09/19/2017, Summary of Meeting with Exelon Regarding Peach Bottom, Units 2 and 3 Subsequent License Renewal Application
ML17275A522
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/16/2017
From: Martinez N
Division of Materials and License Renewal
To: Benjamin Beasley
Office of Nuclear Reactor Regulation
Nancy Martinez, NRR/DLR, 415-2719
References
Download: ML17275A522 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2017 MEMORANDUM TO: Benjamin Beasley, Chief Environmental Review and NEPA Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation FROM: Nancy Martinez, Physical Scientist /RA/

Environmental Review and NEPA Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF SEPTEMBER 19, 2017, PREAPPLICATION MEETING WITH EXELON REGARDING THE PEACH BOTTOM, UNITS 2 AND 3 SUBSEQUENT LICENSE RENEWAL APPLICATION On September 19, 2017, the U.S. Nuclear Regulatory Commission (NRC) held a Category 1 public meeting at NRC headquarters with Exelon Generation Co., LLC. This was a preapplication meeting to discuss the environmental report that Exelon plans to submit as part of its future subsequent license renewal application for Peach Bottom Atomic Power Station, Units 2 and 3. The meeting notice and presentation slides are available in the Agencywide Documents Access and Management System (ADAMS) at Accession Nos. ML17261B208 and ML17257A161, respectively. A list of meeting attendees is enclosed.

During the meeting, Exelon presented background information on the site location, the surrounding area, and the plant. This was followed by a discussion on the following topics pertaining to the scope and key features of the Peach Bottom, Units 2 and 3 subsequent license renewal environmental report:

  • Environmental Report Title
  • Refurbishment Activities
  • Incorporation by Reference
  • Peach Bottom, Unit 1 Site Status
  • Groundwater Monitoring Program
  • Transmissions Lines
  • Protected Species and Consultations CONTACT: Nancy Martinez NRR/DMLR (301) 415-2719
  • Clean Water Act Section 401 Certification
  • Coastal Zone Management Act Consistency Determination
  • Cultural Resources
  • Status of the National Pollutant Discharge Elimination System Permit Renewal
  • New and Significant Severe Accident Mitigation Alternative Analysis
  • High Burnup Fuel
  • Reasonable Alternatives to the Proposed Action The NRC staff made the following suggestions during the meeting:
  • Exelon may want to consider conducting a historical structure assessment for Peach Bottom, Unit 1 and other plant structures for National Register eligibility as the State Historic Preservation Officer may request such an assessment.
  • If Services (National Marine Fisheries Service and Fish and Wildlife Service) do not respond to consultation letters, Exelon should consider making followup calls with the Services as well as involving the NRC staff in communications between Exelon and the Services.
  • Exelon should ensure that a full accounting is provided in its environmental report for all generic (Category 1) and site-specific (Category 2) issues currently listed in Table B-1 of Appendix B to Subpart A of 10 CFR Part 51.
  • During the technical review of the license renewal application, it would be beneficial for Exelon to provide thermal discharge studies Exelon conducted in association with Clean Water Act Section 316(a) evaluations on the electronic portal.

After Exelons presentation and discussions, the NRC staff asked for comments or questions from the public. There were no public comments or questions. The NRC made no regulatory decisions or commitments during the meeting.

Docket Nos. 50-277 and 50-278

Enclosure:

Attendee list

SUBJECT:

SUMMARY

OF SEPTEMBER 19, 2017, PREAPPLICATION MEETING WITH EXELON REGARDING THE PEACH BOTTOM, UNITS 2 AND 3 SUBSEQUENT LICENSE RENEWAL APPLICATION Distribution PUBLIC BBeasley AWong BBrady TTran GWilson JDonoghue WBurton CKanatas NMartinez ADAMS Package No. ML17275A522 OFFICE NRR/DMLR/MENB/PS NRR/DMLR/LA NRR/DMLR/MENB/BC NRR/DMLR/MENB/PS NAME NMartinez YEdmonds BBeasley NMartinez DATE 10/10/2017 10/06/2017 10/10/2017 10/16/2017 OFFICIAL RECORD COPY

PUBLIC MEETING ATTENDEES Peach Bottom, Units 2 and 3, Subsequent License Renewal Environmental Preapplication Meeting September 19, 2017, 1 to 4 P. M.

NRC One White Flint North, 07B04 11555 Rockville Pike, Rockville, MD NAME ORGANIZATION William Rautzen U.S. Nuclear Regulatory Commission (NRC)

Nancy Martinez NRC Bill Rogers NRC David Lewis Pillsbury Kevin Folk NRC Bobbie Hurley AECOM Jeffrey Rikhoff NRC Lois James NRC William Ford NRC Elaine Keegan NRC Michelle Moser NRC Joe Donoghue NRC Briana Grange NRC Cathy Kanatas NRC Bennett Brady NRC C.J. Fong NRC John Hufnagel Exelon Generation Co., LLC (Exelon)

Michael Gallagher Exelon Nancy Ranek Exelon Tony Banks Dominion Enclosure