Additional Information Supporting Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-21 Request for Alternative to ASME Code Rules for the Embedded Flaw Repair Process for Control..
ML063280024
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/20/2006
From: Pressey L
Edison International Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML063280024 (18)


Text

SOUTHERN CALIFORNIA A. Edward Scherer L-z* EDISON' Manager of Nuclear Regulatory Affairs An EDISON INTFRNATIONAL R Company November 20, 2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Docket No. 50-362 Additional Information Supporting Third Ten-Year Inservice Inspection (ISl) Interval Relief Request ISI-3-21 Request for Alternative to ASME Code Rules for the Embedded Flaw Repair Process for Control Element Drive Mechanism (CEDM) # 56 San Onofre Nuclear Generating Station Unit 3

References:

See Enclosure 1

Dear Sir or Madam,

Pursuant to 10 CFR 50.55a(a)(3)(i), the Southern California Edison (SCE) Company requested the U. S. Nuclear Regulatory Commission (NRC) approval to allow the continued use of the embedded flaw repair process during Cycle 14 operation as an alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Process for the current configuration of Reactor Vessel Head Penetration (RVHP) CEDM # 56 (Reference 1).

SCE implemented the embedded flaw repair process on CEDM # 56 during the Cycle 13 refueling outage in October 2004, as described in Relief Request ISI-3-13, (Reference 2), which was approved for one cycle of operation.

In a public meeting on March 2, 2006, SCE presented information regarding its conclusion that the indication in CEDM # 56 may not be a flaw indication; and SCE proposed a course of action that would allow SCE to gather further data prior to making additional repairs on CEDM # 56. Ifthe Cycle 14 refueling outage inspection data indicated growth, SCE would immediately perform additional repairs on CEDM # 56 using Relief Request ISI-3-22 (Reference 3). Ifthe Cycle 14 refueling outage inspection data did not indicate growth, SCE proposed to operate one additional cycle while making a final determination of the indication in CEDM # 56. Following return to service from the Cycle 14 refueling outage, if SCE can not conclude that the indication in CEDM

  1. 56 is not a flaw, SCE will perform additional repairs using ISI-3-22 during the Cycle 15 P.O. Box 128 San Clemente, CA 92672 949-368-7501 4b47 Fax 949-368-7575

Document Control Desk November 20, 2006 refueling outage. SCE proposed that a measured change from 77.6% through wall to 81.8% through wall be considered growth and a repair be initiated.

On March 22, 2006, SCE and NRC staff conducted a teleconference regarding the information provided during the March 2, public meeting. As a result of the agreement reached between SCE and the NRC staff during that teleconference, SCE submitted ISI-3-21, in which SCE stated that a change in dimension of the indication from 77.6%

through wall to 80.7% through wall (change of 0.020 inches) would be considered growth and a repair would be initiated.

SCE has completed the Cycle 14 inspection and, SCE has determined that the indication in CEDM # 56 did not increase more than the 0.020 inches specified in ISI 21. The data sheets provided in Enclosure 2 show a decrease in size from 0.513 to 0.464 inches, which equates to a change from 77.6% through wall 70.2% through wall in Cycle 14.

Furthermore, as agreed in a November 14, 2006, teleconference between SCE and NRC staff, SCE has completed the Cycle 14 inspection and is providing a report (Enclosure 3) that provides a comparison of volumetric examinations performed on the SONGS Unit 3 RVHP for CEDM # 56 during the Cycle 12, Cycle 13, and Cycle 14 refueling outages. This comparison was derived from the raw data files recorded during those examinations. Each of these inspections employed the same transducer design that is also equivalent to the design employed during the EPRI demonstration of Westinghouse RVHP inspection technique.

For the purpose of this comparison, the non destructive examination (NDE) data analysis was performed by a single qualified analyst using consistent software for all three data sets. This approach was used to reduce non relevant variables from the comparison. The attachment also includes graphics presenting ultrasonic data at the position of maximum indication depth. The results of this comparison are summarized below:

Indication depth from ID surface (Penetration nominal wall thickness 0.661)

Cycle-12 0.169 inches (74.4%)

Cycle-13 0.170 inches (74.3%)

Cycle-14 0.169 inches (74.4%)

The results from this comparison demonstrate that there has been no discernable change in the indication since first detected during the Cycle 12 refueling outage.

As provided in the attached report, the data analysis performed at the time of the inspections (the inspections of record) has a much wider variation in recorded position.

These variations led to a conclusion in the Cycle 13 refueling outage that primary water stress corrosion cracking (PWSCC) may have been present in CEDM # 56 due to apparent growth of the indication relative to the Cycle 12 record.

Document Control Desk November 20, 2006 During the Cycle 14 refueling outage, SCE also deployed an inspection probe that was developed by Westinghouse to more precisely locate the maximum depth of this indication. Analysis of data from that probe is not included in the attached report.

However the initial field analysis indicates that the reflector may be positioned slightly over 75% from the OD surface, which exceeds ASME Code limitations for flaw evaluation. For that reason, SCE is not prepared to withdraw Relief Request ISI-3-21 based on the enclosed report (Enclosure 3) which shows a depth of less than 75% in all cases.

SCE continues to believe that the indication identified in CEDM # 56 is not a flaw.

Inspection data collected during the current Cycle 14 refueling outage supports that conclusion. SCE intends to complete a formal evaluation documenting that conclusion and expects to provide a copy of that evaluation to the staff in the spring of 2007.

Upon SCE concluding that the indication in CEDM # 56 is not a flaw, SCE intends to withdraw Relief Requests ISI-3-21 and ISI-3-22. If SCE is unable to conclude the indication is not a flaw, SCE will perform an additional repair on CEDM # 56 during the Cycle 15 refueling outage.

SCE and Westinghouse personnel are available to discuss details of the analysis, present the original inspection reports, and the present the inspection data at your earliest availability.

Should you have any questions or want to set up a meeting to discuss the inspection data, please contact Ms. Lynn Pressey at (949) 368-6351.

Sincerely, Enclosures cc: B. S. Mallett, Regional Administrator, NRC Region IV N. Kalyanam, NRC Project Manager, San Onofre Units 2, and 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3

ENCLOSURE I References

ENCLOSURE 1 References

References:

1) Letter from A. E. Scherer (SCE) to the U. S. Nuclear Regulatory Commission (Document Control Desk) dated May 11, 2006;

Subject:

Docket No. 50-362, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-21 Request for Alternative to ASME Code Rules for the Embedded Flaw Repair Process for Control Element Drive Mechanism (CEDM) # 56 San Onofre Nuclear Generating Station Unit 3

2) Letter from A. E. Scherer (SCE) to the U. S. Nuclear Regulatory Commission (Document Control Desk) dated October 26, 2004;

Subject:

Docket No. 50-362, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI 13 Request for Alternative to ASME Code Rules for the Embedded Flaw Repair Process for Reactor Vessel Head Penetrations 56 San Onofre Nuclear Generating Station Unit 3

3) Letter from A. E. Scherer (SCE) to the U. S. Nuclear Regulatory Commission (Document Control Desk) dated May 11, 2006;

Subject:

Docket No. 50-362, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-22 Request fo&Alternative to ASME Code Rules for the Inside Diameter Structural Weld Overlay Repair Process for Control Element Drive Mechanism (CEDM) # 56 San Onofre Nuclear Generating Station Unit 3

ENCLOSURE 2 SAN ONOFRE Unit 3 Control Element Drive Mechanism (CEDM) #56 Ultrasonic Report Sheet dated 1018104 Ultrasonic Report Sheet dated 10127106

0 ULTRASONIC REPORT SHEET Westinghouse WDI-UT-010 Rev. 13, FCN 1 Procedure No: WDI-UT-013 Rev. 11, FCN 1,2 Plant: San Onofre Unit: 3 File Name: CONO3 C14 OH01 056 01 Date: 10/27/06 56 Analyst: G. Rqper Level 2 Penetration No:

Probe Type: CEDM OHS Signature: Wd4, e .e IND RESO Evaluation L 0 comments IND # CH/PR a max @ max 1.060 350 ** 2.46 342 358 0.464" PTI/ CBH 1 1 2

NDD 3

Comments: ** Lower edge of weld not visible in area of indication. CH 2 shows evidence of grain growth in area of indication 1, but no diffraction signals.

,j/( a5egvebD o- 3o /,A4-r ePm)Tre,',T,7Y LDA IND LDA RESO LDA (Leak detection assessment) Comments: NDD W/A E l m V# (e/lZ Pff7, d11seRveIDI-INDD 0.661" AS MEASURED LOWER EXAMt EXTENT AS MEASURED UPPER EXAM EXTENT NOMINAL T:

"CHI @ 0"' oe xmEtn ' CHI @ ISO- Upper Exam E Top Stop (Stop - Top) Scn Ders Start Bottom (Bottom - Start)

N/AINA 1.160 5.420', 9.500 4.080 10'-360' S**Reviewer: ,_J** /** -,* L v: Date: lo0zlff

, jjj9*#..Lv: .\Date: tV*Ou to(,

Resolution:

Customer Review: N*o,-,* *

  • Date: "29 N*O0o

,Th .9

0) ULTRASONIC REPORT SHEET Westinghouse WDI-UT-013 Rev. 6 FCN# 1, 2, 3 Procedure No: WDI-UT-129 Rev. 1 FCN# 1, 2 Plant: SAN ONOFRE Unit: 3 File Name: CONO 3 OH01 056 01 Date: 10/8/04 Penetration No: 56 Analyst: Joshua Whitin Level: II Signature: 01 Probe Type: OHS dl d OL- IND RESO Evaluation LI L2 L3 L4 01 0 2 Comments IND # CHIPR C LL.max gO max 1A 1 1.020" 356° 0.300" 1.500" 0.980" 2.700" 356° 3560 N/a 0.513" 1B 1 1.900" 348° 1.500" 2.260" 1.060" 2.700" 348° 3560 N/a 0.313" 1 1 Summary 0.300" 2.260" - - 348° 3560 N/a 0.513 PTI** /

Ch. #2 confirms Ind. I seen with Ch.# 1 PTI**

1 2 1 4 -. 0.500" 0.980" 0.980" 2.700" 3560 3580 N/a N/a LOB 4/9.

N/A 1 NDD* 10,) d N/A 2 _______-" -'"'- NDD* Y)0__._

N/A 3 -_N/A_"

329' set to 0' Comments: *WII Observed From 0 to 360° Intermittently

    • From the last Inspection (Cycle 12) the Ind. # 1 has grown by 0.14" in length and 0.068" in depth. However, the date-quality has improved since last cycle (Cycle 12)

DA (Leak detection assesset) Comments: LDAIND LDA RESO No Leak Path Observed INDD, -)

NOMINAL T: 0.661" AS MEASURED LOWER EXAM EXTENT AS MEASURED UPPER EXAM EXTENT 0" Xnt 0'r 0 0 X-ducer 180 Upper Exam Extent Bottom (ottom Start) Top Stop (Stop - Top) Scan# Degrees Start -

-0.100 1.060 1.160 5.660 9.060 3.400 1 211-360-217 Reviewer: f*  : Date: q, ilzfn4( -

_/_v: Date: -

Resolution:

Customer Review: Date:

ENCLOSURE 3 SAN ONOFRE Unit 3 Control Element Drive Mechanism (CEDM) #56 November 2006 Ultrasonic Exam Re-evaluation

SAN ONOFRE Unit 3 Control Element Drive Mechanism (CEDM) #56 November 2006 Ultrasonic Exam Re-evaluation Scope:

This report contains the November 2006 reanalysis of Reactor Vessel Head Penetration (RVHP) penetration CEDM #56 Time of Flight Differential (TOFD) ultrasonic data collected for the inspection periods of 2003, 2004 Pre and Post repair, and 2006.

Examination Results:

2003 Inspection (PCS-24)

During the inspection of CEDM #56 a Parent Tube Indication (PTI) was reported at a circumferential location of 3560 near the lower extent of the weld. This indication was reported to have a remaining ligament of 0.293" from the inside surface and was dispositioned as grain noise after supplemental eddy current examination confirmed that there was no outside diameter (OD) or inside diameter (ID)surface connection.

Data from the 2003 inspection were re-evaluated in November 2006.

Evaluation of the same indication has determined that the indication had a remaining wall of 0.169". This evaluation considered both the B and "B" prime scan (Figures 1A and I B)for evaluation.

2004 Inspection Results. (PCS-24)

During the inspection of CEDM #56 a PTI was reported. This indication was reported at a circumferential location of 3560 near the lower extent of the weld. This indication was reported to have a through wall depth of 0.513" with a remaining ligament of 0.148". The reported growth since the previous inspection led to a weld repair of the penetration.

Sizing results of this indication in November 2006 were similar to the 2004 inspection record. The indication through wall depth was 0.491" with a remaining ligament of 0.170". (See Figures 2A and 2B).

The November 2006 analysis of post repair inspection data found no change from the pre repair inspection data. (See Figure 3)

Page 1 of 9

SAN ONOFRE Unit 3 Control Element Drive Mechanism (CEDM) #56 November 2006 Ultrasonic Exam Re-evaluation 2006 Inspection Results. (PCS-24)

During the inspection of CEDM #56 a PTI was reported. This was the same indication reported during the 2003 and 2004 pre and post repair inspections. This indication was reported at a circumferential location of 3500 near the lower extent of the weld. This indication was reported to have a through wall depth of 0.464" with a remaining ligament of 0.197".

The analyst noted there were no diffraction signals typical of PWSCC observed.

The November 2006 re-evaluation concluded that the Indication has A through wall depth of 0.492" and a remaining ligament of 0.169". (See Figures 4A and 4B).

Summary:

Comparing Figures 1A from the Cycle-12 inspection and Figure 4A from the Cycle-14 inspection shows that the depth of this indication in CEDM 56 has remained essentially the same from 2003 thru 2006. It is SCE's conclusion that this indication shows no growth from discovery in 2003.

Within this comparison there are slight changes in the grain noise due to refinement in calibration settings, better transducer contact and an increase in pulse voltage. It appears that the original sizing of this indication during the 2003 inspection did not accurately identify the indication's maximum depth. This is in part due to having determined in 2003 that the indication was not a PWSCC flaw. Under sizing of this indication in 2003 led to reported growth and repairs during the 2004 inspection.

Page 2 of 9

Figure IA ri 7.,

File Mode Channel Gate C-Scan B-Scan A-Scan Tools Display Settings Help I FiE: SCE3IL01 Exam Date: 01/12/2003 Tim: 13:24 - 13:35 1W: I II9M:1.

Mumsel: 1 6ate: 91 2 Node: UI Vidweo Kok: Off Video Filter: 2 Gain: 4.0 0 Oec: OFF Orfset: 0.0 dA Pl Voltage: 200 Axial: 2.080, Circ: 35F.000 Peak: 30 Z i 7.0 a 401:0.

4. 0 820 4

+/- 1. P 10

, 2 20 20 i0 300 I I I I I 40 350 40 90 140 <- £I-Zoom Axial: 2.080 Circ: 356.000 M:TI:0,300 us Neu: NAC 4:'0.50 ~~xial: 2.B0 Tirm: 356.000 Soft Gain: 6.0 4 .': -3Z TOF: 9.000 us TOF2: 8.700 us MP: 0.430 in Qpth: 0.159 Thlkns: 16.90M 11/2 V 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 7.0- ia v (2 )

8.0- 50 T 9.0-4 8 12.0-c 13.0 3

-10 140 -20 15.0

-40 100 50 0-

.-50.

-100 Zoom _ I I 1 I I I I I I I L,

! 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 (- TOF (uwe)

LCopp'iet 2002-200 Nesdipue Inernational, LLC Indication (Anomaly) #1 B Scan Channel 1 Page 3 of 9

Figure lB File Mode Channel Gate C-Scan B-Scan A-Scan Tools Display Settings HelF File: SCE3056-01i Ema Data: 01/12/20 Tim: 13:24 - 13:35 liP: N/R 1T1:I.

Channel: 1 Gate: SN 2 Node: Nau Video Node: Off Video Filter: 2 Gain: 48.0 d9 Bac: OFF Offset: 0.0 db Pulsar Voltage: 200 Axial: 2.080, Circ: 3.000 Peak: 30 X R

X a 7.0-120 I

80 o- Cir 200 20 300 350 40 90 140 Zoom Axial: 2.080 Circ: 356.000 DTOF: 0.300 Ls Neas: NAC SAxial: 2.080 SCirc: 356.000 Soft Gain: 6.0 0.50:6 AP: -33 TCF: 9.000 us TOF2: 8.700 us MP: 0.430 in Dpth: 0,169 Thckns: 16.9% 0 1/2 V 200 250 300 7.0- Gras MZ 60 8.0-50 9.0-T 0

40-10.0- 30-F 11.0. 20-U S 10 12.0-C 0-C 13.0- 4-1 14.0- 15.0 16.0.

100 0

-50

-100 Zoom N I I I I I I -I I I I 1 7.0 8.0 9.0 10.0 11.0 12*0 13.0 14.0 15.0 16.0 <- TOF (use[

Cwriaht 200e-2006 oumdgne International. LLC Indication (Anomaly) #1 "B" Prime Scan Channel 1 Page 4 of 9

Figure 2A File Mode Channel Gate C-Scan B-Scan A-Scan Tools Display Settings H!elF File: 0IN NSLO56_01 Exan Date: 10/08/2004 Tins: 00:34 - 00:53 WI: N/I N Channel: 2 Sate: S1 3INode: W ui Video Node: Off Video Fifter: 2 Gain: 43.0 dB Sac: OFF Offset: 0.0 4b Pulzer Voltage: 400 Axial: 0.90, Circ: 35G.000 Peak: 127 x K

j 8.0-a 4.0-1 0.0 200 <-120 t_1 I I I 1 1 2 20310 0 50 100+/-0 Zoom Axial: 0.860 Cire, G.000 8W.: 0.260 us Nea;: N C SAxial: 0.860 SCirc: 36.000 Soft Gain: 0.0 3:0.50 A'H: -41X T(F: 8.260 us TF2: 8.000 us HP: 0.516 in Dpth: 0.173 Thcknw: 27.732 @ 1/2 V 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 &.0 9.0 6.0" Peak (M) 7.0-8.0- 100 T 9.0-0 F 10.0- 50 U

11.0-S e 12.0. 0 C

13.0-14.0-15.0-

-100 N

100 50 0

_-W

-100 Zoom i _____________________I-I I 1 I

_A 6.0o 7,0 8,0 9.0 10.0 11'.0 12.0 1.3.0 14.0 15.0 16.0 (- TUFECusec Cap4W*Iut 2002-2006 N i=ne Internatinal* . LLC Indication (Anomaly) #1 B Scan Channel 2 Page 5 of 9

Figure 2B sis - CONOJOH01R Locked I A

File Mode Channel Gate C-Scan B-Scan A-Scan Tools Display Settings HelF File: CUIL3.1OHOILO56.. Exam Date: 11/02/2004 Tine: 23:33 - 23:52 IP: NI Channel: I Satc: SM3 Mode: Iax Video Node: Off Video Filter: 2 Gain: 48.0 dB Bec: OFF Offset: 0.0 dib Pulser Voltage: 400 Axial: 1.270, Circ: 356.000 Peak: 311 K 8,0pe a 4.0 1 0.0 2 I I I I  ! I 2ý 310 0, 50 100 150 200 <-

Zoom Axial: 1.270 Circ: 3%.000 DTOF: 0.340 us h.m: NAC SAxial: 1.2707.200 SClrc: 356.0006.0 Soft 3:0.50 i ff1P: -:18 TRF: us TOF2: us Gain: 0.0 in Ppth: 0.170 TBhk MP: 0.390  : 27.26Z Q 1/2 V 0,0 1,0 2,0 3.0 4,0 5.0 6.0 7.0 8.0 9,0 GO Peak (I) 7,0 100 -

8.0 .

T 9.0 0 50o F lO . -

3 0 c13.o-0 1450 1.0 lký -1 --5O-11000 0

-50

-100 Zoom I

____ 6,0 7,0I0 0 8.00 9.0

.0 10.0 11.0 12.0 1I I0 13.0 14,0 15,0 16.0 I <- TIF (usei I gpb-lst 2002- esdpne

= International, LLC Indication (Anomaly) #1I B Scan Channel 1 Page 6 of 9

Figure 3 File Mode Channel Gate C-Scan B-Scan A-Scan Tools Displayj Settings HtelF File: CEIH NIM3JO1L0_G_1 Exam Date: 11/02/20M4 Time: 23:33 - 23:52 IW: IB Channel: 1 Sate: 93 3 rode: Max Video Node: Off Video FiLter: 2 Gain: 48.0 dB Dec: OFF orrset: 0.0 .i Pulser Voltage: 400 Axial: 1.350, Circ: 357.000 Peak: 49 X Odd Stroke.s 0hl N

8.0 a 4.0 120 24 ID 1 0.0 / 80 I.- 0i 4 3+/-0i __ 0, 50 100 150 200 Zoom Axial: 1.350 Circ: 357.000 DTOF: 0.340 us Heas: NAC SAxial: 1.350 SCirc: 357.000 Soft Gain: 0.0 0.50:4 AW: -16M TF: 7.220 us TOF2: 6.880 us IF: 0.390 in P1th: 0.170 Thcknss: 27.26Z @ 1/2 V 310 0 50 100 150 200 6.0-7.0-8.0-T 9.0-a F 10.0-U 11.0-2 0-12.0-13,0 -

. 14.0-15.0-

-t00-I 100 s0 0

-50

-100 Zoom N I I I I 6.0 710 810 9_0 10.0 11.0 12.0 13.0 14,0 15,0 16.0 ____________ - 11 (usec CoqPrigbt 2002-206 Nesy Int* etional, LLC Post Repair Examination "B" Prime Channel 1 Page 7 of 9

Figure 4A File Mode Channel Gate C-Scan B-Scan A-Scan Tools Display Settings H1elpF File: INO3_Xi401Iuj_05Gl Exa Date: 10/27/2006 Tim: 20:22 - 20:42 iP: N/fl Chanmel: I Gate: SH 3 Node: Nam Video Node: Off Video Filter: 2 6ain: 46.0 M Dec: OFF Ofwfet: 0.0 dh Pulsor Voltagwe: 400 Axial: 1.020. Circ: 50.000 Peak: 27 X K

j a

1 8.0 4.0 0.0 I I I I I +/-4-C0; 1* {- C0

.21 20300 2( 350 40 90 Zoom Axial: 1.020 Circ: 350,000 DTOF: 0.300 us fleas: NA C Sixial: 1.020 SCKri 350.000 Soft Gain: 0.0 3:0.50 AMIP:-17% TOF: 7.840 us TOF2: 7.540 us HP: 0.430 in Ipth: 0.169 Th"kas: 25.691 @ 1/2 V 1.0 2.0 3.0 4.0 5.0 G.0 7.0 6.0-7.0-8.0-T 9.0-0 F 10.0-U 11.0-C C 12.0-13.0-14.0-15.0-100 50 0

-50

-100 Zoom ,i i * ++

1" I

12.0 I 13.0 I 14.0 I 15.0 I 16.0 -.

6.0 7.0 8.0 9.0 10.0 11.0 <- 11F Cusu I Cop!rLet 2002-20.06 NeJdne Internatiual,. LLC Indication (Anomaly) #1 B Scan Channel 1 Page 8 of 9

Figure 4B t,ý I,I UýW w ked File Made Channel Gate C-Scan B-Scan A-Scan -ettings Tools DisplaF He Fim: C1N03_M4_G1N1.05L0_1 Exan, Date: 10/27/2M0 Tim.: 20:22 - 20:42 W: N/N Channol: I Gate: SII3 Node: Me. Video lioed: DIE Video Filter': 2 Gain: 46.0 dB Bam: OFF Mee st: 0.0 .13 Pulow. Voltage: 400 Axial: 1.%60, Circ: 350.000 Peak: 27 Z l

460 I *~I~1 120-E 140 Zoom Axial: LOW6 Circ: 35.000 DT"OF:0.300 us Mew: NAC 0.50:2i Sxial: LOW6 Kimr: 35O.DOO Soft Gain: 0.0

............ IAW: -201 TOF: 7.820 us TOF2: 7.520 us HP): 0,430 in ]Apth: 0.109 ThcUM: 25.692 0 1/2 V 200 250 300 350 40 90 6.0.

7.0-100-T 0

F 9.01 50-U 10.0.

11.0. 0-C 12.0-13.0 14.0 I -100-N l I-50-0-

-100 Zoomr Fi I I I I 1] 6.0 7.0 8.0 9.0 10.0 11.0 12,0 13.0 14.0 15.0 16.0 -1W u

<- TOF W Cpgrigbt 2002-2066 R@ International, LLC Indication (Anomaly) #1 "B" Prime Scan Channel 1 Page 9 of 9