l PLANT MANUAL SECTION:  PROCEDURE /WOBK PLAN TITLE:                                    NO:            l EMERGENCY PLAN            EMERGENCY RESPONSE ORGANIZATION                              1903.50 RKANSAS NUCLEAR ONE 5'sia                          CHAP:GE 1      oata DATE 3n s/81 ATTACHMENT 3 Primary Locations of Members of the Emergency' Response Organization NOTE:      In the event the Onsite Technical Support Center or the Onsite Operations Support Center must be evacuated, personnel in these centers will be relocated to the Emergency Control Center.
                                                                                                                          ;
PLANT MANUAL SECTION:  PROCEDURE /WOBK PLAN TITLE:                                    NO:            l EMERGENCY PLAN            EMERGENCY RESPONSE ORGANIZATION                              1903.50 RKANSAS NUCLEAR ONE 5'sia                          CHAP:GE 1      oata DATE 3n s/81 ATTACHMENT 3 Primary Locations of Members of the Emergency' Response Organization NOTE:      In the event the Onsite Technical Support Center or the Onsite Operations Support Center must be evacuated, personnel in these centers will be relocated to the Emergency Control Center.
t        i l
t        i l
                                                       '                l          !
                                                       '                l          !

Latest revision as of 23:23, 17 February 2020

Central Files Version of Emergency Plan Implementing Procedure 1903.50,Revision 1, Emergency Response Organization.
ML20003D779
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/20/1981
From: Ohanlon J
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20003D777 List:
References
PROC-810320, NUDOCS 8103310600
Download: ML20003D779 (3)


Text

l Cry" ARKANSAS POWER & LIGHT COMPANY yh .s Arkansas Nuclear One OfER$UhYPLAN l FORM 1000 C5A l l N #7 3,. s

..JN!Qk$)l' Agg4 EMERGENCY RESPONSE ORGANIZATION l

, ,> 1903.30 REV. 1 1- \ .1 1 g a 3 1 q , .M f f Q~) .

~

jfff d RECO3D OF CHANGES AND REV!SiONS PAGE R EVIS:CN CHANGE PAGE REviS;CN CHANGE PAGE REVIS;CN CHANGE 1 0 2 0 3 0 4 1 5 0 6 0 7 0 8 0 9 0 r

10 0 11 1 12 0 13 0 14 0

" " " -mesm . . , __

a

.....- 3popi 810 3 310 soo 4

PtANT MANUAL SECTION: PROCEDURE / WORK PLAN TITtE: NO:

l i EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 PAGE 4 o f 14 ARKANSAS NUCLEAR ONE asvision i CHANGE o^te DATE ns/81 5 13 The Health Physics and Chemistry Superintendent is responsible for coordinating health physics and chemistry activities. These activities include onsite and offsite radiological tonitoring, dose assessment calculations, magnitude of t3diological release calcula-tions, primary side chemistry control and sampling, and secondcry side chemistry control and sampling. The Health Physics and Chemistry Superintendent is respon ible for coordinating AP&L offsite radio-4 logical monitoring efforts with the Arkansas Department of Health and Nuclear Regulatory Commission.

This position should be filled by the ANO Technical Analysis Super-intendent.

5.14 The Engineering Resources Coordinator is responsible for coordinating the engineering support of the Nuclear Steam Supply System vendors, Architect / Engineer, Middle South Services, Nuclear Regulatory Commission, other utilities, and consultants.

This position should be filled by the Director of Generation Engineer-ing.

5.15 The Licensing Coordinator is responsible for coordinating activities to respond to Nuclear Regulatory Commission requests.

This position should be filled by the Manager of Licensing.

I 5.16 The Nuclear Support Supervisor is responsible for coordinating activi-ties related to nuclear engineering and reactor physics.

This position should be filled by the AN0 Plant Analysis Superintendent.

5.17 The Site Engineering Supervisor is responsible for coordinating engi-neering activities at the site.

This position should be filled by the Plant Engineering Superintendent.

5.18 The Dose Assessment Supervisor is responsible for calculating magnitude of radiological releases and doses to individuals onsite and offsite.

This position should be filled by the Manager of Technical Analysis.

I 1

l PLANT MANUAL SECTION: PROCEDURE /WOBK PLAN TITLE: NO: l EMERGENCY PLAN EMERGENCY RESPONSE ORGANIZATION 1903.50 RKANSAS NUCLEAR ONE 5'sia CHAP:GE 1 oata DATE 3n s/81 ATTACHMENT 3 Primary Locations of Members of the Emergency' Response Organization NOTE: In the event the Onsite Technical Support Center or the Onsite Operations Support Center must be evacuated, personnel in these centers will be relocated to the Emergency Control Center.

t i l

' l  !

E! 5 5 d l 8 8 dN aN! $ C x

$ E l !$ ;-

d ! l Id!>d

, o

$ >N az

$ m ;l w $ f w s $ j uEd d>5d ld-=

HH z-;

x HS#

z-!

. s c . :- < c : c x m:;mwe

=%0 %5 zz

a z so z%
a a z POSITION TITLE .85;85l@@l8$@ 58l ez Qd 85@

Ops. Superintendent X X Shift Ops. Supervisor X X Shift Technical Advisor

  • X -

Shift Administrative Assistant X X Operations Personnel X X Recovery Manager X Maintenance Manager X Operations Manager X Tech. Support Manager ,

X HP & Chemistry Superintendent X Nuclear & Engr. Support Superintendent X Dose Assessment Supervisor X Maintenance Superintendents X Nuclear Support Supervisor X Site Engineering Supervisor X i Onsite Monitoring & HP Supervisor X '

Radchem. Supervisor i X i

, i Chemistry Supervisor '

X l 1 l

Radwaste Coordinator '

X i I i

Emergency Services Coordinator >

X  !

Site Security Coordinator , X

! i Site Office Services Coordinator i X

  • The Shift Technical Advisor functions in the Control Room of the affected Unit.