MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:Meeting Notice
MONTHYEARPMNS20231323, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-11-27027 November 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230615, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-05-11011 May 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230430, Assessment Meetingsurry Power Station Annual Assessment Meeting2023-04-13013 April 2023 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220318, Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station2022-04-0707 April 2022 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station PMNS20220349, Assessment Meetingsurry Power Station Annual Assessment Meeting2022-04-0404 April 2022 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220301, Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 22022-03-29029 March 2022 Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 2 PMNS20220113, Pre-submittal Meeting with Virginia Electric Power Company (VEPCO) to Discuss Future License Amendment for Surry Power Station, Units 1 and 22022-02-11011 February 2022 Pre-submittal Meeting with Virginia Electric Power Company (VEPCO) to Discuss Future License Amendment for Surry Power Station, Units 1 and 2 PMNS20210540, Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Revise the New and Spent Fuel Pool Criticality Analyses for Surry Power Station, Units 1 and 22021-05-11011 May 2021 Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Revise the New and Spent Fuel Pool Criticality Analyses for Surry Power Station, Units 1 and 2 PMNS20210612, Pre-Submittal Meeting - Proposed License Amendment (LAR) Request to Revise the Licensing Basis for the Turbine Building and the Fuel Building Trolley Support Structures Relative to Tornado Effects for Surry Power Station, Units 1 and 22021-05-10010 May 2021 Pre-Submittal Meeting - Proposed License Amendment (LAR) Request to Revise the Licensing Basis for the Turbine Building and the Fuel Building Trolley Support Structures Relative to Tornado Effects for Surry Power Station, Units 1 and 2 PMNS20210382, the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 20202021-04-12012 April 2021 the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 2020 PMNS20201174, Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc)2020-10-0101 October 2020 Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc) PMNS20201170, Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc)2020-09-30030 September 2020 Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc) ML14076A1112014-03-17017 March 2014 Notice of Public Meeting to Provide an Open Forum to Discuss the Annual Assessment of Surry Power, Units 1 and 2 ML14066A1252014-03-0707 March 2014 March 18, 2014, Notice of Category 3 Public Meeting/Open House Regarding Surry, Units 1 & 2, Annual Assessment ML14065A5302014-03-0606 March 2014 Notice of Category 3 Public Meeting/Open House with Virginia Electric and Power Company to Discuss Surry Power Station Units 1 and 2 Annual Assessment ML14065A4942014-03-0606 March 2014 Notice of Category 3 Public Meeting/Open House with Virginia Electric and Power Company to Discuss Surry Power Station Units 1 and 2 Annual Assessment ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13109A1642013-04-19019 April 2013 Notice of Public Meeting/Open House Regarding Surry Power Station, Units 1 and 2, Annual Assessment ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12100A1952012-04-0909 April 2012 Notice of Meeting to Provide an Open Public Forum to Discuss the NRC Reactor Oversight Process and the Nrc'S Annual Assessment of the Surry Power Station During Calendar Year 2011 ML12089A2742012-03-29029 March 2012 Mtg Ann -Surry Regulatory Conference - 2012 ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML1110304262011-04-13013 April 2011 Public Meeting/Open House Attendees ML1036200902010-12-28028 December 2010 Notice of Category 1 Public Meeting with Virginia Electric and Power Company to Discuss the Plant Status of the Surry Power Station ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML1008803892010-03-29029 March 2010 Meeting Notice to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the Surry Power Station ML0931002542009-11-0909 November 2009 Notice of Conference Call with Virginia Electric and Power Company to Discuss Issues Relating to Surry Power Station ML0918004532009-06-29029 June 2009 Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop ML0908302052009-03-23023 March 2009 Notice of Category 3 Public/Open House Meeting with Surry Power Station to Discuss NRC Reactor Oversight Process and Annual Assessment ML0819600282008-07-11011 July 2008 08/05-06/2008-Notice of Meeting - 2008 Us Nuclear Regulatory Commission Initial Examination Development Workshop ML0807009262008-03-0707 March 2008 Notice of Meeting with Virginia Electric & Power Co to Discuss NRC Reactor Oversight Process Annual Assessment of Surry Power Station ML0726900152007-09-26026 September 2007 Notice of Forthcoming Meeting with Dominion Nuclear to Discuss Proposed Chemical Testing Methods Related to GSI-191, Assessment of Debris Accumulation on PWR Sump Performance, as Proposed by Its Vendor ML0713706072007-05-17017 May 2007 Notice of Meeting for NRC Training Managers' Conference Hosting by Rgn II ML0708701352007-03-27027 March 2007 Notice of Meeting with Surry to Discuss the NRC Reactor Oversight Process Annual Assessment ML0633102092006-11-27027 November 2006 Rescheduled Forthcoming Meeting with Virginia Electric and Power Company (VEPCO) Regarding Main Control Room and Emergency Switchgear Room Air-Conditioning System Application for Surry Nuclear Station, Units 1 and 2 ML0632605122006-11-22022 November 2006 Forthcoming Meeting with Virginia Electric and Power Company. Regarding Main Control Room and Emergency Switchgear Room for Surry Nuclear Station Units 1 and 2 ML0626203902006-09-19019 September 2006 Notice of Meeting with Virginia Electric Power Company (VEPCO) to Discuss Organizational Changes at VEPCO, Etc ML0618700742006-07-0505 July 2006 and 07/20/2006 Meeting Announcement 2006 NRC Initial Exam Development Workshop to Clarify the Exam Development Process and Question Development for Both the Written and Operating Portion of the Initial Examination ML0609404382006-04-0404 April 2006 Notice of Annual Assessment Public Meeting with Virginia Electric and Power Company to Discuss NRC Reactor Oversight Process Annual Assessment of Surry Facility ML0602700902006-01-27027 January 2006 Forthcoming Meeting with Virginia Electric and Power Co. and Westinghouse to Discuss License Amendments to Increase the Lead Rod Average Burnup Limit to 62,000 Mwd/Mt at Surry Power Station, Unit 1 ML0525606282005-09-13013 September 2005 Notice of Category 1 Meeting W/ VEPCO Surry and ISFSI Related Criticality Analysis Between Part 50 and 72 ML0513100022005-05-10010 May 2005 Notice of Meeting Regarding the plant-specific Implementation of VIPRE-D Topical Report for Dominion, VEPCO, (Surry, North Anna & Millstone) ML0510200412005-04-12012 April 2005 Meeting Notice with Nrc/ Dominion to Discuss Status of Current Licensing Issues & Attributes of Good Licensing Submittals ML0506904622005-03-0909 March 2005 Public Meeting Notice - Category One Meeting - Regulatory Performance Meeting - Surry Power Station ML0506803262005-03-0808 March 2005 Meeting Announcement - Public Meeting - Annual Assessment of Surry Power Station ML0436303932004-12-28028 December 2004 2005 U. S. Nuclear Regulatory Commission (NRC) Training Managers' Conference ML0420301852004-07-21021 July 2004 Notice of Meeting with Virginia Electric & Power Company (VEPCO) to Discuss Vepco'S Proposed plant-specific Topical Report That Implements VIPRE-D Code ML0407602222004-03-15015 March 2004 Public Meeting Announcement - Category One Meeting Annual Assessment - Surry Power Station ML0405502402004-02-23023 February 2004 Public Regulatory Conference Meeting to Discuss Risk Significance of Inspection Findings Documented in NRC IR 05000280-03-008 & 05000281-03-008 ML0404202072004-02-11011 February 2004 Meeting with Virginia Electric and Power Company and NRC, Material Control and Accounting Program 2023-05-11
[Table view] |
Text
March 7, 2008 Virginia Electric and Power Company ATTN: Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Innsbrook Technical Center - 2SW 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 - SURRY POWER STATION, DOCKET NOS. 50-280, 50-281,72-002 AND 72-055
Dear Mr. Christian:
This letter confirms the conversation between Mr. Barry Garber of your staff and Mr. Chris Welch of this office on March 4, 2008, concerning a Category 1 public meeting which has been scheduled for April 15, 2008, at 1:30 p.m. The meeting notice, which provides additional details, is enclosed. The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of your Surry Power Station.
During the meeting we recognize that you may have information which you want to present to us or any members of the public in attendance. Accordingly, if you so desire, after our presentation you will be afforded an opportunity to respond to any information contained in the Annual Assessment Letter and to discuss any new or existing programs that are designed to maintain or improve your current performance.
In accordance with 10 CFR 2.390 of the NRC=s "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4662.
Sincerely,
/RA/
Eugene F. Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281,72-002 & 72-055 License Nos.: DPR-32, DPR-37, & SNM-2501
Enclosure:
As stated cc w/encl: (See page 2)
OFFICE RII:DRP SIGNATURE 3/7/08 NAME JDodson DATE March 10, 2008 March 10, 2008 March 10, 2008 March 10, 2008 March 10, 2008 March 10, 2008 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO
VEPCO 2 cc w/encl:
Chris L. Funderburk, Director Nuclear Licensing and Operations Support Virginia Electric & Power Company Electronic Mail Distribution Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, VA 23209 Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219
Letter to David A. Christian from Eugene F. Guthrie dated March 7, 2008
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 - ANNUAL ASSESSMENT OF SURRY POWER STATION, DOCKET NOS. 50-280, 50-281,72-002 AND 72-055 Distribution (E-Mail):
Director, DORL S. Lingam, NRR Region II Administrator=s Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS L. Slack, RII EICS RIDSNRRDIRS RIDSNRRDIRSIPAB OE Mail PUBLIC
SUBJECT:
PUBLIC MEETING WITH VIRGINIA ELECTRIC & POWER COMPANY FACILITY: SURRY POWER STATION DOCKETS: 50-280, 50-281,72-002, 72-055 DATE & TIME: Tuesday, April 15, 2008 1:30 p.m. to 3:30 p.m.
LOCATION: Surry Government Center, Surry County Extension Conference Room 45 School Street Surry, VA 23883 PURPOSE: To discuss the NRC Reactor Oversight Process Annual Assessment of the Surry Power Station. The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC=s document system (ADAMS) (accession number (ML080630294) or the NRC Web site at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/
LETTERS/sur2007q4.pdf. The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.
CATEGORY: This is a Category 1 meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting contact listed below.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
NRC OFFICE(S)
PARTICIPATING: Region II OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC E. Guthrie, Chief, Reactor Projects Branch 5 C. Welch, Senior Resident Inspector, Division of Reactor Projects LICENSEE (partial list)
D. Jernigan, Site Vice President, Surry MEETING CONTACT: Eugene F. Guthrie, NRC RII 404-562-4662 gxg@nrc.gov AUDIO & VIDEO TELE-CONFERENCING: Not available Enclosure