MN 08-018, Notice of Public Meeting with Exelon Generation Co., LLC, Peach Bottom SCWE
| ML080940682 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/03/2008 |
| From: | Paul Krohn Reactor Projects Region 1 Branch 4 |
| To: | |
| KROHN, PG | |
| References | |
| MN 08-018 | |
| Download: ML080940682 (5) | |
Text
MN No.08-018 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING April 3, 2008 Licensee:
Exelon Generation Company, LLC Facility:
Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos.:
50-277; 50-278 Date/ Time:
April 15, 2008 at 5:30 p.m.
Location:
Peach Bottom Inn 6085 Delta Road Delta, PA 17314
Purpose:
The NRC requested a meeting with Exelon to:
- 1) discuss the NRC safety conscious work environment (SCWE) inspection conducted at Peach Bottom from March 24 to 28, 2008 (in accordance with the November 28, 2007 reactor oversight process deviation memorandum); and
- 2) discuss the status of security organization SCWE surveys at other Exelon Nuclear operating reactors.
Attendees:
NRC:
M. Dapas, Deputy Regional Administrator M. Gamberoni, Director, Division of Reactor Safety P. Krohn, Chief, Division of Reactor Projects (DRP) Branch 4 M. Gray, Chief, DRP Technical Support and Assessment Branch F. Bower, Senior Resident Inspector, Peach Bottom M. Brown, Resident Inspector, Peach Bottom Licensee:
J. Grimes, Site Vice President, Peach Bottom M. Massaro, Plant Manager J. Armstrong, Manager, Regulatory Assurance Public Participation: This is a Category 1 Meeting and will be conducted in two parts. The first part will include a public exit regarding the NRCs inspection of Peach Bottoms SCWE survey results. The second part will include a discussion of the status of security organization SCWE surveys at other Exelon Nuclear operating reactor sites.
The public is invited to observe the exit meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before that meeting is adjourned.
2 Meeting
Contact:
Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: pgk1@nrc.gov This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML080940682. ADAMS is accessible from the NRC Web Site at:
http://www.nrc.gov/reading-rm/adams.html.
Previous regulatory actions regarding Peach Bottom can be located in ADAMS with Accession Numbers ML072920283 (Confirmatory Action Letter); ML073090061 (Augmented Inspection Team); ML073320344 (Reactor Oversight Process Deviation Memorandum); ML073550590 (Augmented Inspection Team Follow-up); and ML080440012 (Final Significance Determination).
Confirmatory Action Letter, Item 16, from Exelons October 4, 2007, letter (ML073180128) committed Exelon to performing security organization SCWE surveys to identify any required corrective actions.
The NRCs annual assessment letter regarding Peach Bottom performance during 2007 can be found in ADAMS with Accession Number ML080630190. Information relative to the NRCs Annual Assessment process and the safety performance of Peach Bottom can be found on the NRCs web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting.
Attendance by NRC personnel at this meeting should be made known by April 11, 2008, via telephone to the NRC meeting contact.
Approved By: ___/RA/_____ ____
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:
C. Crane, Executive Vice President, Exelon, Chief Operating Officer, Exelon Generation M. Pacilio, Chief Operating Officer, Exelon J. Grimes, Site Vice President, Peach Bottom R. DeGregorio, Senior Vice President, Mid-Atlantic R. Hovey, Senior Vice President, Nuclear Oversight M. Massaro, Plant Manager, Peach Bottom J. Armstrong, Regulatory Assurance Manager, Peach Bottom J. Bardurski, Manager, Financial Control & Co-Owner Affairs G. Stathes, Acting Director of Operations P. Cowan, Director, Licensing K. Jury, Vice President, Licensing and Regulatory Affairs J. Bradley Fewell, Associate General Counsel, Exelon
3 T. Wasong, Director, Training Correspondence Control Desk D. Allard, Bureau of Radiation Protection, PA Department of Environmental Protection R. McLean, Power Plant and Environmental Review Division (MD)
S. Pattison, Asst Secretary, MD Department of the Environment A. Lauland, Director, Homeland Security Advisor T. Snyder, MD Department of Environment Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. OConnor, Council Administrator of Harford County Council R. Ayers, Deputy Mgr, Harford County Div of Emergency Operations E. Crist, Harford County Div of Emergency Operations S. Ayers, Emergency Planner, Harford County Div of Emergency Operations R. Brooks, Cecil County Dept of Emergency Services Mr & Mrs Dennis Hiebert, Peach Bottom Alliance E. Epstein, TMI - Alert J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams R. Fletcher, Department of Environment, Radiological Health Program J. Powers, Director, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency D. Lockbaum, Union of Concerned Scientists
4 Agenda NRCs Safety Conscious Work Environment (SCWE) Inspection Public Exit and Status of other Exelon Security Organization SCWE Surveys for Peach Bottom Atomic Power Station April 15, 2008 Introduction.......................................................................................................NRC (3 minutes)
Peach Bottom SCWE Inspection Results.........................................................NRC (20 minutes)
Exelon Discussion of Status of Security Organization SCWE.......................Exelon (15 minutes)
Surveys at other Nuclear Operating Reactor Sites NRC Questions................................................................................................NRC (15 minutes)
Closing Remarks..............................................................................................NRC (10 minutes)
Short Break................................................................................................................ (5 minutes)
NRC to address public questions..................................NRC/Members of the Public (as needed)
ML080940682 DOCUMENT NAME: G:\\DRP\\BRANCH4\\Assessment (EOC, MC)\\ROP-7 EOC\\2007 AAM Meeting Notices\\PB 4_15_08 SCWE Meeting Notice Rev0.doc SUNSI Review Complete: PGK (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME MBrown/PGK for MGray/MG PKrohn/PGK DATE 04/03/08 04 /03/08 04/03/08