{{#Wiki_filter:Code of Federal Regulations | {{#Wiki_filter:November 5, 2018 | ||
EA-18-020 | |||
Mr. John Dinelli, Site Vice President | |||
Entergy Operations, Inc. | |||
17265 River Road | |||
Killona, LA 70057-0751 | |||
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3, RESPONSE TO NOTICE | |||
OF VIOLATION EA-18-020 (INSPECTION REPORT 05000382/2017009) | |||
Dear Mr. Dinelli: | |||
On July 20, 2018, the U.S. Nuclear Regulatory Commission (NRC) issued a Notice of Violation | |||
to Entergy Operations, Inc. (Entergy), Waterford Steam Electric Station, Unit 3. The finding and | |||
Notice of Violation were associated with the failure to establish appropriate design and | |||
procedures associated with providing electrical power using the N+1 FLEX diesel generator to | |||
support transition phase (Phase 2) strategies necessary to maintain or restore the core cooling | |||
and spent fuel pool cooling capabilities in mitigating a beyond-design-basis external event | |||
(Inspection Report 05000382/2017009 (Agencywide Documents Access and Management | |||
System (ADAMS) Accession No. ML18201A492). | |||
The Notice of Violation required Entergy to respond in writing within 30 days. You requested an | |||
extension of the 30 days by letter, dated August 9, 2018 (ML18221A639). This request was | |||
approved by letter, dated August 21, 2018 (ML18232A575). On September 12, 2018, you | |||
responded to the Notice of Violation by letter (ML18255A321). | |||
We have reviewed your reply and concluded that it does not describe the corrective actions nor | |||
give a specific expected completion date. Based on discussions during the Problem | |||
Identification and Resolution inspection, we understand that you are still evaluating multiple | |||
options for restoring compliance and the date to restore full compliance is based on the option | |||
that will be selected. | |||
In order to support inspection planning, you are requested to supplement your initial response to | |||
the Notice of Violation promptly after you have determined the option you will pursue to restore | |||
compliance. Your update should describe the corrective actions planned to restore compliance | |||
and the date which compliance is expected to be restored. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs | |||
Rules of Practice, a copy of this letter will be made available electronically for public inspection | |||
in the NRC Public Document Room or from the NRCs document system Agencywide | |||
Document Access and Management System (ADAMS), accessible from the NRC Web site at | |||
http://www.nrc.gov/reading-rm/adams.html. | |||
/RA/ | J. Dinelli 2 | ||
Please contact me at 817-200-1574 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Neil OKeefe, Branch Chief | |||
Project Branch D | |||
Division of Reactor Projects | |||
Docket No. 50-382 | |||
License No. NPF-38 | |||
ML18309A221 | |||
X SUNSI Review: ADAMS: Non-Publicly Available X Non-Sensitive Keyword: | |||
By: JLD X Yes No X Publicly Available Sensitive NRC-002 | |||
OFFICE SPE: PBD C: PBD | |||
NAME JDixon NOKeefe | |||
SIGNATURE /RA/ /RA/ | |||
DATE 11/5/18 11/5/18 | |||
}} | }} |
Latest revision as of 11:16, 20 October 2019
ML18309A221 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 11/05/2018 |
From: | O'Keefe N NRC/RGN-IV/DRP |
To: | Dinelli J Entergy Operations |
References | |
EA-18-020, IR 2017009 | |
Download: ML18309A221 (3) | |
See also: IR 05000382/2017009
Text
November 5, 2018
Mr. John Dinelli, Site Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3, RESPONSE TO NOTICE
OF VIOLATION EA-18-020 (INSPECTION REPORT 05000382/2017009)
Dear Mr. Dinelli:
On July 20, 2018, the U.S. Nuclear Regulatory Commission (NRC) issued a Notice of Violation
to Entergy Operations, Inc. (Entergy), Waterford Steam Electric Station, Unit 3. The finding and
Notice of Violation were associated with the failure to establish appropriate design and
procedures associated with providing electrical power using the N+1 FLEX diesel generator to
support transition phase (Phase 2) strategies necessary to maintain or restore the core cooling
and spent fuel pool cooling capabilities in mitigating a beyond-design-basis external event
(Inspection Report 05000382/2017009 (Agencywide Documents Access and Management
System (ADAMS) Accession No. ML18201A492).
The Notice of Violation required Entergy to respond in writing within 30 days. You requested an
extension of the 30 days by letter, dated August 9, 2018 (ML18221A639). This request was
approved by letter, dated August 21, 2018 (ML18232A575). On September 12, 2018, you
responded to the Notice of Violation by letter (ML18255A321).
We have reviewed your reply and concluded that it does not describe the corrective actions nor
give a specific expected completion date. Based on discussions during the Problem
Identification and Resolution inspection, we understand that you are still evaluating multiple
options for restoring compliance and the date to restore full compliance is based on the option
that will be selected.
In order to support inspection planning, you are requested to supplement your initial response to
the Notice of Violation promptly after you have determined the option you will pursue to restore
compliance. Your update should describe the corrective actions planned to restore compliance
and the date which compliance is expected to be restored.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be made available electronically for public inspection
in the NRC Public Document Room or from the NRCs document system Agencywide
Document Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html.
J. Dinelli 2
Please contact me at 817-200-1574 with any questions you have regarding this letter.
Sincerely,
/RA/
Neil OKeefe, Branch Chief
Project Branch D
Division of Reactor Projects
Docket No. 50-382
License No. NPF-38
X SUNSI Review: ADAMS: Non-Publicly Available X Non-Sensitive Keyword:
By: JLD X Yes No X Publicly Available Sensitive NRC-002
OFFICE SPE: PBD C: PBD
NAME JDixon NOKeefe
SIGNATURE /RA/ /RA/
DATE 11/5/18 11/5/18