and per FSAR section      _
6.2.2.2.1 (for CP1-CTAVT-01) and per DBD-ME-260          -]
section 5.1 (for CP1-RHATVT-01), the tanks are no          i longer part of the containment barrier      Therefore the breakers feeding thene valves are nc longer cont ainment penetration conductor overcutrent 9404190204 940415 gDR      ADOCK 05000445 PDR
 
n Attachment to TXX-94071' Apr11.15, 1994 Page 2 of 2 TR Page (as amended)        Group Description protective devices.
Change Request Number        : TR-93-12.1 Commitment Register Number :
Related SER : 8.4.1    SSER :22 8.3 SER/SSER Impact              : No 4-12                      2    Deletes from surveillance requirements, breakers-pertaining to the motor operated valves 1-HV-4783 and 1-88118.
Revision        :
Containment isolation tanks CP1-CTATVT-02 and CP1-RHATVT-2 located outside the containment used to._
be part of the containment barrier and the associated valves 1-HV-4783 and 1-8811B are installed inside the respective tanks and therefore the electrical protection devices for the valves were considered as containment penetration conductor overcurrent protective devices. However the tanks were later declassified and per FSAR section 6.2.2.2.1 (for CP1-CTATVT-02) and per DBD-ME-260 section 5.1 (for CP1-RHATVT-02), the tanks are no longer containment penetration conductor overcurrent protective devices.
Change Request Number        : TR-93-12.2-Commitment Register Number
* Related SER : 8.4.1    SSER :22 8.3 SER/SSER Impact'            : No 4-25                      2    Deletes from surveillance requirements,. breakers pertaining to the motor operated valves 2-HV-4782 and 2-8811A.
Revision        :
The electrical penetrations from the tanks are spared and therefore not connected to the THED breakers in the MCC 2EB3-2 compartments 9RF'and 9RM. See also TR-93-12.1.
Change Request Nwmber        : TR-93-12.3 Commitment Register Number :
Related SER : 8.4.1    SSER :22 8.3.
SER/SSER Impact              : No 4-26                      2    Deletes from surveillance requirements, breakers pertaining to the motor operated valves 2-HV-4783 and 2-8811B.
Revision
* The electrical penetrations from the tanks had been spared and are not connected to the THED breakers in the FCC 2EB4-2 compartments BRT and 8RM.
See also TR-93-12.2.
Change Request Number        : TR-93-12.4 Commitment Register Number :
Related SER : 8.4.1    SSER :22 8.3 SER/SSER Impact              : No
 
p -., >-mK.4~*.- * .a > .d.eet .am r'
e R
e a
r ENCLOSURE TO TXX-94071
                                                                                                                            . .l
                                                                                                                              'l -
i l
e
  ..n. _. _ _    . ;_. __ _ _ . , _ __  . _ _ _ _ . _ _ _ . _ _ _ , _ _ _ _ _ ..__ _ .                    .. ;.
 
~
              ,              COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)
INSTRUCTION SHEET (Page1of1)
The following instructional information and checklist is being furnished to help insert Revision 15 into the Comanche Peak Steam Electric Station TRM. A description of this revision is provided in TXX-94071, dated April 15, 1994.
Discard the old sheets and insert the new sheets, as listed below. Keep all instruction sheets in the front of the Effective Page Listing to service as a record of changes.
Remny_c                                                          Insert Section 4 4-1                                                              4-1 4-5 and 4-6                                                      4-5 and 4-6 4-11 and 4-12                                                    4-1I and 4-12 4-18 and 4-19                                                    4-18 and 4-19 4-25 and 4-26                                                    4-25 and 4-26 I,ist of Effective Pages EPL-1 and EPL-4                                                  EPL-l and EPL-4 i
i 1:
b c
o '.
 
  .T.ECHt11 CAL REQUIREfiENT 4 d _ CONTAINMENT PENETRATION CONDUCTOR O'lERlURRENT PROTECTION DEyICES NOTE:      This Technical Requirement contains the listing of overcurrent      15  l protection devices subject to the requirements of Technical            l Specification 3/4.8.4. Although the Specification is                    j repeated here, care must he taken not to overlook Technical            i Specification P,equirements.
l l
l l
COMANCHE PEAK - UNITS 1 AND 2                  4-1              Revision 15 April 15, 1C94
 
1 TECHNIML REQUIREMENT 4.1 TABLE 4.1.la                              8 UNIT 1                                8 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER                                    SYSTEM MD LOCATIDti                                      POWERED
: 1. 6.9 KVAC from Switchgears
: a. Switchgear Bus 1Al                        RCP #11
: 1)  Primary Breaker 1PCPX1 a) Relay 50M1-51 b)  Relay 86M                                              9 15
: 2) Backup Breakers 1Al-1 or 1Al-2 a)  Relay 51M3 b) Relay 51 for 1Al-1 c) Relay 51 for 1Al-2 d)  Relay 86/1A1
: b. Switchgear Bus 1A2                        RCP #12
: 1)  Primary Breaker 1PCPX2 a) Relay 50M1-51 b)  Relay 86M                                              9 15
: 2) Backup Breakers 1A2-1 or 1A2-2 a) Relay 51M3 b) Relay 51 for 1A2-1 c)  Relay 51 for 1A2-2 d)  Relay 86/1A2
                                                                              )
l COMANCHE PEAK - UNITS 1 AND 2            4-5              Revision 15 April 15, 1994
 
TECHNICAL REQU18EMENT 4.1 (continued)
IABLE 4.1.la (continued)                                  8 LLELT L                                              8 CD!!IAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER                                              SYSTEM AND LOCATION                                              POWERED
: 1. 6.9 KVAC from Switchgears (continued)
: c. Switchgear Bus 1A3                                RCP #13
: 1) Primary Breaker IPCPX3 a) Relay 50M1-51 b) Relay 86M                                                              .9 15
: 2) Backup Breakers 1A3-1 or 1A3-2 a) Relay 51M3 4                                b) Relay 51 for 1A3-1 c) Relay 51 for 1A3-2 d) Relay 86/1A3
: d. Switchgear Bus 1A4                                RCP #14
: 1)      Primary Breaker 1PCPX4 a) Relay 50H1-51 b) Relay 86M                                                                9 15
: 2) Backup Breaker 1A4-1 or 1A4-2 a) Relay 51M3 b) Relay 51-for 1A4-1 c) Relay 51 for 1A4-2 d) Relay 86/1A4.
: 2. 480 VAC from Switchgears 2.1        Device Location -                        Containment 480V Switchgears 1EB1, 1EB2,              Recirc, Fans                                  '
1EB3 and IEB4                            and CRDM Vent Fans                                    ,
: a. Primary. Breakers - 1FNAV1, IFNAV2, 1FNAV3, 1FNAV4, IFNCB1 and 1FNCB2
                                                                                                                          )
COMANCHE PEAK - UNITS 1 AND 2                      4-6              Revision 15 April 15, 1994-                    '
 
. ,                                                                                                                      1 TECHNi(6t_ REQUIREMENT 4.1 (continuedl                                        !
TABLE 4.1.la (continued)                              8 UNIT 1                                        8              j CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES                                            l l
DEVICE NUMBER AND LOCATION
: 3.          480VAC from Motor Control Centers (continued)
MCC 1EB3-2                G.E.
COMPT. NO.              BKR. TYPE          SYSTEM POWERED 8RF          THED              JB-15-10050, Altern. Feed to Motor Operated Valve 1-8702A 1G            THED              Motor Operated Valve 1-8112 9G            THED              Motor Operated Valve 1-8701A                              '
9M            THED              Motor Operated Valve 1-8701B SM            THED              Motor Operated Valve 1-8000A SG            THED              Motor Operated Valve 1-HV-6074 4G            THED              Motor Operated Valve 1-HV-6076 4M            THED*            Motor Operated Valve 1-HV-6078 2G            THED              Motor Operated Valve 1-HV-4696 2M            THED              Motor Operated Valve 1-HV-4701 3G            THED*            Motor Operated Valve 1-HV-5541 3M            THED*            Motor Operated Valve 1-HV-5543 1M            THED              Motor Operated Valve 1-HV-6083 6F            THED              Motor Operated Valve 1-8808A              12 6M            THED              Motor Operated Valve 1-8808C              12 7M            THED              Containment Ltg. XFMR-18 (PNL SC1 & SC3) 8M            THED              Neutron Detector Well Fan-09 7F            THFK              Electric H2 Recombiner Power Supply PNL-01 8RM            THED              Motor Operated Valve 1-HV-4075C 15
                                                                                                      '15-          'i Primary protection is provided by Gould Tronic TR5 fusible switch with 3.2A fuse.
COMANCHE PEAK - UNITS 1 AND 2                    4-11            Revision 15 April 15,-1994
 
                    .                          TECHNICAL REQUIREMENT 4.1 (continued) l TABLE 4.1.la (continued)                                                      8          l UNIT 1                                                            8 CONTAINMENT PENETRATION CQNDUCTOR OVERCURRENT PROTECT [VE DEVICES                                                                l i
DEVICE hUMBER AND LOCATION
: 3. 480VAC From Motor Control Centers (continued) 3.4    Device Location              - MCC 1EB4-2 Compartment numbers                                12 listed below.
Primary and Backup          - Unless noted otherwise, both primary and backup breakers have identical trip ratings and are-located in the same MCC compt.
These breakers are General Electric type THED or THFK with thermal-magnetic trip elements.
MCC 1EB4-2            G.E.
COMPT. NO.        BKR. TYPE                    SYSTEM POWERED IM            THED                      JB-15-1230G, Altern. Feed to Motor Operated Valve 1-87018 8G            THED                      Motor Operated Valve 1-8702A 8M            THED                      Motor Operated Valve 1-87028 4M              THED                      Motor Operated Valve 1-8000B 4G            THED                      Motor Operated Valve 1-HV-6075 3G            THED                      Motor Operated Valve 1-HV-6077 3M            THED*                    Motor Operated Valve 1-HV-6079 2G            THED                      Motor Operated Valve 1-HV-5562 2M            THED*                    Motor Operated Valve 1-HV-5563 SF            THED                      Motor Operated Valve 1-8808B SM            THED                      Motor Operated Valve 1-8808D 6M              THED                      Containment Ltg. XFMR-19
                                                                          .(PNL SC2 & SC4)                              .
7M            THED                      Neutron Detector Well Fan-10 6F              THFK                      Elect. H2 Recombiner Power Supply PNL-02 15 15 Primary protection is provided by Gould Tronic-TRS fusible switch with 3.2A fuse.
l i
l COMANCHE PEAK - UNITS 1 AND 2                        4-12                            Revision 15-April 15~, 1994
_ . , . . - . .      _    ...      .            . , _ .        . _ _ .    - ._ _                                  _ _ _ _ . _ _ =
 
IECHNICAL REQUIREMENT 4.1 (cgDtinued)                                        8 TABLE 4.1.lb                                                      8 UNIT 2                                                  8 r
CONTAINMENT PENETRATION CONDUCTOR                                            8 OVERCURRENT PROTECTIVE DEVICES                                            8 DEVICE NUMBER                                                            SYSTEM                        8 AND LOCATION                                                            POWEREO                        8
: 1.      6.9 KVAC from Switchgears                                                                      8.
: a. Switchgear Bus 2A1                                          RCP #21                        8
: 1) Primary Breaker 2PCPX1                                                                  8 a) Relay 50M1-51                                                                      8 b) Relay 86M                                                                          9 15    ,
: 2) Backup Breakers 2Al-1 or 2Al-2                                                          8 a) Relay 51M3                                                                          8 b) Relay 51 for 2Al-1                                                                  12 c) Relay 51 for 2Al-2 12 d) Relay 86/2A1                                                                        12
: b. Switchgear Bus 2A2                                          RCP #22                        8
: 1)  Primary Breaker 2PCPX2                                                                8 a) Relay 50M1-51                                                                      8 b) Relay 86M                                                                          9 15
: 2) Backup Breakers 2A2-1 or 2A2-2                                                          8 a) Relay 51M3                                                                          8 b) Relay 51 for 2A2-1                                                                  12 c) Relay 51 for 2A2-2                                                                  12
,                                              d)' Relay 86/2A2                                                                      12      i l
i l                            COMANCHE PEAK - UNITS 1 AND 2                            4-18                      Revision 15 April 15, 1994
        ..    . _    . _.              _ _            _    _ _ _  _ . . .          .    .        ._.      . ___    ,. _ _.~,
 
  -    _ _ - . . . _        . . _ . -        . . . _ _          _ . ~ . .          __    .    .    ._  _ . _    _ . . _ . _        .
                      .                              TECHNICAL REQUIRE,iENT 4.1 (continued)                                        8 TABLE 4.1.lb (continued)                                            8 U.N_[J_2                                                8 CONTAINMENT PENETRATION CONDUCTOR                                          8 OVERCURRENT PROTECTIVE DEVICES                                          8 1
DEVICE NUMBER                                                      SYSTEM                                8 AND LOCATION                                                        POWERED                              B
: 1. 6.9KVACfromSwitchgears(continued)                                                                '8 8
: c. Switchgear Bus 2A3                                        RCP #23                              8
: 1) Primary Breaker 2PCPX3                                                                  -8 a) Relay 50M1-51                                                                        8 b) Relay 86M                                                                            9 15
: 2) Backup Breakers 2A3-1 or 2A3-2                                                          8 a) Relay 51M3                                                                          8 b) Relay 51 for 2A3-1                                                                  12~
c) Relay 51'for 2A3-2                                                                  12 d) Relay 86/2A3                                                                        12
: d. Switchgear Bus 2A4                                        RCP #24                              8
: 1) Primary Breaker 2PCPX4                                                                  5 a) Relay 50M1-51                                                                        8 b) Relay 86M                                                                            9 15
: 2) Backup Breaker 2A4-1 or 2A4-2                                                          '8 a) Relay 51M3                                                                          8 b) Relay 51 for 2A4-1                                                                  12 c) Relay 51 for 2A4-2                                                                  12 d) Relay 86/2A4                                                                        12
: 2. 480 VAC from Switchgears                                                                            8 2.1        Device Location -                                Containment                          8 480V Switchgears 2EB1, 2EB2,                      Recirc. Fans                          8-2EB3 and 2EB4                                    and CRDM                              8 Vent Fans                            8:
: a.      Primary Breakers - 2FNAV1,                                                    8 2FNAV2, 2FNAV3, 2FNAV4,                                                        8 2FNCB1 and 2FNCB2                                                              8 l.
L COMANCHE. PEAK - UNITS 1 AND 2                            4-19                Revision 15 i
April 15, 1994
 
                                                                                                                                              .\
TECHNICAL REOUIREMENT 4.1 (continued)                        8 e                                                                                                                          l TABLE 4.1.lb (continued)                            8 UNIT 2                                    8 LONTAINMENT PENETRATION CONDUCTOR                          8 OVEACURRENT PROTECTIVE DEVICES                          8 DEVICE NUMBER AND LOCATION
: 3.                  480VAC from Motor Control Centers (continued)
MCC 2EB3-2                          G.E.                                                      8 COMPT. NO.                      BKR. TYPE              SYSTEM POWERED                        8 8RF          THED                Altern. Feed to Motor                8 Operated Valve 2-8702A              ~8 1G            THED                Motor Operated Valve 2-8112          8 9G            THED                Motor Operated Valve 2-8701A          8 9M            THED                Motor Operated Valve 2-87018          8 SM            THED                Motor Operated Valve 2-8000A          8 SG            THED                Motor Operated Valve 2-HV-6074        8 l                                                          4G            THED                Motor Operated Valve 2-HV-6076        8
;                                                          4M            THED*                Motor Operated Valve 2-HV-6078        8
!                                                          2G            THED                Motor Operated Valve 2-HV-4696        8 2M            THED                Motor Operated Valve 2-HV-4701        8 3G            THED                Motor Operated Valve 2-HV-5541        8 3M            THED                Motor Operated Valve 2-HV-5543        8 1M            THED                Motor Operated Valve 2-HV-6083-      8 6F            THED                Motor Operated Valve 2-8808A          12 6M            THED                Motor Operated Valve 2-8808C          12 7M            THED                Containment Ltg. XFMR-18              8 (PNL 2SC1 & 2SC3)                    8 8M            THED                Neutron Detector Well Fan-09          8 7F            THFK                Electric H2 Recombiner Power          8 Supply PNL-01                        8 8RM          THED                Motor Operated Valve 2-HV-4075C      8 15          ,
15' Primary protection is provided by Gould Tronic-TR5 fusible switch        8.
with 3.2A fuse.                                                                      ,
B COMANCHE PEAK - UNITS 1 AND 2                              4-25              Revision 15 April 15,.1994
 
t T1CHN!_(Al REQUIREMENT 4.1 4 continued)                                      8 1
IABLE 4.1.lb Lc_ontinued)                                          8 UNIT 2                                              8 4
[0NTAINMENT PENETRATION CONDUCTOR                                          8 OVERCURRENT PROTECTIVE DEVICES                                          8        -
DEVICE NUMBER                                                                                                8 AND LOCATION                                                                                                8 J
: 3. 480VAC From Motor Control Centers (continued)                                                          8-3.4                Device Location                - MCC 2EB4-2 Compartment numbers                    12 listed below.                                    8 Primary and Backup            - Unless noted otherwise, both                      8 primary and backup breakers have                  8' identical trip ratings and are                    8' located in the same MCC compt.                    8 These breakers are General                        8 Electric type THED or THFK with                  .8 thermal-magnetic trip elements.                  8 MCC 2EB4-2                        G.E.                                                                      8 COMPT. NO.                    SKR. TYPE                  SYSTEM POWERED                                    8 1M                          THED                    Altern. Feed to Motor                              8 Operated Valve 2-87018                            8 8G                          THED                    Motor Operated Valve 2-8702A                      8-8M                          THED                    Motor Operated Valve 2-8702B                      8 4M                          THED                    Motor Operated Valve'2-80008                      -8 4G                          THED                    Motor Operated Valve 2-HV-6075                    8 3G                          THED                    Motor Operated Valve 2-HV-6077                    8 3M                          THED*                    Motor Operated Valve 2-HV-6079                    8~
,                                20                          THE0*  .
Motor Operated Valve 2-HV-5562                    8 2M                          THE0*                    Motor Operated Valve 2-HV-5563                    -8 SF                          THED                    Motor Operated Valve 2-88088                      8-SM                          THED                    Motor. Operated Valve 2-88080                      8
,                                6M                          THED                    Containment Ltg. XFMR-19.                          8 (PNL 2SC2 & 2SC4)                                8 7M                          THED                    Neutron Detector Well Fan-10                      8 6F                          THFK                    Elect. H _Recombiner 2                  Power            8 Supply PNL-02                                    .8 i                                                                                                                                        15 15 8          .
Primary protection is provided by Gould Tronic TRS fusible switch                                      8          l with 3.2A fuse, j
i COMANCHE PEAK -UNITS 1 AND 2                                    4-26                        Revision 15 April 15, 1994            .
            ''Nl'    ~                    *P            y                                                                                    '
 
l e
* j COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)
I EFFECTIVE PAGE LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:                                        ;
Original                                          Submitted July 21, 1989 Revision 1                                        September 15, 1989 Revision 2                                        January 15, 1990
:    Revision 3                                        July 20, 1990 Revision 4                                        April 24, 1991 Revision 5                                        September 6, 1991 Revision 6                                        November 22, 1991 Revision 7                                        March 18, 1992 Revision 8                                        June 30, 1992 Revision 9                                        December 18, 1992 Revision 10                                      January 22, 1993 Revision 11                                      February 3, 1993 Revision 12                                      July.15, 1993 Revision 13                                      September 14, 1993 Revision 14                                      November 30, 1993 Revision 15                                      April 15, 1994 EPL-1                            April 15, 1994
                                                                                            .i
 
COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)
EFFECTIVE PAGE LISTING 3-9                                                    June 30, 1992 3-10                                                    Revision 11 3-11                                                    Revision 11 Sec. 4-Tab                                              Original 4-1                                                    Revision 15 4-2                                                    Revision 12 4-3                                                    July 15,.1993 l:            4-4                                                    July 15, 1993                                  -
!              4-5                                                    Revision 15                                    ,
4-6                                                    Revision 15 4-7                                                    Revision 8 4-8                                                    Revision 13 4-9                                                    Revision 13 4-10                                                    Revision 13
.              4-11                                                    Revision 15 4-12                                                    Revision 15 4-13                                                    Revision 13 4-14                                                    Revision 13 l
4-15                                                    Revision 8 4-16                                                    Revision 12 4-17                                                    Revision 10 4-18                                                    Revision 15 4-19                                                    Revision 15 4-20                                                    Revision 8 4-21                                                    Revision ~12 l            4-22                                                    July 15, 1993 4-23                                                    Revision 12 4-24                                                    Revision 12 4-25                                                    Revision 15 4-26                                                    Revision 15 4-27                                                    Revision 8 4-28                                                    Revision 10 4-29                                                    Revision 12 4-30                                                    Revision 10 4-31                                                    July 154 1993 EPL-Tab                                                  Original g            EPL-1                                                    April 15 1994 EPL-2                                                    November ~30, 1993 EPL-3                                                    November 30, 1993 EPL-4                                                    April 15, 1994 EPL-4                                    April =15, 1994-
      .~. ~,,:- -.    .  .        .-.    . . - - . - . . . - . . . -  -  - -. .    -      . . . . . . .
 
4 CORRESPONDENCE INTERNAL                                    DISTRIBUTION 100lO LOG NO. TXX 94071                                                                                    FILE NO.        +eef3' 916 (TRM)
TO: DISTRIBUTION                      FROM: LICENSING                    DATE: 04/15/1994 SURJEqll                    TECilNICAL REQUIREMENTS MANUAL REVISION 15 - REVISION TO TO SECTION 4.1 AND TABLES 4.1.l A AND 4.1.lB LICENSINO LEAD;            JMK COMMENTS:
DAl.LAS DIS'IRIHUTED                                                                                  SITE DISTRillUTED ALL                                                                        All W. M. Taylor 19BT                                                          W. J. Cahill. Jr. E22 R. D. Walker / 24ST                                                      FY SUBJEC.I J. S. Marshall                                                          T. A. Ilope        A08 R. A. Wooldridge 32BT                                                      D. E. Buschbaum      A08 P. Johnson (FC)                                                            D. L. Davis        EOS CCS - E06                                                                D. McAfec            A08 DY SUBJECT                                                                D. E. Armstrong      M38 D. R. Woodlan 24ST                                                        F. L. Powers (NODIL) C07A A. Ilusain      24SL                                                      J. J. Kelley        EOS J, L. Vota (W) (FC)                                                        J. J. LaMarca        M35 DOCKET REL6IliQ                                                          J. W. Muffett      N20 R. M. tillmore 32BT                                                      C. L. Terry        E01 D. Fiorelli    16BT                                                      M. R. Blevins      E08 R. O. Spangler 21BT                                                        R. J. Prince      M37 J. L. French (FC)                                                          B. T. Lancaster    M32 QENERIC                                                                    D. R. Moore          M32
_ L " ." , ,      l'IT                                                    M. L. Lucas        M32 H.5.L,..U. W)                                                              J. F. McMahon        T01 flSES    IR ONLY                                                          fPSES IR & RESPONSES c    u  ..
                              ; rc) .__                                              g ;.g              oy_
O-- :            dL                                                      ' L Lau JGGG ;,^2 io.;C) , ,
                                                                                                              ^
I?t\RT 21 SUBMITTAIJ                                                      M.....'-
7'"'""",            SQ                                                    VENDOR f n: ;            J C;                                                    S. D. Mann            C07A 9111Eli                                                                    W. G. Guldemand (All IR) 006 TXX File (Corp) 24 ST                                                      OTilER TXX File (Site)    A08 l
M6'MOFC) - Fint Class Mail                                                                              IR - Inspection Reports  4 NODIL - Correspondence related to material'eomponent acceptability.
VENDOR - \ endor documents per STA-206 (Vendor Document Group or VETIP Coordinator).
l J
IOER - NRCB, GL and IN                                                                                                            l ORC - Part 21 Submittals, Incoming Part 21 notifications, LER, and description letters for changes to licensing basis documents.
PUC - Monthly Operating Report, Notices of Civil Penalty, SALP Reports and LERs April 8,1994 If revisi(ms are required to distribution or distribution sheet, contact Cayle Peck (N12-8219), ihm Woodlan (812-8225) or John Marshall (H12-8220).
l l
                                                                                                                                            \
                                                  -          -_}}

Latest revision as of 07:16, 6 January 2021

Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual
ML20065K172
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/15/1994
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20065K169 List:
References
PROC-940415, NUDOCS 9404190204
Download: ML20065K172 (16)


Text

_ _ _

I' . .

Attachment to'TXX-94071 April 15, 1994 Page 1 of 2 CPSES - TECHNICAL REQUIREMENTS MANUAL (TRM)

AMENDMENT / REVISION 15 DETAILED DESCRIPTION TR Page (as amended) Group Description ,

4-1 4 Changes the reference to technical specification section from 3.8.4 to 3/4.8.4.

Editorial  :

This is an editorial change to identify the complete technical specification reference applicable to this part of the TRM.

Change Request Number  : TR-93-12.5 Commitment Register Number :

Related SER : 8.4.1 SSER :22 8.3 SER/SSER Impact  : No 4-5 2 See Sheet No(s) :6,18 and 19 Deletes 51M2 relays associated with the Reactor Coolant Pumps from surveillance requirements for containment electrical penetration conductor  ;

overcurrent protective devices.

Revision  :

The primary protection for the containment RCP electrical penetration conductor is provided by relays 50M1-51 and the backup. protection by relay 51M3. A1+ hcugh the relay 51M2 provides additional protection for RCP penetration conductor during  ;

Modes 1, 2 and 3, the sole purpose cf the relay'is I to provide RCP motor protection during hot loop operation.

Chauge Request Number  : TR-93-15.1 ,

Commitment Reglster Number :

Related SER.: 8.4.1 SSER :22 8.3 SER/SSER Impact  : No .l 4-11 2 Deletes from surveillance requirements, breakers j pertaining to the motor operated valves-1-HV-4782 l and 1-8811A. j Revision  :

Containment isolation tanks CP1-CTAVT-01 and CP1-RHATVT-01 located outside the containment used to be part of the containment barrier and the associated valves 1-HV-4782 and 1-8811A.are installed inside the respective tanks and therefore

, the electrical protection devices for.the valves were considered as containment penetration conductor

~

overcurrent protective devices. However the tanks were later declassified and per FSAR section _

6.2.2.2.1 (for CP1-CTAVT-01) and per DBD-ME-260 -]

section 5.1 (for CP1-RHATVT-01), the tanks are no i longer part of the containment barrier Therefore the breakers feeding thene valves are nc longer cont ainment penetration conductor overcutrent 9404190204 940415 gDR ADOCK 05000445 PDR

n Attachment to TXX-94071' Apr11.15, 1994 Page 2 of 2 TR Page (as amended) Group Description protective devices.

Change Request Number  : TR-93-12.1 Commitment Register Number :

Related SER : 8.4.1 SSER :22 8.3 SER/SSER Impact  : No 4-12 2 Deletes from surveillance requirements, breakers-pertaining to the motor operated valves 1-HV-4783 and 1-88118.

Revision  :

Containment isolation tanks CP1-CTATVT-02 and CP1-RHATVT-2 located outside the containment used to._

be part of the containment barrier and the associated valves 1-HV-4783 and 1-8811B are installed inside the respective tanks and therefore the electrical protection devices for the valves were considered as containment penetration conductor overcurrent protective devices. However the tanks were later declassified and per FSAR section 6.2.2.2.1 (for CP1-CTATVT-02) and per DBD-ME-260 section 5.1 (for CP1-RHATVT-02), the tanks are no longer containment penetration conductor overcurrent protective devices.

Change Request Number  : TR-93-12.2-Commitment Register Number

  • Related SER : 8.4.1 SSER :22 8.3 SER/SSER Impact'  : No 4-25 2 Deletes from surveillance requirements,. breakers pertaining to the motor operated valves 2-HV-4782 and 2-8811A.

Revision  :

The electrical penetrations from the tanks are spared and therefore not connected to the THED breakers in the MCC 2EB3-2 compartments 9RF'and 9RM. See also TR-93-12.1.

Change Request Nwmber  : TR-93-12.3 Commitment Register Number :

Related SER : 8.4.1 SSER :22 8.3.

SER/SSER Impact  : No 4-26 2 Deletes from surveillance requirements, breakers pertaining to the motor operated valves 2-HV-4783 and 2-8811B.

Revision

  • The electrical penetrations from the tanks had been spared and are not connected to the THED breakers in the FCC 2EB4-2 compartments BRT and 8RM.

See also TR-93-12.2.

Change Request Number  : TR-93-12.4 Commitment Register Number :

Related SER : 8.4.1 SSER :22 8.3 SER/SSER Impact  : No

p -., >-mK.4~*.- * .a > .d.eet .am r'

e R

e a

r ENCLOSURE TO TXX-94071

. .l

'l -

i l

e

..n. _. _ _ . ;_. __ _ _ . , _ __ . _ _ _ _ . _ _ _ . _ _ _ , _ _ _ _ _ ..__ _ . .. ;.

~

, COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

INSTRUCTION SHEET (Page1of1)

The following instructional information and checklist is being furnished to help insert Revision 15 into the Comanche Peak Steam Electric Station TRM. A description of this revision is provided in TXX-94071, dated April 15, 1994.

Discard the old sheets and insert the new sheets, as listed below. Keep all instruction sheets in the front of the Effective Page Listing to service as a record of changes.

Remny_c Insert Section 4 4-1 4-1 4-5 and 4-6 4-5 and 4-6 4-11 and 4-12 4-1I and 4-12 4-18 and 4-19 4-18 and 4-19 4-25 and 4-26 4-25 and 4-26 I,ist of Effective Pages EPL-1 and EPL-4 EPL-l and EPL-4 i

i 1:

b c

o '.

.T.ECHt11 CAL REQUIREfiENT 4 d _ CONTAINMENT PENETRATION CONDUCTOR O'lERlURRENT PROTECTION DEyICES NOTE: This Technical Requirement contains the listing of overcurrent 15 l protection devices subject to the requirements of Technical l Specification 3/4.8.4. Although the Specification is j repeated here, care must he taken not to overlook Technical i Specification P,equirements.

l l

l l

COMANCHE PEAK - UNITS 1 AND 2 4-1 Revision 15 April 15, 1C94

1 TECHNIML REQUIREMENT 4.1 TABLE 4.1.la 8 UNIT 1 8 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER SYSTEM MD LOCATIDti POWERED

1. 6.9 KVAC from Switchgears
a. Switchgear Bus 1Al RCP #11
1) Primary Breaker 1PCPX1 a) Relay 50M1-51 b) Relay 86M 9 15
2) Backup Breakers 1Al-1 or 1Al-2 a) Relay 51M3 b) Relay 51 for 1Al-1 c) Relay 51 for 1Al-2 d) Relay 86/1A1
b. Switchgear Bus 1A2 RCP #12
1) Primary Breaker 1PCPX2 a) Relay 50M1-51 b) Relay 86M 9 15
2) Backup Breakers 1A2-1 or 1A2-2 a) Relay 51M3 b) Relay 51 for 1A2-1 c) Relay 51 for 1A2-2 d) Relay 86/1A2

)

l COMANCHE PEAK - UNITS 1 AND 2 4-5 Revision 15 April 15, 1994

TECHNICAL REQU18EMENT 4.1 (continued)

IABLE 4.1.la (continued) 8 LLELT L 8 CD!!IAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER SYSTEM AND LOCATION POWERED

1. 6.9 KVAC from Switchgears (continued)
c. Switchgear Bus 1A3 RCP #13
1) Primary Breaker IPCPX3 a) Relay 50M1-51 b) Relay 86M .9 15
2) Backup Breakers 1A3-1 or 1A3-2 a) Relay 51M3 4 b) Relay 51 for 1A3-1 c) Relay 51 for 1A3-2 d) Relay 86/1A3
d. Switchgear Bus 1A4 RCP #14
1) Primary Breaker 1PCPX4 a) Relay 50H1-51 b) Relay 86M 9 15
2) Backup Breaker 1A4-1 or 1A4-2 a) Relay 51M3 b) Relay 51-for 1A4-1 c) Relay 51 for 1A4-2 d) Relay 86/1A4.
2. 480 VAC from Switchgears 2.1 Device Location - Containment 480V Switchgears 1EB1, 1EB2, Recirc, Fans '

1EB3 and IEB4 and CRDM Vent Fans ,

a. Primary. Breakers - 1FNAV1, IFNAV2, 1FNAV3, 1FNAV4, IFNCB1 and 1FNCB2

)

COMANCHE PEAK - UNITS 1 AND 2 4-6 Revision 15 April 15, 1994- '

. , 1 TECHNi(6t_ REQUIREMENT 4.1 (continuedl  !

TABLE 4.1.la (continued) 8 UNIT 1 8 j CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES l l

DEVICE NUMBER AND LOCATION

3. 480VAC from Motor Control Centers (continued)

MCC 1EB3-2 G.E.

COMPT. NO. BKR. TYPE SYSTEM POWERED 8RF THED JB-15-10050, Altern. Feed to Motor Operated Valve 1-8702A 1G THED Motor Operated Valve 1-8112 9G THED Motor Operated Valve 1-8701A '

9M THED Motor Operated Valve 1-8701B SM THED Motor Operated Valve 1-8000A SG THED Motor Operated Valve 1-HV-6074 4G THED Motor Operated Valve 1-HV-6076 4M THED* Motor Operated Valve 1-HV-6078 2G THED Motor Operated Valve 1-HV-4696 2M THED Motor Operated Valve 1-HV-4701 3G THED* Motor Operated Valve 1-HV-5541 3M THED* Motor Operated Valve 1-HV-5543 1M THED Motor Operated Valve 1-HV-6083 6F THED Motor Operated Valve 1-8808A 12 6M THED Motor Operated Valve 1-8808C 12 7M THED Containment Ltg. XFMR-18 (PNL SC1 & SC3) 8M THED Neutron Detector Well Fan-09 7F THFK Electric H2 Recombiner Power Supply PNL-01 8RM THED Motor Operated Valve 1-HV-4075C 15

'15- 'i Primary protection is provided by Gould Tronic TR5 fusible switch with 3.2A fuse.

COMANCHE PEAK - UNITS 1 AND 2 4-11 Revision 15 April 15,-1994

. TECHNICAL REQUIREMENT 4.1 (continued) l TABLE 4.1.la (continued) 8 l UNIT 1 8 CONTAINMENT PENETRATION CQNDUCTOR OVERCURRENT PROTECT [VE DEVICES l i

DEVICE hUMBER AND LOCATION

3. 480VAC From Motor Control Centers (continued) 3.4 Device Location - MCC 1EB4-2 Compartment numbers 12 listed below.

Primary and Backup - Unless noted otherwise, both primary and backup breakers have identical trip ratings and are-located in the same MCC compt.

These breakers are General Electric type THED or THFK with thermal-magnetic trip elements.

MCC 1EB4-2 G.E.

COMPT. NO. BKR. TYPE SYSTEM POWERED IM THED JB-15-1230G, Altern. Feed to Motor Operated Valve 1-87018 8G THED Motor Operated Valve 1-8702A 8M THED Motor Operated Valve 1-87028 4M THED Motor Operated Valve 1-8000B 4G THED Motor Operated Valve 1-HV-6075 3G THED Motor Operated Valve 1-HV-6077 3M THED* Motor Operated Valve 1-HV-6079 2G THED Motor Operated Valve 1-HV-5562 2M THED* Motor Operated Valve 1-HV-5563 SF THED Motor Operated Valve 1-8808B SM THED Motor Operated Valve 1-8808D 6M THED Containment Ltg. XFMR-19

.(PNL SC2 & SC4) .

7M THED Neutron Detector Well Fan-10 6F THFK Elect. H2 Recombiner Power Supply PNL-02 15 15 Primary protection is provided by Gould Tronic-TRS fusible switch with 3.2A fuse.

l i

l COMANCHE PEAK - UNITS 1 AND 2 4-12 Revision 15-April 15~, 1994

_ . , . . - . . _ ... . . , _ . . _ _ . - ._ _ _ _ _ _ . _ _ =

IECHNICAL REQUIREMENT 4.1 (cgDtinued) 8 TABLE 4.1.lb 8 UNIT 2 8 r

CONTAINMENT PENETRATION CONDUCTOR 8 OVERCURRENT PROTECTIVE DEVICES 8 DEVICE NUMBER SYSTEM 8 AND LOCATION POWEREO 8

1. 6.9 KVAC from Switchgears 8.
a. Switchgear Bus 2A1 RCP #21 8
1) Primary Breaker 2PCPX1 8 a) Relay 50M1-51 8 b) Relay 86M 9 15 ,
2) Backup Breakers 2Al-1 or 2Al-2 8 a) Relay 51M3 8 b) Relay 51 for 2Al-1 12 c) Relay 51 for 2Al-2 12 d) Relay 86/2A1 12
b. Switchgear Bus 2A2 RCP #22 8
1) Primary Breaker 2PCPX2 8 a) Relay 50M1-51 8 b) Relay 86M 9 15
2) Backup Breakers 2A2-1 or 2A2-2 8 a) Relay 51M3 8 b) Relay 51 for 2A2-1 12 c) Relay 51 for 2A2-2 12

, d)' Relay 86/2A2 12 i l

i l COMANCHE PEAK - UNITS 1 AND 2 4-18 Revision 15 April 15, 1994

.. . _ . _. _ _ _ _ _ _ _ . . . . . ._. . ___ ,. _ _.~,

- _ _ - . . . _ . . _ . - . . . _ _ _ . ~ . . __ . . ._ _ . _ _ . . _ . _ .

. TECHNICAL REQUIRE,iENT 4.1 (continued) 8 TABLE 4.1.lb (continued) 8 U.N_[J_2 8 CONTAINMENT PENETRATION CONDUCTOR 8 OVERCURRENT PROTECTIVE DEVICES 8 1

DEVICE NUMBER SYSTEM 8 AND LOCATION POWERED B

1. 6.9KVACfromSwitchgears(continued) '8 8
c. Switchgear Bus 2A3 RCP #23 8
1) Primary Breaker 2PCPX3 -8 a) Relay 50M1-51 8 b) Relay 86M 9 15
2) Backup Breakers 2A3-1 or 2A3-2 8 a) Relay 51M3 8 b) Relay 51 for 2A3-1 12~

c) Relay 51'for 2A3-2 12 d) Relay 86/2A3 12

d. Switchgear Bus 2A4 RCP #24 8
1) Primary Breaker 2PCPX4 5 a) Relay 50M1-51 8 b) Relay 86M 9 15
2) Backup Breaker 2A4-1 or 2A4-2 '8 a) Relay 51M3 8 b) Relay 51 for 2A4-1 12 c) Relay 51 for 2A4-2 12 d) Relay 86/2A4 12
2. 480 VAC from Switchgears 8 2.1 Device Location - Containment 8 480V Switchgears 2EB1, 2EB2, Recirc. Fans 8-2EB3 and 2EB4 and CRDM 8 Vent Fans 8:
a. Primary Breakers - 2FNAV1, 8 2FNAV2, 2FNAV3, 2FNAV4, 8 2FNCB1 and 2FNCB2 8 l.

L COMANCHE. PEAK - UNITS 1 AND 2 4-19 Revision 15 i

April 15, 1994

.\

TECHNICAL REOUIREMENT 4.1 (continued) 8 e l TABLE 4.1.lb (continued) 8 UNIT 2 8 LONTAINMENT PENETRATION CONDUCTOR 8 OVEACURRENT PROTECTIVE DEVICES 8 DEVICE NUMBER AND LOCATION

3. 480VAC from Motor Control Centers (continued)

MCC 2EB3-2 G.E. 8 COMPT. NO. BKR. TYPE SYSTEM POWERED 8 8RF THED Altern. Feed to Motor 8 Operated Valve 2-8702A ~8 1G THED Motor Operated Valve 2-8112 8 9G THED Motor Operated Valve 2-8701A 8 9M THED Motor Operated Valve 2-87018 8 SM THED Motor Operated Valve 2-8000A 8 SG THED Motor Operated Valve 2-HV-6074 8 l 4G THED Motor Operated Valve 2-HV-6076 8

4M THED* Motor Operated Valve 2-HV-6078 8

! 2G THED Motor Operated Valve 2-HV-4696 8 2M THED Motor Operated Valve 2-HV-4701 8 3G THED Motor Operated Valve 2-HV-5541 8 3M THED Motor Operated Valve 2-HV-5543 8 1M THED Motor Operated Valve 2-HV-6083- 8 6F THED Motor Operated Valve 2-8808A 12 6M THED Motor Operated Valve 2-8808C 12 7M THED Containment Ltg. XFMR-18 8 (PNL 2SC1 & 2SC3) 8 8M THED Neutron Detector Well Fan-09 8 7F THFK Electric H2 Recombiner Power 8 Supply PNL-01 8 8RM THED Motor Operated Valve 2-HV-4075C 8 15 ,

15' Primary protection is provided by Gould Tronic-TR5 fusible switch 8.

with 3.2A fuse. ,

B COMANCHE PEAK - UNITS 1 AND 2 4-25 Revision 15 April 15,.1994

t T1CHN!_(Al REQUIREMENT 4.1 4 continued) 8 1

IABLE 4.1.lb Lc_ontinued) 8 UNIT 2 8 4

[0NTAINMENT PENETRATION CONDUCTOR 8 OVERCURRENT PROTECTIVE DEVICES 8 -

DEVICE NUMBER 8 AND LOCATION 8 J

3. 480VAC From Motor Control Centers (continued) 8-3.4 Device Location - MCC 2EB4-2 Compartment numbers 12 listed below. 8 Primary and Backup - Unless noted otherwise, both 8 primary and backup breakers have 8' identical trip ratings and are 8' located in the same MCC compt. 8 These breakers are General 8 Electric type THED or THFK with .8 thermal-magnetic trip elements. 8 MCC 2EB4-2 G.E. 8 COMPT. NO. SKR. TYPE SYSTEM POWERED 8 1M THED Altern. Feed to Motor 8 Operated Valve 2-87018 8 8G THED Motor Operated Valve 2-8702A 8-8M THED Motor Operated Valve 2-8702B 8 4M THED Motor Operated Valve'2-80008 -8 4G THED Motor Operated Valve 2-HV-6075 8 3G THED Motor Operated Valve 2-HV-6077 8 3M THED* Motor Operated Valve 2-HV-6079 8~

, 20 THE0* .

Motor Operated Valve 2-HV-5562 8 2M THE0* Motor Operated Valve 2-HV-5563 -8 SF THED Motor Operated Valve 2-88088 8-SM THED Motor. Operated Valve 2-88080 8

, 6M THED Containment Ltg. XFMR-19. 8 (PNL 2SC2 & 2SC4) 8 7M THED Neutron Detector Well Fan-10 8 6F THFK Elect. H _Recombiner 2 Power 8 Supply PNL-02 .8 i 15 15 8 .

Primary protection is provided by Gould Tronic TRS fusible switch 8 l with 3.2A fuse, j

i COMANCHE PEAK -UNITS 1 AND 2 4-26 Revision 15 April 15, 1994 .

Nl' ~ *P y '

l e

  • j COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

I EFFECTIVE PAGE LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:  ;

Original Submitted July 21, 1989 Revision 1 September 15, 1989 Revision 2 January 15, 1990

Revision 3 July 20, 1990 Revision 4 April 24, 1991 Revision 5 September 6, 1991 Revision 6 November 22, 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 Revision 10 January 22, 1993 Revision 11 February 3, 1993 Revision 12 July.15, 1993 Revision 13 September 14, 1993 Revision 14 November 30, 1993 Revision 15 April 15, 1994 EPL-1 April 15, 1994

.i

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 3-9 June 30, 1992 3-10 Revision 11 3-11 Revision 11 Sec. 4-Tab Original 4-1 Revision 15 4-2 Revision 12 4-3 July 15,.1993 l: 4-4 July 15, 1993 -

! 4-5 Revision 15 ,

4-6 Revision 15 4-7 Revision 8 4-8 Revision 13 4-9 Revision 13 4-10 Revision 13

. 4-11 Revision 15 4-12 Revision 15 4-13 Revision 13 4-14 Revision 13 l

4-15 Revision 8 4-16 Revision 12 4-17 Revision 10 4-18 Revision 15 4-19 Revision 15 4-20 Revision 8 4-21 Revision ~12 l 4-22 July 15, 1993 4-23 Revision 12 4-24 Revision 12 4-25 Revision 15 4-26 Revision 15 4-27 Revision 8 4-28 Revision 10 4-29 Revision 12 4-30 Revision 10 4-31 July 154 1993 EPL-Tab Original g EPL-1 April 15 1994 EPL-2 November ~30, 1993 EPL-3 November 30, 1993 EPL-4 April 15, 1994 EPL-4 April =15, 1994-

.~. ~,,:- -. . . .-. . . - - . - . . . - . . . - - - -. . - . . . . . . .

4 CORRESPONDENCE INTERNAL DISTRIBUTION 100lO LOG NO. TXX 94071 FILE NO. +eef3' 916 (TRM)

TO: DISTRIBUTION FROM: LICENSING DATE: 04/15/1994 SURJEqll TECilNICAL REQUIREMENTS MANUAL REVISION 15 - REVISION TO TO SECTION 4.1 AND TABLES 4.1.l A AND 4.1.lB LICENSINO LEAD; JMK COMMENTS:

DAl.LAS DIS'IRIHUTED SITE DISTRillUTED ALL All W. M. Taylor 19BT W. J. Cahill. Jr. E22 R. D. Walker / 24ST FY SUBJEC.I J. S. Marshall T. A. Ilope A08 R. A. Wooldridge 32BT D. E. Buschbaum A08 P. Johnson (FC) D. L. Davis EOS CCS - E06 D. McAfec A08 DY SUBJECT D. E. Armstrong M38 D. R. Woodlan 24ST F. L. Powers (NODIL) C07A A. Ilusain 24SL J. J. Kelley EOS J, L. Vota (W) (FC) J. J. LaMarca M35 DOCKET REL6IliQ J. W. Muffett N20 R. M. tillmore 32BT C. L. Terry E01 D. Fiorelli 16BT M. R. Blevins E08 R. O. Spangler 21BT R. J. Prince M37 J. L. French (FC) B. T. Lancaster M32 QENERIC D. R. Moore M32

_ L " ." , , l'IT M. L. Lucas M32 H.5.L,..U. W) J. F. McMahon T01 flSES IR ONLY fPSES IR & RESPONSES c u ..

rc) .__ g ;.g oy_

O-- : dL ' L Lau JGGG ;,^2 io.;C) , ,

^

I?t\RT 21 SUBMITTAIJ M.....'-

7'"'""", SQ VENDOR f n: ; J C; S. D. Mann C07A 9111Eli W. G. Guldemand (All IR) 006 TXX File (Corp) 24 ST OTilER TXX File (Site) A08 l

M6'MOFC) - Fint Class Mail IR - Inspection Reports 4 NODIL - Correspondence related to material'eomponent acceptability.

VENDOR - \ endor documents per STA-206 (Vendor Document Group or VETIP Coordinator).

l J

IOER - NRCB, GL and IN l ORC - Part 21 Submittals, Incoming Part 21 notifications, LER, and description letters for changes to licensing basis documents.

PUC - Monthly Operating Report, Notices of Civil Penalty, SALP Reports and LERs April 8,1994 If revisi(ms are required to distribution or distribution sheet, contact Cayle Peck (N12-8219), ihm Woodlan (812-8225) or John Marshall (H12-8220).

l l

\

- -_