Similar Documents at Salem |
---|
Category:License-Operator
MONTHYEARML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22116A1922022-03-30030 March 2022 Post Exam Comments and NRC Resolutions (Folder 1) ML22175A1682022-02-11011 February 2022 Final Written Examination and Operating Test Outlines (Folder 3) ML22175A1522022-02-11011 February 2022 Amended Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1892022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22175A1932022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22116A1772022-02-11011 February 2022 Final Operating Test (Sections a, B, and C) (Folder 3) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1742022-02-11011 February 2022 Handouts to Applicants (Summary) (Folder 3) ML22175A1782021-11-29029 November 2021 Draft Written Examination (Folder 2) ML22175A1772021-11-29029 November 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML22175A1942021-09-23023 September 2021 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) NTD-21-060, Draft Written Examination and Operating Test Outlines (Folder 2)2021-09-0303 September 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20279A4372020-10-13013 October 2020 September 9, 2020, NRC Generic Fundamentals Examination for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19289C4412019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18107A2302018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval 2023-08-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22116A1922022-03-30030 March 2022 Post Exam Comments and NRC Resolutions (Folder 1) ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22175A1742022-02-11011 February 2022 Handouts to Applicants (Summary) (Folder 3) ML22116A1772022-02-11011 February 2022 Final Operating Test (Sections a, B, and C) (Folder 3) ML22175A1522022-02-11011 February 2022 Amended Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1682022-02-11011 February 2022 Final Written Examination and Operating Test Outlines (Folder 3) ML22175A1932022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22175A1892022-02-11011 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1772021-11-29029 November 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML22175A1782021-11-29029 November 2021 Draft Written Examination (Folder 2) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML22175A1942021-09-23023 September 2021 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) NTD-21-060, Draft Written Examination and Operating Test Outlines (Folder 2)2021-09-0303 September 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17201A0612017-07-19019 July 2017 Senior Reactor and Reactor Operator Initial License Examinations - Salem Nuclear Generating Station IR 05000272/20173022017-06-29029 June 2017 Senior Reactor Operator Retake License Examination Report 05000272/2017302 and 05000311/2017302 ML17249A1322017-06-0707 June 2017 Final Qa/Related Forms (Folder 1) ML17174B2102017-06-0606 June 2017 Final Outlines (Folder 3) 2023-05-23
[Table view] |
Text
ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility:
Date of Examination:
Initials Item Task Description a
b*
c**
- 1.
- a. Verify that the outline(s) fit(s) the appropriate model in accordance with ES-401 or ES-401 N.
R,J
w b.
Assess whether the outline was systematically and randomly prepared in accordance with
u f R
Section D.1 of ES-401 or ES-401 N and whether all KIA categories are appropriately sampled.
I
(( IJ -
T c.
Assess whether the outline overemphasizes any systems, evolutions, or generic topics.
T E
cl. Assess whether the justifications for deselected or rejected KIA statements are appropriate.
R t/:8 N
- 2.
a.
Using Form ES-301-5, verify that the proposed scenario sets cover the required number of R w fiJ normal evolutions, instrument and component failures, technical specifications, and major s
transients.
I M
b.
Assess whether there are enough scenario sets (and spares) to test the projected number and u
mix of applicants in accordance with the expected crew composition and rotation.!:lchedule
<<. LJ /J L
without compromising exam integrity, and ensure that each applicant can be tested using at A
least one new or significantly modified scenario, that no scenarios are duplicated from the T
applicants' audit test(s), and that scenarios will not be repeated on subsequent days.
0
- c. To the extent possible, assess whether the outline(s) conforms with the qualitative and jJ R
quantitative criteria specified on Form ES-301-4 and described in Appendix D and in R u Section D.5, "Specific Instructions for the 'Simulator Operating Test,"' of ES-301 (including overlap).
- 3.
- a. Verify that the systems walkthrough outline meets the criteria specified on Form ES-301-2:
(1)
The outline(s) contains the required number of control room and in-plant tasks distributed among the safety functions as specified on the form.
R. LI /iJ A
(2) Task repetition from the last two NRC examinations is within the limits specified on the form.
L (3)
No tasks are duplicated from the applicant's audit test(s).
(4)
The number of new or modified tasks meets or exceeds the minimums specified on the form.
T (5) The number of alternate-path, low-power, emergency, and radiologically controlled area H
tasks meets the criteria on the form.
R
()'
0
- b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
Q. u u
(1) The tasks are distributed among the topics as specified on the form.
G (2)
At least one task is new or significantly modified.
H (3)
No more than one task is repeated from the last two NRC licensing examinations.
C.
Determine whether there are enough different outlines to test the projected number and mix of Cl
applicants and ensure that no items are duplicated on subsequent days.
- 4.
- a. Assess whether plant-specific priorities (including probabilistic risk assessment and individual fl., IJ J!;*
plant examination insights) are covered in the appropriate exam sections.
G
(?... 1,J l&J E
- b. Assess whether the 10 CFR 55.41, 55.43, and 55.45 sampling is appropriate.
N Ensure that KIA importance ratings (except for plant-specific priorities) are at least 2.5.
u ttJJ E
c.
R d.
Check for duplication and overlap among exam sections and the last two NRC exams.
f<. u J A
(<. \\) #J*
L
- e. Check the entire exam for balance of coverage.
f.
Assess whether the exam fits the appropriate job level (RO or SRO).
{c. V -PJ.
'/?vJ Pa e/Sig Da
- a. Author
-1cr-2,
- b. Facility Reviewer (*)
/.,,,,J/->> -
LJ:i I*""' u.ar1.1r
-Jd.. ll
- c. NRC's Chief Examiner (#) -J.o.re,,,0/, li'M.tLc,,l Al /4",.,. g J,"),
ct"1<-lJ NRC Supervisor ihdt. roJ J... ek'/) J 1_,,fJ,L \\ r./
112"7
- d.
- Not applicable for NRG-prepared examination outlines.
- The independent NRC reviewer initials items in column "c"; the chief examiner's concurrence is required.
ES-201, Page 30 of 32 Salem 2/14/2022