| {{#Wiki_filter:SOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL Company A. Edward Scherer Manager of Nuclear Regulatory Affairs November 20, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | | {{#Wiki_filter:SOUTHERN CALIFORNIA A. Edward Scherer Manager of EDISON Nuclear Regulatory Affairs An EDISON INTERNATIONAL Company November 20, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Docket No. 50-362 Additional Information Supporting the Third Ten-Year Inservice Inspection (ISl) Interval Relief Request ISI-3-24 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques San Onofre Nuclear Generating Station, Unit 3 | | Docket No. 50-362 Additional Information Supporting the Third Ten-Year Inservice Inspection (ISl) Interval Relief Request ISI-3-24 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques San Onofre Nuclear Generating Station, Unit 3 |
|
| |
|
| ==References:== | | ==References:== |
| | | : 1) Letter from A. E. Scherer to the U. S. Nuclear Regulatory Commission dated June 30, 2006; |
| 1)Letter from A. E. Scherer to the U. S. Nuclear Regulatory Commission dated June 30, 2006; | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Docket No. 50-362, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-24, Use of Structural Weld Overlay and Associated Alternative Repair Techniques, San Onofre Nuclear Generating Station, Unit 3 2) Letter from A. E. Scherer to the U. S. Nuclear Regulatory Commission dated October 23, 2006; | | Docket No. 50-362, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-24, Use of Structural Weld Overlay and Associated Alternative Repair Techniques, San Onofre Nuclear Generating Station, Unit 3 |
| | : 2) Letter from A. E. Scherer to the U. S. Nuclear Regulatory Commission dated October 23, 2006; |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Docket Nos. 50-361 and 50-362, Additional Information Supporting the Third Ten-Year Inservice Inspection (ISI) Interval Relief Requests ISI-3-24 and ISI-3-25 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques, San Onofre Nuclear Generating Station, Units 2 and 3 | | Docket Nos. 50-361 and 50-362, Additional Information Supporting the Third Ten-Year Inservice Inspection (ISI) Interval Relief Requests ISI-3-24 and ISI-3-25 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques, San Onofre Nuclear Generating Station, Units 2 and 3 |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| The Reference I submittal proposed an alternative (ISI-3-24), in accordance with 10 CFR 50.55a(a)(3)(i), to the repair/replacement requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, 1995 Edition, through 1996 Addenda, IWA-4000, for the structural weld overlays on the San Onofre Nuclear Generating Station Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends. | | |
| P.O. Box 128 San Clemente, CA 92672 949-368-7501 Fax 949-368-7575-AD47 Document Control Desk November 20, 2006 The Reference 2 submittal provided additional information in support of the proposed alternative and commitment to provide a report that summarizes the results of the final ultrasonic (UT) examination within fourteen days of completion of the final UT examination of the structural weld overlays on the San Onofre Nuclear Generating Station Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends to the NRC.In accordance with the Reference 2 commitment, Southern California Edison (SCE) is providing the summary of UT results of the structural weld overlays on the San Onofre Nuclear Generating Station Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends. | | The Reference I submittal proposed an alternative (ISI-3-24), in accordance with 10 CFR 50.55a(a)(3)(i), to the repair/replacement requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), |
| | Section XI, 1995 Edition, through 1996 Addenda, IWA-4000, for the structural weld overlays on the San Onofre Nuclear Generating Station Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends. |
| | P.O. Box 128 San Clemente, CA 92672 949-368-7501 |
| | -AD47 Fax 949-368-7575 |
| | |
| | Document Control Desk November 20, 2006 The Reference 2 submittal provided additional information in support of the proposed alternative and commitment to provide a report that summarizes the results of the final ultrasonic (UT) examination within fourteen days of completion of the final UT examination of the structural weld overlays on the San Onofre Nuclear Generating Station Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends to the NRC. |
| | In accordance with the Reference 2 commitment, Southern California Edison (SCE) is providing the summary of UT results of the structural weld overlays on the San Onofre Nuclear Generating Station Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends. |
| After completing the full structural weld overlay on the Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends SCE performed the required UT examination. | | After completing the full structural weld overlay on the Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends SCE performed the required UT examination. |
| The UT examination was completed on November 15, 2006, with the following results.1. Pressurizer S31201 ME087 spray nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-030) | | The UT examination was completed on November 15, 2006, with the following results. |
| -No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations | | : 1. Pressurizer S31201 ME087 spray nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-030) - No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations |
| : 2. Pressurizer S31201 ME087 safety nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-027) | | : 2. Pressurizer S31201 ME087 safety nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-027) - No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations |
| -No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations | | : 3. Pressurizer S31201 ME087 safety nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-028) - No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations |
| : 3. Pressurizer S31201 ME087 safety nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-028) | | : 4. Pressurizer 531201 ME087 safety nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-029) - No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations Should you have any questions, please contact Ms. Lynn Pressey at 949-368-6351. |
| -No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations | | |
| : 4. Pressurizer 531201 ME087 safety nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-029) | | Document Control Desk November 20, 2006 cc: B. S. Malleft, Regional Administrator, NRC Region IV N. Kalyanam, NRC Project Manager, San Onofre Units 2 and 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3}} |
| -No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations Should you have any questions, please contact Ms. Lynn Pressey at 949-368-6351. | |
| Document Control Desk-3-November 20, 2006 cc: B. S. Malleft, Regional Administrator, NRC Region IV N. Kalyanam, NRC Project Manager, San Onofre Units 2 and 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3}} | |
Letter Sequence Request |
---|
|
|
MONTHYEARML0624902362006-09-12012 September 2006 Request for Additional Information on Relief Request ISI-3-24, Use of Structural Weld Overlay and Associated Alternative Repair Techniques Project stage: RAI ML0632800232006-11-20020 November 2006 Additional Information Supporting the Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-24 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques Project stage: Request ML0713707402007-06-12012 June 2007 Relief Request ISI-3-24 Third 10-Year ISI Interval Regarding Four Reactor Coolant System Pressurizer, Dissimilar Metal, Nozzle-to-safe-end Welds Structural Overlay & Alternative Repair Techniques Project stage: Other 2006-09-12
[Table View] |
|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML13102A2972013-04-10010 April 2013 Special Report: Inspection of Steam Generator Tubes, Cycle 17 ML11139A2732011-05-17017 May 2011 Owner'S Report of Inservice Inspection, Form NIS-1 ML1107604852011-03-16016 March 2011 Third Ten-Year Inservice Interval Relief Request ISI-3-31, Flaw Evaluation of High-Energy Schedule 10s Emergency Core Cooling System Piping ML1019300792010-07-0808 July 2010 Submittal of Inservice Inspection Summary and Owner'S of Repair/Replacement Activities ML0935702702009-12-18018 December 2009 Response to Request for Additional Information Regarding Third Ten-Year Inservice Inspection (Isl) Interval Relief Request ISI-3-30, Inspection of Reactor Vessel Head In-Core Instrument Nozzles ML0908904022009-03-17017 March 2009 Owner'S Report of Inservice Inspection, Form NIS-1, for Period December 13, 2006 Through December 18, 2008 ML0905705542009-02-17017 February 2009 Day Post Refueling Outage Reactor Pressure Vessel Head Inspection Report ML0904200642009-01-28028 January 2009 Ultrasonic Test Results Related to Inservice Inspection (ISI) Interval Relief Request ISI-3-27 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0826104582008-09-24024 September 2008 Upcoming Steam Generator Tube Inservice Inspection ML0824700242008-08-29029 August 2008 Correction to Third Ten-Year Inservice Inspection (ISI) Interval Requests ISI-3-27 and ISI-3-28, Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0817800982008-06-19019 June 2008 Transmittal of Special Report: Inspection of Steam Generator Tubes, Cycle 15 ML0810906302008-04-18018 April 2008 Owner'S Report of Lnservice Inspection, Form NIS-1 ML0721500462007-08-0101 August 2007 Third Ten-Year Inservice Inspection (ISI) Interval Request ISI-3-28 48-Hour Hold Period ML0707207342007-03-0909 March 2007 Owner'S Report of Inservice Inspection, Form NIS-1 San Onofre Nuclear Generating Station, Unit 3 ML0705704332007-02-21021 February 2007 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-27 Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0632800242006-11-20020 November 2006 Additional Information Supporting Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-21 Request for Alternative to ASME Code Rules for the Embedded Flaw Repair Process for Control.. ML0632800232006-11-20020 November 2006 Additional Information Supporting the Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-24 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0629802032006-10-23023 October 2006 Additional Information Supporting the Third Ten-Year Inservice Inspection Interval Relief Request ISI-3-24 and ISI-3-25 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0627602332006-09-29029 September 2006 Additional Information Supporting Third Ten-Year Inservice Inspection (ISI) Interval Relief Requests ISI-3-24 and ISI-3-25 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0620702622006-07-21021 July 2006 Owner'S Report of Inservice Inspection, Form NIS-1 ML0605504232006-02-22022 February 2006 Uni 2, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-18 Use of Structural Weld Overlay and Associated Alternative Repair Techniques, ML0536200212005-12-23023 December 2005 Third Ten-Year Inservice Inspection Interval Relief Requests ISI-3-16, and ISI-3-17 to Support Pressurizer Lower Level Instrument Nozzle Repairs, San Onofre, Units 2 and 3 ML0508804232005-03-23023 March 2005 Owner'S Report of Inservice Inspection, Form NIS-1 San Onofre Nuclear Generating Station, Unit 3 ML0503301292005-01-28028 January 2005 Inservice Inspection Relief Request ISI-3-14 Request Use of Subsequent ASME Code Edition and Addenda for Pressure Testing of Welded Repair/Replacements in Third Inspection Interval ML0502100512005-01-14014 January 2005 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-10, Revision 1 ML0430202682004-10-26026 October 2004 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-13 Request to Use Alternative to ASME Code Rules for the Embedded Flaw Repair Process for Reactor Vessel Head Penetration 56 ML0430202752004-10-25025 October 2004 Special Report: Inservice Inspection of Steam Generator Tubes, Cycle 13 ML0427102772004-09-23023 September 2004 Report of Inservice Inspection of Steam Generator Tubes, Cycle 13 Additional Information ML0426403392004-09-15015 September 2004 Revision to the Duration of Relief Request ISI-3-7 Third 10-Year Inspection Interval ML0426102142004-09-15015 September 2004 Additional Information Supporting Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-1 Request to Use Risk-Informed Inservice Inspection (Ri ISI) ML0424504672004-08-26026 August 2004 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-10 Revision 1, Regarding American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-638 Similar. ML0418903022004-07-0101 July 2004 Owner'S Report of Inservice Inspection, Form NIS-1 ML0412805032004-05-0303 May 2004 ASME Code Update for the Third Ten-Year Interval, Inservice Testing Program ML0411203482004-04-16016 April 2004 Second Ten-Year Inservice Inspection (ISI) Interval Relief Request RR-B-2-08 Regarding American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Inspection Requirements ML0334201782003-12-0303 December 2003 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request, ISI-3-8 Request to Use Alternative to ASME Code Rules for the Embedded Flaw Repair Process ML0318303272003-06-27027 June 2003 Report of Inservice Inspection of Steam Generator Tubes, Cycle 12 Additional Information ML0317502542003-06-18018 June 2003 ASME Code Update for Third Ten-Year Interval, Inservice Testing Program ML0312901052003-05-0505 May 2003 Owner'S Report of Inservice Inspection, Form NIS-1 for San Onofre, Unit 3 ML0230500202002-10-29029 October 2002 Second Ten-Year Interval Inservice Inspection Program Reactor Pressure Vessel Examination Relief Request B-2-05 San Onofre Nuclear Generating Station Unit 3 ML0227001372002-09-23023 September 2002 Second Interval, Third Period Refueling Outage-12, Inservice Inspection Summary Report ML0207002842002-02-26026 February 2002 Part 6 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, Form NIS-1, 10 Attachment-2 ML0207002692002-02-26026 February 2002 Part 5 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, Form NIS-1 ML0206706952002-02-26026 February 2002 Part 4 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, Form NIS-1 ML0206706742002-02-26026 February 2002 Part 2 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, from NIS-1, 10 Attachment-2 ML0206706642002-02-26026 February 2002 Part 2 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, from NIS-1, 10 Attachment-2 ML0206706442002-02-26026 February 2002 Part 1 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, Form NIS-1 2013-04-10
[Table view] Category:Letter
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 ML24191A2472024-07-0202 July 2024 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24141A0802024-05-15015 May 2024 (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 ML24094A0642024-03-27027 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Status Report 2023 ML24065A0152024-02-28028 February 2024 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation 2023 ML24044A0812024-02-14014 February 2024 LTR-24-0008: NRC Response to Paul Blanch Email Safety of Spent Nuclear Fuel at SONGS ISFSI IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) ML24037A0542024-01-30030 January 2024 (Songs), Units 2 and 3, Submittal of Annual Corporate Financial Reports ML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 And Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Services December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 – NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commissions Analysis of Southern California Edisons Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 2024-09-18
[Table view] |
Text
SOUTHERN CALIFORNIA A. Edward Scherer Manager of EDISON Nuclear Regulatory Affairs An EDISON INTERNATIONAL Company November 20, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Docket No. 50-362 Additional Information Supporting the Third Ten-Year Inservice Inspection (ISl) Interval Relief Request ISI-3-24 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques San Onofre Nuclear Generating Station, Unit 3
References:
- 1) Letter from A. E. Scherer to the U. S. Nuclear Regulatory Commission dated June 30, 2006;
Subject:
Docket No. 50-362, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-24, Use of Structural Weld Overlay and Associated Alternative Repair Techniques, San Onofre Nuclear Generating Station, Unit 3
- 2) Letter from A. E. Scherer to the U. S. Nuclear Regulatory Commission dated October 23, 2006;
Subject:
Docket Nos. 50-361 and 50-362, Additional Information Supporting the Third Ten-Year Inservice Inspection (ISI) Interval Relief Requests ISI-3-24 and ISI-3-25 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques, San Onofre Nuclear Generating Station, Units 2 and 3
Dear Sir or Madam:
The Reference I submittal proposed an alternative (ISI-3-24), in accordance with 10 CFR 50.55a(a)(3)(i), to the repair/replacement requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),
Section XI, 1995 Edition, through 1996 Addenda, IWA-4000, for the structural weld overlays on the San Onofre Nuclear Generating Station Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends.
P.O. Box 128 San Clemente, CA 92672 949-368-7501
-AD47 Fax 949-368-7575
Document Control Desk November 20, 2006 The Reference 2 submittal provided additional information in support of the proposed alternative and commitment to provide a report that summarizes the results of the final ultrasonic (UT) examination within fourteen days of completion of the final UT examination of the structural weld overlays on the San Onofre Nuclear Generating Station Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends to the NRC.
In accordance with the Reference 2 commitment, Southern California Edison (SCE) is providing the summary of UT results of the structural weld overlays on the San Onofre Nuclear Generating Station Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends.
After completing the full structural weld overlay on the Unit 3 pressurizer spray and three pressurizer safety nozzle safe-ends SCE performed the required UT examination.
The UT examination was completed on November 15, 2006, with the following results.
- 1. Pressurizer S31201 ME087 spray nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-030) - No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations
- 2. Pressurizer S31201 ME087 safety nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-027) - No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations
- 3. Pressurizer S31201 ME087 safety nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-028) - No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations
- 4. Pressurizer 531201 ME087 safety nozzle to safe end HSS dissimilar metal weld (ISI Designation Number 03-005-029) - No suspected flaw indications, such as lack of bond, weld flaws, planar flaws, or laminar flaws, were observed during the examinations Should you have any questions, please contact Ms. Lynn Pressey at 949-368-6351.
Document Control Desk November 20, 2006 cc: B. S. Malleft, Regional Administrator, NRC Region IV N. Kalyanam, NRC Project Manager, San Onofre Units 2 and 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3