{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 29, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 29, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
 
Glen Allen, VA 23060  


==SUBJECT:==
==SUBJECT:==
MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY CONFERENCE MEETING - SURRY POWER STATION, DOCKET NOS. 50-280 AND 281
MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY CONFERENCE MEETING - SURRY POWER STATION, DOCKET NOS. 50-280 AND 281


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
This letter confirms the email correspondence between Mr. Barry Garber of your staff and Mr. Gerald McCoy of the NRC, on March 21, 2012, concerning a Regulatory Conference being conducted at your request, which has been scheduled for April 19, 2012, from 1:30 p.m. to 3:30 p.m. Eastern Daylight Time (EDT). The enclosed meeting notice provides additional details. The purpose of this Regulatory Conference is to discuss one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. The result s of the NRC's inspection of this issue are available in NRC Inspection Report No. 05000280, 281/2012007, available at the Agencywide Document Access and Management System (ADAMS) (ML120730510).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's ADAMS.
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html  (Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact me at (404) 997-4551.
Sincerely, 
      /RA/  Gerald J. McCoy, Chief Reactor Projects Branch 5


Division of Reactor Projects Docket Nos.: 50-280 & 50-281 License Nos.: DPR-32 & DPR-37  
This letter confirms the email correspondence between Mr. Barry Garber of your staff and Mr.
Gerald McCoy of the NRC, on March 21, 2012, concerning a Regulatory Conference being conducted at your request, which has been scheduled for April 19, 2012, from 1:30 p.m. to 3:30 p.m. Eastern Daylight Time (EDT). The enclosed meeting notice provides additional details.
The purpose of this Regulatory Conference is to discuss one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. The results of the NRCs inspection of this issue are available in NRC Inspection Report No. 05000280, 281/2012007, available at the Agencywide Document Access and Management System (ADAMS) (ML120730510).
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs ADAMS.
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4551.
Sincerely,
                                              /RA/
Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280 & 50-281 License Nos.: DPR-32 & DPR-37


==Enclosure:==
==Enclosure:==
As stated
As stated
 
_ ML12089A274 ________  X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE Rii:DRP RII:DRP      SIGNATURE SON by email GJM1      NAME SNinh GMcCoy      DATE 03/27/2012 03/29/2012      E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO VEPCO 2cc w/encl:
Larry Lane Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution
 
B. L. (Sonny) Stanley
 
Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution
 
Kenny B. Sloane
 
Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution
 
Lillian M. Cuoco, Esq.
 
Senior Counsel Dominion Resources Services, Inc. Electronic Mail Distribution
 
Tom Huber Director, Nuclear Licensing & Operations
 
Support Innsbrook Technical Center Electronic Mail Distribution
 
Ginger L. Rutherford Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197
 
Richmond, VA  23209 Attorney General Supreme Court Building
 
900 East Main Street
 
Richmond, VA  23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission


5850 Hog Island Rd Surry, VA   23883 Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution  
_ ML12089A274 ________                  X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE            Rii:DRP        RII:DRP SIGNATURE          SON by email  GJM1 NAME              SNinh          GMcCoy DATE                  03/27/2012    03/29/2012 E-MAIL COPY?          YES    NO    YES      NO   YES    NO    YES    NO    YES    NO    YES    NO    YES    NO VEPCO                                    2 cc w/encl:                                Michael M. Cline Larry Lane                                Director Site Vice President                        Virginia Department of Emergency Services Surry Power Station                        Management Virginia Electric and Power Company        Electronic Mail Distribution Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution Tom Huber Director, Nuclear Licensing & Operations Support Innsbrook Technical Center Electronic Mail Distribution Ginger L. Rutherford Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883


VEPCO 3Letter to David A. Heacock from Gerald J. McCoy dated March 29, 2012  
VEPCO                                       3 Letter to David A. Heacock from Gerald J. McCoy dated March 29, 2012


==SUBJECT:==
==SUBJECT:==
MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY CONFERENCE MEETING - SURRY POWER STATION, DOCKET NOS. 50-280 AND 281 Distribution w/encl:
MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY CONFERENCE MEETING - SURRY POWER STATION, DOCKET NOS. 50-280 AND 281 Distribution w/encl:
C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS  
C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS
 
PUBLIC RidsNrrPMSurry Resource Region II Administrator's Secretary Region II DRP Division Secretary Region II Division Directors and Deputies  
 
Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist  
 
Region II Regional Coordinator OEDO  
 
Headquarters Operation Officer PMNS Enclosure


==SUBJECT:==
==SUBJECT:==
REGULATORY CONFERENCE MEETING WITH VIRGINIA ELECTRIC POWER COMPANY  
REGULATORY CONFERENCE MEETING WITH VIRGINIA ELECTRIC POWER COMPANY FACILITY:     SURRY POWER STATION DOCKETS:       50-280 AND 50-281 DATE & TIME:   Thursday, April 19, 2012 from 1:30 p.m. to 3:30 p.m. EDT LOCATION:     US Nuclear Regulatory Commission Region II 245 Peachtree Center Ave. NE Suite 1200 Atlanta, GA 30303 PURPOSE:       The purpose of this Regulatory Conference is to discuss one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. The results of the NRCs inspection of this issue are available in NRC Inspection Report No. 05000280, 281/2012007, available at Agencywide Document Access and Management System (ADAMS) (ML120730510). The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov, and contains information regarding conduct of NRC meetings.
 
CATEGORY:     This is a Category 1 meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
FACILITY:   SURRY POWER STATION
The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
 
NRC OFFICE PARTICIPATING: Region II Enclosure
DOCKETS:   50-280 AND 50-281
 
DATE & TIME: Thursday, April 19, 2012 from 1:30 p.m. to 3:30 p.m. EDT
 
LOCATION:   US Nuclear Regulatory Commission Region II 245 Peachtree Center Ave. NE Suite 1200  
 
Atlanta, GA 30303  
 
PURPOSE: The purpose of this Regulatory Conference is to discuss one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS)  
 
standpipe level erratic indications. The results of the NRC's inspection of this issue are available in NRC Inspection Report No. 05000280, 281/2012007, available at Agencywide Document Access and Management System (ADAMS) (ML120730510). The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov, and contains information regarding conduct of NRC meetings.
CATEGORY: This is a Category 1 meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case  
 
basis.
NRC OFFICE       PARTICIPATING:   Region II 2 Enclosure OTHER      ORGANIZATIONS  PARTICIPATING:  None


PARTICIPANTS:   NRC (partial list)
2 OTHER ORGANIZATIONS PARTICIPATING:  None PARTICIPANTS:   NRC (partial list)
V. McCree, Regional Administrator, Region II (RII)     L. Wert, Deputy Regional Administrator, RII R. Croteau, Division Director, Division of Reactor Projects J. Munday, Director, Division of Reactor Safety H. Christensen, Deputy Director, Division of Reactor Safety C. Evans, Regional Council, Office of Enforcement and Investigation Coordination G. MacDonald, Senior Reactor Analyst, Division of Reactor Safety     G. McCoy, Chief, Reactor Projects Branch 5     J. Nadel, Resident Inspector, Surry R. Clagg, Resident Inspector, North Anna LICENSEE (partial list)
V. McCree, Regional Administrator, Region II (RII)
L. Lane, Site Vice President, Surry K. Sloane, Plant Manager B. Stanley, Director, Station Safety and Licensing MEETING CONTACT:
L. Wert, Deputy Regional Administrator, RII R. Croteau, Division Director, Division of Reactor Projects J. Munday, Director, Division of Reactor Safety H. Christensen, Deputy Director, Division of Reactor Safety C. Evans, Regional Council, Office of Enforcement and Investigation Coordination G. MacDonald, Senior Reactor Analyst, Division of Reactor Safety G. McCoy, Chief, Reactor Projects Branch 5 J. Nadel, Resident Inspector, Surry R. Clagg, Resident Inspector, North Anna LICENSEE (partial list)
Gerald J. McCoy 404-997-4551 Gerald.McCoy@nrc.gov AUDIO TELE- CONFERENCING: Interested members of the public can participate in this meeting   via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting to obtain teleconferencing information.
L. Lane, Site Vice President, Surry K. Sloane, Plant Manager B. Stanley, Director, Station Safety and Licensing MEETING CONTACT: Gerald J. McCoy 404-997-4551 Gerald.McCoy@nrc.gov AUDIO TELE-CONFERENCING:   Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting to obtain teleconferencing information.
VIDEO TELE-CONFERENCING: Not Available}}
VIDEO TELE-CONFERENCING:   Not Available Enclosure}}

Latest revision as of 16:53, 6 February 2020

Mtg Ann -Surry Regulatory Conference - 2012
ML12089A274
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/29/2012
From: Gerald Mccoy
NRC/RGN-II/DRP/RPB5
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
FOIA/PA-2013-0030, FOIA/PA-2013-0139
Download: ML12089A274 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 29, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY CONFERENCE MEETING - SURRY POWER STATION, DOCKET NOS. 50-280 AND 281

Dear Mr. Heacock:

This letter confirms the email correspondence between Mr. Barry Garber of your staff and Mr.

Gerald McCoy of the NRC, on March 21, 2012, concerning a Regulatory Conference being conducted at your request, which has been scheduled for April 19, 2012, from 1:30 p.m. to 3:30 p.m. Eastern Daylight Time (EDT). The enclosed meeting notice provides additional details.

The purpose of this Regulatory Conference is to discuss one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. The results of the NRCs inspection of this issue are available in NRC Inspection Report No. 05000280, 281/2012007, available at the Agencywide Document Access and Management System (ADAMS) (ML120730510).

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs ADAMS.

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4551.

Sincerely,

/RA/

Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280 & 50-281 License Nos.: DPR-32 & DPR-37

Enclosure:

As stated

_ ML12089A274 ________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE Rii:DRP RII:DRP SIGNATURE SON by email GJM1 NAME SNinh GMcCoy DATE 03/27/2012 03/29/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO VEPCO 2 cc w/encl: Michael M. Cline Larry Lane Director Site Vice President Virginia Department of Emergency Services Surry Power Station Management Virginia Electric and Power Company Electronic Mail Distribution Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Electronic Mail Distribution Tom Huber Director, Nuclear Licensing & Operations Support Innsbrook Technical Center Electronic Mail Distribution Ginger L. Rutherford Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883

VEPCO 3 Letter to David A. Heacock from Gerald J. McCoy dated March 29, 2012

SUBJECT:

MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY CONFERENCE MEETING - SURRY POWER STATION, DOCKET NOS. 50-280 AND 281 Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS

SUBJECT:

REGULATORY CONFERENCE MEETING WITH VIRGINIA ELECTRIC POWER COMPANY FACILITY: SURRY POWER STATION DOCKETS: 50-280 AND 50-281 DATE & TIME: Thursday, April 19, 2012 from 1:30 p.m. to 3:30 p.m. EDT LOCATION: US Nuclear Regulatory Commission Region II 245 Peachtree Center Ave. NE Suite 1200 Atlanta, GA 30303 PURPOSE: The purpose of this Regulatory Conference is to discuss one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. The results of the NRCs inspection of this issue are available in NRC Inspection Report No. 05000280, 281/2012007, available at Agencywide Document Access and Management System (ADAMS) (ML120730510). The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov, and contains information regarding conduct of NRC meetings.

CATEGORY: This is a Category 1 meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

NRC OFFICE PARTICIPATING: Region II Enclosure

2 OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC (partial list)

V. McCree, Regional Administrator, Region II (RII)

L. Wert, Deputy Regional Administrator, RII R. Croteau, Division Director, Division of Reactor Projects J. Munday, Director, Division of Reactor Safety H. Christensen, Deputy Director, Division of Reactor Safety C. Evans, Regional Council, Office of Enforcement and Investigation Coordination G. MacDonald, Senior Reactor Analyst, Division of Reactor Safety G. McCoy, Chief, Reactor Projects Branch 5 J. Nadel, Resident Inspector, Surry R. Clagg, Resident Inspector, North Anna LICENSEE (partial list)

L. Lane, Site Vice President, Surry K. Sloane, Plant Manager B. Stanley, Director, Station Safety and Licensing MEETING CONTACT: Gerald J. McCoy 404-997-4551 Gerald.McCoy@nrc.gov AUDIO TELE-CONFERENCING: Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting to obtain teleconferencing information.

VIDEO TELE-CONFERENCING: Not Available Enclosure