| | issue date = 03/06/2014 | | | issue date = 03/06/2014 |
| | title = Licensed Operator Positive Fitness-For-Duty-Test (FY14) | | | title = Licensed Operator Positive Fitness-For-Duty-Test (FY14) |
| | author name = Lorson R K | | | author name = Lorson R |
| | author affiliation = NRC/RGN-I/DRS | | | author affiliation = NRC/RGN-I/DRS |
| | addressee name = Joyce T P | | | addressee name = Joyce T |
| | addressee affiliation = PSEG Nuclear, LLC | | | addressee affiliation = PSEG Nuclear, LLC |
| | docket = 05000272, 05000311 | | | docket = 05000272, 05000311 |
| | license number = DPR-070, DPR-075 | | | license number = DPR-070, DPR-075 |
| | contact person = Jackson D E | | | contact person = Jackson D |
| | case reference number = ER 49872 | | | case reference number = ER 49872 |
| | document type = Letter, License-Operator, Part 55 Examination Related Material, Request for Additional Information (RAI) | | | document type = Letter, License-Operator, Part 55 Examination Related Material, Request for Additional Information (RAI) |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 6, 2014 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038 |
| | |
| Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 LICENSED OPERATOR POSITIVE FITNESS-FOR-DUTY-TEST | | SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 LICENSED OPERATOR POSITIVE FITNESS-FOR-DUTY-TEST |
|
| |
|
| ==Dear Mr. Joyce:== | | ==Dear Mr. Joyce:== |
|
| |
|
| On March 5, 2014, your facility reported to the NRC via 10 CFR 26.719 that an NRC-licensed operator tested positive following a fitness-for-duty test administered under 10 CFR 26.31(c) on March 4, 2014 (Event Report 49872). Although we have obtained preliminary information, this letter is a formal request for information pertaining to this occurrence. Within 30 days of the date of this letter, please provide responses to the questions listed in the enclosure. In addition, please provide other records and information on this operator's fitness-for-duty that are relevant to this occurrence. If you are unable to meet this deadline, please notify us no later than 15 days from the date of this letter, with the reasons for the delay and a proposed date of submittal. | | On March 5, 2014, your facility reported to the NRC via 10 CFR 26.719 that an NRC-licensed operator tested positive following a fitness-for-duty test administered under 10 CFR 26.31(c) on March 4, 2014 (Event Report 49872). Although we have obtained preliminary information, this letter is a formal request for information pertaining to this occurrence. Within 30 days of the date of this letter, please provide responses to the questions listed in the enclosure. In addition, please provide other records and information on this operator's fitness-for-duty that are relevant to this occurrence. If you are unable to meet this deadline, please notify us no later than 15 days from the date of this letter, with the reasons for the delay and a proposed date of submittal. |
| | | We request that any personal privacy, proprietary, or safeguards information in your response be contained in a separate enclosure and appropriately marked. The affidavit required by 10 CFR 2.390(b) must accompany your response, where applicable. |
| We request that any personal privacy, proprietary, or safeguards information in your response be contained in a separate enclosure and appropriately marked. The affidavit required by 10 CFR 2.390(b) must accompany your response, where applicable. | | You should determine whether the operator meets the requirements of 10 CFR 55.33(a)(1). You should ensure that: (1) the operator meets the general health requirements of ANSI/ANS-3.4-1983; (2) the operator does not have a disqualifying condition under Section 5.3 of that standard; and (3) documentation describing the designated physician's conclusion that the operator meets the requirements of ANSI/ANS-3.4-1983 is available for review by the NRC. |
| | | If a conditional license is requested per 10 CFR 55.25, that condition should be documented on NRC Form 396, "Certification of Medical Examination by Facility Licensee," and sent to the U.S. |
| You should determine whether the operator meets the requirements of 10 CFR 55.33(a)(1). You should ensure that: (1) the operator meets the general health requirements of ANSI/ANS-3.4-1983; (2) the operator does not have a disqualifying condition under Section 5.3 of that standard; and (3) documentation describing the designated physician's conclusion that the operator meets the requirements of ANSI/ANS-3.4-1983 is available for review by the NRC. If a conditional license is requested per 10 CFR 55.25, that condition should be documented on NRC Form 396, "Certification of Medical Examination by Facility Licensee," and sent to the U.S. Nuclear Regulatory Commission, ATTN: Regional Administrator, Region 1 Office, 2100 Renaissance Boulevard, King of Prussia, PA 19406-2713. | | Nuclear Regulatory Commission, ATTN: Regional Administrator, Region 1 Office, 2100 Renaissance Boulevard, King of Prussia, PA 19406-2713. |
| If you determine that the operator no longer meets the medical qualifications described in 10 CFR 55.33(a)(1), then, in accordance with 10 CFR 55.25, you must notify the NRC, in writing, of the operator's permanent incapacitation. For example, you must notify the NRC if you determine, based on your employee assistance program in consultation with your designated physician, that the operator can no longer meet the medical criteria of ANSI/ANS-3.4-1983. | | If you determine that the operator no longer meets the medical qualifications described in 10 CFR 55.33(a)(1), then, in accordance with 10 CFR 55.25, you must notify the NRC, in writing, of the operator's permanent incapacitation. For example, you must notify the NRC if you determine, based on your employee assistance program in consultation with your designated physician, that the operator can no longer meet the medical criteria of ANSI/ANS-3.4-1983. |
| The NRC will evaluate the information in your reply to this letter to determine if further action is warranted pursuant to 10 CFR Part 50 or Part 55. The information supplied will be maintained in NRC Privacy Systems of Records-16 and will be subject to the Privacy Act. | | The NRC will evaluate the information in your reply to this letter to determine if further action is warranted pursuant to 10 CFR Part 50 or Part 55. The information supplied will be maintained in NRC Privacy Systems of Records-16 and will be subject to the Privacy Act. |
| March 6, 2014 T. Joyce 2
| |
|
| |
| Please provide a copy of this letter, as well as your response to this letter, to the operator. If you are unwilling to provide this information to the operator for any reason, the NRC will provide the information to the operator when it is available as part of the operator's docket file. If you have any questions concerning this matter, please contact Donald Jackson, Chief, Operations
| |
|
| |
| Branch, at 610-337-5306.
| |
|
| |
|
| | T. Joyce 2 Please provide a copy of this letter, as well as your response to this letter, to the operator. If you are unwilling to provide this information to the operator for any reason, the NRC will provide the information to the operator when it is available as part of the operators docket file. If you have any questions concerning this matter, please contact Donald Jackson, Chief, Operations Branch, at 610-337-5306. |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| Sincerely, | | Sincerely, |
| /RA/ Raymond K. Lorson, Director Division of Reactor Safety
| | /RA/ |
| | | Raymond K. Lorson, Director Division of Reactor Safety Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 |
| Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Fitness-for-Duty Request for Additional Information
| |
|
| |
|
| cc w/ | | Fitness-for-Duty Request for Additional Information cc w/ |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Distribution via ListServ | | Distribution via ListServ |
| | |
| ML14066A295 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB R/DRS NAME DJackson/DEJ RLorson/
| |
| DATE 03/05/14 03/06/14 Enclosure Licensed Operator Fitness-for-Duty Request for Additional Information
| |
|
| |
|
| Salem Nuclear Generating Station, Units 1 and 2 is requested to provide the following information concerning the fitness-for-duty occurrence (10 CFR Part 26.719) reported on March 5, 2014, regarding the involved licensed operator: | | ML14066A295 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB R/DRS NAME DJackson/DEJ RLorson/ |
| | DATE 03/05/14 03/06/14 Licensed Operator Fitness-for-Duty Request for Additional Information Salem Nuclear Generating Station, Units 1 and 2 is requested to provide the following information concerning the fitness-for-duty occurrence (10 CFR Part 26.719) reported on March 5, 2014, regarding the involved licensed operator: |
| : 1. Name, Docket Number, and responsibilities of the operator. | | : 1. Name, Docket Number, and responsibilities of the operator. |
| : 2. A summary of the operator's entire fitness-for-duty testing history. Please include the dates and times the operator was tested, the reasons for the tests (i.e., | | : 2. A summary of the operator's entire fitness-for-duty testing history. Please include the dates and times the operator was tested, the reasons for the tests (i.e., |
| random, for-cause, or follow-up), the results of the tests, including quantification, and the dates that any tests were confirmed positive. | | random, for-cause, or follow-up), the results of the tests, including quantification, and the dates that any tests were confirmed positive. |
| : 3. Whether the operator used, sold, or possessed illegal drugs. If so, please provide the details of the circumstances surrounding such use, sale, or possession. | | : 3. Whether the operator used, sold, or possessed illegal drugs. If so, please provide the details of the circumstances surrounding such use, sale, or possession. |
| OR Whether the operator consumed alcoholic beverages within the protected area. | | OR Whether the operator consumed alcoholic beverages within the protected area. |
| If so, please provide the details of the circumstances surrounding such consumption. | | If so, please provide the details of the circumstances surrounding such consumption. |
| : 4. Whether the operator was at the controls or supervising licensed activities while under the influence of illegal drugs or alcohol. If so, please provide the details of the operator's performance of licensed duties while under the influence. | | : 4. Whether the operator was at the controls or supervising licensed activities while under the influence of illegal drugs or alcohol. If so, please provide the details of the operator's performance of licensed duties while under the influence. |
| : 5. Whether the operator fulfilled a position that was required to meet minimum licensed operating staffing requirements (fire brigade, emergency plan operations, etc.) while under the influence. | | : 5. Whether the operator fulfilled a position that was required to meet minimum licensed operating staffing requirements (fire brigade, emergency plan operations, etc.) while under the influence. |
| : 6. Whether the operator was involved in procedural errors related to this occurrence. If so, please provide the details of the procedural errors and the consequences of the errors. | | : 6. Whether the operator was involved in procedural errors related to this occurrence. If so, please provide the details of the procedural errors and the consequences of the errors. |
| : 7. The extent to which you reviewed the operator's past work history, both on the day of the occurrence and prior to March 4, 2014. | | : 7. The extent to which you reviewed the operators past work history, both on the day of the occurrence and prior to March 4, 2014. |
| : 8. Your intentions with regard to the operator's resumption of duties under the 10 CFR Part 50 and Part 55 licenses, including your plans for follow-up testing.}} | | : 8. Your intentions with regard to the operator's resumption of duties under the 10 CFR Part 50 and Part 55 licenses, including your plans for follow-up testing. |
| | Enclosure}} |
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] Category:License-Operator
MONTHYEARML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20279A4372020-10-13013 October 2020 September 9, 2020, NRC Generic Fundamentals Examination for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19289C4412019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18107A2302018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17278A1702017-10-0505 October 2017 September 6, 2017, NRC Generic Fundamentals Examination for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17201A0612017-07-19019 July 2017 Senior Reactor and Reactor Operator Initial License Examinations - Salem Nuclear Generating Station IR 05000272/20173022017-06-29029 June 2017 Senior Reactor Operator Retake License Examination Report 05000272/2017302 and 05000311/2017302 ML17249A1322017-06-0707 June 2017 Final Qa/Related Forms (Folder 1) ML17174B2102017-06-0606 June 2017 Final Outlines (Folder 3) ML17174B2112017-06-0606 June 2017 Final Operating Test (Section C) (Folder 3) ML17156A5622017-06-0505 June 2017 Operator Licensing Retake Examination Approval LR-N17-0099, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17249A1342017-04-20020 April 2017 Draft Operating Exam (Section C) (Folder 2) 2023-08-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17201A0612017-07-19019 July 2017 Senior Reactor and Reactor Operator Initial License Examinations - Salem Nuclear Generating Station IR 05000272/20173022017-06-29029 June 2017 Senior Reactor Operator Retake License Examination Report 05000272/2017302 and 05000311/2017302 ML17249A1322017-06-0707 June 2017 Final Qa/Related Forms (Folder 1) ML17174B2102017-06-0606 June 2017 Final Outlines (Folder 3) ML17174B2112017-06-0606 June 2017 Final Operating Test (Section C) (Folder 3) LR-N17-0099, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17249A1342017-04-20020 April 2017 Draft Operating Exam (Section C) (Folder 2) ML17249A1332017-04-20020 April 2017 Draft - Outlines (Folder 2) ML17102B2082017-04-11011 April 2017 Senior Reactor Operator Retake License Examination: Salem Nuclear Generating Station, Units 1 and 2 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17031A3372016-12-19019 December 2016 Handouts to Applicants (Folder 3) ML17031A3472016-12-12012 December 2016 Final Operating Test (Sections a, B, and C) (Folder 3) ML17031A2942016-12-12012 December 2016 Final Outlines (Folder 3) ML17109A3512016-12-12012 December 2016 Final Qa/Related Forms (Folder 1) ML17109A3522016-12-12012 December 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) 2023-05-23
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML22333A9022022-11-29029 November 2022 NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22318A1062022-11-14014 November 2022 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000272/2023011 and 05000311/2023011 ML22290A2202022-10-17017 October 2022 NRR E-mail Capture - Final RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22055A0702022-02-22022 February 2022 NRR E-mail Capture - Final RAI - Salem 1-Relief Request Associated with Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2021-LLR-0085) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21068A4142021-03-0909 March 2021 NRR E-mail Capture - Final RAI for Salem Unit 1 LAR to Revise and Relocate Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML21043A1442021-02-11011 February 2021 NRR E-mail Capture - Salem - Final RAI Alternative for Examination of ASME Section XI, Category B-B, Item Number B2.11and B2.12 (L-2020-LRR-0103) ML21021A2592021-01-21021 January 2021 NRR E-mail Capture - Final RAI - Salem 1 - Steam Generator Tube Inspection Report ML20281A5172020-10-13013 October 2020 Notification of Conduct of a Fire Protection Team Inspection ML18267A1712018-09-21021 September 2018 NRR E-mail Capture - Final RAI from PRA Branch: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140) ML18264A0122018-09-20020 September 2018 NRR E-mail Capture - Final RAI from I&C Branch: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140) ML18250A3132018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140) ML18171A3212018-06-20020 June 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Adopt TSTF-411 and 418 (L-2017-LLA-0442) ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17212B1152017-07-31031 July 2017 Request for Additional Information - Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Amendment Request (CACs MF9364 and MF9365) ML17199A1122017-07-18018 July 2017 Request for Additional Information - Salem Units 1 and 2 - Accident Monitoring Instrumentation License Amendment Request (CAC Nos. MF8859 & MF8860) ML17192A1672017-07-11011 July 2017 Request for Additional Information - Salem Unit 1 - Steam Generator Tube Inspection Report ML17115A4032017-05-0909 May 2017 Request for Additional Information Regarding Relief Request SC-14R-171 - Use of Code Cases N-695-1 and N-696-1 ML16321A4642016-11-21021 November 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Additional Information Regarding License Amendment Request to Remove Certain Training Requirements ML16218A0052016-08-11011 August 2016 Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-001 ML16195A4492016-07-14014 July 2016 Request for Additional Information Regarding Chilled Water System Modifications ML16188A4152016-07-0707 July 2016 Request for Additional Information Aging Management Program Plan for Reactor Vessel Internals ML16124A5802016-05-0303 May 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Redacted - Request for Additional Information Review of Security Plan Revision 17 Changes ML16013A1592016-02-17017 February 2016 Request for Additional Information Regarding Chilled Water System Modifications ML15287A1412015-11-0202 November 2015 Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems ML15287A1052015-11-0202 November 2015 Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) (CAC Nos. MF5831 & MF5832) ML15299A3832015-10-29029 October 2015 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request Regarding Chilled Water System Modification ML15069A1812015-03-31031 March 2015 Request for Additional Information Aging Management Program Plan for Reactor Vessel Internals (TAC Nos. MF5149 and MF5150) ML15075A2602015-03-24024 March 2015 Request for Additional Information Spring 2014 Steam Generator Tube Inspections ML15055A3772015-03-10010 March 2015 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information Request to Update Appendix B to Renewed Facility Operating License DPR-70, DPR-75 and NPF-57 ML14197A6192014-07-24024 July 2014 and Salem Nuclear Generating Station, Units 1 and 2 - Request for Additional Information Regarding Cyber Security Plan Milestone 8 Implementation Schedule (Tac Nos. MF3384, MF3385 and MF3386) ML14168A2422014-06-28028 June 2014 Request for Additional Information Regarding Flooding Hazard Reevaluation ML14135A2912014-06-0202 June 2014 RAI Regarding Request for Relief SC-I4R-140 from American Society of Mechanical Engineers Boiler & Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection ML14086A6362014-04-30030 April 2014 Request for Additional Information Regarding Core Operating Limits Report ML14066A2952014-03-0606 March 2014 Licensed Operator Positive Fitness-For-Duty-Test (FY14) ML13330A5672013-11-22022 November 2013 Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13304B9362013-10-29029 October 2013 Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376) ML13270A4142013-10-17017 October 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0913 and Mf ML13249A0112013-09-0505 September 2013 Weko Seal Relief Request RAI ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML13192A2322013-07-11011 July 2013 Draft Request for Additional Information Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation. ML13186A1672013-07-11011 July 2013 Request for Additional Information Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13179A3032013-06-28028 June 2013 RAIs for Salem Regarding Response to Order EA-12-051 (SFP Instrumentation) ML13137A4882013-06-0505 June 2013 Request for Additional Information Relief Request SC-l4R-133 ML13149A0862013-06-0505 June 2013 Request for Additional Information Decommissioning Funding Status Report ML13102A2752013-04-25025 April 2013 Request for Additional Information Change to PSEG Emergency Plan to Remove the Backup R45 Plant Vent Radiation Monitor Indications ML13063A7172013-03-11011 March 2013 Second Request for Additional Information Deletion of Condition for Inoperable Control Area Air Condition System/Control Room Emergency Air Conditioning System Isolation Dampers 2022-02-22
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 6, 2014 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 LICENSED OPERATOR POSITIVE FITNESS-FOR-DUTY-TEST
Dear Mr. Joyce:
On March 5, 2014, your facility reported to the NRC via 10 CFR 26.719 that an NRC-licensed operator tested positive following a fitness-for-duty test administered under 10 CFR 26.31(c) on March 4, 2014 (Event Report 49872). Although we have obtained preliminary information, this letter is a formal request for information pertaining to this occurrence. Within 30 days of the date of this letter, please provide responses to the questions listed in the enclosure. In addition, please provide other records and information on this operator's fitness-for-duty that are relevant to this occurrence. If you are unable to meet this deadline, please notify us no later than 15 days from the date of this letter, with the reasons for the delay and a proposed date of submittal.
We request that any personal privacy, proprietary, or safeguards information in your response be contained in a separate enclosure and appropriately marked. The affidavit required by 10 CFR 2.390(b) must accompany your response, where applicable.
You should determine whether the operator meets the requirements of 10 CFR 55.33(a)(1). You should ensure that: (1) the operator meets the general health requirements of ANSI/ANS-3.4-1983; (2) the operator does not have a disqualifying condition under Section 5.3 of that standard; and (3) documentation describing the designated physician's conclusion that the operator meets the requirements of ANSI/ANS-3.4-1983 is available for review by the NRC.
If a conditional license is requested per 10 CFR 55.25, that condition should be documented on NRC Form 396, "Certification of Medical Examination by Facility Licensee," and sent to the U.S.
Nuclear Regulatory Commission, ATTN: Regional Administrator, Region 1 Office, 2100 Renaissance Boulevard, King of Prussia, PA 19406-2713.
If you determine that the operator no longer meets the medical qualifications described in 10 CFR 55.33(a)(1), then, in accordance with 10 CFR 55.25, you must notify the NRC, in writing, of the operator's permanent incapacitation. For example, you must notify the NRC if you determine, based on your employee assistance program in consultation with your designated physician, that the operator can no longer meet the medical criteria of ANSI/ANS-3.4-1983.
The NRC will evaluate the information in your reply to this letter to determine if further action is warranted pursuant to 10 CFR Part 50 or Part 55. The information supplied will be maintained in NRC Privacy Systems of Records-16 and will be subject to the Privacy Act.
T. Joyce 2 Please provide a copy of this letter, as well as your response to this letter, to the operator. If you are unwilling to provide this information to the operator for any reason, the NRC will provide the information to the operator when it is available as part of the operators docket file. If you have any questions concerning this matter, please contact Donald Jackson, Chief, Operations Branch, at 610-337-5306.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Raymond K. Lorson, Director Division of Reactor Safety Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75
Enclosure:
Fitness-for-Duty Request for Additional Information cc w/
Enclosure:
Distribution via ListServ
ML14066A295 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB R/DRS NAME DJackson/DEJ RLorson/
DATE 03/05/14 03/06/14 Licensed Operator Fitness-for-Duty Request for Additional Information Salem Nuclear Generating Station, Units 1 and 2 is requested to provide the following information concerning the fitness-for-duty occurrence (10 CFR Part 26.719) reported on March 5, 2014, regarding the involved licensed operator:
- 1. Name, Docket Number, and responsibilities of the operator.
- 2. A summary of the operator's entire fitness-for-duty testing history. Please include the dates and times the operator was tested, the reasons for the tests (i.e.,
random, for-cause, or follow-up), the results of the tests, including quantification, and the dates that any tests were confirmed positive.
- 3. Whether the operator used, sold, or possessed illegal drugs. If so, please provide the details of the circumstances surrounding such use, sale, or possession.
OR Whether the operator consumed alcoholic beverages within the protected area.
If so, please provide the details of the circumstances surrounding such consumption.
- 4. Whether the operator was at the controls or supervising licensed activities while under the influence of illegal drugs or alcohol. If so, please provide the details of the operator's performance of licensed duties while under the influence.
- 5. Whether the operator fulfilled a position that was required to meet minimum licensed operating staffing requirements (fire brigade, emergency plan operations, etc.) while under the influence.
- 6. Whether the operator was involved in procedural errors related to this occurrence. If so, please provide the details of the procedural errors and the consequences of the errors.
- 7. The extent to which you reviewed the operators past work history, both on the day of the occurrence and prior to March 4, 2014.
- 8. Your intentions with regard to the operator's resumption of duties under the 10 CFR Part 50 and Part 55 licenses, including your plans for follow-up testing.