ML081140745: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML081140745
| number = ML081140745
| issue date = 04/23/2008
| issue date = 04/23/2008
| title = 04/15/2008 - Summary of Meeting with Exelon Generation Company, LLC Peach Bottom Safety Conscious Work Environment
| title = Summary of Meeting with Exelon Generation Company, LLC Peach Bottom Safety Conscious Work Environment
| author name = Krohn P
| author name = Krohn P
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4

Latest revision as of 07:11, 7 December 2019

Summary of Meeting with Exelon Generation Company, LLC Peach Bottom Safety Conscious Work Environment
ML081140745
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/23/2008
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN P, RI/DRP/PB4/610-337-5120
References
Download: ML081140745 (2)


Text

April 23, 2008 MEETING

SUMMARY

LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 & 3

SUBJECT:

SUMMARY

OF APRIL 15, 2008, PEACH BOTTOM SAFETY CONSCIOUS WORK ENVIRONMENT (SCWE) EXIT MEETING On April 15, 2008, at 5:30 p.m., a meeting was conducted at the Peach Bottom Inn in Delta, PA between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company, LLC (Exelon). The NRC requested the meeting with Exelon management to discuss: 1) the SCWE inspection conducted at Peach Bottom from March 24 to 28, 2008 (in accordance with the November 28, 2007 reactor oversight process deviation memorandum, ML073320344); and 2) the status of security organization SCWE surveys at other Exelon Nuclear operating reactors (in accordance with the October 19, 2007 Confirmatory Action Letter (ML072920283) and an October 4, 2007 letter from Exelon to the NRC (ML072850708)).

The NRC presented the results of its SCWE inspection conducted during the week of March 24, 2008. The NRC presentation included a discussion of SCWE inspection objectives; the results of a SCWE survey of the Peach Bottom staff; the independent results of focus group and individual interviews of Peach Bottom staff conducted by NRC inspectors; inspector observations regarding the Employee Concerns Program; and inspector observations regarding the SCWE within the security organization. As part of the meeting, Exelon commented on the SCWE inspection results and provided a status of security organization SCWE surveys at other Exelon Nuclear operating reactors.

The public observed the meeting and were offered the opportunity to communicate with the NRC regarding Exelons SCWE performance and the role of the agency in ensuring safe plant operations. At the end of the meeting the NRC answered questions from the public including a discussion of evacuation plans, tornado impacts on site structures, past allegation history, and security. The meeting notice with attached meeting agenda can be located in ADAMS under Accession Number ML080940682. The slides for the meeting can be found in ADAMS under Accession Number ML081130088.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

ML081140745 DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP-7 EOC\2007 AAM Meeting Notices and Summaries\PB 4_15_08 SCWE Public Meeting Summary.doc SUNSI Review Complete: PGK (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP

  • RI/DRP NAME TSetzer/TS MGray/PGK for PKrohn/PGK DATE 04/22 /08 04/23/08 04/23/08