| title = R.E. Ginna - Forwards Monthly Operating Status Report for Month of January 1978
| title = Forwards Monthly Operating Status Report for Month of January 1978
| author name = Lang L
| author name = Lang L
| author affiliation = Rochester Gas & Electric Corp
| author affiliation = Rochester Gas & Electric Corp
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DISTRIBUTION FOR INCOMING MATERIAL 50-244 REC: NRC ORG: LANG L S ROCHESTER GAS 8c ELEC DOCI3ATE: 02/09/78 DATE RCVD: 02/16/78 DOCTYPE: OTHER NOTARIZED:
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO COPIES RECEIVED  
DISTRIBUTION FOR INCOMING MATERIAL                             50-244 REC:                               ORG: LANG L S                       DOCI3ATE: 02/09/78 NRC                                ROCHESTER GAS  8c ELEC            DATE RCVD: 02/ 16/78 DOCTYPE: OTHER     NOTARIZED: NO                                         COPIES RECEIVED


==SUBJECT:==
==SUBJECT:==
LTR 1 ENCL 10 MONTHLY OPERATING REPT FQR JANUARY 1978-UNIT 1...W/ATT NARRATIVE  
LTR 1   ENCL 10 MONTHLY OPERATING REPT FQR JANUARY       1978 UNIT   1... W/ATT NARRATIVE


==SUMMARY==
==SUMMARY==
.PLANT NAME: RE GINNA-UNIT 1 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:+++++++++++++++++
PLANT NAME: RE GINNA UNIT     1                             REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS+4+4<++<+<<<<<<<<+
+++++++++++++++++ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +4+4<++<+<<<<<<<<+
MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.(DISTRIBUTION CODE A003>FOR ACTION: INTERNAL: EXTERNAL: BRANCH CHIEF Z IEMANN~+W/2 ENCL EG F,++W/ENCL OR ACTION+4W/2 ENCL LPDR S ROCHESTER'Y~I
MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
+W/ENCL T IC~~W/ENCL NSIC++W/ENCL BNL<NATLAB)44M/ENCL ACRS CAT B++W/0 ENCL NRC PDR++W/ENCL DISTRIBUTION:
(DISTRIBUTION CODE A003>
LTR 10 ENCL 10 SIZE: 1P+3P+iP CONTROL NBR: 780480239 END I'P I P il 44 I 4 IC
FOR ACTION:     BRANCH CHIEF Z IEMANN~+W/2 ENCL INTERNAL:          EG F,   ++W/ENCL                    NRC PDR++W/ENCL OR   ACTION+4W/2 ENCL EXTERNAL:        LPDR S ROCHESTER'Y~I +W/ENCL T IC~~W/ENCL NSIC++W/ENCL BNL<NATLAB)44M/ENCL ACRS CAT B++W/0 ENCL DISTRIBUTION:   LTR 10       ENCL 10                           CONTROL NBR:  780480239 SIZE: 1P+3P+iP END
(;/g'/~;,"" gFI gp~t I30gt(<j'3.$
tII'.II+j';;;:,',I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649 g), yg PEcovEO++~IC(7S78 0)G.~TELEPHONE APEA cooE Tie 546.2700 Ginna Station February 9, 1978 Director, Office of Management Information and Program Control U.S.NUCLEAR REGULATORY COMMISSION Washington, D.C.20555 Subject Monthly Report for January, 1978 Operating Status Information R.E.Ginna Nuclear.Power Plant Unit No.1 Docket No.50-244 Gentlemen:
Pursuant to our proposed Technical Specification 6.9.1 attached herewith is the monthly operating status report for Ginna Station for the month of January, 1978.ll Very truly yours, LSL:fah Attachments Superintendent 780480239)god 3 I jo 4 It I OPERATING DATA REPORT DOCKET NO.50 244 DATE Fe rua 1 78 COMPI,ETED BY'ndrew E.McNamara, Operations Aide~OPERATING STATUS 490 1.Unit Name: GINNA STATIO 2.Reporting Period: 3.Licensed.Thermal Power (MWt): 4.Nameplate Rating (Gross MWc): 5.Design Electrical Rating (Net MWe)t 6.Maximum Dependable Capacity (Gross hfWe): 7.Maximum Dependable Capacity (Net MWe): 8.If Changes Occur in Capacity Ratings (Items 490 470 TELEPHONE.
1-716-546-2700 Ext.291-205 at Ginna Notes Line ll: The number of hours in Reporting Period, Cumula-tive, are from date of Initial, on-line of generator, not date of commercial operation.
Number 3 Through 7)Since Last Report, Give Reasons: 9.'ower Level to Which Restricted, If Any (Net i~fWe): 10.Reasons For Restrictions, If Any: This Month Yr.-to-Date Cumulative 744 744 11.Hours In Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type, Date Refueling"-March 17, 1978-6 weeks 587 587 0 0 872,256 872,256 239,624 239 624 79%79%79%72%72%72%72%1%l%%d and Duration of Each): 71 736 54,625.62 8.5*.69,309,298 22 427 484 74%70%70%12%25.If Shut Down At End Of Report.Period, Estimated Date of Startup: February 3y 1978 26.Units In Test Status (Prior to Commercial Operation):
*Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved*Cumulative Data Commencing January 1, 1975 49 88 (RKV.I/78) 4 l ,q,  A RAGE DAILY UNIT POWER UNIT MONTH January 1978 DAY AVERAGE DAILY POWER LEVEL (M We-Net)DOCKET NO..UNIT&#xb9;I Gtnna Statio Februar.3 1978 COMPLETED BY Andrew E.McNamara, Operations Aide TELEPHONE 1-716-546-2700, Ext.291-205, at Ginna DAY.AVERAGE DAILY POWER LEVEL (MWe-Net)1 2 10 ll 12 13 14 16 415 415 416.415 417 416 416 416 414 376 367 411 349 315 17 18 19 20 21.22 23 24 25*26'7*2B*2$30*31 415 415 416 415 415 416 416 416 357*Unit Shutdown INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.40 47 tRKVo 1/74)


DOCKET NO.50-244 UNIT NAhll<l Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS C:OhtPLETED ltY Andrew E.McNamara, Ope ations Aide REPORT hlONTll*TELEPllO l: 1-716-546-2700 Ext.291-205 At Ginna Ho.Date 0 ss 0 P.0 0 o O lxl Ol~0 c v e<<IA c 0 l.icensee Event Report Il Ew.e O N o o c D~C 0 Q c~o lJ Cause L Corrective Action to Prevent Recurrence 780125 157 78-03 CB HTEXCH"B" Steam Generator, Tuba Leak (Refer to L.E.R.78-03 for Corrective Actions)F: Forced St Scheduled 49 dg (Ra v, t/rd)Reason: A-Equipmcnt Failure (Explain)8-htaintenancc or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)ll-Other (Explain)hlechod: 1-hlanual 2-hlanual Scram.3-Automatic Scram.4-Other (Explain)FxhibicAi-Inscruccions for Preparation of.Data Entry Sheets for Licensee Event Rcport (LER)File (NUREG-ol6l)Exhibit~-Same Source 1 I 4 HARRATIYE  
I'      P  I P
il 44 I
4 IC
 
(;/g'/~;,""                            gFI gp~t        I30gt(<j'3.$ tII'.II+j';;;:,',I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE g), yg                  APEA cooE Tie 546.2700
                                            +                    Ginna    Station PEcovEO February 9, 1978
                                      +~ IC(7S78
: 0)    G .~
Director, Office of  Management  Information and Program Control U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Subject    Monthly Report for January, 1978 Operating Status Information R. E. Ginna Nuclear. Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:
Pursuant  to our proposed Technical Specification 6.9.1 attached herewith is the monthly operating status report for Ginna Station for the month of January, 1978.
ll Very truly yours, Superintendent LSL:fah Attachments 780480239
                                                              )god 3 I jo
 
4 It I
 
OPERATING DATA REPORT DOCKET NO. 50 244 DATE Fe rua                  1 78 COMPI,ETED BY E. McNamara, Operations Aide
                                                                                      'ndrew TELEPHONE.              1-716-546-2700
    ~ OPERATING STATUS                                                                        Ext. 291-205 at Ginna
: 1. Unit Name:      GINNA STATIO                                    Notes      Line        ll:
: 2. Reporting Period:                                                    The number of hours in
: 3. Licensed. Thermal Power (MWt):
490 Reporting          Period, Cumula-
: 4. Nameplate Rating (Gross MWc):                                      tive, are from date of
: 5. Design Electrical Rating (Net MWe)t                                Initial,          on-line of
: 6. Maximum Dependable Capacity (Gross hfWe):        490              generator, not date of
: 7. Maximum Dependable Capacity (Net MWe):
470              commercial operation.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.'ower Level to Which Restricted, If Any (Net    i~fWe):
: 10. Reasons For Restrictions, If Any:
This Month          Yr.-to-Date            Cumulative
: 11. Hours In Reporting Period                            744                744                    71 736
: 12. Number of Hours Reactor Was Critical 587                587                    54,625.62
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On-Line
: 15. Unit Reserve Shutdown Hours                              0                  0                          8.5
* 872,256            872,256              .69,309,298
: 16. Gross Thermal Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)                239,624            239 624                22 427 484 79%                79%                      74%
: 19. Unit Service Factor
: 20. Unit Availability Factor                                79%
Unit Capacity Factor (Using MDC Net)                  72%                  72%                      70%
21.
72%                  72%                      70%
l%%d                1%                      12%
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refueling "- March 17, 1978        -  6  weeks
: 25. If Shut Down At End Of Report.Period, Estimated Date of Startup:  February    3y 1978
: 26. Units In Test Status (Prior to Commercial Operation):
* Forecast                  Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 49 88 (RKV. I/78)
* Cumulative Data      Commencing January 1, 1975
 
l ,q,4 A    RAGE DAILY UNIT POWER UNIT DOCKET NO..
UNIT    &#xb9;I  Gtnna Statio Februar  . 3  1978 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE 1-716-546-2700, Ext. 291-205, at Ginna MONTH January    1978 DAY AVERAGE DAILY POWER LEVEL                        DAY. AVERAGE DAILY POWER          LEVEL (M We-Net)                                        (MWe-Net) 415 1                                                  17 415                                                      415 2                                                  18 415                                                      416 19 416                                                      415 20
                .415                                                      415 21.
417                                                      416 22 416                                                      416 23 416                                  24 416 416                                                      357 25 414
* 10 ll              376 367
                                                  '7 26 12                                                  2B 411
* 13                                                  2$
14              349                                  30 315
* 31 16
* Unit    Shutdown INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
40 47 tRKVo 1/74)
 
DOCKET NO.        50-244 UNIT NAhll   <l Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS C:OhtPLETED ltY Andrew E. McNamara, Ope ations Aide REPORT hlONTll
* TELEPllO l: 1-716-546-2700       Ext. 291-205 At Ginna Ol ~0                              c D~
0 ss              c v      l.icensee      Ew.        C              Cause  L Corrective 0                              O e      0 Ho.           Date           0                     e      Event        N  o      Q c                  Action to P. 0     o O
lxl   << IA c     Report Il         o       ~o             Prevent Recurrence 0
lJ 780125           157                       78-03           CB       HTEXCH "B" Steam Generator, Tuba Leak (Refer to L.E.R. 78-03 for Corrective Actions)
F: Forced           Reason:                                        hlechod:                        FxhibicAi - Inscruccions St Scheduled         A-Equipmcnt Failure (Explain)                 1-hlanual                        for Preparation of. Data 8-htaintenancc or Test                         2-hlanual Scram.                Entry Sheets for Licensee C-Refueling                                   3-Automatic Scram.              Event Rcport (LER) File (NUREG-D-Regulatory Restriction                       4-Other (Explain)                ol6l)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 49 dg (Ra v, t/rd)     ll-Other (Explain)                                                             Exhibit~- Same   Source
 
1 I
 
4 HARRATIYE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.0-2 UNIT DATE February 3, 1978 COMPLETED BY Andrew E.McNamara, Operations Aide NTH JAWJARY, 1978 TELEPHONE 1 716 546 2700'xt~291 205 at Ginna The Reactor Power Level averaged 100%in the Report Month.The exceptions were: Two unit power level reductions to~48%to repair condenser tube leaks, on 1/11 and 1/14, respectively.
OF OPERATING EXPERIENCE DOCKET NO.       0-2 UNIT DATE   February 3, 1978 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE   1 716 546   2700'xt         ~   291 205 at Ginna NTH  JAWJARY, 1978 The Reactor Power Level averaged 100% in the Report Month. The exceptions were:
A unit shutdown on 1/25 to effect repairs on the"B" steam generator, tube leak.The unit remained shutdown at the end of the Report Period.iQ~123 u/TS) 7 NARRATIVE  
Two unit power level reductions   to ~ 48% to repair condenser tube leaks, on 1/11 and 1/14, respectively.
A unit shutdown on 1/25 to effect repairs on the "B" steam generator,     tube leak.
The unit remained shutdown at the end of the Report Period.
iQ ~ 123   u/TS)
 
7 NARRATIVE  


==SUMMARY==
==SUMMARY==
OF SAFETY-RELATED MAINTENANCE I.JANUARY 1978 Ma)or safety-related.
OF SAFETY-RELATED MAINTENANCE I.
maintenance"for the month of January included plugging of a tube leak in the 1B Steam Generator." An additi'onal seven tubes were plugged due to defect indications.
JANUARY 1978 Ma)or safety-related. maintenance "for the month of January included plugging of a tube leak in the 1B Steam Generator." An additi'onal seven tubes were plugged due to defect indications. During the steam generator outage, the "B" loop sample valve was repaired due to a gasket leak and. the steam general'r"snubber SG>> A-7 was inspected and.
During the steam generator outage, the"B" loop sample valve was repaired due to a gasket leak and.the steam general'r"snubber SG>>A-7 was inspected and.rebuilt with new seals as preventive mannite'nance.
rebuilt with new seals as preventive mannite'nance. The terminal blocks for the pressurizer pressure   and level control transmitters located in the containment were replaced, with Westinghouse terminal blocks. Con-trol rod power cables were checked for proper polarity and. terminal changes were made as necessary. Additional non-shutdown work included repair of a weld leak in the 1B charging pump discharge relief piping and rebuilding of a worn 1A charging pump varidrive unit.
The terminal blocks for the pressurizer pressure and level control transmitters located in the containment were replaced, with Westinghouse terminal blocks.Con-trol rod power cables were checked for proper polarity and.terminal changes were made as necessary.
 
Additional non-shutdown work included repair of a weld leak in the 1B charging pump discharge relief piping and rebuilding of a worn 1A charging pump varidrive unit.
RECEIVEO ppCUHEH'O<
RECEIVEO ppCUHEH'O<
WOL OES.C ggFEB l6               Phf lR 4l U.S. tIRC OISTRIBUTIOH SERVICES SRAIICH}}
WOL OES.C ggFEB l6 Phf lR 4l U.S.tIRC OISTRIBUTIOH SERVICES SRAIICH}}

Latest revision as of 00:33, 3 February 2020

Forwards Monthly Operating Status Report for Month of January 1978
ML18142B359
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/09/1978
From: Lang L
Rochester Gas & Electric Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18142B359 (14)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-244 REC: ORG: LANG L S DOCI3ATE: 02/09/78 NRC ROCHESTER GAS 8c ELEC DATE RCVD: 02/ 16/78 DOCTYPE: OTHER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 10 MONTHLY OPERATING REPT FQR JANUARY 1978 UNIT 1... W/ATT NARRATIVE

SUMMARY

PLANT NAME: RE GINNA UNIT 1 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:

+++++++++++++++++ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +4+4<++<+<<<<<<<<+

MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.

(DISTRIBUTION CODE A003>

FOR ACTION: BRANCH CHIEF Z IEMANN~+W/2 ENCL INTERNAL: EG F, ++W/ENCL NRC PDR++W/ENCL OR ACTION+4W/2 ENCL EXTERNAL: LPDR S ROCHESTER'Y~I +W/ENCL T IC~~W/ENCL NSIC++W/ENCL BNL<NATLAB)44M/ENCL ACRS CAT B++W/0 ENCL DISTRIBUTION: LTR 10 ENCL 10 CONTROL NBR: 780480239 SIZE: 1P+3P+iP END

I' P I P

il 44 I

4 IC

(;/g'/~;,"" gFI gp~t I30gt(<j'3.$ tII'.II+j';;;:,',I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE g), yg APEA cooE Tie 546.2700

+ Ginna Station PEcovEO February 9, 1978

+~ IC(7S78

0) G .~

Director, Office of Management Information and Program Control U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Subject Monthly Report for January, 1978 Operating Status Information R. E. Ginna Nuclear. Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to our proposed Technical Specification 6.9.1 attached herewith is the monthly operating status report for Ginna Station for the month of January, 1978.

ll Very truly yours, Superintendent LSL:fah Attachments 780480239

)god 3 I jo

4 It I

OPERATING DATA REPORT DOCKET NO. 50 244 DATE Fe rua 1 78 COMPI,ETED BY E. McNamara, Operations Aide

'ndrew TELEPHONE. 1-716-546-2700

~ OPERATING STATUS Ext. 291-205 at Ginna

1. Unit Name: GINNA STATIO Notes Line ll:
2. Reporting Period: The number of hours in
3. Licensed. Thermal Power (MWt):

490 Reporting Period, Cumula-

4. Nameplate Rating (Gross MWc): tive, are from date of
5. Design Electrical Rating (Net MWe)t Initial, on-line of
6. Maximum Dependable Capacity (Gross hfWe): 490 generator, not date of
7. Maximum Dependable Capacity (Net MWe):

470 commercial operation.

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.'ower Level to Which Restricted, If Any (Net i~fWe):

10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744 744 71 736
12. Number of Hours Reactor Was Critical 587 587 54,625.62
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 0 0 8.5
  • 872,256 872,256 .69,309,298
16. Gross Thermal Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 239,624 239 624 22 427 484 79% 79% 74%
19. Unit Service Factor
20. Unit Availability Factor 79%

Unit Capacity Factor (Using MDC Net) 72% 72% 70%

21.

72% 72% 70%

l%%d 1% 12%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refueling "- March 17, 1978 - 6 weeks

25. If Shut Down At End Of Report.Period, Estimated Date of Startup: February 3y 1978
26. Units In Test Status (Prior to Commercial Operation):
  • Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 49 88 (RKV. I/78)
  • Cumulative Data Commencing January 1, 1975

l ,q,4 A RAGE DAILY UNIT POWER UNIT DOCKET NO..

UNIT ¹I Gtnna Statio Februar . 3 1978 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE 1-716-546-2700, Ext. 291-205, at Ginna MONTH January 1978 DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (M We-Net) (MWe-Net) 415 1 17 415 415 2 18 415 416 19 416 415 20

.415 415 21.

417 416 22 416 416 23 416 24 416 416 357 25 414

  • 10 ll 376 367

'7 26 12 2B 411

  • 13 2$

14 349 30 315

  • 31 16
  • Unit Shutdown INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

40 47 tRKVo 1/74)

DOCKET NO. 50-244 UNIT NAhll <l Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS C:OhtPLETED ltY Andrew E. McNamara, Ope ations Aide REPORT hlONTll

  • TELEPllO l: 1-716-546-2700 Ext. 291-205 At Ginna Ol ~0 c D~

0 ss c v l.icensee Ew. C Cause L Corrective 0 O e 0 Ho. Date 0 e Event N o Q c Action to P. 0 o O

lxl << IA c Report Il o ~o Prevent Recurrence 0

lJ 780125 157 78-03 CB HTEXCH "B" Steam Generator, Tuba Leak (Refer to L.E.R. 78-03 for Corrective Actions)

F: Forced Reason: hlechod: FxhibicAi - Inscruccions St Scheduled A-Equipmcnt Failure (Explain) 1-hlanual for Preparation of. Data 8-htaintenancc or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) ol6l)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 49 dg (Ra v, t/rd) ll-Other (Explain) Exhibit~- Same Source

1 I

4 HARRATIYE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 0-2 UNIT DATE February 3, 1978 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE 1 716 546 2700'xt ~ 291 205 at Ginna NTH JAWJARY, 1978 The Reactor Power Level averaged 100% in the Report Month. The exceptions were:

Two unit power level reductions to ~ 48% to repair condenser tube leaks, on 1/11 and 1/14, respectively.

A unit shutdown on 1/25 to effect repairs on the "B" steam generator, tube leak.

The unit remained shutdown at the end of the Report Period.

iQ ~ 123 u/TS)

7 NARRATIVE

SUMMARY

OF SAFETY-RELATED MAINTENANCE I.

JANUARY 1978 Ma)or safety-related. maintenance "for the month of January included plugging of a tube leak in the 1B Steam Generator." An additi'onal seven tubes were plugged due to defect indications. During the steam generator outage, the "B" loop sample valve was repaired due to a gasket leak and. the steam general'r"snubber SG>> A-7 was inspected and.

rebuilt with new seals as preventive mannite'nance. The terminal blocks for the pressurizer pressure and level control transmitters located in the containment were replaced, with Westinghouse terminal blocks. Con-trol rod power cables were checked for proper polarity and. terminal changes were made as necessary. Additional non-shutdown work included repair of a weld leak in the 1B charging pump discharge relief piping and rebuilding of a worn 1A charging pump varidrive unit.