W3F1-2018-0052, Extension for Waterford 3 Response to Notice of Violation; EA-18-020 (Inspection Report 05000382/2017009)

From kanterella
(Redirected from ML18221A639)
Jump to navigation Jump to search
Extension for Waterford 3 Response to Notice of Violation; EA-18-020 (Inspection Report 05000382/2017009)
ML18221A639
Person / Time
Site: Waterford 
(NPF-038)
Issue date: 08/09/2018
From: Jarrell J
Entergy Operations
To: Kennedy K
Document Control Desk, Office of Nuclear Reactor Regulation, NRC Region 4
References
EA-18-020, W3F1-2018-0052 IR 2017009
Download: ML18221A639 (2)


Text

10 CFR 2.201 W3F1-2018-0052 August 9, 2018 Mr. Kriss Kennedy Regional Administrator U.S. Nuclear Regulatory Commission Region IV Office 1600 East Lamar Boulevard Arlington, TX 76011-4511

SUBJECT:

Extension for Waterford 3 Response to Notice of Violation; EA-18-020 (Inspection Report 05000382/2017009)

Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

REFERENCE:

Waterford Steam Electric Station, Unit 3 - Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans - Inspection Report 05000382/2017009 and Notice of Violation EA-18-020, July 20, 2018 [ADAMS Accession Number ML18201A492].

Dear Mr. Kennedy:

Entergy Operations, Inc. (Entergy) is in receipt of the referenced correspondence which transmitted Notice of Violation (NOV) EA-18-020 with regard to failure to establish appropriate design and procedures associated with providing electrical power using the N+1 FLEX diesel generator to support transition phase (Phase 2) strategies necessary to maintain or restore the core cooling and spent fuel pool cooling capabilities in mitigating a beyond-design-basis external event.

Entergy requested an extension of twenty-three (23) days beyond the current response due date of August 20, 2018, in order to complete the development of the response in a manner which will appropriately address the subject issues comprising the NOV. This request was granted per telephone conversation with Mr. Ryan Lantz, Deputy Director, Division of Reactor Projects, Region IV. Entergy will submit the required response by September 12, 2018. This correspondence is to serve as confirmation of that discussion.

There are no new commitments contained in this letter.

Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6678 jdinelli@entergy.com John P. Jarrell Manager, Regulatory Assurance Waterford 3

W3F1-2018-0052 Page 2 of 2 If you have any questions or require additional information, please contact John Jarrell, Regulatory Assurance Manager, at 504-739-6685.

Sincerely, JPJ/mmz cc: U.S. Nuclear Regulatory Commission, Document Control Desk One White Flint North, 11555 Rockville Pike Rockville, MD 20852 Mr. Kriss Kennedy, Regional Administrator U.S. Nuclear Regulatory Commission, Region IV RidsRgn4MailCenter@nrc.gov Mr. Anton Vegel, Director Division of Reactor Projects U. S. Nuclear Regulatory Commission, Region IV Anton.Vegel@nrc.gov Mr. Ryan Lantz, Deputy Director Division of Reactor Projects U. S. Nuclear Regulatory Commission, Region IV Ryan.Lantz@nrc.gov U.S. NRC Project Manager for Waterford 3 April.Pulvirenti@nrc.gov U.S. NRC Senior Resident Inspector for Waterford 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov