|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML13102A2972013-04-10010 April 2013 Special Report: Inspection of Steam Generator Tubes, Cycle 17 ML11139A2732011-05-17017 May 2011 Owner'S Report of Inservice Inspection, Form NIS-1 ML1107604852011-03-16016 March 2011 Third Ten-Year Inservice Interval Relief Request ISI-3-31, Flaw Evaluation of High-Energy Schedule 10s Emergency Core Cooling System Piping ML1019300792010-07-0808 July 2010 Submittal of Inservice Inspection Summary and Owner'S of Repair/Replacement Activities ML0935702702009-12-18018 December 2009 Response to Request for Additional Information Regarding Third Ten-Year Inservice Inspection (Isl) Interval Relief Request ISI-3-30, Inspection of Reactor Vessel Head In-Core Instrument Nozzles ML0908904022009-03-17017 March 2009 Owner'S Report of Inservice Inspection, Form NIS-1, for Period December 13, 2006 Through December 18, 2008 ML0905705542009-02-17017 February 2009 Day Post Refueling Outage Reactor Pressure Vessel Head Inspection Report ML0904200642009-01-28028 January 2009 Ultrasonic Test Results Related to Inservice Inspection (ISI) Interval Relief Request ISI-3-27 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0826104582008-09-24024 September 2008 Upcoming Steam Generator Tube Inservice Inspection ML0824700242008-08-29029 August 2008 Correction to Third Ten-Year Inservice Inspection (ISI) Interval Requests ISI-3-27 and ISI-3-28, Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0817800982008-06-19019 June 2008 Transmittal of Special Report: Inspection of Steam Generator Tubes, Cycle 15 ML0810906302008-04-18018 April 2008 Owner'S Report of Lnservice Inspection, Form NIS-1 ML0721500462007-08-0101 August 2007 Third Ten-Year Inservice Inspection (ISI) Interval Request ISI-3-28 48-Hour Hold Period ML0707207342007-03-0909 March 2007 Owner'S Report of Inservice Inspection, Form NIS-1 San Onofre Nuclear Generating Station, Unit 3 ML0705704332007-02-21021 February 2007 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-27 Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0632800242006-11-20020 November 2006 Additional Information Supporting Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-21 Request for Alternative to ASME Code Rules for the Embedded Flaw Repair Process for Control.. ML0632800232006-11-20020 November 2006 Additional Information Supporting the Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-24 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0629802032006-10-23023 October 2006 Additional Information Supporting the Third Ten-Year Inservice Inspection Interval Relief Request ISI-3-24 and ISI-3-25 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0627602332006-09-29029 September 2006 Additional Information Supporting Third Ten-Year Inservice Inspection (ISI) Interval Relief Requests ISI-3-24 and ISI-3-25 for the Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0620702622006-07-21021 July 2006 Owner'S Report of Inservice Inspection, Form NIS-1 ML0605504232006-02-22022 February 2006 Uni 2, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-18 Use of Structural Weld Overlay and Associated Alternative Repair Techniques, ML0536200212005-12-23023 December 2005 Third Ten-Year Inservice Inspection Interval Relief Requests ISI-3-16, and ISI-3-17 to Support Pressurizer Lower Level Instrument Nozzle Repairs, San Onofre, Units 2 and 3 ML0508804232005-03-23023 March 2005 Owner'S Report of Inservice Inspection, Form NIS-1 San Onofre Nuclear Generating Station, Unit 3 ML0503301292005-01-28028 January 2005 Inservice Inspection Relief Request ISI-3-14 Request Use of Subsequent ASME Code Edition and Addenda for Pressure Testing of Welded Repair/Replacements in Third Inspection Interval ML0502100512005-01-14014 January 2005 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-10, Revision 1 ML0430202682004-10-26026 October 2004 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-13 Request to Use Alternative to ASME Code Rules for the Embedded Flaw Repair Process for Reactor Vessel Head Penetration 56 ML0430202752004-10-25025 October 2004 Special Report: Inservice Inspection of Steam Generator Tubes, Cycle 13 ML0427102772004-09-23023 September 2004 Report of Inservice Inspection of Steam Generator Tubes, Cycle 13 Additional Information ML0426403392004-09-15015 September 2004 Revision to the Duration of Relief Request ISI-3-7 Third 10-Year Inspection Interval ML0426102142004-09-15015 September 2004 Additional Information Supporting Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-1 Request to Use Risk-Informed Inservice Inspection (Ri ISI) ML0424504672004-08-26026 August 2004 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-10 Revision 1, Regarding American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-638 Similar. ML0418903022004-07-0101 July 2004 Owner'S Report of Inservice Inspection, Form NIS-1 ML0412805032004-05-0303 May 2004 ASME Code Update for the Third Ten-Year Interval, Inservice Testing Program ML0411203482004-04-16016 April 2004 Second Ten-Year Inservice Inspection (ISI) Interval Relief Request RR-B-2-08 Regarding American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Inspection Requirements ML0334201782003-12-0303 December 2003 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request, ISI-3-8 Request to Use Alternative to ASME Code Rules for the Embedded Flaw Repair Process ML0318303272003-06-27027 June 2003 Report of Inservice Inspection of Steam Generator Tubes, Cycle 12 Additional Information ML0317502542003-06-18018 June 2003 ASME Code Update for Third Ten-Year Interval, Inservice Testing Program ML0312901052003-05-0505 May 2003 Owner'S Report of Inservice Inspection, Form NIS-1 for San Onofre, Unit 3 ML0230500202002-10-29029 October 2002 Second Ten-Year Interval Inservice Inspection Program Reactor Pressure Vessel Examination Relief Request B-2-05 San Onofre Nuclear Generating Station Unit 3 ML0227001372002-09-23023 September 2002 Second Interval, Third Period Refueling Outage-12, Inservice Inspection Summary Report ML0207002842002-02-26026 February 2002 Part 6 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, Form NIS-1, 10 Attachment-2 ML0207002692002-02-26026 February 2002 Part 5 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, Form NIS-1 ML0206706952002-02-26026 February 2002 Part 4 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, Form NIS-1 ML0206706742002-02-26026 February 2002 Part 2 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, from NIS-1, 10 Attachment-2 ML0206706642002-02-26026 February 2002 Part 2 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, from NIS-1, 10 Attachment-2 ML0206706442002-02-26026 February 2002 Part 1 of 6, San Onofre Nuclear Generating Station, Units 2 & 3, Owner'S Report of Inservice Inspection, Form NIS-1 2013-04-10
[Table view] Category:Letter
MONTHYEARML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 and Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Service'S December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commission'S Analysis of Southern California Edison'S Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 ML22136A0842022-05-12012 May 2022 Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report ML22122A0402022-04-28028 April 2022 (Songs), Units 1, 2 and 3 - Annual Radioactive Effluent Release Report - 2021 ML22105A5662022-04-0505 April 2022 20053 Letter - OI Closure to Licensee - Wrongdoing Signed ML22081A1692022-03-31031 March 2022 SONGS Application Acceptance Proposed Exemption from Title 10 of the CFR, Part 72.106(b), ISFSI Controlled Boundary IR 05000206/20214022022-03-24024 March 2022 Notice of Violation, NRC Inspection Report 05000206/2021402, 05000361/2021402, 05000362/2021402, and 07200041/2021401; and Investigation Report 4-2021-004- Public- Cover Letter ML22084A0552022-03-23023 March 2022 10 CFR 50.82(a)(8Xv and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 San Onofre Nuclear Generating Station Units 1, 2, and 3 and Independent Spent Fuel Storage Installation IR 05000361/20220012022-03-14014 March 2022 NRC Inspection Report 05000361/2022-001; 05000362/2022-001 ML22066B0242022-03-0303 March 2022 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision 2 to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML22062B0282022-02-28028 February 2022 and Independent Spent Fuel Storage Installation (Isfsi), Response to Request for Supplemental Information Regarding Request for Exemption from 10 CFR 72.106(b) ML22059B0392022-02-25025 February 2022 International, Proprietary Information to Support SCE Exemption ML22060A1132022-02-24024 February 2022 Nuclear Property Insurance ML22060A1152022-02-24024 February 2022 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2021 ML22048B4972022-02-15015 February 2022 (Songs), Units 1, 2 and 3 - 2021 Annual Turtle Incidental Take Report ML22031A1112022-01-26026 January 2022 (Songs), Units 2 and 3 - Annual Corporate Financial Reports 2024-01-17
[Table view] |
Text
Richard I. St. Onge JSOUTHERN EDISON CALIFORNIA An EDISON INTERNATIONAL Company Director Nuclear Regulatory Affairs December 18, 2009 10CFR50.55a U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket Nos. 50-361 and 50-362 Response to Request for Additional Information Regarding Third Ten-Year Inservice Inspection (ISl) Interval Relief Request ISI-3-30, Inspection of Reactor Vessel Head In-Core Instrument Nozzles San Onofre Nuclear Generating Station, Units 2 and 3
Reference:
Letter from R. St Onge (SCE) to Document Control Desk (NRC), dated October 2, 1999;
Subject:
Docket Nos. 50-361 and 50-362, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-30, Inspection of Reactor Vessel Head In-Core Instrument Nozzles San Onofre Nuclear Generating Station, Units 2 and 3 (ADAMS Accession #ML092790155)
Dear Sir or Madam,
By the referenced letter Southern California Edison (SCE) submitted Inservice Inspection (ISI) Relief Request ISI-3-30, regarding inspection of Reactor Vessel Head In-Core Instrument Penetration Nozzles.
By e-mail dated December 2, 2009, the NRC requested additional information regarding SONGS relief request ISI-3-30. Enclosed is SCE's response to the NRC request for additional information.
This letter and the enclosure contain no new commitments.
P.O. Box 128 San Clemente, CA 92674
Document Control Desk December 18, 2009 Should you have any questions, please contact Ms. Linda T. Conklin at (949) 368-9443.
Sincerely,
Enclosure:
cc: E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3
ENCLOSURE Response to NRC Request for Additional Information Regarding Relief Request ISI-3-30
NRC Questions regarding ISI-3-30 and SCE Responses to NRC questions NRC Question 1:
Please describe the spatial extent, i.e., the distance above the root of the J-groove weld and the distance below the toe of the J-groove weld, of the eddy current (ECT) examination and the ultrasonic (UT) time of flight diffraction (TOFD) examination.
SCE Response:
Eddy current examinations of the inner diameter surface and lower end surface were performed on all ten In Core Instrument (ICI) penetrations. The inner diameter examination included the entire surface from at least 1.5 inches above the uppermost point of the J-weld root downward to the bottom edge of the ID surface where it intersects with the lower end. The entire lower end surface was also examined using eddy current examination. The outer diameter ICI penetration surface from the J-weld toe downward to the lower end was not examined.
There are no ultrasonic Time of Flight Diffraction (TOFD) examination techniques that meet 50,55(a) qualification requirements. However, each of the SONGS Unit-2 ICI penetrations were examined during the current refueling outage using TOFD techniques that are similar to those qualified for Control Element Drive Mechanism (CEDM) penetrations and to those used previously under NRC First Revised Order EA-03-009.
All TOFD examination volumes extended upward to at least 1.5 inches above the uppermost point of the ICI J-weld root. The lower extent of TOFD volumetric coverage below the J-weld toe varied due to as-built weld lengths and loss of Ultrasonic Test (UT) coupling due to weld induced distortion of the lower penetration extremity. Measured TOFD coverage below the J-weld toe is provided in the tables in Attachment 1 of this Enclosure. These tables provide measurements at 30-degree increments around each of the ten ICIs (penetration numbers 92 through 101).
NRC Question 2:
Please provide a best estimate of the fractional volume of the in-core instrument nozzle (ICI) nozzle material which could be successfully evaluated from the nozzle ID using UT TOFD examination for each ICI nozzle. This evaluation should be restricted to the volume of the nozzle from the root of the J-groove weld to 2 inches below the root or the end of the nozzle, whichever is less.
SCE Response:
The tables in Attachment 1 of this Enclosure provide measurements of the evaluated TOED examination coverage below the J-groove weld. The estimated fraction of incore instrument nozzle volume from the root of the J-weld to 2 inches below the root of the J-weld that was evaluated using TOFD is provided below. These estimates were calculated by assuming that the measurement represents the average coverage within the 30 degree tube section, and that each section represents one twelfth of the entire volume of interest.
ICI 92 93 94 95 96 97 98 99 100 101 Penetration Fractional 0.94 1.00 0.98 0.98 0.99 0.99 0.99 1.00 1.00 0.96 volume NRC Question 3:
Please provide information on spatial extent (length, height) of compensatory manually delivered ECT examination performed on the nozzle outside diameter as the result of unacceptable quality UIT TOFD data.
SCE Response:
The quality of UT TOMD data was acceptable to at least 1-inch below the J-weld root over the full circumference of all ICI penetrations. This met the criteria proposed for relief from performing manually delivered ECT examinations of the nozzle outside diameter. Therefore no compensatory outside diameter surface examinations were performed.
Enclosure 1 Attachment 1 Measured Time of Flight Diffraction Coverage Below the J-weld Toe San Onofre Unit 2 In-Core Instrument Penetration Nozzles
1304322 1
n WESpynrE IHT 9 AN AT1 ICI PENETRATION #92 C16 DATA SCE UNIT 2 2009 TUBE MEASUREMENTS Azimuth 00 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 J-Weld Root 3.24" 3.76" 5.24" 7.32" 9.08" 10.48" 11.04" 10.72" 9.8" 7.68" 5.76" 4.16" J-Weld Toe (Lower) N/A"* 2.0" 2.8" 4.84' 8.16" 9.16" 9.4" 8.7" 7.48" 5.12" 3.16" 2.68" Lower Exam Extent 2.2" 1.84" 2.6" 4.12" 5.52" 8.2" 7.48" 7.04" 5.72" 4.16" 2.78" 2.4" Coverage below 1.04" 1.92" 2.64" 3.2" 3.56" 2.28" 3.56" 3.68" 4.08" 3.52" 2.98" 1.76" Root Name: Phil Lancaster Date: 11/24/09 PDQS# 1015 Note: Values shown above are relative indicated instrument positions.
Zero degrees is referenced to the down hill side of the penetration. (Lowest point of the Penetration)
1304322 2
mWF.spynE I N T E1N AT I O A ICI PENETRATION #93 C16 DATA SCE UNIT 2 2009 TUBE MEASUREMENTS Azimuth 00 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 J-Weld Root 4.16" 5.04" 6.6" 8.52" 10.44" 11.64" 12.12" 11.84" 10.36" 8.52" 6.6" 4.92" J-Weld Toe (Lower) 1.2" 2.36" 4.4" 6.36" 8.76" 9.96" 10.36" 9.84" 8.28" 6.2" 3.92" 2.48" Lower Exam Extent 1.16" 2.0" 3.52" 5.24" 6.84" 9.12" 8.56" 8.44" 6.6" 5.0" 3.32" 1.88" Coverage below 3.0" 3.04"1 3.08" 3.28" 3.6" 2.52" 3.56" 3.4" 3.76" 3.52" 3.28" 3.04" Root Name: Phil Lancaster Date: 11/24/09 PDQS# 1015 Note: Values shown above are relative indicated instrument positions.
Zero degrees is referenced to the down hill side of the penetration. (Lowest point of the Penetration)
1304322 3
rmWESpynEm INTERHATiON ICI PENETRATION #94 C16 DATA SCE UNIT 2 2009 TUBE MEASUREMENTS Azimuth 00 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 J-Weld Root 2.76" 3.24" 4.64" 6.56" 8.68" 10.04" 10.32" 9.72" 8.24" 6.28", 4.28" 3.08" J-Weld Toe (Lower, 1.56" 1.8" 3.0" 4.96" 6.6" 8.32" 8.64" 8.36"16.48" 4.64" 2.0" 1.04" Lower Exam Extent 1.0" 0.6" 1.68" 3.44" 5.04" 6.4" 6.84" 7.8" 4.92" 3.4" 1.56" 0.44" Coverage below 1.76" 2.64" 2.96" 3.12" 3.64" 3.64" 3.48" 1.92" 3.32" 2.88" 2.72" 2.64" Root Name: Phil Lancaster Date: 11/24/09 PDQS# 1015 Note: Values shown above are relative indicated instrument positions.
Zero degrees is referenced to the down hill side of the penetration. (Lowest point of the Penetration)
1304322 4
WiESDynfE I NT E RNA Ti0 ICI PENETRATION #95 C16 DATA SCE UNIT 2 2009 TUBE MEASUREMENTS Azimuth J-Weld Root J-Weld Toe (Lower)
Lower Exam Coverage below Root Name: Phil Lancaster Date: 11/25/09 PDQS# 1015 Note: Values shown above are relative indicated instrument positions.
Zero degrees is referenced to the down hill side of the penetration. (Lowest point of the Penetration)
1304322 5
WEspynE INHTa aN ATIONA0 ICI PENETRATION #96 C16 DATA SCE UNIT 2 2009 TUBE MEASUREMENTS Azimuth 00 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 J-Weld Root 4.84" 5.24" 6.4" 8.84" 10.56" 11.56" 12.08" 11.76" 0.52" 8.72" 6.48" 4.96" J-Weld Toe (Lower) 2.0" 2.8" 3.64" 5.92" 7.96"'9.72" 10.16" N/A* N/A* 6.32" 3.6" 2.36" Lower Exam Exteni 1.76" 2.0" 3.48" 5.32" 6.84" 8.56" 8.56" 9.96" 8.32" 5.0" 3.16" 1.88" Coverage below 3.08" 3.24" 2.92" 3.52" 3.72" 3.0" 3.52" 1.8" 2.2" 3.72" 3.32" 3.08" Root Name: Phil Lancaster Date: 11/24/09 PDQS# 1015 Note: Values shown above are relative indicated instrument positions.
Zero degrees is referenced to the down hill side of the penetration. (Lowest point of the Penetration)
- J-Weld lower toe not observed.
1304322 IWNTS 6
mwmyml RH n1E ICI PENETRATION #97 C16 DATA SCE UNIT 2 2009 TUBE MEASUREMENTS Azimuth 00 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 J-Weld Root 3.12" 3.56" 5.24" 7.16" 9.16" 10.44" 11.00" 10.6" 9.08" 7.16" 5.44" 3.92" J-Weld Toe (Lower) 1.24" 1.24" 3.12"15.04" 7.44" 8.72" 9.12" 8.6" 6.76" 4.88" 2.64" 2.28" Lower Exam Extent 0.6" 0.8" 2.32" 4.08" 7.2" 8.32" 7.48" 6.96" 5.4" 3.72" 2.12" 1.12" Coverage below 2.52" 2.76" 2.92" 3.08" 1.96" 2.12" 3.52" 3.64" 3.68" 3.44" 3.32" 2.8" Root Name: Phil Lancaster Date: 11/25/09 PDQS# 1015 Note: Values shown above are relative indicated instrument positions.
Zero degrees is referenced to the down hill side of the penetration. (Lowest point of the Penetration)
1304322 7
WESDynE IN TOERNAT I*O ICI PENETRATION #98 C16 DATA SCE UNIT 2 2009 TUBE MEASUREMENTS Azimuth 00 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 J-Weld Root 3.24" 3.72" 5.4" 7.48" 9.24" 0.44" 10.68" 10.56" 9.44" 7.2" 5.2" 3.8" J-Weld Toe (Lower) 1.64" 2.36" 2.8" 5.4" 7.64" 8.6" 9.16" 8.8" 7.48" 5.56" 3.32" 2.48" Lower Exam Extent 1.32" 0.92" 2.08" 3.84" 5.68" 8.2" 7.36" 7.08" 5.6" 4.0" 2.36" 1.8" Coverage below 1.92" 2.8" 3.32" 3.64" 3.56" 2.24" 3.32" 3.48" 3.84" 3.2" 2.84" 2.0" Root Name: Phil Lancaster Date: 11/24/09 PDQS# 1015 Note: Values shown above are relative indicated instrument positions.
Zero degrees is referenced to the down hill side of the penetration. (Lowest point of the Penetration)
1304322 8
WESDyfnE INHT RNHATl 1NA ICI PENETRATION #99 C16 DATA SCE UNIT 2 2009 TUBE MEASUREMENTS Azimuth 00 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 J-Weld Root 3.52" 3.72" 5.08" 6.84" 8.84" 10.36" 10.72" 10.24" 8.92" 7.04" 5.0" 3.76" J-Weld Toe (Lower) 1.16" 1.32" 2.48' 5.0" 6.96" 8.56" 9.16" 8.88" 7.08" 5.32" 2.66' 2.16" Lower Exam Extent 0.72" 0.88" 2.24" 3.92" 5.6" 7.24" 7.4" 7.6" 5.32" 3.76" 2.0" 0.88" Coverage below 2.8" 2.84" 2.84" 2.92" 3.24" 3.12" 3.32" 2.64" 3.6" 3.28" 3.0" 2.88" Root Name: Phil Lancaster Date: 11/24/09 PDQS# 1015 Note: Values shown above are relative indicated instrument positions.
Zero degrees is referenced to the down hill side of the penetration. (Lowest point of the Penetration)
1304322 9
FWESDynlE i NTi9 RNAT 1 ICI PENETRATION #100 C16 DATA SCE UNIT 2 2009 TUBE MEASUREMENTS Azimuth 00 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 J-Weld Root 4.0" 4.6" 5.88" 7.68" 9.56" 11.24" 11.72" 11.24" 9.2" 7.8" 5.84" 4.48" J-Weld Toe (Lower) 1.84" 1.88" 2.96" 5.48' 7.8" 9.6" 9.84" 9.56" 7.92" 5.76" 3.24" 2.48" Lower Exam Extent 1.36" 1.4" 2.64" 4.52" 6.28" 8.72" 8.08" 7.72" 6.16" 4.72" 2.88" 1.52" Coverage below 2.64" 3.2" 3.24" 3.16" 3.28" 2.52" 3.64" 3.52" 3.04" 3.08" 2.96" 2.96" Root Name: Phil Lancaster Date: 11/24/09 PDQS# 1015 Note: Values shown above are relative indicated instrument positions.
Zero degrees is referenced to the down hill side of the penetration. (Lowest point of the Penetration)
1304322 10 F11 WESynE IN T 6ItNATI 1 0 ICI PENETRATION #101 C16 DATA SCE UNIT 2 2009 TUBE MEASUREMENTS Azimuth 00 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 J-Weld Root 2.92" 3.72" 4.84" 6.76" 9.08" 10.32" 10.8" 10.48" 9.12" 7.2" 5.04" 4.16" J-Weld Toe (Lower) 1.84" 1.72" 2.68" 5.16" 6.84" 8.4" 8.8" 8.4" 6.96" 4.92" 3.24" 3.08" Lower Exam ExtenI 1.32" 1.04" 2.44" 4.24" 5.72" 7.72" 7.4" 7.2" 5.64" 4.04" 2.48" 2.6" Coverage below 1.6" 2.68" 2.4" 2.52" 3.36" 2.6" 3.4" 3.28" 3.48" 3.16" 2.56" 1.56" Root Name: Phil Lancaster Date: 11/24/09 PDQS# 1015 Note: Values shown above are relative indicated instrument positions.
Zero degrees is referenced to the down hill side of the penetration. (Lowest point of the Penetration)