{{#Wiki_filter:3-21-06; 8:53AM;DCPP FIFTH FL. EAST# 2/ 7 t. ' .;- ,.Pacific Gas and Electic Company James L Becker Vite President-Diablo Canyon Operations and Station Director Diablo Canyon Power Plant PO. Box 56 Avita Beach, CA 93424 805.545.3462 Fax: 805.545.4234 January 15, 2004 PG&E Letter DCL-04-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units I and 2 Monthly Operating Report for December 2003 Dear Commissioners and Staff: Enclosed is the Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2, for December 2003. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.Sincerely, C_.-.,-----.?C- -James R. Becker smg/1 713/R0253694 Enclosures cc/enc: Paul R. Fox, American Nuclear Insurers Robert D. Glynn, Jr.Bruce S. Mallett, NRC Regional Administrator, Region IV David L. Prouix, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager INPO Record Center I.kn A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
{{#Wiki_filter:#    2/    7 3-21-06;   8 :53AM;DCPP     FIFTH FL. EAST                                                                             t. '     .;- ,.
Pacific Gas and Electic Company James L Becker                 Diablo Canyon Power Plant Vite President-Diablo Canyon   PO. Box 56 Operations and Station Director Avita Beach, CA93424 January 15, 2004                                                                                          805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-04-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units I and 2 Monthly Operating Report for December 2003
 
==Dear Commissioners and Staff:==
 
Enclosed is the Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2, for December 2003. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.
C_.-.,--           ---. ?
Sincerely, C-   -
James R. Becker smg/1 713/R0253694 Enclosures cc/enc:       Paul R. Fox, American Nuclear Insurers Robert D. Glynn, Jr.
Bruce S. Mallett, NRC Regional Administrator, Region IV David L. Prouix, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager                                                                                 I.
INPO Record Center A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Comanche Peak
* Comanche Peak
* Diablo Canyon
* Diablo Canyon
* Palo Verde
* Palo Verde
* South Texas Project
* South Texas Project
* Wolf Creek  
* Wolf Creek kn
;055453 4 159 # 3/ 7 3-21-06; 8:53AM;DCPP FIFTH FL. EAST Enclosure I PG&E Letter DCL-04-003 DECEMBER 2003, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS 1 AND 2 Summary of Unit I Operation Unit I began the month in Mode I (Power Operation) at approximately 100 percent power. On December 10, 2003, operators commenced a planned ramp to below 25 percent power in response to a storm forecast predicting high ocean swells. After the high swell warning had been terminated, on December 11, 2003, operators commenced ramping to approximately 50 percent power and remained at that power level to inspect the condenser for saltwater leakage. After these inspections were completed, operators commenced ramping to full power and reached approximately 100 percent power on December 12, 2003. On December 22, 2003, at I 1 16 PST, a 6.5M earthquake occurred approximately 50 km NNW from the plant, resulting in an Unusual Event (reference Special Report 2003-04, dated January 5, 2004, DCL-03-184).
 
The units remained at 100 percent power during the seismic event Summary of Unit 2 Operation Unit 2 began the month in Mode 1 at approximately 100 percent power. On December 10, 2003, operators commenced a planned ramp to below 25 percent power in response to a storm forecast predicting high ocean swells. After the swell warning had been terminated, on December 11, 2003, operators commenced ramping to full power and reached approximately 1 00 percent later that day. With the exception of this planned power change, Unit 2 remained at approximately 100 percent power in December 2003.Actuations of Pressurizer Safety or Power-Operated Relief Valves There were no challenges to the pressurizer power-operated relief valves, pressurizer safety valves, or steam generator safety valves.
4
SP=3-21-06; e:53AM;DCPP FtFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
                                                                        ;055453   159         # 3/ 7 3-21-06;     8:53AM;DCPP FIFTH FL. EAST Enclosure I PG&E Letter DCL-04-003 DECEMBER 2003, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS 1 AND 2 Summary of Unit I Operation Unit I began the month in Mode I (Power Operation) at approximately 100 percent power. On December 10, 2003, operators commenced a planned ramp to below 25 percent power in response to a storm forecast predicting high ocean swells. After the high swell warning had been terminated, on December 11, 2003, operators commenced ramping to approximately 50 percent power and remained at that power level to inspect the condenser for saltwater leakage. After these inspections were completed, operators commenced ramping to full power and reached approximately 100 percent power on December 12, 2003. On December 22, 2003, at I 116 PST, a 6.5M earthquake occurred approximately 50 km NNW from the plant, resulting in an Unusual Event (reference Special Report 2003-04, dated January 5, 2004, DCL-03-184). The units remained at 100 percent power during the seismic event Summary of Unit 2 Operation Unit 2 began the month in Mode 1 at approximately 100 percent power. On December 10, 2003, operators commenced a planned ramp to below 25 percent power in response to a storm forecast predicting high ocean swells. After the swell warning had been terminated, on December 11, 2003, operators commenced ramping to full power and reached approximately 100 percent later that day. With the exception of this planned power change, Unit 2 remained at approximately 100 percent power in December 2003.
50-275 Diablo Canyon Unit 1 110212004 S. Guess (805) 545-4692 REPORT MONTH: December 2003 1. 1 Design Electrical Rating (Mwe -Net): I 1,103 2. Maximum Dependable Capacity (Mwe -Net): 1,087_ _ .This Month I YTD I Cumulative
Actuations of Pressurizer Safety or Power-Operated Relief Valves There were no challenges to the pressurizer power-operated relief valves, pressurizer safety valves, or steam generator safety valves.
: 3. Number of Hours Reactor Critical:
 
744.0 8,760.0 142,986.8 4. Number of Hours Generator On-Line: 744.0 8,760.0 141,469.6 5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0 6. Net Electrical Energy Generated (MWH): 781,249 9,585,431 146,791,730 I I a 5/ 7 3-21-06; 8:53AM; DCPP FIFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 UNIT SHUTDOWNS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
SP=
50-275 Diablo Canyon Unit 1 1/02/2004 S. Guess (805) 545-4692 REPORT MONTH: December 2003 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE I LFMDo) (ced) OU) OF ACTIONS S (ScheduLed) qUTN DOWN 2 COMMENTS N/A There were no shutdowns this month._ -- .1. Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)2. Method I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month 5-Other 2
3-21-06;     e:53AM;DCPP FtFTH   FL. EAST Enclosure 2 PG&E Letter DCL-04-003 OPERATING DATA REPORT DOCKET NO.:         50-275 UNIT NAME:           Diablo Canyon Unit 1 DATE:                 110212004 COMPLETED BY:         S. Guess TELEPHONE:            (805) 545-4692 REPORT MONTH: December 2003
; 805+545 3459 # 8/ 7 3-21-06; 8:53AM;DCPP FIFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
: 1. 1Design Electrical Rating (Mwe - Net):         I 1,103
50-323 Diablo Canyon Unit 2 1/02/2004 S. Guess (805) 5454692 REPORT MONTH: December 2003 I 1. I Design Electrical Rating (MWe -Net): I 1119 ll 2. l Maximum Dependable Capacity (MWe -Net): 1 1087-- -. 1 ThIs Month I YTD Cumulative
: 2. Maximum Dependable Capacity (Mwe - Net):           1,087 This Month I YTD I Cumulative
: 3. Number of Hours Reactor Critical:
: 3. Number of Hours Reactor Critical:             744.0   8,760.0       142,986.8
744.0 7,291.41 138,649.9 4. Number of Hours Generator On-Line: 744.0 7,226.2 137,114.1 5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0 6. Net Electrical Energy Generated (MWH: 784,934 7,725.227 144,417,217 3  
: 4. Number of Hours Generator On-Line:             744.0   8,760.0       141,469.6
;805+545+345  
: 5. Unit Reserve Shutdown Hours:                     0.0         0.0             0.0
# 7/ 7 3-21-06; 8:53AM;DCPP FIFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 UNIT SHUTDOWNS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
: 6. Net Electrical Energy Generated (MWH):     781,249 9,585,431 146,791,730 I
50-323 Diablo Canyon Unit 2 1/02/2004 S. Guess (805) 545-4692 REPORT MONTH: December 2003 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE
I
..(YYMMD) F(Fara.d) (HOURS) OF ACSTINGCORRNTS (YMD)S(Scheduled)
 
SHUTTINGACIN
a 5/ 7 3-21-06;       8:53AM; DCPP FIFTH     FL. EAST Enclosure 2 PG&E Letter DCL-04-003 UNIT SHUTDOWNS DOCKET NO.:               50-275 UNIT NAME:               Diablo Canyon Unit 1 DATE:                      1/02/2004 COMPLETED BY:            S. Guess TELEPHONE:                (805) 545-4692 REPORT MONTH: December 2003 NO.       DATE       TYPE           DURATION   REASON'     METHOD         CAUSE & CORRECTIVE I             LFMDo)
______ DWN 2 COMMENTS N/A There were no shutdowns this month.1. Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)2. Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month 5-Other 4}}
(ced)
S (ScheduLed)
OU) qUTN OF                ACTIONS DOWN 2             COMMENTS N/A                                                                       There were no shutdowns this month.
: 1. Reason                                         2. Method A-Equipment Failure (Explain)                       I-Manual B-Maintenance or Test                             2-Manual Trip/Scram C-Refueling                                       3-Automatic Trip/Scram D-Regulatory Restriction                           4-Continuation from Previous Month E-Operator Training/License Examination           5-Other F-Administrative G-Operational Error (Explain)
H-Other (Explain) 2
 
                                                                    ; 805+545 3459       # 8/ 7 3-21-06;     8:53AM;DCPP FIFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 OPERATING DATA REPORT DOCKET NO.:         50-323 UNIT NAME:         Diablo Canyon Unit 2 DATE:              1/02/2004 COMPLETED BY:      S. Guess TELEPHONE:          (805) 5454692 REPORT MONTH: December 2003 I 1. I Design Electrical Rating (MWe - Net):           I 1119 l l 2. l Maximum Dependable Capacity (MWe - Net):         1 1087
                                                          --   -. 1 ThIs Month I       YTD         Cumulative
: 3. Number of Hours Reactor Critical:             744.0       7,291.41     138,649.9
: 4. Number of Hours Generator On-Line:             744.0       7,226.2     137,114.1
: 5. Unit Reserve Shutdown Hours:                     0.0           0.0             0.0
: 6. Net Electrical Energy Generated (MWH:     784,934     7,725.227     144,417,217 3
 
                                                                            ;805+545+345           # 7/ 7 3-21-06;     8:53AM;DCPP   FIFTH     FL. EAST Enclosure 2 PG&E Letter DCL-04-003 UNIT SHUTDOWNS DOCKET NO.:             50-323 UNIT NAME:               Diablo Canyon Unit 2 DATE:                    1/02/2004 COMPLETED BY:            S. Guess TELEPHONE:              (805) 545-4692 REPORT MONTH: December 2003 NO.     DATE       TYPE         DURATION   REASON'       METHOD       CAUSE & CORRECTIVE
                .. (YMD)S(Scheduled)
(YYMMD)     F(Fara.d)     (HOURS)                   OF SHUTTINGACIN      ACSTINGCORRNTS
______   DWN2              COMMENTS N/A                                                                     There were no shutdowns this month.
: 1. Reason                                         2. Method A-Equipment Failure (Explain)                       1-Manual B-Maintenance or Test                             2-Manual Trip/Scram C-Refueling                                       3-Automatic Trip/Scram D-Regulatory Restriction                           4-Continuation from Previous Month E-Operator Training/License Examination           5-Other F-Administrative G-Operational Error (Explain)
H-Other (Explain) 4}}

Latest revision as of 07:44, 23 March 2020

December 2003 Monthly Operating Report for Diablo Canyon
ML060890092
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/15/2004
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-04-003, FOIA/PA-2006-0139
Download: ML060890092 (6)


Text

  1. 2/ 7 3-21-06; 8 :53AM;DCPP FIFTH FL. EAST t. ' .;- ,.

Pacific Gas and Electic Company James L Becker Diablo Canyon Power Plant Vite President-Diablo Canyon PO. Box 56 Operations and Station Director Avita Beach, CA93424 January 15, 2004 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-04-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units I and 2 Monthly Operating Report for December 2003

Dear Commissioners and Staff:

Enclosed is the Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2, for December 2003. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.

C_.-.,-- ---. ?

Sincerely, C- -

James R. Becker smg/1 713/R0253694 Enclosures cc/enc: Paul R. Fox, American Nuclear Insurers Robert D. Glynn, Jr.

Bruce S. Mallett, NRC Regional Administrator, Region IV David L. Prouix, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager I.

INPO Record Center A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek kn

4

055453 159 # 3/ 7 3-21-06; 8
53AM;DCPP FIFTH FL. EAST Enclosure I PG&E Letter DCL-04-003 DECEMBER 2003, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS 1 AND 2 Summary of Unit I Operation Unit I began the month in Mode I (Power Operation) at approximately 100 percent power. On December 10, 2003, operators commenced a planned ramp to below 25 percent power in response to a storm forecast predicting high ocean swells. After the high swell warning had been terminated, on December 11, 2003, operators commenced ramping to approximately 50 percent power and remained at that power level to inspect the condenser for saltwater leakage. After these inspections were completed, operators commenced ramping to full power and reached approximately 100 percent power on December 12, 2003. On December 22, 2003, at I 116 PST, a 6.5M earthquake occurred approximately 50 km NNW from the plant, resulting in an Unusual Event (reference Special Report 2003-04, dated January 5, 2004, DCL-03-184). The units remained at 100 percent power during the seismic event Summary of Unit 2 Operation Unit 2 began the month in Mode 1 at approximately 100 percent power. On December 10, 2003, operators commenced a planned ramp to below 25 percent power in response to a storm forecast predicting high ocean swells. After the swell warning had been terminated, on December 11, 2003, operators commenced ramping to full power and reached approximately 100 percent later that day. With the exception of this planned power change, Unit 2 remained at approximately 100 percent power in December 2003.

Actuations of Pressurizer Safety or Power-Operated Relief Valves There were no challenges to the pressurizer power-operated relief valves, pressurizer safety valves, or steam generator safety valves.

SP=

3-21-06; e:53AM;DCPP FtFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 OPERATING DATA REPORT DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 110212004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: December 2003

1. 1Design Electrical Rating (Mwe - Net): I 1,103
2. Maximum Dependable Capacity (Mwe - Net): 1,087 This Month I YTD I Cumulative
3. Number of Hours Reactor Critical: 744.0 8,760.0 142,986.8
4. Number of Hours Generator On-Line: 744.0 8,760.0 141,469.6
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWH): 781,249 9,585,431 146,791,730 I

I

a 5/ 7 3-21-06; 8:53AM; DCPP FIFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 UNIT SHUTDOWNS DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 1/02/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: December 2003 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE I LFMDo)

(ced)

S (ScheduLed)

OU) qUTN OF ACTIONS DOWN 2 COMMENTS N/A There were no shutdowns this month.

1. Reason 2. Method A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F-Administrative G-Operational Error (Explain)

H-Other (Explain) 2

805+545 3459 # 8/ 7 3-21-06; 8
53AM;DCPP FIFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 OPERATING DATA REPORT DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 1/02/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 5454692 REPORT MONTH: December 2003 I 1. I Design Electrical Rating (MWe - Net): I 1119 l l 2. l Maximum Dependable Capacity (MWe - Net): 1 1087

-- -. 1 ThIs Month I YTD Cumulative

3. Number of Hours Reactor Critical: 744.0 7,291.41 138,649.9
4. Number of Hours Generator On-Line: 744.0 7,226.2 137,114.1
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWH: 784,934 7,725.227 144,417,217 3
805+545+345 # 7/ 7 3-21-06; 8
53AM;DCPP FIFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 UNIT SHUTDOWNS DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 1/02/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: December 2003 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE

.. (YMD)S(Scheduled)

(YYMMD) F(Fara.d) (HOURS) OF SHUTTINGACIN ACSTINGCORRNTS

______ DWN2 COMMENTS N/A There were no shutdowns this month.

1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F-Administrative G-Operational Error (Explain)