| issue date = 06/05/2007
| issue date = 06/05/2007
| title = Commitment Summary Report for Period of June 1, 2005 to February 28, 2007
| title = Commitment Summary Report for Period of June 1, 2005 to February 28, 2007
| author name = Morris G W
| author name = Morris G
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:June 5, 2007  
{{#Wiki_filter:June 5, 2007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
 
In the Matter of                                 )                   Docket Nos. 50-327 Tennessee Valley Authority                       )                               50-328 SEQUOYAH NUCLEAR PLANT - UNITS 1 AND 2 - COMMITMENT  
U.S. Nuclear Regulatory Commission
 
ATTN: Document Control Desk  
 
Washington, D.C. 20555  
 
Gentlemen:  
 
In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328  
 
SEQUOYAH NUCLEAR PLANT - UNITS 1 AND 2 - COMMITMENT  


==SUMMARY==
==SUMMARY==


REPORT The purpose of this letter is to provide the Sequoyah Commitment Summary Report for the period of June 1, 2005 to February 28, 2007, as r equired by the NRC endorsed Nuclear Energy Institute's (NEI) "Guideline for Managing NRC Commitments.This  
REPORT The purpose of this letter is to provide the Sequoyah Commitment Summary Report for the period of June 1, 2005 to February 28, 2007, as required by the NRC endorsed Nuclear Energy Institutes (NEI) Guideline for Managing NRC Commitments. This enclosed report summarizes docketed commitments that TVA has evaluated and revised using administrative controls that incorporate the guidelines.
 
If you should have any questions, please contact me at (423) 843-7170 or J. W. Proffitt at (423) 843-6651.
enclosed report summarizes docketed commitments that TVA has evaluated and revised  
 
using administrative controls that incorporate the guidelines.  
 
If you should have any questions, please contact me at (423) 843-7170 or J. W. Proffitt at  
 
(423) 843-6651.  
 
Sincerely, Original signed by:
Sincerely, Original signed by:
Glenn W. Morris  
Glenn W. Morris Manager, Site Licensing and Industry Affairs Enclosure
 
Manager, Site Licensing and  
 
Industry Affairs  
 
Enclosure  
 
U.S. Nuclear Regulatory Commission Page 2 June 5, 2007
 
GWM:JWP:KTS


cc (Enclosure):
U.S. Nuclear Regulatory Commission Page 2 June 5, 2007 GWM:JWP:KTS cc (Enclosure):
Mr. Brendan T. Moroney, Senior Project Manager  
Mr. Brendan T. Moroney, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 08G-9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739
 
U.S. Nuclear Regulatory Commission  
 
Mail Stop 08G-9a  
 
One White Flint North  
 
11555 Rockville Pike  
 
Rockville, Maryland 20852-2739  


ENCLOSURE SEQUOYAH NUCLEAR PLANT (SQN)
ENCLOSURE SEQUOYAH NUCLEAR PLANT (SQN)
Line 71: Line 32:


==SUMMARY==
==SUMMARY==
REPORT  
REPORT


COMMITMENT  
COMMITMENT  


==SUMMARY==
==SUMMARY==
REPORT 2 Basis/Justification for Change:  
REPORT Basis/Justification for Change:
 
An evaluation of each of the below listed commitments was performed in accordance with NEI 99-04. NRC amended its regulations, RIN 3150-AH95, such that the requirements governing criticality control for spent fuel pool storage racks do not apply to the fuel within a spent fuel transportation package or storage cask when the package is in a spent fuel pool. The evaluation determined that each of the items are no longer commitments based on the rule change. Because these commitments were initiated as a result of a safety evaluation report decision, they have been tabulated in the commitment summary report for NRC notification.
An evaluation of each of the below list ed commitments was performed in accordance wi th NEI 99-04. NRC amended its regulations, RIN 3150-AH95, such that the requirements governing critic ality control for spent fuel pool storage racks do not apply to the fuel within a sp ent fuel transportation package or storage cask when the package is in a spent fuel pool.
Commitment         Commitment           Source                                 Summary of Original                                     Summary of Evaluation #        Tracking #        Document                                      Commitment                                          Commitment Changes 2007-01         NCO040002001       TVA letter to     Plant operating procedures will be enhanced and training provided         Decommit NRC dated        to address the use of the fire protection system for spent fuel pool April 27, 2004    make-up and reaction to notification or alarms ensuring that operators can identify and terminate any dilution sources during the dry cask storage loading and unloading operations.
The evaluation determined that each of the items are no long er commitments based on the rule change. Because these commitments were initiated as a result of a safety eval uation report decision, they ha ve been tabulated in the commitment summary r eport for NRC notification.
2007-01 NCO040002003       TVA letter to     The normal make-up flow path to the spent fuel pool from the               Decommit NRC dated        demineralized water and primary water systems will be tagged out April 27, 2004    during cask loading/unloading in the cask pit pool.
Commitment Evaluation # Commitment Tracking #
2007-01 NCO040002006       TVA letter to     During dry cask loading or unloading operations, either operations         Decommit NRC dated        personnel will increase the frequency of their normal rounds or a April 27, 2004    trained monitor will be assigned to watch for dilution events in the spent fuel pool area (i.e., spent fuel pool level changes and water accumulation on the refueling floor).
Source Document Summary of Original Commitment Summary of Commitment Changes 2007-01 NCO040002001 TVA letter to  
2}}
 
NRC dated
 
April 27, 2004
 
Plant operating procedures will be enhanced and training provided  
 
to address the use of the fire prot ection system for spent fuel pool make-up and reaction to notificat ion or alarms ensuring that operators can identify and terminate any dilution sources during the dry cask storage loading and unloading operations.  
 
Decommit 2007-01 NCO040002003 TVA letter to  
 
NRC dated
 
April 27, 2004
 
The normal make-up flow path to the spent fuel pool from the  
 
demineralized water and primary water systems will be tagged out  
 
during cask loading/unloading in the cask pit pool.  
 
Decommit 2007-01 NCO040002006 TVA letter to  
 
NRC dated
 
April 27, 2004
 
During dry cask loading or unloading operations, either operations  
 
personnel will increase the frequency of their normal rounds or a trained monitor will be assigned to watch for dilution events in the  
 
spent fuel pool area (i.e., spent fuel pool level changes and water  
 
accumulation on the refueling floor).
Decommit}}

Latest revision as of 06:36, 23 November 2019

Commitment Summary Report for Period of June 1, 2005 to February 28, 2007
ML071560604
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/05/2007
From: Morris G
Tennessee Valley Authority
To:
Document Control Desk, NRC/NRR/ADRO
References
Download: ML071560604 (4)


Text

June 5, 2007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT - UNITS 1 AND 2 - COMMITMENT

SUMMARY

REPORT The purpose of this letter is to provide the Sequoyah Commitment Summary Report for the period of June 1, 2005 to February 28, 2007, as required by the NRC endorsed Nuclear Energy Institutes (NEI) Guideline for Managing NRC Commitments. This enclosed report summarizes docketed commitments that TVA has evaluated and revised using administrative controls that incorporate the guidelines.

If you should have any questions, please contact me at (423) 843-7170 or J. W. Proffitt at (423) 843-6651.

Sincerely, Original signed by:

Glenn W. Morris Manager, Site Licensing and Industry Affairs Enclosure

U.S. Nuclear Regulatory Commission Page 2 June 5, 2007 GWM:JWP:KTS cc (Enclosure):

Mr. Brendan T. Moroney, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 08G-9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739

ENCLOSURE SEQUOYAH NUCLEAR PLANT (SQN)

COMMITMENT

SUMMARY

REPORT

COMMITMENT

SUMMARY

REPORT Basis/Justification for Change:

An evaluation of each of the below listed commitments was performed in accordance with NEI 99-04. NRC amended its regulations, RIN 3150-AH95, such that the requirements governing criticality control for spent fuel pool storage racks do not apply to the fuel within a spent fuel transportation package or storage cask when the package is in a spent fuel pool. The evaluation determined that each of the items are no longer commitments based on the rule change. Because these commitments were initiated as a result of a safety evaluation report decision, they have been tabulated in the commitment summary report for NRC notification.

Commitment Commitment Source Summary of Original Summary of Evaluation # Tracking # Document Commitment Commitment Changes 2007-01 NCO040002001 TVA letter to Plant operating procedures will be enhanced and training provided Decommit NRC dated to address the use of the fire protection system for spent fuel pool April 27, 2004 make-up and reaction to notification or alarms ensuring that operators can identify and terminate any dilution sources during the dry cask storage loading and unloading operations.

2007-01 NCO040002003 TVA letter to The normal make-up flow path to the spent fuel pool from the Decommit NRC dated demineralized water and primary water systems will be tagged out April 27, 2004 during cask loading/unloading in the cask pit pool.

2007-01 NCO040002006 TVA letter to During dry cask loading or unloading operations, either operations Decommit NRC dated personnel will increase the frequency of their normal rounds or a April 27, 2004 trained monitor will be assigned to watch for dilution events in the spent fuel pool area (i.e., spent fuel pool level changes and water accumulation on the refueling floor).