ML18135A301

From kanterella
Jump to navigation Jump to search

NRC Comments on Draft Licensee-Developed Operating Test (Folder 2)
ML18135A301
Person / Time
Site: Salem  
Issue date: 05/15/2018
From:
Operations Branch I
To:
Public Service Enterprise Group
Shared Package
ML17194A494 List:
References
CAC 000500
Download: ML18135A301 (1)


Text

Comments Incorporated from NRC Prep Week December 11, 2017 Scenario #1 (ESG-1):

Include Tech Spec AOT times.

Expand RCP seal malfunction response description to include commencing shutdown.

Modify guidance for when to initiate SGTR event.

Various editorial comments.

Scenario# 2 (ESG-2):

Added SG NR adverse numbers on page 20.

Added the various parts of CT#2 on page 35.

Included Tech Spec AOT times.

Deleted malfunction for 22 CFCU trip and added 22 RC Loop Tavg channel fails high.

Scenario# 3 (ESG-5):

Deleted malfunction for 22 RC Loop Tavg channel fails high and added 22 CFCU trip.

Added SG Wide Range criteria for Bleed and Feed on page 23.

Deleted optional CT# 3 from page 35.

Included Tech Spec AOT times.

Spare Scenario (ESG-3):

Deleted malfunction associated with rod control failure to allow rods to function in manual following auto rod speed controller malfunction.

Broke down CT#2 into two parts.

Included Tech Spec AOT times.

Outlines (ES-D-1, ES-301-1, ES-301-2, ES-301-5, ES-301-6):

Revised ES-D-1 scenario outlines to reflect changes to malfunctions stated above.

Revised ES-301-2 simulator JPM outlines to reflect change to in-plant JPM task for item "i".

Revised ES-301-5 & 6 to reflect five (5) candidates and one surrogate.

~ ?L i It? ) p 1'-1 Pc c.,P4~

>'hc9