Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 October 26, 2007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter ) Docket No. 50-327 Tennessee Valley Authority )

SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 - PRESSURIZER WELD OVERLAY EXAMINATION RESULTS TO RELIEF REQUEST G-RR-1

Reference:

TVA letter to NRC dated December 21, 2006, "Sequoyah Nuclear Plant (SQN) - Unit 2 - Pressurizer Weld Overlay Examination Results to Relief Request G-RR-1" TVA completed the weld overlays for SQN's Unit 1 pressurizer and has enclosed the Unit 1 examination results. The final weld overlay ultrasonic examination was completed on October 21 during the Unit 1 Cycle 15 refueling outage.

The enclosure provides the detailed results of the initial UT inspections performed on the Unit 1 pressurizer nozzles following the weld overlay.

In the above referenced letter, TVA provided examination results of the SQN Unit 2 weld overlay on Alloy 600 pressurizer nozzle-to-pipe welds. The Unit 2 weld overlays were performed during the Unit 2 Cycle 14 refueling outage.

There are no commitments contained in this submittal. If you have any questions about this change, please contact me at (423) 843-7170 or J. W. Proffitt at (423) 843-6651.

Sincerely, Glenn W. Morris Manager, Site Licensing and Industry Affairs Enclosure Kg Pded7 Prin~ted onrecycled paper

U.S. Nuclear Regulatory Commission Page 2 October 26, 2007 cc (Enclosure):

Mr. Brendan Moroney, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 08G-9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739

ENCLOSURE TENNESSEE VALLEY AUTHORITY (TVA)

SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 1 PRESSURIZER WELD OVERLAY RESULTS The attached table provides the detailed results of the initial ultrasonic examination (UT) inspections performed on the pressurizer nozzles following the weld overlay. The following is a summary of these results:

Nozzle Number of Flaw Flaw Indications Assessment Summary Indications SPRAY No Recordable RCF-23A-OL Indications N/A (RCW-24-SE)

RELIEF No Recordable N/A RCF-24Q-OL Indications (RCW-26-SE)

SAFETY No Recordable RCF-45B-OL Indications N/A (RCW-25-SE)

SAFETY No Recordable RCF-42B-OL Indications N/A (RCW-28-SE)

SAFETY No Recordable RCF-36B-OL Indications N/A (RCW-27-SE)

SURGE No Recordable RC-35A-OL Indications N/A (RCW-29-SE)

E-I