{{#Wiki_filter:FENOC | {{#Wiki_filter:FENOC Perry Nuclear Power Station 10 Center Road FirstEnergyNuclear OperatingCompany Perry,Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President', Fax: 440-280-8029 September -10;,200,8 -- | ||
-10;,200,8 | P.Y7C EI/O E'PA-0494L".::,iý,: | ||
--P.Y7C EI/O E'PA-0494L".::,iý,: | Ohio Environmental Protection Agency Division of Water Pollution. Control Enforcement Section, ES/DMR P.O. Box 1049 Columbus, Ohio 43216-1049 | ||
Ohio Environmental Protection Agency Division of Water Pollution. | |||
Control Enforcement Section, ES/DMR P.O. Box 1049 Columbus, Ohio 43216-1049 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Perry Nuclear Power Plant, August NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms. for the month of August 2008. No violations occurred during this period.If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536. | |||
UI3~E2~S Ohio EPA -Daily Discharge Monitoring Report -Form 4500 | Perry Nuclear Power Plant, August NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms. for the month of August 2008. No violations occurred during this period. | ||
If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536. | |||
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-08-01 83 128.8 8.55 AH AA 0.05 2008-08-02 84.2 114.1 AH AA 0.05 2008-08 82.4 113.9 AH AA 0.05 2008-08-04 | Sincerely, N 1/2.,7 Mark Bezillai. | ||
Enclosures,,,, , | |||
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized ubmitted information is true, accurate and complete. | A Station Code 004 Report-B Station Code 094 Report C Station Code 601 Report D. StationQpCoq, 602 Report | ||
I am aware that there are Representative A" | 'E Station Code 800 Report | ||
penalties for submitting false information, including the possibility of | -:,,,cc: NRC.Region III NRC Resident Inspector NRR. Project Manager NRC Document Control Desk (Docket No. 50-440)... | ||
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, , Page 1 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... | UI3~E2~S | ||
9/4/2008 | |||
STATION CODE:'MONITORING PERIOD: | Page 1 of 10 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Plt PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 004 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB: CCB125 DISTRICT: NEDO ANALYST: . Liz Ryan NO DISCHARGE INDICATOR: | ||
Water Temperature F aRecoverable Zinc, Total Copper, Total. | |||
100 2008-08-05 100 2008-08-06 100 2008-08-07 100 2008-08-08 100 2008-08-09 105 2008-08-10 103 2008-08-11 100 2008-08-12 100* 2008-08-13 100 2008-08-14 100 2008-08-15 100 2008-08-16 100 2008-08-17 100" 2008-08-i8 100 2008-08-19 100 2008-08-20 100 2008-08-21. | Recoverable Oxidants, Residual Total Chlorine, ResidualTotal PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY I/Day 1/Day 2/Week I/Month I/Month When Disch. When'Disch. | ||
100 2008-08-22 100 2008-08-23 100.2008-08-24 100 2008-08-25 100 2008-08-26 100 2008-08-27 100 2008-08-28 100 2008-08-29 100 2008-08-30 100 2008-08-31 100 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY) | SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-08-01 83 128.8 8.55 AH AA 0.05 2008-08-02 84.2 114.1 AH AA 0.05 2008-08 82.4 113.9 AH AA 0.05 2008-08-04 82. 112.1 AH AA 0.05 2008-08-05 83 104.1 8.69 AH 0.06 2008-08-06 83 .113.6 AH AA 0.05 2008-08-07 82 131.4 AH AA 0.05 2008-08-08 82 135.9 8.68 AH 0.06 | ||
Official or Authorized with'the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, " | *2008-08-09 81.5 119.2 AH AA 0.05 2008-08-10 80.6 120.4 ,. AA 8.0 AA 2.0 AH AA 0.05 2008-08-11 79 117.0 AH AA 0.05 2008-08-12 79.7 114.5 8.54 AH AA 0.05 2008-08-13 80 114.5 AH AA 0.05 2008-08-14 81 114.5 AH AA 0.05 2008-08-15 81 114.5 8.66 AH AA 0.05 2008-08-16 81 114.5 AH AA 0.05 2008-08-17 80 114.5 AH AA 0.05 2008-08-18 79 114.5 AH AA 0.05 2008-08-19 79 114.5 8.62 AH AA 0.05 2008-08-20 77.9 114.5 AH AA 0.05 2008-08-21 79.7 114.5 AH AA 0.05 2008-08-22 76.9 114.5 8.64 AH AA 0.05 2008-08-23 76 114.5 AH 0.06 | ||
*submittedinformation is true, accurate and complete. | * 2008-08-24 77 114.5 AH AA 0.05 2008-08-25 77 114.5 AH AA 0.05 2008-08-26 78 81.1 8.23 AH AA 0.05 2008-08-27 70 78.1 AH 0.07 2008-08-28 70 74.9 AH 0.07 2008-08-29 70 74.9 8.2 AR AA 0.05 2008-08-30 75 82.4 AH AA 0.05 2008-08-31 75 74.9 AH AA 0.05 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY) | ||
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized ubmitted information is true, accurate and complete. I am aware that there are Representative pP A" C'clqr s*ignificant penalties for submitting false information, including the possibility of fine and imprisonment. | |||
o -When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, 7 Page 2 https://ebiz.epa.ohio .gov/edwr.web/page/report/viewWithXslt. | When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, , Page 1 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008 | ||
doactType=viewWithXslt&f.. | |||
9/4/2008 Page 4 of 10 Ohio EPA% I Mofiit8'rifiarin eport -Form 4500 FACILITY: | Page 2 of 10 Ohio EPA -',DiilyDischarge:M6i0,iting Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power PIt PERMIT.NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE:' 004 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB: CCB125 DISTRICT: NEDO ANALYST: Liz Ryan NO DISCHARGE INDICATOR: | ||
PARAMETER Phlorination/Bromination Drto ____ ____ ____ | |||
AL | Duration PARAMETER 78739 CODE 78739__ | ||
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. | UNITS 6655 FREQUENCY When Disch. " | ||
I am aware that there are Representative significant penalties for submitting false information, including the possibility of V i N dear fine and imprisonment. | SAMPLING TYPE Total 2008-08-01 100 2008-08-02 100 2008-08-03 100 2008-08-04. 100 2008-08-05 100 2008-08-06 100 2008-08-07 100 2008-08-08 100 2008-08-09 105 2008-08-10 103 2008-08-11 100 2008-08-12 100 | ||
* 2008-08-13 100 2008-08-14 100 2008-08-15 100 2008-08-16 100 2008-08-17 100 | |||
9/4/2008 Page 5 of 10 Ohio EPA!- bDaily Discharge Moitorin "Report -Form 4500 FACILITY: | " 2008-08-i8 100 2008-08-19 100 2008-08-20 100 2008-08-21. 100 2008-08-22 100 2008-08-23 100 | ||
STATION CODE: | .2008-08-24 100 2008-08-25 100 2008-08-26 100 2008-08-27 100 2008-08-28 100 2008-08-29 100 2008-08-30 100 2008-08-31 100 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY) | ||
Official or Authorized with'the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, "Ibelieve the Authorized am aware that there are | |||
*submittedinformation is true, accurate and complete. Iincluding Representative | |||
_____ ___________ | *9 *A*[* | ||
* fine ansignificantim snetpenalties for submitting false information, the possibility of ". t °/f* | |||
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. | P V 0,K fine and imprisonment. o - | ||
i am aware that there are Representative At a significant penalties for submitting false information; including the possibility of VP Nudmr" Sfine and imprisonment. | When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, 7 Page 2 https://ebiz.epa.ohio .gov/edwr.web/page/report/viewWithXslt. doactType=viewWithXslt&f.. 9/4/2008 | ||
When completed mail this report to: EDMR Administrator, EDMR Administrator,, , OH, Pag 4 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWlthXslt.doactType | |||
/ViewWlthXslt&f... | Page 4 of 10 Ohio EPA% DA3i*Pischarge I Mofiit8'rifiarin eport - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Plt PERMIT NUMBER: 31B00016*ID LOCATION: 10 Center Rd STATION CODE: 094 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB: | ||
9/4/2008 Page 7 of 10 Ohio EPA'~: | DISTRICT:. NEDO ANALYST: | ||
NO DISCHARGE INDICATOR: AL Water Flow Rate pH Zinc, Total Copper, Total Oxidants, Total Chlorine, Total PARAMETER Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY I/Day I/Day 2/Week I/Month 1/Monfth When Disch. When Disch. | |||
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the infnrmation, I believe the Authorized submitted information is true, accurate and complete. | SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-08-01 2008-08-02 2008-08-03 2008-08-04 2008-08-05 2008-08-06 2008-08-07 2008-08-08 2008-08-09 2008-08-10 2008-08-11 2008-08-12 2008-08-13 2008-08-14 2008-08-15 2008-08-16 2008-08-17 2008-08-18 2008-08-19 2008-08-20 2008-08-21 2008-08-22 2008-08-23 2008-08-24 2008-08-25 2008-08-26 2008-08-27 2008-08-28 2008-08-29 2008-08-30 2008-08-31 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY) | ||
I am aware that there are Representative significant penalties for submitting false information, including the possibility of 7"VP MKmC{ fine and imprisonment. | Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of V | ||
When completed mail this report to: EDMR Administrator, EDMR Administrator, , OH, Page 5 https'://ebiz.epa.ohio.gov/edwr.web/page/repprt/viewWithXslt.do?actType=viewWithXslt&f... | i N dear fine and imprisonment. | ||
9/4/2008 Page 8 of 10 Ohio EPA, -DahilyDischarge Monijvtori'ng`Report | When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, | ||
-Form 4500 FACILITY: | ./ | ||
AL P METER Flow Rate pH Total Suspended Oil and Grease, Iron, Total Copper, Total Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS 4108 6653 4106 4106 4107 4107 FREQUENCY Continuous I / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks I / 2 Weeks I / 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite 24hr Composite 2008-08-01 2008-08-02 2008-08-03 2008-08-04 2008-08-05 2008-08-06 2008-08-07 2008-08 -08 2008-08-09 2008-08-10 2008-08-11 2008-08-12 2008-08-13 2008-08-14 2008-08-15 2008-08-I 6 2008-08-17 2008-08-18 2008-08-19. | 7 y | ||
2008-08-20 2008-08-21 2008-08-22 2008-08-23 2008-08-24 2008-08-25 2008-08-26 2008-08-27 2008-08-28 2008-08-29 2008-08-30 2008-08-31 Name/Title of Responsible | Page 3 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008 | ||
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. | |||
I am aware that there are Representative significant penalties for submitting false information, including the possibility ofn/ -fine and imprisonment. | Page 5 of 10 Ohio EPA!- bDaily Discharge Moitorin "Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Plt PERMIT'NUMBER: 3IB00016*ID " | ||
When completed mail this report to: EDMR Administrator, EDMR Administrator, , OH, Page 6 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... | LOCATION: 10 Center Rd STATION CODE: 094 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB: | ||
9/4/2008 Page 9 of 10 | DISTRICT: NEDO ANALYST: | ||
-Form 4500 FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 31BOOO0 10 Center Rd STATION CODE: 800 North Perry, 44081 MONITORING PERIOD: 2008-08-01 Lake REPORTING LAB: CCB 125 NEDO ANALYST: Liz Ryan | NO DISCHARGE INDICATOR: AL PARAMETERDuain Chlorination/Bromination _____ ___________ _______ ____ | ||
Water Zinc, Total Copper, Total | Duration PARAMETER 78739 CODE 7873_ | ||
*74 2008-08-18 74 2008-08-19 75 2008-08-20 74 2008-08-21 73 2008-08-22 65 2008-08-23 73 2008-08-24 73 2008-08-25 74 2008-08-26 73 2008-08-27 61 2008-08-28 61 2008-08-29 61 2008-08-30 67 2008-08-31 68 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MMIDD/YY) | UNITS 6655 FREQUENCY When Disch. | ||
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative , individuals immediately responsible for obtaining the information, I believe the -Authorized submitted information is true, accurate and complete. | SAMPLING TYPE Total 2008-08-01 2008-08-02 2008-08-03 2008-08-04 2008-08-05 2008-08-06 2008-08-07 2008-08-08 2008-08-09 2008-08-10 2008-08-11 2008-08-12 2008-08-13 2008-08-14 2008-08-15 2008-08-16 2008-08-17 2008-08-18 2008-08-19 2008-08-20 2008-08-21 2008-08-22 2008-08-23 2008-08-24 2008-08-25 2008-08-26 2008-08-27 2008-08-28 2008-08-29 2008-08-30 2008-08-31 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY) | ||
I am aware that there are presentative significant penalties for submitting false information, including the possibility of ,/ | Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. i am aware that there are Representative At a significant penalties for submitting false information; including the possibility of VP Nudmr" Sfine and imprisonment. | ||
When completed mail this report to: EDMR Administrator, EDMR Administrator,, , OH, Pag 4 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWlthXslt.doactType /ViewWlthXslt&f... 9/4/2008 | |||
9/4/2008 Ohio EPA -Daily Discharge Monitoring Report -Form 4500 | |||
Page 7 of 10 Ohio EPA'~: DiailyDischarg4MAnil6rilgeReport - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Plt PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 601 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB: | |||
4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-24 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-25 4106 No bromination eyent this date 004 Oxidants, Total Residual 34044 2008-08-26 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-27 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-28 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-29 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-30 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-31 4106 No bromination event this date https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... | DISTRICT: NEDO ANALYST: | ||
9/4/2008}} | NO DISCHARGE INDICATOR: AL Total Suspended Oil and Grease, PARAMETER Flow Rate pH Solids Total PARAMETER CODE 50050 00400 00530 00550 UNITS 4108 6653 4106 4106 FREQUENCY Continuous 1/ 2 Weeks / 2 Weeks 1/2 Weeks SAMPLING TYPE 24hr Total Grab Grab Grab 2008-08-01 2008-08-02 2008-08-03 2008-08-04 2008-08-05 2008-08-06 2008-08-07 2008-08-08 2008 09 2008-08-10 2008-08-1l 2008-08-12 2008-08-13 2008-08-14 2008-08-15 2008-08-16 2008-08-17 2008-08-18 2008-08-19 2008-08-20 2008-08-21 2008-08-22 2008-08-23 2008-08-24 2008-08-25 2008-08-26 2008-08-27 2008-08-28 2008-08-29 2008-08-30 2008-08-31 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY) | ||
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the infnrmation, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of 7 "VP MKmC{ fine and imprisonment. | |||
When completed mail this report to: EDMR Administrator, EDMR Administrator, , OH, Page 5 https'://ebiz.epa.ohio.gov/edwr.web/page/repprt/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008 | |||
Page 8 of 10 Ohio EPA, -DahilyDischarge Monijvtori'ng`Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Plt PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 602 North Perry, 44081 MONITORING PERIOD : 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB: | |||
DISTRICT: NEDO ANALYST: | |||
NO DISCHARGE INDICATOR: AL P METER Flow Rate pH Total Suspended Oil and Grease, Iron, Total Copper, Total Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS 4108 6653 4106 4106 4107 4107 FREQUENCY Continuous I / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks I / 2 Weeks I / 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite 24hr Composite 2008-08-01 2008-08-02 2008-08-03 2008-08-04 2008-08-05 2008-08-06 2008-08-07 2008-08 -08 2008-08-09 2008-08-10 2008-08-11 2008-08-12 2008-08-13 2008-08-14 2008-08-15 2008-08-I 6 2008-08-17 2008-08-18 2008-08-19. | |||
2008-08-20 2008-08-21 2008-08-22 2008-08-23 2008-08-24 2008-08-25 2008-08-26 2008-08-27 2008-08-28 2008-08-29 2008-08-30 2008-08-31 Name/Title of Responsible Icertify under the penalty of law that I have personally examined and am familiar Signature of Date (MVIM/DD/YY) | |||
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility ofn/ - | |||
fine and imprisonment. | |||
When completed mail this report to: EDMR Administrator, EDMR Administrator, , OH, Page 6 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008 | |||
Page 9 of 10 Ohio EPA - DalyDscharge.MconitorlngReport - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 31BOOO0 r6*ID LOCATION: 10 Center Rd STATION CODE: 800 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB: CCB 125 DISTRICT: NEDO ANALYST: Liz Ryan NO DISCHARGE INDICATOR: | |||
PARAMETER Water Zinc, Total Copper, Total Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 01119 UNITS 4103 4107 4107 FREQUENCY 1/Day I/Month 1/Month SAMPLING TYPE Continuous Grab Grab 2008-08-01 76 2008-08-02 77 2008-08-03 77 2008-08-04 77 2008-08-05 77 2008-08-06 77 2008-08-07 77 2008-08-08 77 2008-08-09 76 2008-08-10 75 AA 8.0 4 2008-08-1I 73 2008-08-12 74 2008-08-13 73 2008-08-14 73 2008-08-15 73 2008-08-16 73 2008-08-17 *74 2008-08-18 74 2008-08-19 75 2008-08-20 74 2008-08-21 73 2008-08-22 65 2008-08-23 73 2008-08-24 73 2008-08-25 74 2008-08-26 73 2008-08-27 61 2008-08-28 61 2008-08-29 61 2008-08-30 67 2008-08-31 68 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MMIDD/YY) | |||
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative , individuals immediately responsible for obtaining the information, I believe the - Authorized submitted information is true, accurate and complete. I am aware that there are presentative significant penalties for submitting false information, including the possibility of ,/ | |||
VPNvc~eW fine and imprisonment. | |||
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, / Page 7 I | |||
https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008 | |||
Page 10 of 10 Ohio EPA - Daily Discharge Monitoring Report -Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 31BOO016*ID LOCATION: 10 Center Rd MONITORING PERIOD : 2008-08-01 To: 2008-08-31 North Perry, 44081 PARAMETER COMMENTS: _,, | |||
Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2008-08-01 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-02 4106 N6 bromination event this date 004 Oxidants, Total Residual 34044 2008-08-03 4106 No brominatiofi event this date 004 Oxidants, Total Residual 34044 2008-08-04 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-05 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-06 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-07 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-08 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-09 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-10 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-11 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-12 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-13 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-14 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-15 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-16 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-17 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-18 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-19 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-20 4106 No bromination event this date 004 Oxidants, Total Residual 34044 r 2008-08-21 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-22 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-23. 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-24 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-25 4106 No bromination eyent this date 004 Oxidants, Total Residual 34044 2008-08-26 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-27 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-28 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-29 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-30 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-31 4106 No bromination event this date https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008}} |
Latest revision as of 13:41, 14 November 2019
ML082671122 | |
Person / Time | |
---|---|
Site: | Perry ![]() |
Issue date: | 09/10/2008 |
From: | Bezilla M FirstEnergy Nuclear Generation Corp |
To: | Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency |
References | |
PY-CEI/OEPA-0494L | |
Download: ML082671122 (9) | |
Text
FENOC Perry Nuclear Power Station 10 Center Road FirstEnergyNuclear OperatingCompany Perry,Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President', Fax: 440-280-8029 September -10;,200,8 --
P.Y7C EI/O E'PA-0494L".::,iý,:
Ohio Environmental Protection Agency Division of Water Pollution. Control Enforcement Section, ES/DMR P.O. Box 1049 Columbus, Ohio 43216-1049
SUBJECT:
Perry Nuclear Power Plant, August NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms. for the month of August 2008. No violations occurred during this period.
If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536.
Sincerely, N 1/2.,7 Mark Bezillai.
Enclosures,,,, ,
A Station Code 004 Report-B Station Code 094 Report C Station Code 601 Report D. StationQpCoq, 602 Report
'E Station Code 800 Report
-:,,,cc: NRC.Region III NRC Resident Inspector NRR. Project Manager NRC Document Control Desk (Docket No. 50-440)...
UI3~E2~S
Page 1 of 10 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Plt PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 004 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB: CCB125 DISTRICT: NEDO ANALYST: . Liz Ryan NO DISCHARGE INDICATOR:
Water Temperature F aRecoverable Zinc, Total Copper, Total.
Recoverable Oxidants, Residual Total Chlorine, ResidualTotal PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY I/Day 1/Day 2/Week I/Month I/Month When Disch. When'Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-08-01 83 128.8 8.55 AH AA 0.05 2008-08-02 84.2 114.1 AH AA 0.05 2008-08 82.4 113.9 AH AA 0.05 2008-08-04 82. 112.1 AH AA 0.05 2008-08-05 83 104.1 8.69 AH 0.06 2008-08-06 83 .113.6 AH AA 0.05 2008-08-07 82 131.4 AH AA 0.05 2008-08-08 82 135.9 8.68 AH 0.06
- 2008-08-09 81.5 119.2 AH AA 0.05 2008-08-10 80.6 120.4 ,. AA 8.0 AA 2.0 AH AA 0.05 2008-08-11 79 117.0 AH AA 0.05 2008-08-12 79.7 114.5 8.54 AH AA 0.05 2008-08-13 80 114.5 AH AA 0.05 2008-08-14 81 114.5 AH AA 0.05 2008-08-15 81 114.5 8.66 AH AA 0.05 2008-08-16 81 114.5 AH AA 0.05 2008-08-17 80 114.5 AH AA 0.05 2008-08-18 79 114.5 AH AA 0.05 2008-08-19 79 114.5 8.62 AH AA 0.05 2008-08-20 77.9 114.5 AH AA 0.05 2008-08-21 79.7 114.5 AH AA 0.05 2008-08-22 76.9 114.5 8.64 AH AA 0.05 2008-08-23 76 114.5 AH 0.06
- 2008-08-24 77 114.5 AH AA 0.05 2008-08-25 77 114.5 AH AA 0.05 2008-08-26 78 81.1 8.23 AH AA 0.05 2008-08-27 70 78.1 AH 0.07 2008-08-28 70 74.9 AH 0.07 2008-08-29 70 74.9 8.2 AR AA 0.05 2008-08-30 75 82.4 AH AA 0.05 2008-08-31 75 74.9 AH AA 0.05 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized ubmitted information is true, accurate and complete. I am aware that there are Representative pP A" C'clqr s*ignificant penalties for submitting false information, including the possibility of fine and imprisonment.
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, , Page 1 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008
Page 2 of 10 Ohio EPA -',DiilyDischarge:M6i0,iting Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power PIt PERMIT.NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE:' 004 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB: CCB125 DISTRICT: NEDO ANALYST: Liz Ryan NO DISCHARGE INDICATOR:
PARAMETER Phlorination/Bromination Drto ____ ____ ____
Duration PARAMETER 78739 CODE 78739__
UNITS 6655 FREQUENCY When Disch. "
SAMPLING TYPE Total 2008-08-01 100 2008-08-02 100 2008-08-03 100 2008-08-04. 100 2008-08-05 100 2008-08-06 100 2008-08-07 100 2008-08-08 100 2008-08-09 105 2008-08-10 103 2008-08-11 100 2008-08-12 100
- 2008-08-13 100 2008-08-14 100 2008-08-15 100 2008-08-16 100 2008-08-17 100
" 2008-08-i8 100 2008-08-19 100 2008-08-20 100 2008-08-21. 100 2008-08-22 100 2008-08-23 100
.2008-08-24 100 2008-08-25 100 2008-08-26 100 2008-08-27 100 2008-08-28 100 2008-08-29 100 2008-08-30 100 2008-08-31 100 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with'the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, "Ibelieve the Authorized am aware that there are
- submittedinformation is true, accurate and complete. Iincluding Representative
- 9 *A*[*
- fine ansignificantim snetpenalties for submitting false information, the possibility of ". t °/f*
P V 0,K fine and imprisonment. o -
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, 7 Page 2 https://ebiz.epa.ohio .gov/edwr.web/page/report/viewWithXslt. doactType=viewWithXslt&f.. 9/4/2008
Page 4 of 10 Ohio EPA% DA3i*Pischarge I Mofiit8'rifiarin eport - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Plt PERMIT NUMBER: 31B00016*ID LOCATION: 10 Center Rd STATION CODE: 094 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB:
DISTRICT:. NEDO ANALYST:
NO DISCHARGE INDICATOR: AL Water Flow Rate pH Zinc, Total Copper, Total Oxidants, Total Chlorine, Total PARAMETER Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY I/Day I/Day 2/Week I/Month 1/Monfth When Disch. When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-08-01 2008-08-02 2008-08-03 2008-08-04 2008-08-05 2008-08-06 2008-08-07 2008-08-08 2008-08-09 2008-08-10 2008-08-11 2008-08-12 2008-08-13 2008-08-14 2008-08-15 2008-08-16 2008-08-17 2008-08-18 2008-08-19 2008-08-20 2008-08-21 2008-08-22 2008-08-23 2008-08-24 2008-08-25 2008-08-26 2008-08-27 2008-08-28 2008-08-29 2008-08-30 2008-08-31 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of V
i N dear fine and imprisonment.
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH,
./
7 y
Page 3 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008
Page 5 of 10 Ohio EPA!- bDaily Discharge Moitorin "Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Plt PERMIT'NUMBER: 3IB00016*ID "
LOCATION: 10 Center Rd STATION CODE: 094 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB:
DISTRICT: NEDO ANALYST:
NO DISCHARGE INDICATOR: AL PARAMETERDuain Chlorination/Bromination _____ ___________ _______ ____
Duration PARAMETER 78739 CODE 7873_
UNITS 6655 FREQUENCY When Disch.
SAMPLING TYPE Total 2008-08-01 2008-08-02 2008-08-03 2008-08-04 2008-08-05 2008-08-06 2008-08-07 2008-08-08 2008-08-09 2008-08-10 2008-08-11 2008-08-12 2008-08-13 2008-08-14 2008-08-15 2008-08-16 2008-08-17 2008-08-18 2008-08-19 2008-08-20 2008-08-21 2008-08-22 2008-08-23 2008-08-24 2008-08-25 2008-08-26 2008-08-27 2008-08-28 2008-08-29 2008-08-30 2008-08-31 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. i am aware that there are Representative At a significant penalties for submitting false information; including the possibility of VP Nudmr" Sfine and imprisonment.
When completed mail this report to: EDMR Administrator, EDMR Administrator,, , OH, Pag 4 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWlthXslt.doactType /ViewWlthXslt&f... 9/4/2008
Page 7 of 10 Ohio EPA'~: DiailyDischarg4MAnil6rilgeReport - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Plt PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 601 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB:
DISTRICT: NEDO ANALYST:
NO DISCHARGE INDICATOR: AL Total Suspended Oil and Grease, PARAMETER Flow Rate pH Solids Total PARAMETER CODE 50050 00400 00530 00550 UNITS 4108 6653 4106 4106 FREQUENCY Continuous 1/ 2 Weeks / 2 Weeks 1/2 Weeks SAMPLING TYPE 24hr Total Grab Grab Grab 2008-08-01 2008-08-02 2008-08-03 2008-08-04 2008-08-05 2008-08-06 2008-08-07 2008-08-08 2008 09 2008-08-10 2008-08-1l 2008-08-12 2008-08-13 2008-08-14 2008-08-15 2008-08-16 2008-08-17 2008-08-18 2008-08-19 2008-08-20 2008-08-21 2008-08-22 2008-08-23 2008-08-24 2008-08-25 2008-08-26 2008-08-27 2008-08-28 2008-08-29 2008-08-30 2008-08-31 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the infnrmation, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of 7 "VP MKmC{ fine and imprisonment.
When completed mail this report to: EDMR Administrator, EDMR Administrator, , OH, Page 5 https'://ebiz.epa.ohio.gov/edwr.web/page/repprt/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008
Page 8 of 10 Ohio EPA, -DahilyDischarge Monijvtori'ng`Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Plt PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 602 North Perry, 44081 MONITORING PERIOD : 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB:
DISTRICT: NEDO ANALYST:
NO DISCHARGE INDICATOR: AL P METER Flow Rate pH Total Suspended Oil and Grease, Iron, Total Copper, Total Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS 4108 6653 4106 4106 4107 4107 FREQUENCY Continuous I / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks I / 2 Weeks I / 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite 24hr Composite 2008-08-01 2008-08-02 2008-08-03 2008-08-04 2008-08-05 2008-08-06 2008-08-07 2008-08 -08 2008-08-09 2008-08-10 2008-08-11 2008-08-12 2008-08-13 2008-08-14 2008-08-15 2008-08-I 6 2008-08-17 2008-08-18 2008-08-19.
2008-08-20 2008-08-21 2008-08-22 2008-08-23 2008-08-24 2008-08-25 2008-08-26 2008-08-27 2008-08-28 2008-08-29 2008-08-30 2008-08-31 Name/Title of Responsible Icertify under the penalty of law that I have personally examined and am familiar Signature of Date (MVIM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility ofn/ -
fine and imprisonment.
When completed mail this report to: EDMR Administrator, EDMR Administrator, , OH, Page 6 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008
Page 9 of 10 Ohio EPA - DalyDscharge.MconitorlngReport - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 31BOOO0 r6*ID LOCATION: 10 Center Rd STATION CODE: 800 North Perry, 44081 MONITORING PERIOD: 2008-08-01 To: 2008-08-31 COUNTY: Lake REPORTING LAB: CCB 125 DISTRICT: NEDO ANALYST: Liz Ryan NO DISCHARGE INDICATOR:
PARAMETER Water Zinc, Total Copper, Total Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 01119 UNITS 4103 4107 4107 FREQUENCY 1/Day I/Month 1/Month SAMPLING TYPE Continuous Grab Grab 2008-08-01 76 2008-08-02 77 2008-08-03 77 2008-08-04 77 2008-08-05 77 2008-08-06 77 2008-08-07 77 2008-08-08 77 2008-08-09 76 2008-08-10 75 AA 8.0 4 2008-08-1I 73 2008-08-12 74 2008-08-13 73 2008-08-14 73 2008-08-15 73 2008-08-16 73 2008-08-17 *74 2008-08-18 74 2008-08-19 75 2008-08-20 74 2008-08-21 73 2008-08-22 65 2008-08-23 73 2008-08-24 73 2008-08-25 74 2008-08-26 73 2008-08-27 61 2008-08-28 61 2008-08-29 61 2008-08-30 67 2008-08-31 68 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MMIDD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative , individuals immediately responsible for obtaining the information, I believe the - Authorized submitted information is true, accurate and complete. I am aware that there are presentative significant penalties for submitting false information, including the possibility of ,/
VPNvc~eW fine and imprisonment.
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, / Page 7 I
https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008
Page 10 of 10 Ohio EPA - Daily Discharge Monitoring Report -Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 31BOO016*ID LOCATION: 10 Center Rd MONITORING PERIOD : 2008-08-01 To: 2008-08-31 North Perry, 44081 PARAMETER COMMENTS: _,,
Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2008-08-01 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-02 4106 N6 bromination event this date 004 Oxidants, Total Residual 34044 2008-08-03 4106 No brominatiofi event this date 004 Oxidants, Total Residual 34044 2008-08-04 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-05 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-06 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-07 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-08 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-09 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-10 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-11 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-12 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-13 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-14 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-15 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-16 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-17 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-18 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-19 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-20 4106 No bromination event this date 004 Oxidants, Total Residual 34044 r 2008-08-21 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-22 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-23. 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-24 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-25 4106 No bromination eyent this date 004 Oxidants, Total Residual 34044 2008-08-26 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-27 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-28 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-29 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-30 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-08-31 4106 No bromination event this date https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 9/4/2008